AFMC260FirstArticle_amd01.pdf

PDF 95 KB Posted

Attached to
MANUFACTURE OF NSN 5996-01-365-4599EW LOG VIDEO AMPLIFIER/DETECTOR
Solicitation number
SPRWA1-20-R-0032
Issued by

View the file

Other files

File Type Posted
SPRWA120R0032_______0006.pdf PDF
SPRWA120R0032_______0004.pdf PDF
Pricing Matrix rev. 3.xlsx XLSX spreadsheet
SPRWA120R0032_______0005.pdf PDF
Pricing Matrix rev. 2.xlsx XLSX spreadsheet
Document 1- QA Revised 01 Oct 2020.docx DOCX document
SPRWA120R0032_______0003.pdf PDF
Pricing Matrix rev. 1.xlsx XLSX spreadsheet
SPRWA120R0032_______0002.pdf PDF
Document 1- QA Revised 21 Sep 2020.docx DOCX document
Document 1- QA Revised 27 Aug 2020.docx DOCX document
SPRWA120R0032_______0001.pdf PDF
Document 1- QA.docx DOCX document
SPRWA120R0032.pdf PDF
AFMC 158 Packaging.pdf PDF
DD FORM 1653 Transportation.pdf PDF
PricingMatrix.xlsx XLSX spreadsheet
AFMC 260 First Article.pdf PDF
CDRLS.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

21 AUG 2020(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

81413 / 330404-101

4. NSN

5996013654599EW

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM 0

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Contract, Technical Data Package and all QA provisions of vendor drawings and test requirements documentation.

B. The detailed technical requirements for First Article approval tests are contained in

Contract, Technical Data Package and Government approved Acceptance Test Procedures.

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 30 days.

D. Contractor's notification to ACO and

AFLCMC/WNY

(Requesting Activity) of test time and location due 20 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

AFLCMC/WNY

235 Byron Street, Suite 19A

Robins AFB, GA 31098

Robert Rickerson

(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 185 calendar days from date contract.

(2) Notify 20 calendar days prior to shipment.

(3) Delivered to government at

SW3119

FD2060 DDWG ER DLA CENTRAL RCVG

455 Byron Street

Robins AFB, GA 31098

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 60 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$3,000.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 21 Aug 2020

FIRST ARTICLE REQUIREMENTS 1. DATE

21 AUG 2020(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

X 2 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor

X will be retained by AFLCMC/WNY pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Pham, Ky N

408 SCMS / GU E A

478-222-4382

472-4382

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Robert Rickerson

AFLCMC/WNY

478-222-4298

472-4298

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 4Generated by PRPS using Jasper Reports on 21 Aug 2020

File details come from the government source that posted it. Updated .