This document is a pre-solicitation notice for a sole source requirements contract. The Air Force Materiel Command is seeking to acquire the Global Positioning System Antenna System-1 and Advanced Digital Antenna Production system and components, repairs, spares, and engineering services. Items include antenna electronics, controlled reception pattern antennas, ground plane assemblies, fiber optic antenna links, and portable test sets. Interested offerors should notify the point of contact by email and provide company information. The notice lists national stock numbers and part numbers for the items required.
Contract Data Requirements List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PACKAGING.pdf | ||
| SectionL.pdf | ||
| TRANSPORTATION.pdf | ||
| PWS.pdf | ||
| SPRWA1-19-R-0068.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
Raytheon Systems Limited UK
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF (CAV AF) End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81634C/T
5. CONTRACT REFERENCE
PWS 4.2.3
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
Block 16
12. DATE OF FIRST SUBMISSION
Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg Repro
16. REMARKS
1. The contractor shall report End item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML IAW the referenced DID and/ or IAW CAV AF CFM SOW. This information will be assessed by the program office PMS and by AFLCMC/WNYBC in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 7.2 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training, if necessary, will be provide by 406 SCMS. Contractor may send an email to:
406scms.cav.af.ar@us.af.mil
4. This DD Form 1423-1 applies to Contractor Furnished Material (CFM) type contracts.
Block 10: Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor User Guide.
Block 11: Data shall be current within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified IAW CAV AF AF Users Guide.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
WR-ALC 1
460 Richard Ray Blvd Suite 200 Robins AFB, GA 31098-1813
15. TOTAL 0 1 0
G. PREPARED BY
HOLLINGSHEAD.RONALD.C.12 Digitally signed by
HOLLINGSHEAD.RONALD.C.1230677790
30677790 Date: 2019.06.24 08:18:00 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:59:53 -04'00'
J. DATE
24-Jun-2019 mailto:406scms.cav.af.ar@us.af.mil
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A002
CONFERENCE AGENDA
3. SUBTITLE
Meetings
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249B/T
5. CONTRACT REFERENCE
PWS 4.1.7
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
C
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Applicable to all program meetings, reviews, audits and conferences. Contractor format is acceptable.
Block 8: Government to review and provide approval and/or comments within five (5) calendar days after receipt from Contractor.
Block 9: Distribution authorized to U.S. Government agencies and their contractors Reason: OEM proprietary information and implementation of critical technology. Other requests for this document shall be referred to the PNT-PO (JSSMO) AFLCMC/WNY.
Destruction Notice: For classified documents follow the procedures in DOD Manual 4400.22M, Industrial Security Manual, Section 11-19, or DOD Regulation 4400.1 AFR 205-1, Information Security Program, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Block 10: As required by all program meetings, reviews, TIMS, ICWGs, audits and conferences. Contractor to attach any presentation material to the minutes.
Blocks 11, 12, 13: Submit ten (10) working days before each event. If required, submit update NLT five (5) calendar days after receipt of government comments (requires re-submittal).
Block 14: Official submittals shall be submitted electronically using the Multi-user Engineering Change Proposal Automated Review System (MEARS). Oversized files shall be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an email notification to the email address: ccb.cmo@us.af.mil.
Block 16 1
30677790 Date: 2019.06.24 08:18:48 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:00:29 -04'00' mailto:ccb.cmo@us.af.mil
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A003
CONFERENCE MINUTES
3. SUBTITLE
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250B/T
5. CONTRACT REFERENCE
PWS 4.1.7
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4. Applicable to all program meetings, reviews, audits and conferences. Contractor format is acceptable.
Block 8: Government to review and provide approval and/or comments within ten (10)
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Block 10: As required by all program meetings, reviews, TIMS, ICWGs, audits and conferences. Contractor to attach any presentation material to the minutes.
Blocks 11, 12, 13: Submit ten (10) working days after each event. If required, submit update NLT five (5) calendar days after receipt of government comments (requires re-submittal).
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:19:34 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:01:10 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A004
DATA ACCESSION LIST
3. SUBTITLE
DAL
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453B/T
5. CONTRACT REFERENCE
PWS 4.1.7
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
1/R
12. DATE OF FIRST SUBMISSION
90 DAC
8. APP CODE
N/A
11. AS OF DATE
CA
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor Format is acceptable.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 10, 11, 13: Revisions submitted quarterly, as required. Government reserves the right to review document on the list electronically. Requests for documents shall be honored when made through the PCO only. Submit final DAL thirty (30) days prior to contract close out.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:20:10 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:01:41 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER PSSS
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A005
Bill of Materials (BOM) for Logistics and Supply Chain Risk Management
3. SUBTITLE
DMSMS Reporting
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81656B/T
5. CONTRACT REFERENCE
PWS 4.3.5
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
Quarterly
12. DATE OF FIRST SUBMISSION
180 DAC
8. APP CODE
A
11. AS OF DATE
0 days
13. DATE OF SUBSEQUENT
Quarterly
Reg Repro
16. REMARKS
Block 4: Official submittal shall be generated using established Microsoft Excel Product.
