Safe Streets and Roads for All (SS4A) Grant Program - General Terms and Conditions
This document contains the general terms and conditions for the U.S. Department of Transportation's Fiscal Year 2024 Safe Streets and Roads for All Grant Program, administered by the Federal Highway Administration (FHWA). The agreement establishes the framework for federal financial assistance to support local initiatives focused on reducing and eliminating roadway fatalities and serious injuries through safety action plan development or infrastructure projects benefiting all road users, including pedestrians, bicyclists, public transportation users, motorists, and commercial vehicle operators. Recipients must complete projects in accordance with the terms outlined, provide quarterly performance progress reports on or before the 20th of the first month of each calendar quarter, and submit final performance and financial reports no later than 120 days after the period of performance ends. The budget period extends no later than five years from the date of grant execution, and recipients must comply with all applicable federal laws, regulations, and policies throughout project delivery, construction, operation, and maintenance phases.
The award obligates federal funds for a specified budget period, with amounts ranging from single obligations to phased funding based on obligation conditions outlined in project-specific agreements. Recipients must demonstrate non-federal funding commitments equal to at least the difference between total eligible project costs and the SS4A grant amount, and must maintain at least 20 percent match throughout the project. All costs must be allowable and allocable under 2 C.F.R. Part 200, with reimbursement requested monthly or less frequently. Recipients are subject to Build America, Buy America requirements mandating domestic sourcing of iron, steel, manufactured products, and construction materials; small and disadvantaged business requirements; environmental review compliance; and critical infrastructure security considerations. The USDOT may terminate the agreement for noncompliance, failure to meet milestones by six months, failure to expend funds within five years, or if deemed in the public interest, and all federal funds not expended within the statutory availability period lapse and become unavailable.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Development_of_a_Safety_Action_Plan_and_Crosswalk_Connection_Demonstration_Activity_(Addendum_#2_Revision).pdf | ||
| Development_of_a_Safety_Action_Plan_and_Crosswalk_Connection_Demonstration_Activity.pdf | ||
| RFQ_..._26_Safety_Action_Plan.pdf | ||
| 26-0491_-_Pdf.pdf | ||
| Base_1_SS4A_Solicitations.pdf | ||
| FL_Division_No_ROW_Checklist.docx | DOCX document | |
| NEPA_CE_Checklist_for_Planning_Activities_Walton_County_FHWA_04.30.2026.pdf | ||
| Executed_Grant_Agreement__693JJ32640486_SS4A_FY24_Walton_County.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF TRANSPORTATION
GENERAL TERMS AND CONDITIONS UNDER THE
FISCAL YEAR 2024 SAFE STREETS AND ROADS FOR ALL (“SS4A”) GRANT
PROGRAM:
FHWA PROJECTS
Date: June 13, 2024 Revised: October 1, 2024 Revised: March 17, 2025
Revised: November 4, 2025
Table of Contents
Article 7 Purpose
7.1 Purpose
Article 8 USDOT Role
8.1 Division of USDOT Responsibilities
8.2 USDOT Program Contact
Article 9 Recipient Role
9.1 Statements on the Project
9.2 Statements on Authority and Capacity
9.3 USDOT Reliance
9.4 Project Delivery
9.5 Rights and Powers Affecting the Project
9.6 Notification of Changes to Key Personnel
Article 10 Award Amount, Obligation, and Time Periods
10.1 Federal Award Amount
10.2 Federal Obligations
10.3 Budget Period
10.4 Period of Performance
Article 11 Statement of Work, Schedule, and Budget Changes
11.1 Notification Requirement
11.2 Statement of Work Changes
11.3 Schedule Changes
11.4 Budget Changes
11.5 USDOT Acceptance of Changes
Article 12 General Reporting Terms
12.1 Report Submission
12.2 Alternative Reporting Methods
12.3 Paperwork Reduction Act Notice
Article 13 Progress and Financial Reporting
13.1 Quarterly Performance Progress Reports
13.2 Quarterly Financial Status
13.3 Final Performance Progress Reports and Financial Status………………………………..…….13 Article 14 Performance Reporting
14.1 Baseline Performance Measurement
14.2 SS4A Final Report:
14.3 Performance Measurement Information……………….………………………………………..15
14.4 Performance Reporting Survival……………………….……………………………………….15
14.5 Program Evaluation……………………………………………………………………………..15
Article 15 Noncompliance and Remedies
15.1 Noncompliance Determinations
15.2 Remedies
15.3 Other Oversight Entities
Article 16 Agreement Termination………………………………………………………………17
16.1 USDOT Termination
16.2 Closeout Termination
16.3 Post-Termination Adjustments
16.4 Non-Terminating Events
16.5 Other Remedies
Article 17 Monitoring, Financial Management, Controls, and Records
17.1 Recipient Monitoring and Record Retention
17.2 Financial Records and Audits
17.3 Internal Controls
17.4 USDOT Record Access
Article 18 Contracting and Subawards
18.1 Build America, Buy America
18.2 Small and Disadvantaged Business Requirements
18.3 Engineering and Design Services
18.4 Foreign Market Restrictions
18.5 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. .. 23
18.6 Recipient Responsibilities for Subawards
18.7 Subaward and Contract Authorization
Article 19 Costs, Payments, and Unexpended Funds
19.1 Limitation of Federal Award Amount
19.2 Projects Costs
19.3 Timing of Project Costs
19.4 Recipient Recovery of Federal Funds
19.5 Unexpended Federal Funds
19.6 Timing of Payments to the Recipient
19.7 Payment Method
19.8 Information Supporting Expenditures
19.9 Reimbursement Frequency
19.10 Match
Article 20 Liquidation, Adjustments, and Funds Availability...….……………………………...25
20.1 Liquidation of Recipient Obligations
Article 21 Agreement Modifications
21.1 Bilateral Amendments
