Summary

This is an Exhibit 4 Scope of Work requirements matrix for the Ohio Department of Health's Special Supplemental Nutrition Program for Women, Infants and Children (WIC) Management Information System (MIS) Provider RFP. The document establishes comprehensive functional and technical requirements that offerors must address across thirteen major categories: project staffing and management, system design and development, new MIS requirements, system development, system configuration, data migration and conversion, training, testing, pilot implementation, statewide rollout, hosting, security, and disaster recovery. The scope encompasses all aspects of transitioning Ohio's WIC program from an internally managed system to a contractor-managed MIS, including participant certification, nutrition education, food benefit issuance via EBT, vendor management, financial management, caseload management, and operations management. Key deliverables include work plans, staffing plans, project schedules, change management plans, joint application design sessions, gap analyses, test plans, user acceptance testing, and comprehensive training materials. The contractor must provide a browser-based, scalable system with interfaces to the WIC EBT Processor, online nutrition education platforms, and a participant portal, with three environments (test, training, and production) operational before user acceptance testing begins.

The contractor must provide six years of cloud-hosting with three optional three-year extensions, maintaining the hosting environment throughout the contract period with stringent security, availability, and disaster recovery requirements. All data centers must be located within the contiguous United States with real-time database replication to a disaster recovery site capable of resuming operations within one business hour. The contractor bears sole liability for data breaches and must notify the agency within two hours of any security incident discovery. Security requirements include compliance with NIST 800-53 Release 5.1.1, annual independent security assessments, monthly vulnerability scans, multi-factor authentication, encryption of sensitive data in transit and at rest, and adherence to Ohio IT standards. The contractor must maintain host response times under two seconds for 99 percent of online messages, provide onsite support during the first week of pilot and rollout phases, and establish a help desk for issue reporting and resolution. Monthly status reports, weekly status meetings during implementation phases, and bi-weekly meetings during maintenance and operations phases are required, with the MIS Project Manager required to remain assigned throughout the contract term.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Exhibit 4 MIS Provider Scope of Work
Each Offeror must complete the requirements matrix contained in this Excel spreadsheet. The fields are described below. For purposes of this Exhibit 4, "Project" has the same meaning as "Work" in the RFP.

Requirement Number: Specific number assoicated with each requirement.

Priority: Identifies which functions/requirements/services are Required (R) or Optional (O).

Required (R) functions/requirements/services are items that must be provided.

Optional (O) functions/requirements/services are items that the Agency may want to exercise during the contract period. Costs for some of the optional functions/requirements/services are requested in Part 5 Cost Proposal Form.

If the functionality has been developed for another State agency, it will be available to the Agency.

Function/Requirement/Service: Description of the function/requirement/service.

Narrative Required?: The Agency would like the Offeror to provide narrative for requirements that have “Yes” documented in this column. These responses must be provided by Offerors in Exhibit 5 Required Narrative Responses.

Functionality Delivered: For each row (excluding headers), the Offeror should use an "X" to indicate how the Offeror's proposed System will deliver the Function/Requirement/Service.

OB: Delivered “Out of the box” as part of the proposed solution.

CI: Functionality can be delivered via a Configuration Item.

CS: Customized code or a separate product required to deliver functionality. If "CS" is selected, Offerors may provide a brief explanation in the field "Offeror Comments."

NS: Not supported, cannot deliver this functionality.

Effort Complexity: For each row (excluding headers), the Offeror should use an "X" to indicate the Offeror's level of effort required to deliver the Function/Requirement/Service. If the "Functionality Delivered" was answered "OB" Offerors may select "L" for Effort Complexity.

L: Low Complexity M: Medium Complexity H: High Complexity

Offeror Complies: Offerors must provide a “Yes” or “No” response in this column for each line item (excluding headers). If an Offeror is able to partially meet a requirement, the response should be "No" and a brief explanation can be provided in the next column "Offeror Comments." Yes: Indicates that this function/requirement/service exists or will be available by the time of contract execution, and the Offeror agrees to provide it under this contract. No: Indicates that the Offeror is unable to provide or does not agree to this function/requirement/service. A "No" response necessitates a comment in the Offeror Comments column. If an Offeror is able to partially meet a requirement, the response should be "No" and a brief explanation can be provided in the next column "Offeror Comments".

Offeror Comments: Information about why the Offeror will not, or may not, be able to comply must be provided in this column for all requirements where a “No” response is provided in the Offeror Complies column.

