SRR-SCM-2017-00217
Expression Of Interest / Technical requirements Summary
Saltstone Dry Feed Chemicals.
Savannah River Remediation, LLC
Savannah River Site Aiken, SC
1. Scope
Provide premixed material required for the continuous operation of the Saltstone facility, which will include a dry feed mixture, per specifications, and delivery to the Savannah River Site. Initial requirement tentative starting period should be in January 2019. This would be for a 12-hour processing shift seven days a week and eventually moving to 24/7/365 operating shift. There would 8 trucks a day with each truck with a capacity of 28 tons of the dry feed mixture for the 12 hour shift and increase the number of trucks for the 24 hour shifts. We would also like the supplier to have a one weeks reserve of dry feed mixture available at all times.
2. Item Requirements
2.1 Operating Conditions.
The ambient temperature range during operations will be 0o F to 110o F. The ambient pressure and humidity is atmospheric.
2.2 Dry Feed Material.
The dry feed material ratio of 45/45/10, Slag/Flyash/Cement. The Slag is a grad 100 or 120, ground, granulated blast furnace slag per ASTM C-989. The Flyash is Class FR thermally beneficiated per ASTM c-618. Portland Type II Cement per ASTM C-150.
3. Information Requested
3.1 Information Requested.
Provide documentation to indicate that your firm/team’s technical capability to perform the work scope.
3.2 Organization Experience
Demonstrate your firm/team’s organization and past experience.
3.3 Estimate/ Schedule
Please provide a Rough order of Magnitude (ROM) budget estimate and schedule.
SRR-SCM-2017-00217
4. EOI Questions
All questions should be directed to Greg Lichtenberg at (803)-952-5993 or email at greg.lichtenberg@srs.gov.
The EOI is due by Dec 31, 2017. Please submit your estimate via email to greg.lichtenberg@srs.gov.
If you do not plan to submit a response, a brief email indication your reason.
5. Procurement Reference Documents
Procurement reference documents such as standard terms and conditions, standard representations and certifications, subcontractor safety program guidance and other forms are located on the Savannah River Site Internet Homepage at:
http://www.srremediation.com/business.html