21.2 Unilateral Contact Modifications
21.3 USDOT Unilateral Modifications
21.4 Other Modifications
Article 22 [RESERVED]
22.1 [RESERVED]
Article 23 [RESERVED]
23.1 [RESERVED]
Article 24 Labor and Workforce……………………………………………………………… 26
24.1 Labor and Workforce………………………………………………………………………… .26
Article 25 Critical Infrastructure Security and Resilience……………………………...……..26
25.1 Critical Infrastructure Security and Resilience…………………………………………………26 Article 26 Civil Rights and Title VI…………………………………………………….……
26.1 Civil Rights and Tile VI……………………………………………………………………...…26 Article 27 Federal Financial Assistance, Administrative, and National Policy Requirements
27.1 Uniform Administrative Requirements for Federal Awards
27.2 Federal Law and Public Policy Requirements
27.3 Federal Freedom of Information Act
27.4 History of Performance
27.5 Whistleblower Protection
27.6 External Award Terms and Obligations
27.7 Incorporated Certifications
Article 28 Assignment
28.1 Assignment Prohibited
Article 29 Waiver
29.1 Waivers
Article 30 Additional Terms and Conditions
30.1 Effect of Planning and Demonstration or Implementation Award
30.2 Disclaimer of Federal Liability
30.3 Environmental Review
30.4 Railroad Coordination
30.5 Relocation and Real Property Acquisition
30.6 Equipment Disposition
Article 31 Mandatory Award Information
31.1 Information Contained in a Federal Award
Article 32 Construction and Definitions
32.1 Attachments
32.2 Exhibits
32.3 Construction
32.4 Integration
32.5 Definitions
Article 33 Agreement Execution and Effective Date
33.1 Counterparts
33.2 Effective Date
Index of Definitions
Administering Operating Administration Environmental Review Entity………………………………………………………………… Federal Share
FHWA
NOFO
OMB
Program Statute Project……………………………………………………………………………………………22 Project Closeout SS4A Grant
USDOT
GENERAL TERMS AND CONDITIONS
The Infrastructure Investment and Jobs Act (Pub. L. 117–58, November 15, 2021; also referred to as the “IIJA”) established the Safe Streets and Roads for All (the “SS4A”) Discretionary Grant Program (IIJA Section 24112) and appropriated funds to the United States Department of Transportation (the “USDOT”) under Division J, Title VIII of IIJA to implement the program.
The funds are available to provide Federal financial assistance to support local initiatives to prevent death and serious injury on roads and streets, commonly referred to as “Vision Zero” or “Toward Zero Deaths” initiatives.
The USDOT published a Notice of Funding Opportunity (the “NOFO”) to solicit applications for Federal financial assistance in Fiscal Year 2024 for the SS4A Discretionary Grant Program.
These general terms and conditions are incorporated by reference in a project-specific grant agreement under the fiscal year 2024 SS4A grant program. Articles 1–6 are in the project-specific portion of the agreement. The term “Recipient” is defined in the project-specific portion of the agreement. Attachments A through F are project-specific attachments.
ARTICLE 7
PURPOSE
7.1 Purpose. The purpose of this award is to improve roadway safety by significantly reducing or eliminating roadway fatalities and serious injuries through safety action plan development or projects focused on all users, including pedestrians, bicyclists, public transportation users, motorists, personal conveyance and micromobility users, and commercial vehicle operators. The parties will accomplish that purpose by achieving the following objectives:
(1) timely completing the Project; and
(2) ensuring that this award does not substitute for non-Federal investment in the Project, except as proposed in the Grant Application, as modified by section 3.3 and Attachment B.
ARTICLE 8
USDOT ROLE
8.1 Division of USDOT Responsibilities.
(a) The Office of the Secretary of Transportation is ultimately responsible for the USDOT’s administration of the SS4A Grant Program.
(b) The Federal Highway Administration (the “FHWA”) will administer this grant agreement on behalf of the USDOT. In this agreement, the “Administering Operating Administration” means the FHWA.
8.2 USDOT Program Contact.
Safe Streets and Roads for All Federal Highway Administration Office of Safety 1200 New Jersey Avenue SE HSSA-1, Mail Drop E71-117 Washington, DC 20590 SS4A.FHWA@dot.gov
(202) 366-2822
ARTICLE 9
RECIPIENT ROLE
9.1 Statements on the Project. The Recipient states that:
(1) all material statements of fact in the Grant Application were accurate when that application was submitted; and
(2) Attachment B documents all material changes in the information contained in that application.
9.2 Statements on Authority and Capacity. The Recipient states that:
(1) it has the authority to receive Federal financial assistance under this agreement;
(2) it has the legal authority to complete the Project, including either ownership and/or maintenance responsibilities over a roadway network; safety responsibilities that affect roadways; or has an agreement from the agency that has ownership and/or maintenance responsibilities for the roadway within the applicant’s jurisdiction; if applicable;
(3) it has the capacity, including institutional, managerial, and financial capacity, to comply with its obligations under this agreement;
(4) not less than the difference between the “Total Eligible Project Cost” and the “SS4A Grant Amount” listed in section 3.3 are committed to fund the Project;
(5) it has sufficient funds available, or an agreement with the agency that has ownership and/or maintenance responsibilities for the roadway within the recipient’s jurisdiction, to ensure that infrastructure completed or improved under this agreement will be operated and maintained in compliance with this agreement and applicable Federal law; and
(6) the individual executing this agreement on behalf of the Recipient has authority to enter this agreement and make the statements in this article 9 and in section 27.7 on behalf of the Recipient.
