SS-26-143 Notice.pdf
PDF 137 KB Posted
- Attached to
- Dry Cargo TUGCON
- Solicitation number
- N32205-SS-PM4-26-143
About this file
This is a Source Sought Notification for market research issued by Military Sealift Command (MSC) Norfolk on July 20, 2026, regarding the requirement for a U.S. flag, Jones Act-compliant, ocean-going certified tug to tow the ex-Germantown (LSD-42) vessel from Naval Station San Diego, California to Pearl Harbor, Hawaii. The requirement is for a single voyage with four days of laytime, commencing September 29, 2026. The tug must be built in 1970 or later with sufficient bollard pull to maintain a minimum tow speed of six knots in Beaufort 5 conditions, must be fully bunkered, and must have internet and satellite phone capability. The vessel to be towed displaces 15,500 long tons, measures 617 feet in length, 84 feet in beam, with a maximum draft of 20 feet 3 inches.
Interested parties must submit responses by email by 1100 hours Eastern Time on July 27, 2026, to Matthew Price at matthew.r.price40.civ@us.navy.mil or (564) 230-3782. Required information includes vessel name and characteristics (Certificate of Inspection/Documentation and photos), layday confirmation or earliest availability, lumpsum price (including up to four days at destination for customs/delivery) and demurrage rate, itinerary and number of days to complete the mission, business size classification, and confirmation of compliance with 46 CFR Chapter 1 Subchapter M regarding towing vessels. Contractors must provide towing package documentation, independent marine surveyor services, tow bridle and emergency lines, and position reports twice daily in port and four times daily at sea. The small business size standard for water transportation services (NAICS 483111) is 1,050 employees. This is market research only and does not commit the government to contract or reimburse any costs incurred in response preparation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20 JULY 2026
THIS IS THE MILITARY SEALIFT COMMAND NORFOLK, STRATEGIC SEALIFT
PROGRAM SUPPORT OFFICE, N103A
SOURCE SOUGHT NOTIFICATION NO. N32205-SS-PM4-26-143
SUBJECT: DRY CARGO TUGCON; OPEN-OCEAN TOW MISSION
1. THIS IS MARKET RESEARCH CONDUCTED BY THE PM4 PROGRAM OFFICE OF
MSC. IT IS A REQUEST FOR INFORMATION ONLY, AND YOUR RESPONSE WILL
NOT BE CONSIDERED AN OFFER. THIS REQUEST FOR INFORMATION DOES NOT
COMMIT THE GOVERNMENT TO PAY ANY COSTS INCURRED IN THE
PREPARATION OR SUBMISSION TO THIS MARKET SURVEY OR TO CONTRACT FOR
SERVICES.
2. MSC REQUESTS INFORMATION ABOUT THE PRICE AND AVAILABILITY OF A U.S.
FLAG, JONES ACT, OCEAN-GOING CERTIFIED TUG CAPABLE OF TOWING EX-
GERMANTOWN (LSD-42) “IAW THE U.S. NAVY TOW MANUAL (SL740-AA-MAN-
010).” THE REQUIREMENT IS FOR ONE VOYAGE.
3. DESCRIPTION OF THE TOW:
• DISPLACEMENT – 15,500 LT
• LENGTH – 617’
• BEAM – 84’
• MAX DRAFT – 20’ 3”
4. PORT(S)/PLACE(S) OF DEPARTURE: NAVAL STATION SAN DIEGO, CA PIER 10
BERTH 2
5. LAYTIME: FOUR (4) DAYS FOR THE ENTIRE MISSION.
6. PORT(S)/PLACE(S) OF DESTINATION: INACTSHIPS PEARL HARBOR, HI
7. LAYDAYS: COMMENCING/CANCELLING: 29 SEPTEMBER 2026
8. TUG REQUIREMENTS:
• VESSEL/TUG SHALL BE BUILT IN 1970 OR LATER.
• BOLLARD PULL: SUFFICIENT TO TOW LSD-42 VESSEL AT A MINIMUM TOW
SPEED OF SIX (6) KNOTS FOR FIVE (5) KNOT SOA IN BEAUFORT 5
CONDITIONS. MAXIMUM TOW SPEED TO BE CALCULATED IAW THE U.S.
NAVY TOW MANUAL.
• TUG SHALL BE FULLY BUNKERED FOR THE VOYAGE.
• INTERNET AND SATELLITE PHONE CAPABILITY.