Format and content to be consistent with previous DID, DI-SESS-81656, in lieu of delivering a full BOM. Action plans as per PWS 4.3.5 for significant obsolescence items.
Contractor is only required to include obsolescence items (obsolete or diminishing source).
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:20:53 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:02:17 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A006
Engineering Change Proposal (ECP)
3. SUBTITLE
ECP
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639D/T
5. CONTRACT REFERENCE
PWS 4.1.4, 4.1.5
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 8: Submit Class II ECPs to DCMA for concurrence in classification. DCMA shall have ten (10) calendar days to agree or disagree with ECP classification; ADAP System Engineer shall have the same time period to supersede if necessary. Contractor shall assume government approval if the government has not responded in ten (10) calendar days after receipt of change.
Class I ECP 407 SCMS/GULB CCB action ninety (90) days after receipt.
Class II concurrence ten (10) days after receipt.
All GPA ECPs (Class I or II) shall be formally submitted for approval - DCMA concurrence not required
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 11, 12, 13: Submit Class I ECP when requested by 407 SCMS/GULB sixty (60) days after receipt of Request For Proposal (RFP).
Contractor may submit ECP to correct a deficiency without government request.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:21:33 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:02:59 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A007
Failure Summary and Analysis Report (FSAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80255A/T
5. CONTRACT REFERENCE
PWS 4.2.1
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
Quarterly
12. DATE OF FIRST SUBMISSION
90 DAC
8. APP CODE
A
11. AS OF DATE
0 days
13. DATE OF SUBSEQUENT
Quarterly
Reg Repro
16. REMARKS
Block 4: Format and content to be consistent with established Microsoft Excel Product, based on previous DID, DI-RELI-80255, with required data set and interpretation as:
a. Failure number - Job Control Number.
b. Failure Analysis number - RSL Repair Number
c. Date of Failure - Date Received
d. Part name - Part Name/Number of Failed Component
e. Part number - End Item Part Number
f. Subassembly - Subassembly
g. Major assembly - Platform Designator and Tail Number
h. Serial number - End Item Serial Number
i. Hours of operation - ETI
k. Manufacturer of failed part - Manufacturer Failed Part
l. Symptom of failures - Reported Discrepancy (Customer report plus RSL observations)
m. Cause of failure - Refer to DI-RELI-80255 para 10.3.2 a-h
n. Repair action - Corrective Action
q. The time to failure - Date of Last Repair
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Block 13: Government will have 10 days to review. Contractor shall have 10 days for subsequent resubmission, if required.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:22:22 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:03:43 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A008
Interface Control Document (ICD)
3. SUBTITLE
Interface Specification
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81248B/T
5. CONTRACT REFERENCE
PWS 4.1.8
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Format and content as per established document (US DoD specification
IS-GPS-099).
Block 9: Distribution and other statements specified by US DoD on the CCB-signed front sheet provided with approved ECP.
Blocks 10, 11, 12, 13: Submit document as formally updated from approved ECP, as required be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:23:06 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:04:20 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER AVCS
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A009
Computer Software Product End Items
3. SUBTITLE
Software Product End Items
4. AUTHORITY (Data Acquisition Document No.)
DI-AVCS-80700A/T
5. CONTRACT REFERENCE
PWS 4.1.4, 4.2.5
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: The contractor shall submit final software disk to AFLCMC/WNY. The generated software disk shall include loadable object files in format compatible with Contractor supplied SVDs. Submit software on electronic media (DVD-R/W, CD-R/W, or CD-R) to AFLCMC/WNY on a closed-session disk. Labels shall be affixed to software media to identify and describe the contents.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Block 13: Government shall have 10 days to review. Contractor shall have 10 days for subsequent resubmission, if required. Computer Program Identification Number (CPIN) must be requested thirty (30) days prior to each prototype delivery.