9.3 USDOT Reliance. The Recipient acknowledges that:
(1) the USDOT relied on statements of fact in the Grant Application to select the Project to receive this award;
(2) the USDOT relied on statements of fact in both the Grant Application and this agreement to determine that the Recipient and the Project are eligible under the terms of the NOFO;
(3) the USDOT relied on statements of fact in both the Grant Application and this agreement to establish the terms of this agreement; and
(4) the USDOT’s selection of the Project to receive this award prevented awards under the NOFO to other eligible applicants.
9.4 Project Delivery.
(a) The Recipient shall complete the Project under the terms of this agreement.
(b) The Recipient shall ensure that the Project is financed, constructed, operated, and maintained in accordance with all applicable Federal laws, regulations, and policies.
(c) The Recipient shall provide any certifications or assurances deemed necessary by the USDOT in ensuring the Recipient’s compliance with all applicable laws, regulations, and policies.
(d) The Recipient shall provide access to records as provided at 2 C.F.R. 200.337.
9.5 Rights and Powers Affecting the Project.
(a) The Recipient shall not take or permit any action that deprives it of any rights or powers necessary to the Recipient’s performance under this agreement without written approval of the USDOT.
(b) The Recipient shall act, in a manner acceptable to the USDOT, promptly to acquire, extinguish, or modify any outstanding rights or claims of right of others that would interfere with the Recipient’s performance under this agreement.
9.6 Notification of Changes to Key Personnel. The Recipient shall notify all USDOT representatives who are identified in Section 4.3 in writing within 30 calendar days of any change in key personnel who are identified in Section 4.2.
ARTICLE 10
AWARD AMOUNT, OBLIGATION, AND TIME PERIODS
10.1 Federal Award Amount The USDOT hereby awards a SS4A Grant to the Recipient in the amount listed in section 2.2 as the SS4A Grant Amount.
10.2 Federal Obligations.
This agreement obligates funds for the period of performance listed on Page 1, Block 6 of the grant agreement.
(a) If the Federal Obligation Type identified in section 2.3 is “Single,” then the project-specific agreement obligates for the budget period the amount listed in Section 2.2. as the Grant Amount and sections 10.2 (c)–10.2(f) do not apply to the project specific agreement.
(b) If the Federal Obligation Type identified in section 2.3 is “Multiple,” (for phased agreements) then an amount up to the Grant Amount listed in Section 2.2 will be obligated with one initial obligation and one or more subsequent, optional obligations, as described in sections 10.2(c)–10.2(f).
(c) The Obligation Condition Table in section 2.3 allocates the Grant funds among separate phases of the Project for the purpose of the Federal obligation of funds. The scope of each phase of the Project that is identified in that table is described in section 2.3.
(d) The project-specific agreement obligates for the budget period only the amounts allocated in the Obligation Condition Table in section 2.3 to portions of the Project for which that table does not list an obligation condition.
(e) The project-specific agreement does not obligate amounts allocated in the Obligation Condition Table in section 2.3 to portions of the Project for which that table lists an obligation condition. The parties may obligate the amounts allocated to those portions of the Project only by modifying the project specific agreement under section 21.
(f) For each portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, the amount allocated in that table to that portion of the Project will be obligated if the condition is met not later than the date listed in Section 2.4 of the project-specific agreement.
(g) For any portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, if the obligation condition is satisfied, the parties amend this agreement documenting that:
(1) the FHWA determines that the obligation condition listed in that table for that portion of the Project is satisfied; and
(2) the FHWA determines that all applicable Federal requirements for obligating the amount are satisfied.
(h) The Recipient shall not request reimbursement of costs for a portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, unless the amount allocated in that table to that portion of the Project is obligated under section 10.2(c)-(f).
(i) Reserved.
(j) The Recipient acknowledges that:
(1) the FHWA is not liable for payments for a portion of the Project for which the Obligation Condition Table in section 2.3 lists an obligation condition, unless the amount allocated in that table to that portion of the Project is obligated under section 10.2(c)-(f);
(2) any portion of the Grant that is not obligated under this section 10.2 by the budget period end date identified in the project-specific agreement for those funds lapses on the day after that date and becomes unavailable for the Project; and
(3) the FHWA may consider the failure to obligate funds by the budget period end date identified in the project-specific agreement as applicable to the Grant Program for those funds to be a basis for terminating the project-specific agreement under section 16.
10.3 Budget Period
The budget period for this award begins on the effective date of this agreement and ends on the budget period end date that is listed in section 2.4, which shall be no later than 5 years from the date of grant execution. In this agreement, “budget period” is used as defined at 2 C.F.R. 200.1.
10.4 Period of Performance.
(a) The period of performance for this award begins on the effective date of award listed in page 1, Block 2 and ends on the period of performance end date that is listed in Page 1, Block 6.
(b) In this agreement, “period of performance” is used as defined at 2 C.F.R. 200.1.