1-Project Staffing

Requirement NumberPriority R=Required
O=OptionalFunction / Requirement / ServiceNarrative Required?Functionality DeliveredEffort ComplexityOfferor Complies
Y /NOfferor Comments
OBCICSNSLMH
1--Project Staffing, Management, and Organization--------------------
1.1--Project Kickoff--------------------
1.1.1RWithin ten business days of contract execution, the Contractor must conduct a Project Kick-Off Meeting. The Project Kick-Off Meeting will be facilitated in-person, in Columbus, Ohio.No--------------
1.1.2RThe Contractor must provide electronic copies of all meeting materials three business days prior to the Project Kick-Off Meeting.No--------------
1.1.3RThe Contractor must provide meeting minutes within five business days of the Project Kick-Off Meeting.No--------------
1.1.4RThe Contractor must coordinate with the Office of Management Information Systems (OMIS) to align development and testing activities for inclusion in project planning documents.No--------------
1.2--Document Repository--------------------
1.2.1RThe Contractor must provide a document repository, such as SharePoint, throughout the contract period that is accessible to the Agency and the Contractor's project staff.No--------------
1.2.2RThe Contractor must maintain electronic copies of documents and document updates on the SharePoint site.No--------------
1.3--Project Management--------------------
1.3.1RThe Offeror must provide a draft Work Plan with the proposal. Refer to the Base RFP document, 4.B.1.h Work Plan, for details about what should be included.No--------------
1.3.1.1RAfter the Project Kick-Off Meeting, the Contractor must update the Work Plan. The Work Plan is subject to the review and approval of the Agency.No--------------
1.3.2RThe Offeror must provide a Staffing Plan with the proposal. Refer to the Base RFP document, Section 4.B.1.i Staffing Plan and Time Commitment, for details about what should be included.No
1.3.2.1RThe Contractor, after Project Kick-Off, is responsible for updating the Staffing Plan with any updates needed. The Staffing Plan is subject to the review and approval of the Agency.No
1.3.3RThe Offeror must provide a draft Project Schedule with their proposal.No--------------
1.3.3.1RAfter the Project Kick-Off Meeting, the Contractor must update the Project Schedule. The Contractor must work in collaboration with the Agency's EBT Processor to develop a schedule that will accommodate the activities that both Contractors will undertake to complete the project. The Contractor must provide updates to this Project Schedule during the planning, transition and implementation phases of this effort.No--------------
1.3.3.2RThe Project Schedule must be created in Microsoft Project and available in PDF format. The Contractor will deliver an updated version to Agency no later than ten business days after the Project Kick-Off Meeting. The Project Schedule is subject to the review and approval of the Agency.No--------------
1.3.4RThe Contractor will provide a Change Management Plan that establishes a process for assessing potential changes to the project. This plan will include the process for assessing the impact and consequences a change would have on the project and will also include the formal process for approving a change. This deliverable will be discussed at Project Kick-Off, and a timeline for its delivery will be established with ODH approval.No--------------
1.3.5RFor Deliverable reviews, the Contractor must plan for the Agency to have ten business days for initial reviews and five business days for final deliverable reviews after the Contractor has provided written responses and updates to the deliverable.
If multiple deliverables are submitted to the Agency for review simultaneously and they are greater than 15 pages in length or there are three or more deliverables delivered concurrently, the Agency will require an additional five business days for the initial deliverable review periods.No--------------
1.3.6RThe Contractor must provide monthly status reports, due on the second Thursday of the month. The Agency will provide the ODH Project Status Template that will serve as the basis of this report. The Contractor must notify the Agency in writing when the status report is delivered.
During Pilot and Rollout, the Contractor must provide metrics about defects and their resolutions/workarounds in the monthly status report. During the Maintenance and Operations phase, the Contractor must include an evaluation of the contractual SLAs in the monthly status report.No--------------
1.4--Project Meetings, Staffing & Communications--------------------
1.4.1RDuring the planning, transition and implementation phases of the project, the Contractor must facilitate weekly Status Meetings with the Agency and other Contractor staff. The Contractor must deliver agendas two business days in advance of the meetings and meeting minutes no later than two business days after the meeting. Meeting topics will include at a minimum:

1. Status of scheduled tasks;

2. Concerns that may impact scope, budget, timelines, or quality;

3. Status of action items;

4. Tasks accomplished in the previous timeframe; and

5. Tasks expected within the next two weeks.

Meeting minutes will include a summary of discussions, decisions, and action items.No--------------
1.4.2RDuring the Maintenance and Operations (M&O) phase of the project, the Contractor must facilitate, at a minimum, bi-weekly (i.e., every other week) Status Meetings with the Agency. The Agency and Contractor may have additional meeting needs that must be scheduled on an ad hoc basis when needed. The Contractor must deliver Status Meeting agendas two business days prior to the meeting. Meeting topics will include at a minimum:

Status of scheduled tasks;

Concerns that may impact scope, budget, timelines, or quality;

Status of action items;

Tasks accomplished in the previous timeframe; and Tasks expected within the next two weeks.

Meeting minutes will include a summary of discussions, decisions, and action items.No--------------
1.4.3RThe Contractor must have the appropriate number and mix of project staff at all times to ensure the successful transition and operation of the MIS. The Offeror must define the number of staff, their roles, and responsibilities for each phase of the project. Key personnel from the Offeror subject to the approval of the Agency are:

1. Project Manager

2. Business Analyst Lead

3. Development Team Lead

4. Database Administrator

5. Data Migration Lead

6. Testing Lead

7. Training Lead

8. Technical WriterYes--------------
1.4.4RThe Offeror must provide the resume for the designated MIS Project Manager, meeting the following criteria:

1. Bachelor’s Degree or five years of Project Management experience.

2. Minimum of three years of Project Manager experience.

3. Five years of work experience.

4. Experience supporting at least two WIC MIS projects, including the implementation of at least one EBT system.

5. PMP Certification is preferred but not required.Yes--------------
1.4.5RThe Agency may conduct interviews of key personnel prior to contract award in order to determine acceptability.No--------------
1.4.6RIf any proposed key personnel are not currently employed by the Contractor, a letter of intent to accept employment must be included with the RFP response.No--------------
1.4.7RThe MIS Project Manager must start work on the project no later than five business days after the effective date of the contract and will continue through the Agency’s written acceptance of the successful transition from the current MIS to new MIS and into the Operations Phase.No--------------
1.4.8RThe Agency must continue to have an assigned MIS Project Manager for the entire length of the Operations Phase. During the Operations Phase, the MIS Project Manager must maintain regular and frequent contact with the Agency and designated staff members.No--------------
1.4.9RThe Contractor must return general project calls and emails from the Agency or any designated contactor within one business day.No--------------
1.4.10RThe Contractor must provide notification, whenever possible in advance, when the Agency's normal point of contact is expected to be unavailable. The Contractor must give the Agency contact information for an alternative or back-up point of contact.No--------------

