SPS.RA - ElCapPh3 RecArea Special Project Specs 0418.pdf

PDF 5 MB Posted

Attached to
GAOA - El Cap Recreation Area Improvements: Campground and Day Use Area
Solicitation number
1240BJ24R0012
Issued by

About this file

This document is a 100% construction solicitation for the USDA Forest Service's El Capitan Recreation Area Improvements project. The key details are:

The solicitation is for a Base Bid and three Option Items for construction of a new day use recreation area, campground, and repairs to an adjacent USFS dock facility. The Base Bid includes site preparation, earthwork, a timber shelter, parking area, trails, signs, site furnishings, and a vault toilet. Option 1 is not being exercised. Option 2 includes a 3-site campground. Option 3 covers dock repairs like pile repair, float and flotation replacement, and new dock components. The project is located on the Tongass National Forest in a remote area on Prince of Wales Island, Alaska. The construction value is between $1-5 million, and the period of performance is June 2024 to June 2025. The solicitation is set aside for 100% small businesses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture

Forest Service

(R-10) Alaska Region

Tongass National Forest

Thorne Bay Ranger District

GAOA EL CAP RECREATION AREA:

CAMPGROUND AND DAY USE AREA

IMPROVEMENTS

100% Technical Specifications

February 9, 2024

GAOA El Cap Recreation Area: 100% Construction Documents 2024-02-09 Campground & Day Use Area Improvements

TABLE OF CONTENTS TOC - 1

TABLE OF CONTENTS

Section No. Section Title Page No.

01 10 00 Summary of Work 1

01 14 13 Site Access, Use and Storage 3

01 22 00 Measurement and Payment 10

01 33 00 Submittals 25

01 42 00 References and Definitions 32

01 43 00 Quality Control 36

01 53 00 Protection and Restoration of Existing Facilities 41

01 56 00 Temporary Environmental Control 43

01 56 10 Archaeological Protection 53

01 57 00 Erosion Control 55

01 71 13 Mobilization 60

01 74 23 Final Clean-Up and Site Restoration 61

01 77 00 Project Close Out 63

02 41 00 Demolition, Removal, Repair, and Reinstall of Site Features 66

02 72 00 Construction Surveying 69

03 20 00 Concrete Reinforcing 71

03 30 00 Cast-In-Place Concrete 75

03 31 00 Concrete Steps 94

06 10 00 Rough Carpentry 98

06 13 00 Heavy Timber Construction 106

06 15 33 Wood Decking 111

06 16 00 Sheathing 115

09 93 00 Paints, Stains and Transparent Finishes 119

10 14 00 Signs 121

13 12 10 Shelter Construction 127

13 21 10 Vault Toilet 135

31 00 00 Earthwork 138

31 10 00 Clearing and Grubbing 145

31 20 00 Excavation and Embankment 147

31 37 00 Riprap 151

31 50 00 Trenching 153

32 11 23 Base Course and Wear Course 159

32 15 00 Aggregate Trail 162

32 29 50 Site Revegetation 168

33 32 00 Site Furnishings 173

33 41 00 Storm Sewer Pipe 177

N.I.C.N.I.C.

SITE ACCESS, USE AND STORAGE 01 14 13 - 1

SECTION 01 14 13 � SITE ACCESS, USE AND STORAGE

PART 1 - GENERAL

1.1 CONTRACTOR USE OF PROJECT SITE

A. The Contractor�s use of the project site shall include construction operations and storage of materials, and fabrication of facilities, only within limit of work identified on the Drawings or as approved by the CO.

B. The Contractor shall secure the site from public use during all staging and construction operations. No public access shall be allowed during demolition operations, or when construction hazards exist. Provide to the CO for approval all methods and materials for securing the project site from the public prior to beginning Work.

C. Contractor shall schedule Work so that public access can be allowed year-round between USFS public float and dock, Forest Service Road 15 and the El Capitan Cave trailhead.

Coordinate any closures with CO.

D. The Contractor shall secure the site during seasonal (winter) shut down. Obtain CO approval of site conditions, securing of site, and allowed visitor access prior to Contractor leaving the site including any other periods when the Contractor leaves the site for more than a week (7 days) period. Before leaving the project area, remove from the work area and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Leave the work area in a clean, neat, and orderly condition satisfactory to the CO.

E. It is the Contractor�s responsibility to secure the site, materials, tools, equipment, and the Work when not on site.

1.2 GOVERNMENT USE OF THE PROJECT SITE

A. The Government shall be allowed access to the project site during construction. The Contractor shall cooperate and coordinate with the Government to facilitate safe access while minimizing interference with Contractor�s activities.