ARTICLE 11
STATEMENT OF WORK, SCHEDULE, AND BUDGET CHANGES
11.1 Notification Requirement. The Recipient shall notify all USDOT representatives who are identified in section 4.3 in writing within 30 calendar days of any change in circumstances or commitments that adversely affect the Recipient’s plan to complete the Project. In that notification, the Recipient shall describe the change and what actions the Recipient has taken or plans to take to ensure completion of the Project. This notification requirement under this section 11.1 is separate from any requirements under this article 11 that the Recipient request amendment of this agreement.
11.2 Statement of Work Changes. If the Project’s activities differ from the statement of work that is described in section 3.1 and Attachment B, then the Recipient shall request an amendment of this agreement to update section 3.1.
11.3 Schedule Changes. If one or more of the following conditions are satisfied, then the Recipient shall request an amendment of this agreement to update the relevant date(s):
(1) a substantial completion date for the Project or a component of the Project that is listed in section 3.2 and the Recipient’s estimate for that milestone changes to a date that is more than six months after the date listed in section 3.2; or
(2) a schedule change would require the period of performance to continue after the period of performance end date listed on Page 1, Block 6 (i.e., for projects with multiple phases, changes to the base phase budget period end date for projects with two phases, or changes to base or secondary phase budget period end dates for projects with three phases, etc., will not trigger notification/modification requirements).
For other schedule changes, the Recipient shall request an amendment of this agreement unless the USDOT has consented, in writing consistent with applicable requirements, to the change.
11.4 Budget Changes.
(a) The Recipient acknowledges that if the cost of completing the Project increases:
(1) that increase does not affect the Recipient’s obligation under this agreement to complete the Project; and
(2) the USDOT will not increase the amount of this award to address any funding shortfall.
(b) The Recipient shall request an amendment of this agreement to update section 3.3 and Attachment B if, in comparing the Project’s budget to the amounts listed in section 3.3:
(1) the “Non-Federal Funds” amount decreases; or
(2) the “Total Eligible Project Cost” amount decreases.
(c) For budget changes that are not identified in section 11.4(b), the Recipient shall request an amendment of this agreement to update section 3.3 and Attachment B unless the USDOT has consented, in writing consistent with applicable requirements, to the change.
(d) If the actual eligible project costs are less than the “Total Eligible Project Cost” that is listed in section 3.3, then the Recipient may propose to the USDOT, in writing consistent with applicable requirements, specific additional activities that are within the scope of this award, as defined in sections 7.1 and 3.1, and that the Recipient could complete with the difference between the “Total Eligible Project Cost” that is listed in section 3.3 and the actual eligible project costs.
(e) If the actual eligible project costs are less than the “Total Eligible Project Cost” that is listed in section 3.3 and either the Recipient does not make a proposal under section 11.4(d) or the USDOT does not accept the Recipient’s proposal under section 11.4(d), then:
(1) in a request under section 11.4(b), the Recipient shall reduce the Federal Share by the difference between the “Total Eligible Project Cost” that is listed in section
3.3 and the actual eligible project costs; and
(2) if that amendment reduces this award and the USDOT had reimbursed costs exceeding the revised award, the Recipient shall request to add additional project work that is within the scope of this project.
In this agreement, “Federal Share” means the sum of the “SS4A Grant Amount” and the “Other Federal Funds” amounts that are listed in section 3.3(a).
(f) The Recipient acknowledges that amounts that are required to be refunded under section 11.4(e)(2) constitute a debt to the Federal Government that the USDOT may collect under 2 C.F.R. 200.346 and the Standards for Administrative Collection of Claims (31 C.F.R. part 901).
11.5 USDOT Acceptance of Changes. The USDOT may accept or reject amendments requested under this article 11, and in doing so may elect to consider only the interests of the SS4A grant program and the USDOT. The Recipient acknowledges that requesting an amendment under this article 11 does not amend, modify, or supplement this agreement unless the USDOT accepts that amendment request and the parties modify this agreement under section 21.1.
ARTICLE 12
GENERAL REPORTING TERMS
12.1 Report Submission. The Recipient shall send all reports required by this agreement to all USDOT contacts who are listed in section 4.3. Reports will be added to a central repository maintained by FHWA.
12.2 Alternative Reporting Methods. FHWA may establish processes for the Recipient to submit reports required by this agreement, including electronic submission processes. If the Recipient is notified of those processes in writing, the Recipient shall use the processes required by the FHWA.
12.3 Paperwork Reduction Act Notice.
Under 5 C.F.R. 1320.6, the Recipient is not required to respond to a collection of information that does not display a currently valid control number issued by the Office of Management and Budget (the “OMB”). Collections of information conducted under this agreement are approved under OMB Control No. 2125-0675.
ARTICLE 13
PROGRESS AND FINANCIAL REPORTING
13.1 Quarterly Performance Progress Reports. Quarterly, on or before the 20th day of the first month of each calendar year (e.g., reports due on or before January 20th, April 20th, July 20th, and October 20th) and until the end of the period of performance, the Recipient shall submit to the USDOT a Quarterly Performance Progress Report in the format and with the content described in Exhibit C. If the date of this agreement is in the final month of a calendar year, then the Recipient shall submit the first Quarterly Performance Progress Report in the second calendar year quarter that begins after the date of this agreement.
13.2 Quarterly Financial Status. Quarterly, on or before the 20th day of the first month of each calendar year (e.g., reports due on or before January 20th, April 20th, July 20th, and October 20th) and until the end of the period of performance, the Recipient shall submit a Federal Financial Report using SF-425.