• U.S. NAVY TOWING MANUAL (SL740-AA-MAN-10) WILL BE USED AND
COMPLIED WITH FOR THIS REQUIREMENT. THE LINK FOR DOWNLOAD IS:
HTTP://WWW.NAVSEA.NAVY.MIL/HOME/SUPSALV/00C2-SALVAGE-
PUBLICATIONS/.
http://www.navsea.navy.mil/Home/SUPSALV/00C2-Salvage-Publications/ http://www.navsea.navy.mil/Home/SUPSALV/00C2-Salvage-Publications/
• THERE WILL BE A PRE-TOW CONFERENCE AT NAVAL STATION SAN DIEGO,
CA PRIOR TO TOWING THE VESSEL. THE TIME OF THIS MEETING WILL BE
MUTUALLY AGREED UPON BY MSC AND CONTRACTOR BUT SHOULD
OCCUR NOT LATER THAN 24 HOURS BEFORE TOW. REQUIRED ATTENDEES
INCLUDE TUG CAPTAIN/CONTRACTOR REPRESENTATIVE, MSC
REPRESENTATIVE(S), A REPRESENTATIVE FROM THE LSD-42 VESSEL AND
THE IMS.
• CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT MARINE
SURVEYOR (IMS). THIS SERVICE SHOULD BE INCLUDED IN THE OFFER’S
LUMP-SUM PRICE. THE IMS IS AN INDEPENDENT THIRD PARTY TO ACT AS A
MEDIATOR BETWEEN THE NAVY AND THE CONTRACTOR TO PROVIDE
INDEPENDENT ANALYSIS OF THE OPERATIONS AND TO ASSIST IN SETTLING
DISAGREEMENTS. THE IMS SELECTED SHOULD BE PROPOSED BY THE
TOWING CONTRACTOR AND AGREED TO BY THE MSC TECHNICAL
REPRESENTATIVE. IMS DUTIES SHALL INCLUDE THE FOLLOWING, BUT ARE
NOT LIMITED TO:
O PERFORM DETAILED TECHNICAL EVALUATION AND OVERSIGHT AS
NECESSARY, TO ENSURE THE TUG AND LSD-42 ARE PREPARED AND
RIGGED FOR TOW IAW THE U.S. NAVY TOWING MANUAL, AS
APPLICABLE.
TECHNICAL EVALUATIONS SHALL INCLUDE A REVIEW OF THE
FOLLOWING, BUT NOT LIMITED TO:
• CONTRACTOR PREPARED TOW PACKAGE.
• PRE-TOW CHECKLIST TO INCLUDE ITEMS SUCH AS
VERIFYING THE CONDITION OF THE LSD-42 AS BEING
SEAWORTHY OF THE TOW.
• MATERIAL CONDITION OF THE TUG AND LSD-42.
• PREPARATIONS OF THE TUG AND LSD-42.
• INSPECTION OF ALL MATERIAL, EQUIPMENT,
HARDWARE, LINES, AND REQUIRED CERTIFICATES.
• COMPLETED U.S. NAVY TOWING MANUAL APPENDIX H.
• ISSUE A TOWING CERTIFICATE WHEN THE TUG AND
LSD-42 ARE SAFELY RIGGED FOR TOW.
• CONTRACTOR MUST PROVIDE TOW BRIDLE AND HARDWARE, EMERGENCY
TOW LINES, FLOODING ALARMS, NAVIGATION LIGHTS, AND DAY SHAPES
IAW THE COLREGS RULES OF THE ROAD.
• NONDESTRUCTIVE TESTING (NDT) RESULTS OF VESSEL DECK FITTINGS
WILL BE PROVIDED. ANY ADDITIONAL NDT REQUESTS WILL BE APPROVED
ON A REIMBURSABLE BASIS.
• CONTRACTOR MUST PREPARE AND SUBMIT A COMPREHENSIVE TOWING
PACKAGE FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF
TOW. THIS PACKAGE INCLUDES, BUT IS NOT LIMITED TO:
o A COMPLETED APPENDIX H FROM THE U.S. NAVY TOWING MANUAL
WITH ASSOCIATED DETAIL
o STEADY STATE TOW LINE TENSION CALCULATIONS OVER THE
SPECTRUM OF ANTICIPATED WEATHER CONDITIONS ALONG THE
TOW ROUTE
o SPEEDS OF ADVANCE (SOA) o WEATHER CONDITIONS AND LIMITS o A SKETCH OF THE TOW CONFIGURATION WHICH IDENTIFIES ALL
COMPONENTS IN THE TOW RIG FROM THE TOW MACHINE ON THE
TUG TO THE PAD EYES ON TOW (THIS INCLUDES TOW WIRE,
CONNECTING SHACKLES, CHAIN INSPECTIONS, AND PAD EYE NDT
(NON-DESTRUCTIVE TESTING) INSPECTION PAPERWORK.