B. Use and access shall be maintained to the USFS float and dock system with access to Forest Service Road 15 at all times, unless approved by CO. Water piping and available fresh water via piping from recreation area to the USFS float and dock shall be maintained through duration of Work and loss of service minimized, as approved by CO.

1.3 WORK BY OTHERS IN THE AREA

A. The Government anticipates Work by Others in or adjacent to the Area. Other Contractors, including Contractors under contract by an agency other than the

SITE ACCESS, USE AND STORAGE 01 14 13 - 2

Government, maybe working at or near the site, however the extents of their Work and scheduling are unknown. Coordinate and cooperate with other Contractors and the Government to the full extent practicable. Immediately notify the CO of instances where conflicting Work or schedules may interfere with the Work. Other potential Work by Others in the area may include, and is not limited to:

1. Construction of the El Capitan public use cabin and site improvements to the immediate east of the Area.

2. Use of the Government log transfer facility (LTF), ¼ mile to the east on NF-15 and related haul roads by a State-contracted logging Contractor.

1.4 SUBMITTALS

A. Submit the following items for approval a minimum of 5 calendar days prior to the Pre- Construction conference. All plans shall be for the duration of the project.

1. Site Security Plan: Including but not limited to, securing the site from the public, bears and other wildlife, minimizing impacts to existing wildlife and karst topography, and safety protocol for human and wildlife interactions.

2. Site Usage and Operations Plan: Including but not limited to, site access, types of equipment, use areas, and travel routes, equipment storage, hazardous materials storage, power generation, laydown and materials storage, helicopter operating areas (if required), shop facilities, construction operations within sensitive areas, protection measures for sensitive areas, areas to be protected, and timing of all operations and use areas.

3. Camp Plan: Including but not limited to location and type of crew camp (field camp), facilities to be used, cooking facilities and storage, sanitation and water, and on-site power generation. See Section 01 56 00 Temporary Environmental Control, 1.12 Use of Premises, F.

4. Quarry Development Plan (if using USFS managed quarry on FS Road 15 (FSR-15), adjacent to site): To access royalty-free materials in this quarry, a quarry development plan shall be developed to meet USFS standards in conjunction with the CO and the Thorne Bay Ranger District. The Contractor shall contact the CO, Ranger District and USFS Heritage Department regarding the quarry and developing the quarry plan.

5. Invasive Species Management Plan: Measures to ensure that invasive species contamination does not occur from equipment, materials, and tools used during construction.

6. Health and Safety Plan: Shall address safety of the public and contractor personnel, and protection of improvements. The Safety Plan shall comply with and reference all applicable OSHA Construction and Workplace requirements.

7. Site Restoration Plan: Including but not limited to, the clean-up and restoration of all areas impacted by construction operations and returning to a condition equal to or better than prior to construction activities. This includes any impacts to roads, facilities, and existing and adjacent recreation facilities.

B. The CO will review submittals within 14 calendar days then either approve plans or require changes. If required for approval, modify the submittals within 5 calendar days of receiving comments from the Government.

SITE ACCESS, USE AND STORAGE 01 14 13 - 3

C. The approved plans become part of the project. Both must be signed by the Contractor and the Government. A copy must be kept on site by the Contractor.

1.5 SECURING OF FACILITIES (SITE SECURITY PLAN)

A. Existing recreation facilities and areas not open to the public within the Project Limits shall be secured during performance of the Work for the protection and safety of the public. All closed routes shall be signed, and securely barricaded. Provide adequate signage with clearly-lettered, professional-appearing signs at all roads, docks and floats, and access points that can be read at a distance of 100 feet. Coordinate and receive approval from the CO for securing the site from the public in the form of a Site Security Plan.

B. The Contractor shall take all necessary precautions for the protection of the Work and the safety of the public. All signs, signals, and barricades shall conform to the requirements of Subpart G, Part 1926, of the OSHA Safety and Health Standards for Construction.

1.6 CONTRACTOR'S ACCESS, WORK AND STORAGE AREAS (SITE USAGE AND

OPERATIONS PLAN)

A. Coordinate and receive approval for access to the Project and storage of materials with the CO prior to beginning Work in the form of the Site Usage and Operations Plan. Minimize impacts and damage to the existing natural environment (BMP 12.8; 12.9; National BMP Road-9; Fac-2).

B. Water access to the site is available at the USFS El Cap dock and float facility. Coordinate use of the area with the CO and as submitted in Site Usage and Operations Plan.