13.3 Final Performance Progress Reports and Financial Status. No later than 120 days after the end of the period of performance, the Recipient shall submit:
(1) a Final Performance Progress Report in the format and with the content described in Exhibit C for each Quarterly Performance Progress Report, including a final Federal Financial Report (SF-425); and
(2) any other information required under the Administering Operating Administration’s award closeout procedures.
ARTICLE 14
PERFORMANCE REPORTING
14.1 Baseline Performance Measurement. Recipients of Implementation Grants or Planning and Demonstration Grants with demonstration activities shall:
(1) collect data for each performance measure that is identified in the Performance Measure Table in Attachment A, accurate as of the Baseline Measurement Date that is identified in Attachment A; and
(2) on or before the Baseline Report Date that is stated in Attachment A, the Recipient shall submit a Baseline Performance Measurement Report that contains the data collected under this section 14.1 and a detailed description of the data sources, assumptions, variability, and estimated levels of precision for each performance measure that is identified in the Performance Measure Table in Attachment A.
14.2 SS4A Final Report.
The Recipient shall submit to the USDOT, not later than 120 days after the end of the period of performance, a report in the format specified by FHWA and with the content described in Attachment A that describes, consistent with sections 24112(g)-(h) of IIJA:
(1) the costs of each eligible project and strategy carried out using the grant;
(2) the roadway safety outcomes and any additional benefits (e.g., increased walking, biking, or transit use without a commensurate increase in serious and fatal crashes, etc.) that each such project and strategy has generated, as—
• identified in the grant application; and
• measured by data to the maximum extent practicable;
(3) [RESERVED]
(4) the lessons learned, and any recommendations related to future projects or strategies to prevent death and serious injuries on roads and streets.
14.3 Performance Measurement Information.
For each performance measure identified to be submitted annually in the Performance Measure Table in Attachment A, not later than January 31 of each year, the Recipient shall submit to the USDOT a Performance Measurement Report containing the data collected in the previous calendar year and stating the dates when the data was collected.
14.4 Performance Reporting Survival.
The data collection and reporting requirements in this article 14 survive the termination of this agreement which is three years post period of performance.
14.5 Program Evaluation.
As a condition of grant award, the recipient may be required to participate in an evaluation undertaken by USDOT, or another agency or partner. The evaluation may take different forms such as an implementation assessment across grant recipients, an impact and/or outcomes analysis of all or selected sites within or across grant recipients, before/after photographs of the sites, qualitative activities such as videos describing the project and its impact on the community, or a benefit/cost analysis or assessment of return on investment. The Department may require applicants to collect data elements to aid the evaluation. As a part of the evaluation, as a condition of award, grant recipients must agree to: (1) make records available to the evaluation contractor; (2) provide access to program records, and any other relevant documents to calculate costs and benefits; (3) in the case of an impact analysis, facilitate the access to relevant information as requested; and (4) follow evaluation procedures as specified by the evaluation contractor or USDOT staff.
ARTICLE 15
NONCOMPLIANCE AND REMEDIES
15.1 Noncompliance Determinations.
(a) If the USDOT determines that the Recipient may have failed to comply with the United States Constitution, Federal law, or the terms and conditions of this agreement, the USDOT may notify the Recipient of a proposed determination of noncompliance. For the notice to be effective, it must be written and the USDOT must include an explanation of the nature of the noncompliance, describe a remedy, state whether that remedy is proposed or effective at an already determined date, and describe the process through and form in which the Recipient may respond to the notice.
(b) If the USDOT notifies the Recipient of a proposed determination of noncompliance under section 15.1(a), the Recipient may, not later than 7 calendar days after the notice, respond to that notice in the form and through the process described in that notice. In its response, the Recipient may:
(1) accept the remedy;
(2) acknowledge the noncompliance, but propose an alternative remedy; or
(3) dispute the noncompliance.
To dispute the noncompliance, the Recipient must include in its response documentation or other information supporting the Recipient’s compliance.
(c) The USDOT may make a final determination of noncompliance only:
(1) after considering the Recipient’s response under section 15.1(b); or
(2) if the Recipient fails to respond under section 15.1(b), after the time for that response has passed.
(d) To make a final determination of noncompliance, the USDOT must provide a notice to the Recipient that states the basis for that determination.
15.2 Remedies.
(a) If the USDOT makes a final determination of noncompliance under section 15.1(d), the USDOT may impose a remedy, including:
(1) additional conditions on the award;
(2) any remedy permitted under 2 C.F.R. 200.339–200.340, including withholding of payments; disallowance of previously reimbursed costs, requiring refunds from the Recipient to USDOT; suspension or termination of the award; or suspension and disbarment under 2 C.F.R. part 180; or
(3) any other remedy legally available.
(b) To impose a remedy, the USDOT must provide a written notice to the Recipient that describes the remedy, but the USDOT may make the remedy effective before the Recipient receives that notice.
(c) If the USDOT determines that it is in the public interest, the USDOT may impose a remedy, including all remedies described in section 15.2(a), before making a final determination of noncompliance under section 15.1(d). If it does so, then the notice provided under section 15.1(d) must also state whether the remedy imposed will continue, be rescinded, or modified.
(d) In imposing a remedy under this section 15.2 or making a public interest determination under section 15.2(c), the USDOT may elect to consider the interests of only the
USDOT.
(e) The Recipient acknowledges that amounts that the USDOT requires the Recipient to refund to the USDOT due to a remedy under this section 15.2 constitute a debt to the
Federal Government that the USDOT may collect under 2 C.F.R. 200.346 and the Standards for Administrative Collection of Claims (31 C.F.R. part 901).