2-System Design Dev

Requirement NumberPriority R=Required O=OptionalFunction / Requirement / ServiceNarrative Required?Functionality DeliveredEffort ComplexityOfferor Complies
Y /NOfferor Comments
OBCICSNSLMH
2--System Design and Development--------------------
2.1--Joint Application Design (JAD) Sessions--------------------
2.1.1RThe Contractor must conduct Joint Application Design (JAD) sessions to discuss conversion from the current WIC Ecosystem to the new MIS and the Agency's configuration and functional requirements.No--------------
2.1.2RThe Contractor must provide the agenda for the JAD sessions at least three business days in advance to allow for resource scheduling. These sessions must be onsite in Columbus, Ohio.No--------------
2.1.3RThe Contractor must document the decisions, choices, and plans in meeting notes due within five business days following the meetings.No--------------
2.1.4RThe Contractor must obtain and assess the requirements of the Agency's future WIC EBT Processor's Interface Control Document (ICD).No--------------
2.2--System Walkthrough--------------------
2.2.1RThe Contractor must provide a final configuration session and present a comprehensive system design walkthrough to allow the Agency to view their decisions in relation to each other.No--------------
2.3--Interface Design--------------------
2.3.1RThe new MIS must include all mandatory functions and fields listed in the WUMEI 2022.No--------------
2.3.2RThe Contractor must participate in Requirements Validation Sessions with the Agency's future WIC EBT Processor.No--------------
2.3.3RThe Contractor must collect and assess the requirements for the following interfaces:

1. Future WIC EBT Processor

2. Online WIC Nutrition Education

3. Participant Portal/Mobile ApplicationNo--------------
2.3.5RData documentation for the new MIS must include comprehensive metadata for any fields visible to end users or interfaces.No--------------
2.3.6RThe Contractor must make the aggregate data (as specified in reporting requirements) available for export or direct access on a daily basis in a format that can be ingested onto the State's data and analytics platform. After an initial complete data transfer, daily transfers may be only for changes made since the last transfer.No--------------
2.3.7RThe new MIS must have an open architecture allowing it to interface through generic, mature APIs with other relevant systems, and the Contractor must provide all relevant documentation.No--------------
2.4--Gap Analysis--------------------
2.4.1RThe Contractor must collect requested changes during the JAD sessions and include an estimate of effort for them in a Gap Analysis for the Agency's consideration.No--------------
2.4.2RDuring JAD sessions the Contractor must evaluate new MIS configuration needs in collaboration with the Agency to identify program requirements, terminology, policies, and Agency preferences that will impact system configuration. These configuration needs should be included in the Gap Analysis. Items to be evaluated include but are not limited to:

1. Field labels

2. Food packages

3. Ohio WIC Projects

4. Security roles for selected WIC Project staff and state office

5. Nutrition assessment

6. Breastfeeding assessment

7. Automation used to assign risk codes and apply referrals to healthcare providers and services

8. WIC Vendor information

9. Program financials

10. Reporting

11. Prompts for system pop-upsNo--------------
2.4.3RThe Gap Analysis must include proposed responses to identified system functionality gaps, including enhancements, data conversion, and changes to clinic flow and possibly process changes.No--------------