C. Limit access, work and storage to areas as indicated on the Drawings or as approved by the CO. Make provisions to minimize disturbance within these areas including, but not limited to, the use of mats, boards, cribbing, and other materials and techniques that minimize damage to existing recreation facilities and the natural environment, including existing grade, soils and vegetation and tree roots. Should the Contractor require additional area(s) for work or storage, these areas need to be identified on the Site Usage and Operations Plan for CO approval prior to mobilization, and supported by reasoning of need and mitigation. The request will not necessarily be granted and will be made by the CO.

D. Coordinate all Work within Site Usage and Operations Plan to minimize impacts to existing vegetation to remain, the adjacent marine environment, and wildlife in the area.

E. For land-based motorized equipment, use appropriately scaled/sized excavators, track haulers and other equipment for work that minimize disturbance to the existing landscape, roads, facilities, and existing recreation facilities. Describe the type and size of equipment, how the equipment will be used, what mitigation measures will be

SITE ACCESS, USE AND STORAGE 01 14 13 - 4

followed to minimize adverse effects, how the equipment will be moved to and from the work areas, and other considerations in the Site Usage and Operations Plan.

F. Contractors are cautioned that the existing Forest Service Road 15 (FSR-15) that accesses the Project and roadways connecting to FSR-15 are single lane gravel roads. Construction equipment and materials may subject the roadway to weight loads it is not designed to support. This is especially critical during periods of excessive moisture. This may require appropriate selection and scheduling of equipment and materials to minimize impacts to roadways and adjacent facilities. Any roadway damage resulting from operations will be corrected by the Contractor at Contractor's expense.

G. Replace petroleum-based hydraulic fluid in all heavy equipment and bar oil in chainsaws with vegetable-based oil (biobased oil) to protect water quality while working adjacent to and within karst topography. (BMPs 12.8 and 12.9).

H. The use of helicopters in the project area is allowed. Include in Site Usage and Operations Plan any landing zones, refueling areas, or other areas impacted by helicopter use prior to beginning operations.

I. Refuel all gas-powered equipment including helicopters a distance of at least 150 feet from waterbodies. Include equipment refueling plan as part of Site Usage and Operations Plan.

(BMP 12.8; 12.9; National BMP Road-10).

J. The Contractor shall limit the storage of hazardous materials on the Project site. Protect hazardous materials from spills and potential impacts to the existing landscape and waterbodies. Do not store materials within sensitive areas or areas to be protected. Detail storage of hazardous materials in the Site Usage and Operations Plan and include a Hazardous Materials Control Plan (HMCP) based on the types of hazardous materials/chemicals anticipated. Consult the Materials Safety Data Sheet and product label for information on use, hazards, and safe handling procedures for chemical products under consideration for use. Store chemicals/hazardous materials away from waterbodies (National BMP Chem-1; Chem-3; Road-10). Meet the requirements of 40 CFR 112 (Oil Pollution Prevention) for fuel storage. Meet the requirements of 33 CFR 150 and 33 CFR 154 for facilities transferring oil or hazardous materials in bulk.

K. The Contractor shall make its own arrangements for any off-site storage or shop areas necessary for the proper execution of the Work. Should the Contractor find it necessary to use any additional land for staging or storing equipment or materials for other purposes during the construction of the Work, it shall provide for the use of such lands at its own expense and approval of land manager. The use of off-site storage or shop areas does not include National Forest lands beyond those identified as the Project area.

L. Do not allow materials or equipment to enter the adjacent saltwater, streams, areas of known contaminated soils, or other sensitive areas. Minimize impacts to sensitive areas and vegetation adjacent to the Work. Coordinate and receive approval from CO and permitting agencies for the timing and methods of all Work that may impact sensitive areas.

SITE ACCESS, USE AND STORAGE 01 14 13 - 5

M. Do not stockpile materials, or store or operate equipment in areas outside of the access, work, and storage areas as listed in the Site Usage and Operations Plan.

N. Upon completion of construction and clean-up and removal of materials, equipment and related items from the area, the CO will inspect all access, work, and storage areas.

Restore all areas impacted by access, work, and storage areas to the satisfaction of the CO prior to demobilization and as indicated in the Site Restoration Plan.

1.7 CONTRACTOR�S WORK CAMP AREA

A. The USFS Admin Cabin may be used by the Contractor with CO approval. Available use is outside the cave guide season from Memorial Day to Labor Day. The Contractor must coordinate with the Government for approval of use, booking, and key pick up. The Contractor shall clean and restore the building, site, and facilities impacted by Contractor use to the satisfaction of the CO.