15.3 Other Oversight Entities.
Nothing in this article 15 limits any party’s authority to report activity under this agreement to the United States Department of Transportation Inspector General or other appropriate oversight entities.
ARTICLE 16
AGREEMENT TERMINATION
16.1 USDOT Termination.
(a) The USDOT may terminate this agreement and all its obligations under this agreement if any of the following occurs:
(1) the Recipient fails to obtain or provide any non-SS4A Grant contribution (all eligible project costs other than the SS4A Grant Amount, as described in section 3.3(a) of the grant agreement) or alternatives approved by the USDOT as provided in this agreement and consistent with article 3;
(2) a construction start date for the project or strategy is listed in section 3.2 and the Recipient fails to meet that milestone by six months after the date listed in section 3.2;
(3) a substantial completion date for the project or strategy is listed in section 3.2 and the Recipient fails to meet that milestone by six months after the date listed in section 3.2;
(4) the Recipient fails to comply with the terms and conditions of this agreement, including a material failure to comply with the schedule in section 3.2 even if it is beyond the reasonable control of the Recipient; or,
(5) the USDOT determines that termination of this agreement is in the public interest.
(6) the Recipient fails to expend the funds within 5 years after the date on which the government executes the grant agreement, which is the date funds are provided for the project.
(b) In terminating this agreement under this section, the USDOT may elect to consider only the interests of the USDOT.
(c) This section 16.1 does not limit the USDOT’s ability to terminate this agreement as a remedy under section 15.2.
(d) The Recipient may request that the USDOT terminate the agreement under this section 16.1.
16.2 Closeout Termination.
(a) This agreement terminates on Project Closeout.
(b) In this agreement, “Project Closeout” means the date that the USDOT notifies the Recipient that the award is closed out. Under 2 C.F.R. 200.344, Project Closeout should occur no later than one year after the end of the period of performance.
16.3 Post-Termination Adjustments. The Recipient acknowledges that under 2 C.F.R.
200.345–200.346, termination of the agreement does not extinguish the USDOT’s authority to disallow costs, including costs that USDOT reimbursed before termination, and recover funds from the Recipient.
16.4 Non-Terminating Events.
(a) The end of the period of performance described under section 10.4 does not terminate this agreement or the Recipient’s obligations under this agreement.
(b) The liquidation of funds under section 20.1 does not terminate this agreement or the Recipient’s obligations under this agreement.
16.5 Other Remedies. The termination authority under this article 16 supplements and does not limit the USDOT’s remedial authority under article 15 or 2 C.F.R. part 200, including 2 C.F.R. 200.339–200.340.
ARTICLE 17
MONITORING, FINANCIAL MANAGEMENT, CONTROLS, AND RECORDS
17.1 Recipient Monitoring and Record Retention.
(a) The Recipient shall monitor activities under this award, including activities under subawards and contracts, to ensure:
(1) that those activities comply with this agreement; and
(2) that funds provided under this award are not expended on costs that are not allowable under this award or not allocable to this award.
(b) If the Recipient makes a subaward under this award, the Recipient shall monitor the activities of the subrecipient in compliance with 2 C.F.R. 200.332(e).
(c) The Recipient shall retain records relevant to the award as required under 2 C.F.R.
200.334.
17.2 Financial Records and Audits.
(a) The Recipient shall keep all project accounts and records that fully disclose the amount and disposition by the Recipient of the award funds, the total cost of the project, and the amount or nature of that portion of the cost of the project supplied by other sources, and any other financial records related to the project.
(b) The Recipient shall keep accounts and records described under section 17.2(a) in accordance with a financial management system that meets the requirements of 2 C.F.R.
200.302–200.307, 2 C.F.R. part 200, subpart F, and title 23, United States Code, and will facilitate an effective audit in accordance with 31 U.S.C. 7501–7506.
(c) The Recipient shall separately identify expenditures under the fiscal year 2024 SS4A grants program in financial records required for audits under 31 U.S.C. 7501–7506.
Specifically, the Recipient shall:
(1) list expenditures under that program separately on the schedule of expenditures of Federal awards required under 2 C.F.R. part 200, subpart F, including “FY 2024” in the program name; and
(2) list expenditures under that program on a separate row under Part II, Item 1 (“Federal Awards Expended During Fiscal Period”) of Form SF-SAC, including “FY 2024” in column c (“Additional Award Identification”).
17.3 Internal Controls. The Recipient shall establish and maintain internal controls as required under 2 C.F.R. 200.303.
17.4 USDOT Record Access. The USDOT may access Recipient records related to this award under 2 C.F.R. 200.337.
ARTICLE 18
CONTRACTING AND SUBAWARDS
18.1 Build America, Buy America. This award term implements § 70914(a) of the Build America, Buy America Act, Pub. L. No. 117-58, div. G, tit. IX, subtitle A, 135 Stat. 429, 1294 (2021), 2 CFR part 184, and Office of Management and Budget (OMB) Memorandum M-24-02, “Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure.”
Requirement to Use Iron, Steel, Manufactured Products, and Construction Materials Produced in the United States.
The Recipient shall not use funds provided under this award for a project for infrastructure unless:
(1) all iron and steel used in the project are produced in the United States—this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States;
(2) all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the United States is greater than 55 percent of the total cost of all components of the manufactured product; and
(3) all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States. The construction material standards for each construction material are provided at 2 CFR 184.6.