3-Req New MIS

Requirement NumberPriority R=Required
O=OptionalFunction / Requirement / ServiceNarrative Required?Functionality DeliveredEffort ComplexityOfferor Complies
Y /NOfferor Comments
OBCICSNSLMH
3--Requirements for the New MIS--------------------
3.1--Participant Certification--------------------
3.1.1--Create and Locate Data Records--------------------
3.1.1.1RThe new MIS must be able to add and/or restrict search options for participant records.No
3.1.1.2RThe new MIS must be able to create a new applicant record.No
3.1.1.3RThe new MIS must contain mandatory fields when creating a new household.No
3.1.1.4RThe new MIS must allow users to enter information at the household level to prevent duplicating documentation.No
3.1.1.5RThe new MIS must be able to seamlessly add additional members to existing household.No
3.1.1.6RThe new MIS must have a method for adding foster children to the foster parent account.No
3.1.1.7RThe new MIS must have a method to transfer the participant to a different household.No
3.1.1.8RThe new MIS must have the functionality to search for an applicant/participant record at the WIC Project, Clinic, and State levels.No
3.1.1.9RThe new MIS must provide wild card capabilities for the search function, as well as other user-friendly search options, such as partial names, county, dates, location of birth, sex, etc. (e.g.,: MI% to find Mike and Michael, etc.).No
3.1.1.10RThe new MIS must be able to sort all columns of search results that are contained within a data table (such as by date, last name, etc.).No
3.1.1.11RIn the new MIS, the search results must indicate the total number of records found in a search with the ability to export or copy the search results into a different program.No
3.1.1.12RThe new MIS must maintain the ability to cancel a long search for records to maintain high database performance.No
3.1.2--Manage Application Process--------------------
3.1.2.1RThe new MIS must maintain basic information on the applicant/participant.No
3.1.2.2RThe new MIS must be able to enter application information such as income at the household level to prevent duplicate entries.No
3.1.2.3RThe new MIS must be able to screen the applicant for prior enrollment.No
3.1.2.4RThe new MIS must determine adjunct or automatic income eligibility.No
3.1.2.5RThe new MIS must determine documented income eligibility.No
3.1.2.6RThe new MIS must maintain a waiting list.No
3.1.2.7RThe new MIS must include notices of participant-specific ineligibility that can be electronically generated and printed or emailed to participants.No
3.1.2.8RThe new MIS must be able to attach documents to the participant record.No
3.1.2.9RThe new MIS must be able to record proof of address, income, and other screening items that apply to the entire household at the household level rather than the participant level.No
3.1.2.10RThe new MIS must allow for a previously terminated participant record to be reinstated if still within a valid certification period.No
3.1.3--Determine Nutrition Risk of Applicant--------------------
3.1.3.1RThe new MIS must maintain applicant nutrition and health characteristics.No
3.1.3.2RThe new MIS must contain a health questionnaire that targets risk code assignment and information needed by a Health Professional for the care plan.No
3.1.3.3RThe new MIS must have breastfeeding questions incorporated into the health questionnaire.No
3.1.3.4RThe new MIS must capture and document anthropometric measurements.No
3.1.3.5RThe new MIS must be able to record anthropometric data.No
3.1.3.6RThe new MIS must be able to bypass anthropometric measurement entry.No
3.1.3.7RThe new MIS must have the ability to indicate the reason for missing or bypassed anthropometric measurement entry.No
3.1.3.8RThe new MIS must have the ability to indicate the reason for potential inaccurate entry of anthropometrics.No
3.1.3.9RThe new MIS must be able to record the source for anthropometrics.No
3.1.3.10RThe new MIS must be able to calculate body mass index and produce automated growth charts.No
3.1.3.11RThe new MIS must integrate growth charts within the participant screen, either as an overlay or a link that opens without navigating away from the participant screen.No
3.1.3.12RThe new MIS must be able to record bloodwork data.No
3.1.3.13RThe new MIS must be able to bypass bloodwork data entry.No
3.1.3.14RThe new MIS must be able to indicate the reason for missing or bypassed bloodwork data entry.No
3.1.3.15OThe new MIS must provide a drop-down field to capture the reason for an inaccurate bloodwork capture.No
3.1.3.16OThe new MIS must be able to enter the source for bloodwork.No
3.1.3.17RThe new MIS must be able to determine nutrition risk and calculate priority.No
3.1.3.18RThe new MIS must be able to automatically assign risk codes based on health assessment data.No
3.1.3.19RThe new MIS must be able to assign high risk status to certain risk codes.No
3.1.3.20RThe new MIS must be able to allow Registered Dietitians to sign off on participants assigned a high risk status.No
3.1.3.21RThe new MIS must maintain a history of assigned risk codes.No
3.1.3.22RThe new MIS must allow for manual assignment of risk codes that are not captured through a nutrition interview.No
3.1.3.23RThe new MIS must be able to deactivate a risk code.No
3.1.4--Complete Certification--------------------
3.1.4.1RThe new MIS must be able to assess an applicant for temporary certification/presumptive eligibility requirements and documentation status.No
3.1.4.2RThe new MIS must be able to certify the applicant.No
3.1.4.3RThe new MIS must allow for the legally-required separation of duties as defined by the state of Ohio.No
3.1.4.4RThe new MIS must maintain proxy information.No
3.1.5--Prescribe Food Package--------------------
3.1.5.1RThe new MIS must be able to select and tailor food prescriptions.No
3.1.5.2RThe new MIS must be able to generate pre-populated food packages and allow for the tailoring of each individual food within a package.No
3.1.5.3RThe new MIS must be able to assign a special formula.No
3.1.5.4RThe new MIS must document reason for deviations from the standard food package.No
3.1.5.5RThe new MIS must be able to make changes to the quantity of individual food items within each food category.No
3.1.5.6RThe new MIS must be able to forecast food prescriptions for an entire certification period.No
3.1.5.7RThe new MIS must be able to change food prescriptions.No
3.1.5.8RThe new MIS must be able to assign/add formula to the food prescription.No
3.1.5.9RThe new MIS must be able to select contract formula to be added to the food prescription.No
3.1.5.10RThe new MIS must be able to add non-contract (prescription/therapeutic) formula to the food prescription.No
3.1.5.11RThe new MIS must be able to capture prescription information for non-contract formula.No
3.1.5.12RThe new MIS must have role-based permissions to approve the prescription for non-contract formula.No
3.1.6--Process Participant Changes and Transfers--------------------
3.1.6.1RThe new MIS must be able to change family/household grouping.No
3.1.6.2RThe new MIS must be able to change participation status and/or category.No
3.1.6.3RThe new MIS must be able to terminate certification and document the termination reason(s).No
3.1.6.4RThe new MIS must process in-state transfers and produce the verification of certification (VOC).No
3.1.6.5RThe new MIS must process out of state transfers and produce the VOC.No
3.1.6.6RThe new MIS must be able to transfer the participant to a new clinic.No
3.1.6.7RThe new MIS must be able to automatically update the participant category for the breastfeeding dyad, with WIC staff oversight, if one part of the dyad is updated.No
3.2--Nutrition Education, Health Surveillance, and Referrals--------------------
3.2.1--Maintain Nutrition Education Data--------------------
3.2.1.1RThe new MIS must be able to create the participant care plan.No
3.2.1.2RThe new MIS must have a defined section for Health Professionals to document the nutrition assessment and care plan.No
3.2.1.3RThe new MIS must have a defined section to document participant goal(s).No
3.2.1.4RThe new MIS must have a defined section to document follow-up on the previous care plan and goal(s).No
3.2.1.5RThe new MIS must track nutrition education contacts and topics covered.No
3.2.1.6RThe new MIS must automatically transfer the completion of online nutrition education data from an outside platform such as WICHealth.org to the new MIS.No
3.2.1.7RThe new MIS must have a defined section for Health Professional documentation.No
3.2.1.8RThe new MIS must have fields for Health Professional documentation that can be constructed or is available to be consistent with the Nutrition Care Process.No
3.2.1.9RThe new MIS must have a section for the Health Professional to document follow-up notes.No
3.2.2--Perform Participant Referrals--------------------
3.2.2.1RThe new MIS must track incoming and outgoing referrals.No
3.2.2.2OThe new MIS must track referral participant engagement, including whether the referral was accepted, the date of the first contact, and any subsequent follow-up actions.No
3.2.2.3RThe new MIS must be able to record referrals at the participant or household level.No
3.2.2.4OThe new MIS must have the ability to text or email referral information to the participant.No
3.2.2.5RThe new MIS must maintain a database of referrals.No
3.3--Breastfeeding--------------------
3.3.1RThe new MIS must support the ongoing collection and modification of participant-level breastfeeding data to ensure the information remains current. This data includes, but is not limited to:

1. Initiation - whether breastfeeding was started and the initiation date

2. Duration - whether breastfeeding is ongoing, and the end date if applicable

3. Breastfeeding amount – whether the infant is fully or partially breastfeeding or receiving formula beyond the maximum monthly allowance for partially breastfeeding infants based on FNS food package definitions, including when supplementation began and what was introduced.

For reference: https://www.ecfr.gov/current/title-7/section-246.10No
3.3.2--Breastfeeding Referrals--------------------
3.3.2.1RThe new MIS must generate a referral to the Breastfeeding Peer.No
3.3.2.2RThe new MIS must generate a referral to the Certified Lactation Counselor (CLC) or International Board Certified Lactation Consultant (IBCLC).No
3.3.2.3RThe new MIS must incorporate criteria for the CLC or IBCLC referral such as high risk criteria.No
3.3.3--Breastfeeding Support--------------------
3.3.3.1RThe new MIS must have breast pump follow-up tracking.No
3.3.3.2RThe new MIS must maintain the log of Breastfeeding Peer contacts.No
3.3.3.3OThe new MIS must allow local WIC director/supervisor ability to assign the Breastfeeding Peer and be able to turn this feature off/on for each WIC Project / Clinic (by state system admin).No
3.3.3.4OThe new MIS must be able to update the Breastfeeding Peer log once a contact is completed.No
3.3.3.5OThe new MIS must have a designated area for peers to document their contacts. This documentation area should include but is not limited to:

1. Name

2. Contact date

3. Type of contact (phone, text, in-person, etc.)

4. Subject

5. Notes

6. Pump issued

7. Referral

8. Follow up

9. Classes attended

10. Resources provided

11. Expected Delivery Date

12. Delivery date

13. Hand expression education provided

14. Breastfeeding status

15. Risk statusNo
3.4--Food Management--------------------
3.4.1--Maintain Food Categories/Subcategories--------------------
3.4.1.1RThe new MIS must maintain the Food Category/Subcategory Table.No
3.4.2--Maintain Foods and Food Package Information--------------------
3.4.2.1RThe new MIS must be able to establish and maintain approved foods.No
3.4.2.2RThe new MIS must be able to set up and maintain food package data.No
3.4.2.3RThe new MIS must contain food package data that allows the maximum amount of food categories and allows the user to adjust food substitutions within these categories.No
3.4.2.4RThe new MIS must allow for food package data to be updated by the State Office (for USDA policy changes, etc.), and automatically update the food item(s) within all base/standard food packages and assigned participant food packages, ensuring no manual intervention is needed from Staff.No
3.4.2.5RThe new MIS must allow for the food package to be assigned and categorized by age (e.g.,: 6-9 month package, 9-12 month package; 12-24 month package, 24-60 month package).No
3.4.2.6RThe new MIS must be able to determine the food package proration schedule.No
3.4.3--Maintain UPC Database and Food Item Maximum Allowed Amounts--------------------
3.4.3.1RThe new MIS must maintain the UPC Database for WIC Authorized Foods.No
3.4.3.2RThe new MIS must allow for the bulk upload of UPC codes.No
3.4.3.3RThe new MIS must be able to update the UPC code information (e.g. product size).No
3.4.3.4RThe new MIS must be able to export UPC codes as an Excel file.No
3.4.3.5RThe new MIS must be able to establish food item maximum allowed amounts.No
3.5--Food Benefit Issuance--------------------
3.5.1--Issue Benefits via EBT--------------------
3.5.1.1RThe new MIS must be able to establish the EBT account.No
3.5.1.2RThe new MIS must be able to add participant(s) to an account.No
3.5.1.3RThe new MIS must be able to issue electronic benefits.No
3.5.1.4RThe new MIS must be able to stop food benefit issuance for a critical reason such as, but not limited to, participant changed household, custody, etc.No
3.5.1.5RThe new MIS must be able to preview benefits prior to issuance for accuracy.No
3.5.1.6RThe new MIS must be able to issue electronic benefits in increments of 1, 2, and 3 months.No
3.5.1.7RThe new MIS must issue benefits to select members of the household (to be applied to the card's household balance).No
3.5.1.8RThe new MIS must issue benefits to the entire household at the same time.No
3.5.1.9RThe new MIS must be able to issue the EBT Card.No
3.5.1.10RThe new MIS must be able to obtain the account balance.No
3.5.1.11RThe new MIS must be able to update EBT account information.No
3.5.1.12RThe new MIS must be able to remove participant(s) from an account.No
3.5.1.13RThe new MIS must process changes to electronic benefits (benefit adjustments, voids, and reissuance).No
3.5.1.14RThe new MIS must be able to add formula or increase formula during the current benefit month.No
3.5.1.15RThe new MIS must be able to change the current month's benefits if no benefits have been redeemed.No
3.5.1.16RThe new MIS must be able to make changes to a single food category if needed, such as switching from 1% milk to 2% milk.No
3.5.1.17RThe new MIS must be able to change the current month's benefits if some benefits have been redeemed.No
3.5.1.18RThe new MIS must be able to add/issue a benefit that was not included in the original issuance without having to void and reissue, such as adding eggs after someone said they didn't want eggs and changed their mind.No
3.5.1.19RThe new MIS must be able to void benefits.No
3.5.1.20RThe new MIS must be able to change a future month's benefits.No
3.5.1.21RThe new MIS must be able to automatically update the food package for the breastfeeding dyad, with oversight from WIC staff who will make additional benefit adjustments as needed, if one part of the dyad is updated.No
3.5.1.22RThe new MIS must process changes to the EBT card (status changes, card replacements, etc.).No
3.7--Financial Management--------------------
3.7.1--Monitor Program Expenditures--------------------
3.7.1.1OThe new MIS must collect and report on Nutrition Services and Administration expenditures.No
3.7.1.2OThe new MIS must collect and report on food expenditures.No
3.7.1.3OThe new MIS must perform financial modeling.No
3.7.1.4OThe new MIS must report on cash flow.No
3.7.2--Process Manufacturer Rebates--------------------
3.7.2.1RThe new MIS must be able to estimate total annual rebates.No
3.7.2.2RThe new MIS must be able to calculate rebates and prepare invoices by first use date and by calendar month.No
3.7.2.3RThe new MIS must be able to export the rebate invoice to Excel.No
3.7.2.4RThe new MIS must be able to export the rebate invoice to other file types (e.g., Word, PDF, etc.).No
3.7.2.5RThe new MIS must be able to edit upcoming rebates.No
3.7.2.6RThe new MIS must be able to pull rebate reports by UPC.No
3.7.2.7RThe new MIS must be able to report rebate collections.No