B. A Contractor owned barge or other water-based Work Camp or bunk house can be located at the USFS public dock and float. Obtain permission of CO for location and related logistics. The Contractor shall clean and restore the dock and float, site, and facilities impacted by Contractor use to the satisfaction of the CO.

C. A land-based Work Camp can be located along the existing gravel loop road and is contingent on the following requirements:

1. For any land-based work camp location, obtain permission of CO for location, facilities to be included, and footprint (limit of disturbance) of Work Camp.

2. Impacts from the land-based Work Camp shall be minimized to the existing site.

3. The site shall be restored and all land-based camp facilities removed to the satisfaction of the CO.

D. Handwashing and other potable water facilities are not available on site. Meet State of Alaska drinking water regulations 18 AAC 80 regarding potable water supplies for drinking and washing.

E. Toilet facilities are presently available at the site; however, the Contractor shall provide temporary toilet facilities at the site during construction work. Comply with State of Alaska wastewater disposal regulations 18 AAC 72 for domestic sewage. Do not use, or make available for public use, toilet facilities installed as part of Work until installation is inspected, Work is accepted by the Government, and public use is authorized.

F. Ensure that the design, operation, and maintenance of all solid waste systems are protected from bears and other wildlife and meet all Federal, State, and local requirements.

Meet State of Alaska solid waste management regulations (18 AAC 60) and Federal regulations contained in 40 CFR 243, 40 CFR 245, 40 CFR 257, and 40 CFR 258. Remove solid wastes and/or residues and dispose of in approved commercial landfills.

SITE ACCESS, USE AND STORAGE 01 14 13 - 6

G. The area may be visited by black bears. Bears may be attracted by activity and food and become habituated to humans and learn to associate them with food. Do not allow bears or other wildlife access to human food, garbage, or other attractants. Store food in bear-proof containers or hang at least 12 feet above ground if working from a camp. Do not leave food scraps at any time in camp or within Project area.

1.8 QUARRY PLAN

A. The existing Government managed quarry located approximately ¼ mile to the east of Project area on FSR-15 may be used for quarrying and obtaining aggregate materials, if desired by Contractor and the quarry plan is approved by CO.

B. The royalties for material obtained from this quarry used on Project will be waived. Materials blasted and not used will remain property of the Government. All related quarry Work including clean-up is at the expense of the Contractor including any required permits or monitoring.

C. The quarry plan and activities must comply with Forest Service Manual (FSM) 6745, Explosives and Blasting Material and meet specifications as outlined in FHWA Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) and be approved by CO prior to beginning quarry related Work.

D. Limit of work within Government managed quarry on FSR-15:

1. Disturbance and rock removal is not allowed to extend westward, or along the western side of the existing quarry pit. Quarrying and material removal is only allowable to the north and east of existing quarry pit. Submit quarry plan to also meet this requirement for review and approval by CO and USFS Heritage Department prior to quarry development. Verify approved limits of quarry development as part of the Archaeological Coordination Meeting with the COR and Archaeological Monitor to discuss schedule, limits of work, equipment and methods to be used.

E. A sample Government Quarry Plan template is included at end of Drawings as �Quarry Plan Template T-01� for use by the Contractor.

F. The following are added to FP-14, Section 205 Rock Blasting.

1. Add the following to Subsection 205.06:

a. 205.06 Preblast Condition Survey and Vibration Monitoring and Control.

Limit blasting induced vibrations in saturated soils or on steep slopes as designated or as directed by the CO.

Notify the Owners of nearby facilities at least 24 hours before blasting.

2. Add the following to Subsection 205.07:

a. 205.07 Test Blasting.

Test blast at all new sources, when rock type changes, and when blast layout changes due to slope or other changes.

SITE ACCESS, USE AND STORAGE 01 14 13 - 7

3. Add the following to the bulleted list in the eighth paragraph of Subsection 205.08:

a. 205.08 Blasting.

Precipitation exceeds 1 inch in any 24 hour period.

Precipitation exceeds 3 inches in any 96 hour period.

Precipitation exceeds 4 inches in any 144 hour period.

A landslide occurs within 300 feet of a blast site under any precipitation conditions.

G. The following are added to FP-14, Section 314 Stockpiled Aggregates.

1. Add the following to Subsection 314.01:

a. 314.01 Description.

Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development.

2. Add the following to Subsection 314.04 after the first sentence of second paragraph:

a. 314.04 Stockpile Site.