Inapplicability.
The domestic content procurement preference in this award term only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a domestic content procurement preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.
Categorization of articles, materials, and supplies.
An article, material, or supply should only be classified into one of the following categories: (i) Iron or steel products; (ii) manufactured products; (iii) construction materials; or
(iv) Section 70917(c) materials. An article, material, or supply should not be considered to fall into multiple categories. In some cases, an article, material, or supply may not fall under any of the categories listed in this paragraph. The classification of an article, material, or supply as falling into one of the categories listed in this paragraph must be made based on its status at the time it is brought to the work site for incorporation into an infrastructure project. In general, the work site is the location of the infrastructure project at which the iron, steel, manufactured products, and construction materials will be incorporated. An article, material, or supply incorporated into an infrastructure project must meet the requirements for only the single category in which it is classified.
Waivers.
When necessary, the Recipient may apply for, and the USDOT may grant, a waiver from the domestic content procurement preference in this award term.
A request to waive the application of the domestic content procurement preference must be in writing. The USDOT will provide instructions on the waiver process and on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Office of Management and Budget (OMB) Made in America Office.
When the USDOT has made a determination that one of the following exceptions applies, the awarding official may waive the application of the domestic content procurement preference in any case in which the USDOT determines that:
(1) applying the domestic content procurement preference would be inconsistent with the public interest;
(2) the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or
(3) the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent.
There may be instances where an award qualifies, in whole or in part, for an existing waiver described at https://www.transportation.gov/office-policy/transportation-policy/made-in-america.
Definitions
“Construction materials” means articles, materials, or supplies that consist of only one of the items listed in paragraph (21) of this definition, except as provided in paragraph (2) of this definition. To the extent that one of the items listed in paragraph (1) contains as inputs other items listed in paragraph (1), it is nonetheless a construction material.
(1) The listed items are:
• non-ferrous metals;
• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
• glass (including optic glass);
• fiber optic cable (including drop cable)
• lumber;
• engineered wood; and
• drywall.
https://www.transportation.gov/office-policy/transportation-policy/made-in-america
(2) Minor additions of articles, materials, supplies, or binding agents to a construction material do not change the categorization of the construction material.
“Domestic content procurement preference” means all iron and steel used in the project are produced in the United States; the manufactured products used in the project are produced in the United States; or the construction materials used in the project are produced in the United States.
“Iron or steel products” means articles, materials, or supplies that consist wholly or predominantly or iron or steel or a combination of both.
“Manufactured products” means
(1) Articles, materials, or supplies that have been: (i) Processed into a specific form and shape; or (ii) combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
(2) If an item is classified as an iron or steel product, a construction material, or a Section 70917(c) material under 2 CFR 184.4(e) and the definitions set forth in 2 CFR 184.3, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product under 2 CFR 184.4(e) and paragraph (1) of this definition may include components that are construction materials, iron or steel products, or Section 70917(c) materials.
“Predominantly of iron or steel or a combination of both” means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forging utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components.
“Project” means the development of a safety action plan (including supplemental and topical plans) or the temporary or permanent construction, alteration, maintenance, or repair of infrastructure in the United States.
“Section 70917(c) materials” cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
18.2 Small and Disadvantaged Business Requirements. The Recipient shall expend all funds under this award in compliance with the requirements at 2 C.F.R. 200.321 including any amendments thereto.
18.3 Engineering and Design Services. The Recipient shall award each contract or sub-contract for program management, construction management, planning studies, feasibility studies, architectural services, preliminary engineering, design, engineering, surveying, mapping, or related services with respect to the project in the same manner that a contract for architectural and engineering services is negotiated under 2 C.F.R. 200.320 or an equivalent qualifications-based requirement prescribed for or by the Recipient.
18.4 Foreign Market Restrictions. The Recipient shall not allow funds provided under this award to be used to fund the use of any product or service of a foreign country during the period in which such foreign country is listed by the United States Trade Representative as denying fair and equitable market opportunities for products and suppliers of the United States in procurement and construction.
18.5 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment. The Recipient acknowledges that Section 889 of Pub. L. No. 115-232, 2 C.F.R. 200.216 and 2 C.F.R. 200.471 prohibit the Recipient and all subrecipients from procuring or obtaining certain telecommunications and video surveillance services or equipment under this award.
18.6 Recipient Responsibilities for Subawards.
If the Recipient makes a subaward under this award, the Recipient shall comply with the requirements on pass-through entities under 2 C.F.R. parts 200 and 1201, including 2 C.F.R. 200.331–200.333.
18.7 Subaward and Contract Authorization.
If the USDOT Office for Subaward Authorization identified in section 5.1 is “FHWA Office of Acquisition and Grants Management,” then the Recipient must follow the requirements in 2 C.F.R. 200.308 (f) (6) and 2 C.F.R. 200.333, as applicable, for the subaward of any SS4A Grant work under the Project-Specific Agreement. Approvals under 2 CFR 200.308(f)(6) do not apply to the procurement acquisition of goods and services.
ARTICLE 19
COSTS, PAYMENTS, AND UNEXPENDED FUNDS
19.1 Limitation of Federal Award Amount. Under this award, the USDOT shall not provide funding greater than the amount obligated on the SS4A Grant cover page, Item 11, Federal Funds Obligated. The Recipient acknowledges that USDOT is not liable for payments exceeding that amount, and the Recipient shall not request reimbursement of costs exceeding that amount.