o DOCUMENTATION OF PEDIGREE, TESTING, OR STAMPING FOR THE
INDIVIDUAL JEWELRY COMPONENTS TO ASSIST IN IDENTIFYING
THE WEAKEST LINK AND TO FACILITATE FORENSIC ANALYSIS IN
THE EVENT OF A FAILURE, AND TRACKING OF FAILURE TRENDS.
o TUG SPECIFICATIONS TO INCLUDE HULL AND TOW MACHINERY
CERTIFICATIONS, BOLLARD PULL, TOW WIRE CERTIFICATIONS, AND
THE MASTER’S TOWING ENDORSEMENT.
o ROUTE PLANNING AND IDENTIFICATION OF PORTS OF REFUGE
INCLUDING ASSOCIATED RESTRICTIONS FOR ENTRY AS STATED BY
THE CAPTAIN OF THE PORT.
o THE COMPLETED TOW PACKAGE MUST BE SENT TO NAVSEA AND
MSC REPRESENTATIVES FOR APPROVAL PRIOR TO TOW.
• LUMP SUM AMOUNT SHALL INCLUDE UP TO FOUR (4) DAYS OF LAYTIME
• POSITION REPORTS. POSITION REPORTS SHALL BE ISSUED BY ELECTRONIC
MAIL: VESSEL SHALL PROVIDE POSITION/STATUS REPORT IN PORT TWICE
DAILY AT 0000Z AND 1200Z AND AT-SEA FOUR TIMES DAILY AT 0000Z,
0600Z, 1200Z, AND 1800Z. ADDITIONALLY, POSITION/STATUS REPORTS
SHALL BE SENT UPON DEPARTURE AND ARRIVAL, AND AT OTHER TIMES
REQUESTED BY THE APPLICABLE MSC AREA COMMAND FOR FORCE
PROTECTION REASONS. REPORTS SHALL BE SENT TO THE EMAIL
ADDRESSES THAT WILL BE PROVIDED AFTER THE CONTRACT AWARD.
9. INTERESTED PARTIES ARE REQUESTED TO PROVIDE THE FOLLOWING
INFORMATION:
A. NAME AND COMPLETE DESCRIPTION/CHARACTERISTICS OF THE TOW
VESSEL INCLUDING CERTIFICATE OF INSPECTION (COI), CERTIFICATE OF
DOCUMENTATION (COD) OR CLASSIFICATION SOCIETY EQUIVALENT,
PHOTOS, AND ALL DELIVERABLES AS PER MSC TUG PROFORMA (TUGCON -
SPOT) FEBRUARY 2026 (02-26).
B. CONFIRMATION OF LAYDAY OR PROVIDE EARLIEST LAYDAY
AVAILABILITY.
C. LUMPSUM (INCLUDE UP TO 4 DAYS AT DESTINATION SITE FOR
CUSTOMS/DELIVERY) AND DEMURRAGE RATE.
D. ITINERARY, NUMBER OF DAYS REQUIRED TO COMPLETE THE TOW
MISSION.
E. BUSINESS SIZE. IF OTHER THAN SMALL BUSINESS, PROVIDE A NARRATIVE
OF SUB-CONTRACTING POSSIBILITIES ENVISIONED, IF ANY. IF NONE,
PROVIDE AN EXPLANATION.
F. ANY OTHER PERTINENT QUESTIONS OR COMMENTS INCLUDING 46 CFR,
CHAPTER 1, SUBCHAPTER M - TOWING VESSELS.
10. THE FEDERAL ACQUISITION REGULATION 19.102 ESTABLISHES THE SMALL
BUSINESS SIZE STANDARD FOR THIS TYPE OF WATER TRANSPORTATION
SERVICE AS NAICS “483111” WITH A SMALL BUSINESS SIZE LIMITATION OF 1,050
EMPLOYEES. PLEASE INDICATE IF BUSINESS IS A SMALL BUSINESS CONCERN.
11. RESPONSES ARE REQUESTED, VIA EMAIL, PRIOR TO 1100 HOURS, EASTERN
TIME, 27 JULY 2026. THE POINT OF CONTACT IS MATTHEW PRICE, EMAIL
MATTHEW.R.PRICE40.CIV@US.NAVY.MIL, OR TEL (564) 230-3782.
SIGNED: CHRISTOPHER TOMLIN, CONTRACTING OFFICER, MSC, N103
File details come from the government source that posted it. Updated .