Submit a plan of operation according to Section 105.02. Perform the work in accordance with MSHA 30 CFR, part 56.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 14 13

MEASUREMENT AND PAYMENT 01 22 00 - 1

SECTION 01 22 00 � MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SCOPE

A. Payment for the various items of the Bid Schedule, as further specified herein, shall include all compensation to be received by the Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, transportation, and incidentals appurtenant to the items for Work being described, as necessary to complete the various items of the Work all in accordance with the requirements of the Contract Documents, including all appurtenances thereto, and including all costs of permits and cost of compliance with the regulations of public agencies having jurisdiction, including Safety and Health Requirements of Occupational Safety and Health Administration of the U.S. Department of Labor (OSHA) and Occupational Safety and Health Standards of the Alaska Department of Labor, Division of Labor Standards and Safety.

B. No separate payment will be made for any Pay Item that is not specifically set forth in the Bid Schedule, and all costs therefore shall be included in the prices named in the Bid Schedule for the various appurtenant items of Work.

C. In addition to the other incidental items of Work listed elsewhere in the contract, the following items shall also be considered as incidental to other items of Work under this contract:

1. Maintenance and provision of all services including power, fuel, water, and others

2. Transportation of goods and materials to a remote site

3. Providing remote facilities for all laborers related to the Work including remote accommodations, food, communication and sanitary facilities

4. Archeological protection and monitoring

5. Wildlife and human safety operations

6. Final clean-up and site restoration

7. Stormwater Pollution Prevention Plan including permitting, implementation, maintenance, and monitoring

8. Removal and replacement of survey monuments and markers disturbed during construction, whether shown on the Drawings or not.

1.2 BASE BID AND OPTIONS

A. The Recreation Area improvement project includes one (1) Base Bid and one (1) Option Pay

Items as described below.

1. Base Bid (Recreation Area): Major Work items include site preparation and earthworks for one day use recreation area (lower) with timber shelter and concrete pad, pay station, gravel parking area, aggregate trail, signs, site furnishings, drainage improvements, installation of one vault toilet, and other

MEASUREMENT AND PAYMENT 01 22 00 - 2

miscellaneous Work. Work also includes resurfacing improvements to the existing gravel loop road, removal of debris on the surface and below surface from former use as a logging camp, and the removal and remediation of areas with known invasive plant species.

2. Option 1 (Upper Day Use Area): Not In Contract. Option 1 is referenced in Drawings and Specifications but will not be exercised.

3. Option 2 (Campground): Major Work items include site preparation and earthworks for the three vehicle camp sites, signs, site furnishings, and other miscellaneous Work.

B. The Government intends to exercise Options no later than 30 days following Base Bid award to avoid costs associated with re-mobilizing equipment and personnel separately from Base Bid work.

1.3 BASE BID: 017113 MOBILIZATION (Pay Item No. 01) PRICE BASED ON LUMP SUM PAY

UNIT

A. Measurement for payment for Mobilization will be based upon the completion of the entire Work for Base Bid as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Payment for 017113 Mobilization will be made at the amount shown on the Schedule of Items under Pay Item No. 01 which payment will constitute full compensation for all WORK described in Section 017113 - Mobilization, as required to complete the Work as shown on the Drawings and as approved by the CO for El Capitan Campground & Day Use Area Improvements and as directed by the CO.

C. Progress payments for mobilization will be made as follows:

1. Reimburse for bond premiums before issuing the Notice to Proceed if evidence of payment is received.

2. When 5 percent or more of the original contract amount is earned from other Pay Items, pay mobilization at the rate of 50 percent, or up to 5 percent of the original contract amount, whichever is less.

3. When 10 percent or more of the original contract amount is earned from other Pay Items, pay mobilization at the rate of 100 percent, or up to 10 percent of the original contract amount, whichever is less.

4. Pay any unpaid amount for mobilization upon final acceptance of all work items.

MEASUREMENT AND PAYMENT 01 22 00 - 3

1.4 BASE BID: 024100 DEMOLITION, SALVAGE AND DISPOSAL (Pay Item No. 02) PRICE

BASED ON LUMP SUM PAY UNIT

A. Measurement for payment for Demolition, Salvage and Disposal will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Demolition, Salvage and Disposal will include all resources for the removal of the existing buried and above ground inactive utilities and related facilities, abandoned sewer facilities, piping (above ground and buried), debris, areas of invasive plant species and related soils, and miscellaneous Work. Removal includes both known and unknown facilities, abandoned utilities, debris, piping, and other miscellaneous items as directed by CO within the Demolition Area Limits as shown on Drawings from previous use as a logging camp. These may include items on the surface or within 12-inches of existing grade, or when encountered as part of excavation work. As indicated on Drawings salvage, stockpile, return to the Government, or legally dispose of as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 024100 Demolition, Salvage and Disposal will be made at the Unit Price named in the Schedule of Items under Pay Item No. 02, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.5 BASE BID: 311000 CLEARING AND GRUBBING (Pay Item No. 03) PRICE BASED ON LUMP