3.8--Caseload Management--------------------
3.8.1--Capture and Maintain Caseload Data--------------------
3.8.1.1OThe new MIS must be able to capture data on the potentially eligible population.No
3.8.1.2RThe new MIS must be able to capture historical participation data.No
3.8.2--Allocate Caseload--------------------
3.8.2.1RThe new MIS must be able to determine maximum state caseload.No
3.8.2.2RThe new MIS must be able to prepare WIC Project caseload allocation estimates.No
3.8.2.3RThe new MIS must be able to record caseload allocations.No
3.8.3--Monitor Caseload--------------------
3.8.3.1RThe new MIS must be able to track actual participation.No
3.8.3.2RThe new MIS must be able to track participation at the State level.No
3.8.3.3RThe new MIS must be able to track participation at the WIC Project and clinic level.No
3.8.3.4RThe new MIS must be able to track and conduct caseload reallocations.No
3.9--Operations Management--------------------
3.9.1--Monitor Administrative Operations--------------------
3.9.1.1RThe new MIS must be able to maintain information on WIC Projects and clinics.No
3.9.1.2RThe new MIS must be able to analyze WIC Project operations.No
3.9.1.3RThe new MIS must be able to support clinic/patient flow monitoring.No
3.9.2--Manage Participant Outreach--------------------
3.9.2.1OThe new MIS must be able to maintain the outreach list for WIC Projects.No
3.9.2.2OThe new MIS must be able to track outreach campaign activities.No
3.9.3--Monitor Customer Service--------------------
3.9.3.1RThe new MIS must be able to document complaints.No
3.9.3.2OThe new MIS must be able to track call or complaint outcomes.No
3.9.5--Maintain Inventory--------------------
3.9.5.1RThe new MIS must maintain inventory of serialized items.No
3.9.5.2RThe new MIS must maintain the breast pump inventory log.No
3.9.5.3RThe new MIS must track breast pump issuance.No
3.9.5.4RThe new MIS must track breast pump return.No
3.9.5.5RThe new MIS must maintain inventory of non-serialized items.No
3.9.6--Monitor Program Integrity--------------------
3.9.6.1RThe new MIS must monitor participant integrity, such as reporting on dual participant checks and their outcomes, or participants shopping at stores not close to their address.No
3.9.6.2RThe new MIS must monitor clinic integrity, such as reporting on conflicts of interest, issuance outside of business hours, or the number of participants with no reported income.No
3.9.6.3RThe new MIS must maintain configurable audit records of each electronic file transfer execution in accordance with records retention schedules or other State and Federal requirements.No
3.9.6.4RThe new MIS must be configured to allocate sufficient audit log storage capacity to record all necessary auditable events.No
3.9.6.5RThe new MIS must protect audit information and audit tools from unauthorized access, modification, and deletion.No
3.9.6.6RThe new MIS must track participant sanctions.No
3.9.6.7RThe new MIS must track administrative hearings.No
3.10--Vendor Management--------------------
3.10.1--Manage Vendor Peer Groups--------------------
3.10.1.1RThe new MIS must establish vendor peer groups.No
3.10.1.2RThe new MIS must update vendor peer group and/or vendor peer group criteria.No
3.10.1.3RThe new MIS must provide the ability to assess the effectiveness of the vendor peer groupings and competitive price criteria.No
3.10.1.4RThe new MIS must set competitive pricing criteria (or not-to-exceed amounts) by subcategory or UPC.No
3.10.2--Create and Locate Data Records--------------------
3.10.2.1RThe new MIS must be able to create a new applicant record.No
3.10.2.2RThe new MIS must be able to search for the vendor record (current).No
3.10.2.3RThe new MIS must be able to search for vendor records (historical data/not authorized).No
3.10.2.4RThe new MIS must be able to update field titles in the vendor management module.No
3.10.3--Maintain Vendor Authorizations--------------------
3.10.3.1RThe new MIS must maintain vendor application data.No
3.10.3.2RThe new MIS must track the vendor authorization process.No
3.10.3.3OThe new MIS must initiate and obtain internal signatures required for vendor authorization electronically.No
3.10.3.4RThe new MIS must be able to record vendor denial for authorization.No
3.10.3.5RThe new MIS must be able to record the reason for authorization denial.No
3.10.3.6RThe new MIS must maintain vendor price survey data.No
3.10.3.7RThe new MIS must be able to authorize vendors.No
3.10.3.8RThe new MIS must be able to document the preauthorization site visit date.No
3.10.3.9RThe new MIS must be able to document preauthorization site visit results.No
3.10.3.10RThe new MIS must be able to authorize and reauthorize vendor outlets by corporate owner and by region.No
3.10.3.11RThe new MIS must maintain authorized vendor data.No
3.10.3.12RThe new MIS must be able to document the 6-month assessment after authorization.No
3.10.3.13RThe new MIS must maintain historical data for the vendor application and information for two contracting periods, or seven years, in an organized, accessible format in accordance with federal requirements.No
3.10.3.14RThe new MIS must maintain the list of vendor outlets.No
3.10.3.15RThe new MIS must have functions for Agency state staff to administer the farmer/farmers market program, including:

1. The ability to authorize farmer/farmers markets.

2. The ability to create new farmer/farmers market applicant records.

3. The ability to search for the farmer/farmers market record by name, ID, peer group and expiration date.No
3.10.4--Monitor Vendor Training--------------------
3.10.4.1RThe new MIS must be able to track scheduled vendor training by type.No
3.10.4.2RThe new MIS must be able to track attendance at vendor training and any vendor technical assistance conducted.No
3.10.5--Support Vendor Communications--------------------
3.10.5.1RThe new MIS must be able to produce correspondence to vendors.No
3.10.5.2OThe new MIS must have the ability for vendors to acknowledge message receipt (e.g., checkbox).No
3.10.6--Perform Confidential High Risk Vendor Analysis--------------------
3.10.6.1RThe new MIS must be able to identify high-risk vendor peer groups by comparing vendors within similar peer groups and analyzing transaction data and inventory to detect risk indicators.No
3.10.6.2RThe new MIS must be able to determine high risk vendors (EBT environment).No
3.10.7--Track Compliance Investigations--------------------
3.10.7.1RThe new MIS must be able to record multiple compliance buys and monitoring visits under one investigation.No
3.10.7.2RThe new MIS must maintain the special investigator record for compliance buys.No
3.10.7.3RThe new MIS must maintain food benefit redemption data from compliance buys.No
3.10.7.4RThe new MIS must maintain compliance buy and investigation data.No
3.10.7.5RThe new MIS must be able to record compliance buy date.No
3.10.7.6RThe new MIS must be able to record compliance buy data.No
3.10.7.7RThe new MIS must be able to record comments related to compliance buys and investigation.No
3.10.7.8RThe new MIS must allow for documents related to compliance buys to be uploaded.No
3.10.7.9RThe new MIS must be able to track the compliance buy outcome (e.g., Not Applicable/Pass/Fail).No
3.10.7.11RThe new MIS must support inventory audits.No
3.10.7.10RThe new MIS must have a section available to document the reason for inventory audit failure.No
3.10.7.12RThe new MIS must maintain inventory audit data.No
3.10.7.13RThe new MIS must be able to record inventory audit data.No
3.10.7.14RThe new MIS must be able to record comments related to the inventory audit.No
3.10.7.15RThe new MIS must be able to track inventory audit outcome (e.g., Not Applicable/Pass/Fail).No
3.10.8--Track Routine Monitoring--------------------
3.10.8.1RThe new MIS must maintain routine monitoring data.No
3.10.8.2RThe new MIS must be able to record routine monitoring data.No
3.10.8.3RThe new MIS must have a section for comments related to routine monitoring.No
3.10.8.4RThe new MIS must allow for documents related to routine monitoring to be uploaded.No
3.10.8.5RThe new MIS must be able to track routine monitoring outcomes (e.g., Not Applicable/Pass/Fail).No
3.10.8.6RThe new MIS must have a section available to document the reason for routine monitoring failure.No
3.10.9--Monitor Sanctions and Appeals--------------------
3.10.9.1RThe new MIS must be able to manage vendor sanctions.No
3.10.9.2RThe new MIS must be able to open the vendor complaint and/or investigation.No
3.10.9.3RThe new MIS must be able to close the vendor complaint and/or investigation.No
3.10.9.4RThe new MIS must be able to monitor and track CMP payments and associate the payments with the corresponding sanction.No
3.10.9.5RThe new MIS must maintain vendor appeal data.No
3.10.10--Coordinate with Supplemental Nutrition Assistance Program (SNAP)--------------------
3.10.10.1RThe new MIS must maintain SNAP violation data.No
3.10.10.2RThe new MIS must be able to report WIC sanctions to SNAP.No
3.10.11--Vendor Portal--------------------
3.10.11.1OThe Vendor Portal must be able to support the vendor completing the application process (without being given access by the State).No
3.10.11.2OThe Vendor Portal must be able to support the vendor entering outlet information.No
3.10.11.3OThe Vendor Portal must be able to support the vendor uploading documents during the vendor application process.No
3.10.11.4OThe Vendor Portal must be able to support the vendor scheduling required WIC trainings.No
3.10.11.5OThe Vendor Portal must be able to support vendor communication with state agency staff.No
3.10.11.6OThe Vendor Portal must be able to support the vendor electronically signing documents.No
3.10.11.7OThe Vendor Portal must be able to support entering information about a pharmacy on premise, if applicable.No
3.10.11.8OThe Vendor Portal must be able to support the vendor initiating a fair hearing if authorization is denied.No
3.11--Scheduling--------------------
3.11.1--Appointment Administration--------------------
3.11.1.1RThe new MIS must be able to create and remove clinic resources (e.g., Health Professional, BF, Admin, etc.).No
3.11.1.2RThe new MIS must be able to create and remove appointment types.No
3.11.1.3RThe new MIS must be able to assign an appointment length to each appointment type.No
3.11.1.4RThe new MIS must be able to define which appointment types can be scheduled for individual providers or for different provider types.No
3.11.2--Maintain Master Calendar--------------------
3.11.2.1RThe new MIS must be able to maintain a master calendar.No
3.11.2.2RThe new MIS must be able to customize the master calendar for each individual clinic (provider types, lunch hours, working hours, etc.).No
3.11.2.3RThe new MIS must be able to update the master calendar if needed for situations where the provider will not be available, such as a call-out.No
3.11.2.4RThe new MIS must be able to add in holidays and training days into the master calendar so that no appointments can be scheduled on these days.No
3.11.2.5RThe new MIS must have the ability in the Master Calendar for role-based scheduling rather than scheduling at the individual staff level.No
3.11.3--Manage Appointments--------------------
3.11.3.1RThe new MIS must be able to perform appointment scheduling.No
3.11.3.2RThe new MIS must be able to schedule the appointment at the group or household level.No
3.11.3.3RThe new MIS must be able to schedule multiple household members for different appointment types.No
3.11.3.4RThe new MIS must be able to schedule appointments at the individual level.No
3.11.3.5RThe new MIS must support telehealth appointment scheduling and execution, and integrate with nutrition and breastfeeding education.No
3.11.3.6RThe new MIS must be able to schedule breastfeeding or postpartum certification while the participant is actively certified as pregnant.No
3.11.3.7RThe new MIS must be able to schedule group nutrition education.No
3.11.3.8RThe new MIS must allow the participant to schedule the appointment on their own via an app, portal, or some other method.No
3.11.3.9RThe new MIS must allow the participant to cancel the appointment on their own via an app, portal, or some other method when the cancellation is 24 hours or more prior to the scheduled appointment.No
3.11.3.10RThe new MIS must have the ability to schedule different appointment methods: in person vs. telephone/remote.No
3.11.3.11RThe new MIS must be able to find the next available appointment.No
3.11.3.12RThe new MIS must be able to search for an appointment by different criteria such as appointment type, client's preferred date and time, and clinic.No
3.11.3.13RThe new MIS must perform mass rescheduling.No
3.11.3.14RThe new MIS must track appointment outcomes.No
3.11.3.15RThe new MIS must be able to mark an appointment as kept.No
3.11.3.16RThe new MIS must be able to automatically mark an appointment as missed if it was not kept on the day that it was scheduled.No
3.11.3.17RThe new MIS must be able to automatically mark an appointment re-scheduled when the date/time is changed.No
3.11.3.18RThe new MIS must be able to maintain appointment outcomes in the participant record.No
3.11.4--Generate Appointment Notices--------------------
3.11.4.1RThe new MIS must be able to generate appointment notices.No
3.11.4.2RThe new MIS must be able to use the preferred contact method to send appointment reminders.No
3.11.4.3RThe new MIS must allow the participant to select the preferred contact method for an appointment reminder.No
3.12--System Administration--------------------
3.12.1--Maintain System Data Tables--------------------
3.12.1.1RThe new MIS must maintain system code table data.No
3.12.2--Administer System Security--------------------