19.2 Projects Costs. This award is subject to the cost principles at 2 C.F.R. part 200 subpart E, including provisions on determining allocable costs and determining allowable costs.
19.3 Timing of Project Costs.
(a) The Recipient shall not charge to this award costs that are incurred after the period of performance.
(b) The Recipient shall not charge to this award costs that were incurred before the effective date of award of this agreement unless there has been an approval of pre-award costs under 2 C.F.R. 200.458.
19.4 Recipient Recovery of Federal Funds. The Recipient shall make all reasonable efforts, including initiating litigation, if necessary, to recover Federal funds if the USDOT determines, after consultation with the Recipient, that those funds have been spent fraudulently, wastefully, or in violation of Federal laws, or misused in any manner under this award. The Recipient shall not enter a settlement or other final position, in court or otherwise, involving the recovery of funds under the award unless approved in advance in writing by the USDOT.
19.5 Unexpended Federal Funds. Any Federal funds that are awarded at section 10.1 but not expended on allocable, allowable costs remain the property of the United States.
19.6 Timing of Payments to the Recipient. When reimbursement is used, the Recipient shall not request reimbursement of a cost before the Recipient has entered an obligation for that cost.
19.7 Payment Method. The USDOT may deny a payment request that is not submitted using the method identified in section 5.2.
19.8 Information Supporting Expenditures.
(a) If the USDOT Payment System identified in section 5.2 is “DELPHI iSupplier,” then when requesting reimbursement of costs incurred or credit for cost share incurred, the Recipient shall electronically submit the SF-270 (Request for Advance or Reimbursement) or SF-271 (Outlay Report and Request for Reimbursement for Construction Programs), shall identify the Federal share and the Recipient’s share of costs, and shall submit supporting cost detail to clearly document all costs incurred. As supporting cost detail, the Recipient shall include a detailed breakout of all costs incurred, including direct labor, indirect costs, other direct costs, and travel.
(b) If the Recipient submits a request for reimbursement that the USDOT determines does not include or is not supported by sufficient detail, the USDOT may deny the request or withhold processing the request until the Recipient provides sufficient detail.
19.9 Reimbursement Frequency. If the USDOT Payment System identified in section 5.2 is “DELPHI iSupplier,” then the Recipient shall not request reimbursement more frequently than monthly.
19.10 Match. The recipient should show on each request for reimbursement that at least 20 percent of the incurred costs will count towards match. If the recipient intends to vary the match percentage over the life of the project, it must communicate its plan to USDOT.
The recipient is responsible for tracking match according to the plan. At the completion of the grant award, the cost share requirement must be met, and Federal funds must not exceed the project's Federal share.
ARTICLE 20
LIQUIDATION, ADJUSTMENTS, AND FUNDS AVAILABILITY
20.1 Liquidation of Recipient Obligations.
(a) The Recipient shall liquidate all obligations of award funds under this agreement not later than the earlier of (1) 120 days after the end of the period of performance or (2) the statutory availability to eligible entities date, which shall be 5 years after the date on which the grant is provided.
(b) Liquidation of obligations and adjustment of costs under this agreement follow the requirements of 2 C.F.R. 200.344–200.346.
ARTICLE 21
AGREEMENT MODIFICATIONS
21.1 Bilateral Amendments. The parties may amend, modify, or supplement this agreement by mutual agreement in writing signed by the USDOT and the Recipient. Either party may request to amend, modify, or supplement this agreement by written notice to the other party.
21.2 Unilateral Contact Modifications. The USDOT may update the contacts who are listed in section 4.3 by written notice to all the Recipient contacts who are listed in sections 4.1 and 4.2.
21.3 USDOT Unilateral Modifications.
(a) The USDOT may unilaterally modify this agreement to comply with Federal law, including the Program Statute.
(b) To unilaterally modify this agreement under this section 20.3(a), the USDOT must provide a notice to the Recipient that includes a description of the modification and state the date that the modification is effective.
21.4 Other Modifications. The parties shall not amend, modify, or supplement this agreement except as permitted under sections 21.1, 21.2, 21.3. If an amendment, modification, or supplement is not permitted under section 21.1, not permitted under section 21.2, and not permitted under section 21.3, it is void.
ARTICLE 22
[RESERVED]
ARTICLE 23
[RESERVED]
ARTICLE 24
LABOR AND WORKFORCE
24.1 Labor and Workforce. Attachment E documents the consideration of job quality and labor rights, standards, and protections related to the Project.
ARTICLE 25
CRITICAL INFRASTRUCTURE SECURITY AND RESILIENCE
25.1 Critical Infrastructure Security and Resilience.
Consistent with Presidential Policy Directive 21, “Critical Infrastructure Security and Resilience” (Feb. 12, 2013), and the National Security Presidential Memorandum on Improving Cybersecurity for Critical Infrastructure Control Systems (July 28, 2021), the Recipient shall consider physical and cyber security and resilience in planning, design, and oversight of the Project. Attachment F documents the consideration of critical security infrastructure for projects that include the purchase of information technology and/or operational technology.
ARTICLE 26
CIVIL RIGHTS AND TITLE VI
26.1 Civil Rights and Title VI
(a) The purpose of sections 26.1(b)–26.1(c) is to ensure that the Recipient has a plan to comply with civil rights obligations and nondiscrimination laws, including Title VI and 49 C.F.R. part 21, including any amendments thereto.
(b) If the Recipient is an Existing Recipient, the Recipient shall submit to the USDOT either:
(1) not later than one…