SUM PAY UNIT

A. Measurement for payment for Clearing and Grubbing will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Clearing and Grubbing will include all resources for the cutting, limbing, removal and disposal of trees, stumps, root wads, and vegetation as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 311000 Clearing and Grubbing will be made at the Unit Price named in the Schedule of Items under Pay Item No. 03, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

MEASUREMENT AND PAYMENT 01 22 00 - 4

1.6 BASE BID: 312000 EXCAVATION AND DISPOSAL (Pay Item No. 04) PRICE BASED ON LUMP

SUM PAY UNIT

A. Measurement for payment for Excavation and Disposal will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Excavation and Disposal will include all resources for the excavation and disposal of materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 312000 Excavation and Disposal will be made at the Unit Price named in the Schedule of Items under Pay Item No. 04, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.7 BASE BID: 312000 SHOT ROCK BORROW, CLASS A (Pay Item No. 05) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Shot Rock Borrow, Class A will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Shot Rock Borrow, Class A will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 312000 Shot Rock Borrow, Class A will be made at the Unit Price named in the Schedule of Items under Pay Item No. 05, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, excluding option items, and as directed by the CO.

1.8 BASE BID: 321123 BASE COURSE, GRADING D-1 (Pay Item No. 06) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Base Course, Grading D-1 will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Base Course, Grading D-1 will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

MEASUREMENT AND PAYMENT 01 22 00 - 5

D. Payment for 321123 Base Course, Grading D-1 will be made at the Unit Price named in the Schedule of Items under Pay Item No. 06, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.9 BASE BID: 321123 MARBLE SAND AND MARBLE 3-INCH MINUS (Pay Item No. 07) PRICE

BASED ON LUMP SUM PAY UNIT

A. Measurement for payment for Marble Sand and Marble 3-Inch Minus will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Marble Sand and Marble 3-Inch Minus will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 321123 Marble Sand and Marble 3-Inch Minus will be made at the Unit Price named in the Schedule of Items under Pay Item No. 07, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the

CO.

1.10 BASE BID: 027200 CONSTRUCTION SURVEYING (Pay Item No. 08) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Construction Surveying will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Construction Surveying will include remove and reset all existing survey monuments, monument cases, and other survey markers disturbed by construction activities, whether shown on the Drawings or not, will be considered incidental to other WORK. Resetting of disturbed survey monuments shall be done by, or under the direction of, an Alaska registered land surveyor.

C. The Government will allow progress payments.

D. Payment for 027200 Construction Surveying will be made at the Unit Price named in the Schedule of Items under Pay Item No. 08, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, excluding option items, and as directed by the CO.

MEASUREMENT AND PAYMENT 01 22 00 - 6

1.11 BASE BID: 101400 SIGNAGE (Pay Item No. 09) PRICE BASED ON LUMP SUM PAY UNIT

A. Measurement for payment for Signage will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Signage will include furnishing and installing all necessary sign materials, earthwork, and footings and anchoring for a complete installation. Signage also includes one timber sign kiosk, traffic control and regulatory signs, and USFS signs, as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 101400 Signage will be made at the Unit Price named in the Schedule of Items under Pay Item No. 09, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.12 BASE BID: 333200 SITE FURNISHINGS (Pay Item No. 10) PRICE BASED ON LUMP SUM PAY

UNIT

A. Measurement for payment for Site Furnishings will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Site Furnishings will include furnishing and installing all necessary site furnishings, earthwork, footings and anchoring for a complete installation, including wheel stops, litter bins, pay tube, picnic tables, fire rings, marble boulder seats, and landscape boulders as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 333200 Site Furnishings will be made at the Unit Price named in the Schedule of Items under Pay Item No. 10, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.13 BASE BID: 131200 DAY USE SHELTER (Pay Item No. 11) PRICE BASED ON LUMP SUM PAY

UNIT

A. Measurement for payment for Day Use Shelter will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Day Use Shelter will include furnishing and installing all necessary elements of the shelter including concrete pad, footings, timber shelter, roofing and gutters, and other

MEASUREMENT AND PAYMENT 01 22 00 - 7

miscellaneous Work as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 131200 Day Use Shelter will be made at the Unit Price named in the Schedule of Items under Pay Item No. 11, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.14 BASE BID: 132110 VAULT TOILET (Pay Item No. 12) PRICE BASED ON LUMP SUM PAY

UNIT

A. Measurement for payment for Vault Toilet will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Vault Toilet will include furnishing and installing all necessary elements of the pre-manufactured vault toilet including vault, concrete pad, toilet building, fixtures, concrete transition slab, and other miscellaneous Work as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 132110 Vault Toilet will be made at the Unit Price named in the Schedule of Items under Pay Item No. 12, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.15 BASE BID: 321500 AGGREGATE TRAILS (Pay Item No.13) PRICE BASED ON LUMP SUM

PAY UNIT

A. Measurement for payment for Aggregate Trails will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Aggregate Trails will include furnishing and installing necessary elements for the trails including earthworks, materials, and installing aggregate trails, and retaining structures and other miscellaneous Work as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 321500 Aggregate Trails will be made at the Unit Price named in the Schedule of Items under Pay Item No. 13, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

MEASUREMENT AND PAYMENT 01 22 00 - 8

1.16 BASE BID: 334100 CULVERTS (Pay Item No.14) PRICE BASED ON LUMP SUM PAY UNIT

A. Measurement for payment for Culverts will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Culverts will include furnishing and installing necessary elements for culverts including earthworks, bedding, and materials for a complete installation and other miscellaneous Work as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 334100 Culverts will be made at the Unit Price named in the Schedule of Items under Pay Item No. 14, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.17 OPTION ONE: 311000 CLEARING AND GRUBBING (Pay Item No. 01-1) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Clearing and Grubbing will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Clearing and Grubbing will include all resources for the cutting, limbing, removal and disposal of trees, stumps, root wads, and vegetation as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 311000 Clearing and Grubbing will be made at the Unit Price named in the Schedule of Items under Pay Item No. 01-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.18 OPTION ONE: 312000 EXCAVATION AND DISPOSAL (Pay Item No. 02-1) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Excavation and Disposal will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Excavation and Disposal will include all resources for the excavation and disposal of materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

N.I.C.

austinthomas Cross-Out cljensen Cross-Out cljensen Inserted Text N.I.C.

cljensen Inserted Text N.I.C.

MEASUREMENT AND PAYMENT 01 22 00 - 9

D. Payment for 312000 Excavation and Disposal will be made at the Unit Price named in the Schedule of Items under Pay Item No. 02-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.19 OPTION ONE: 312000 SHOT ROCK BORROW, CLASS A (Pay Item No. 03-1) PRICE BASED

ON LUMP SUM PAY UNIT

A. Measurement for payment for Shot Rock Borrow, Class A will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Shot Rock Borrow, Class A will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 312000 Shot Rock Borrow, Class A will be made at the Unit Price named in the Schedule of Items under Pay Item No. 03-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, excluding option items, and as directed by the CO.

1.20 OPTION ONE: 321123 BASE COURSE, GRADING D-1 (Pay Item No. 04-1) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Base Course, Grading D-1 will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Base Course, Grading D-1 will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 321123 Base Course, Grading D-1 will be made at the Unit Price named in the Schedule of Items under Pay Item No. 04-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.21 OPTION ONE: 321123 MARBLE SAND AND MARBLE 3-INCH MINUS (Pay Item No. 05-1)

PRICE BASED ON LUMP SUM PAY UNIT

A. Measurement for payment for Marble Sand and Marble 3-Inch Minus will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

N.I.C.

austinthomas Cross-Out

MEASUREMENT AND PAYMENT 01 22 00 - 10

B. Marble Sand and Marble 3-Inch Minus will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 321123 Marble Sand and Marble 3-Inch Minus will be made at the Unit Price named in the Schedule of Items under Pay Item No. 05-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.22 OPTION ONE: 027200 CONSTRUCTION SURVEYING (Pay Item No. 06-1) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Construction Surveying will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Construction Surveying will include remove and reset all existing survey monuments, monument cases, and other survey markers disturbed by construction activities, whether shown on the Drawings or not, will be considered incidental to other WORK. Resetting of disturbed survey monuments shall be done by, or under the direction of, an Alaska registered land surveyor.

C. The Government will allow progress payments.

D. Payment for 027200 Construction Surveying will be made at the Unit Price named in the Schedule of Items under Pay Item No. 06-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, excluding option items, and as directed by the CO.

1.23 OPTION ONE: 101400 SIGNAGE (Pay Item No. 07-1) PRICE BASED ON LUMP SUM PAY

UNIT

A. Measurement for payment for Signage will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Signage will include furnishing and installing all necessary sign materials, earthwork, and footings and anchoring for a complete installation. Signage also includes one timber sign kiosks, traffic control and regulatory signs, and USFS signs, as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 101400 Signage will be made at the Unit Price named in the Schedule of Items under Pay Item No. 07-1, which payment will constitute full compensation for all

N.I.C.

MEASUREMENT AND PAYMENT 01 22 00 - 11

WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.24 OPTION ONE: 333200 SITE FURNISHINGS (Pay Item No. 08-1) PRICE BASED ON LUMP

SUM PAY UNIT

A. Measurement for payment for Site Furnishings will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Site Furnishings will include furnishing and installing all necessary site furnishings, earthwork, footings and anchoring for a complete installation, including wheel stops, litter bins, picnic tables, fire rings, marble boulder seats, and landscape boulders as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 333200 Site Furnishings will be made at the Unit Price named in the Schedule of Items under Pay Item No. 08-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.25 OPTION ONE: 131200 DAY USE SHELTER (Pay Item No. 09-1) PRICE BASED ON LUMP

SUM PAY UNIT

A. Measurement for payment for Day Use Shelter will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Day Use Shelter will include furnishing and installing all necessary elements of the shelter including concrete pad, footings, timber shelter, roofing and gutters, and other miscellaneous Work as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 131200 Day Use Shelter will be made at the Unit Price named in the Schedule of Items under Pay Item No. 09-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.26 OPTION ONE: 033100 CONCRETE STEPS AND AGGREGATE TRAIL (Pay Item No.10-1)

PRICE BASED ON LUMP SUM PAY UNIT

A. Measurement for payment for Concrete Steps and Aggregate Trail will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

N.I.C.

austinthomas Cross-Out

MEASUREMENT AND PAYMENT 01 22 00 - 12

B. Concrete Steps and Aggregate Trail will include furnishing and installing necessary elements for the steps and trail including earthworks, base course, materials, and installing pre-cast concrete steps, aggregate trail, and other miscellaneous Work as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 033100 Concrete Steps and Aggregate Trail will be made at the Unit Price named in the Schedule of Items under Pay Item No. 10-1, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the

CO.

1.27 OPTION TWO: 311000 CLEARING AND GRUBBING (Pay Item No. 01-2) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Clearing and Grubbing will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Clearing and Grubbing will include all resources for the cutting, limbing, removal and disposal of trees, stumps, root wads, and vegetation as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 311000 Clearing and Grubbing will be made at the Unit Price named in the Schedule of Items under Pay Item No. 01-2, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.28 OPTION TWO: 312000 EXCAVATION AND DISPOSAL (Pay Item No. 02-2) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Excavation and Disposal will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Excavation and Disposal will include all resources for the excavation and disposal of materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 312000 Excavation and Disposal will be made at the Unit Price named in the Schedule of Items under Pay Item No. 02-2, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

N.I.C.

MEASUREMENT AND PAYMENT 01 22 00 - 13

1.29 OPTION TWO: 312000 SHOT ROCK BORROW, CLASS A (Pay Item No. 03-2) PRICE BASED

ON LUMP SUM PAY UNIT

A. Measurement for payment for Shot Rock Borrow, Class A will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Shot Rock Borrow, Class A will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 312000 Shot Rock Borrow, Class A will be made at the Unit Price named in the Schedule of Items under Pay Item No. 03-2, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, excluding option items, and as directed by the CO.

1.30 OPTION TWO: 321123 BASE COURSE, GRADING D-1 (Pay Item No. 04-2) PRICE BASED ON

LUMP SUM PAY UNIT

A. Measurement for payment for Base Course, Grading D-1 will be based upon the completion of the entire Work as a Lump Sum Pay Unit, complete, all-in accordance with the requirements of the Contract Documents.

B. Base Course, Grading D-1 will include all resources for the furnishing and installing all necessary materials as shown on the Drawings and as approved by the CO for the El Capitan Campground & Day Use Area Improvements.

C. The Government will allow progress payments.

D. Payment for 321123 Base Course, Grading D-1 will be made at the Unit Price named in the Schedule of Items under Pay Item No. 04-2, which payment will constitute full compensation for all WORK described in Specifications and as shown on the Drawings, and as directed by the CO.

1.31 OPTION TWO: 321123 MARBLE SAND AND MARBLE 3-INCH MINUS (Pay Item No. 05-2)