Block 14: All official submittals shall be accompanied with a corresponding transmittal letter and an email notification to the email address: ccb.cmo@us.af.mil. Submit final software release on CD to:
PNT-PO (AFLCMC/WNY)
235 Byron Street, Suite 19-A Robins AFB, GA 31098 Attn: CIO Robert Thomas
30677790 Date: 2019.06.24 08:23:54 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 13:05:03 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00A
Test Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
PWS 4.1.2
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT
Reg Repro
Block 4: Contractor format acceptable.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 10, 11, 12, and 13: Submit 45 days after completion of test. Government shall have 15 days to review. Contractor shall have 15 days for subsequent revision, if required.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:08:20 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:20:12 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00B
Test Procedure
3. SUBTITLE
Test Procedure/Acceptance Test Procedure
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A/T
5. CONTRACT REFERENCE
PWS 4.1.2
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
Block 8: Government shall have ten (10) days to review/approve ATP procedures;
Government shall have 15 days to review and approve/provide comments on all other test procedures.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 11, 12, and 13:
a) ATP Procedures: Supply current versions at contract award; Submit updated versions in accordance with class II ECP/ECN.
Note: ECP/ECN supplied in accordance with CDRL A006. In advance of updated procedure availability, Contractor shall continue ATP using current procedure and approved
ECP/ECN.
b) Other test procedures: Submit 45 days before start of test. Government shall have 15 days to review. Contractor shall have 15 days for subsequent revision, if required.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:09:21 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:24:37 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00C
Request for Variance (RFV)
3. SUBTITLE
Request for Deviation (RFD)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80640D/T
5. CONTRACT REFERENCE
PWS 4.1.4
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
Block 4: Contractor Format acceptable.
Block 8: Government approval/disapproval/comments for major RFD ninety (90) days after receipt and minor RFD fifteen (15) days after receipt.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 11, 12, and 13: Submit major RFD to program office for government CCB approval of a departure. Submit minor RFD to local United States Government Servicing Agency (DCMA) for approval. Submit all GPA RFDs formally for Government/SPAWAR DA approval.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:10:57 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:25:24 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00D
Software Version Description (SVD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A/T
5. CONTRACT REFERENCE
PWS 4.1.4
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 11, 12, and 13: Submit 45 days after completion of test. Government shall have 15 days to review. Contractor shall have 15 days for subsequent revision, if required.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:12:13 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:27:21 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00E
System Problem Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81232/T
5. CONTRACT REFERENCE
PWS 4.1.2
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Tailor report to the issue/problem and disregard TPS references. Contractor format acceptable.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 11, 12, and 13: IAW individual tasking, submit 5 working days after issue/problem evaluation and resolution. Government shall have 30 days to review. Contractor shall have 5 days for subsequent revision, if required.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:12:50 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:27:58 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00F
Status Reports
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A/T
5. CONTRACT REFERENCE
PWS 4.1.7, 4.2.2, 4.3.3
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
Monthly
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 11: The last day of the month for which the report is being submitted.
Block 12: First full month after contract award until end of period of performance. First report shall contain any portion of the previous month not already addressed by a monthly status report.
Block 13: NLT ten (10) days after the end of the month for which the report covers.
Block 14: Official submittals shall be submitted electronically using the Multi-user Engineering Change Proposal Automated Review System (MEARS). Oversized files shall be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:13:39 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:31:02 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00G
Commercial Asset Visibility Navy (CAV Navy) End Item Reporting
3. SUBTITLE
CAV Navy
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81634C/T
5. CONTRACT REFERENCE
PWS 4.2.3
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
DD
N/A
Block 16
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
Block 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 7: Contractor will submit DD250 for CAV reporting on a monthly basis to NAVSUP WSS. Sallyanne Melchiore. Code: N852.
Block 10:
Updates to the Navy CAV system shall be accomplished daily or when a supply or maintenance transaction occurs, IAW the Navy CAV SOW (v7.7; December 20, 2017).
Block 11: Reporting to begin after contractor is trained on Navy CAV.
Block 12: Date of first submission shall be within 5 business days following a supply or maintenance transaction after the contract award date and government training has been completed.
Block 13: Same as remarks regarding Block 10 above.
Block 14:
a. The method of communication from the contractor to the NAVSUP WSS will be mechanized.
b. The contractor will use Navy CAV for reporting all repairable items within five (5) business days of the specific transaction.
NOTE: DELIVERY ORDER REPORTING APPLIES
1. The contractor will report all repairable items on attachment 'A' for the Navy through electronic submission in the Navy CAV website IAW Navy CAV SOW.
This information will be accessed by NAVSUP, in order to track repair status and inventory.
2. Data will be submitted by the contractor as repair transactions occur.
3. Training will be provided by NAVSUP, (215) 697-6983/1281
4. This DD1423-1 applies to both repairable material and government-furnished repairables.
NAVSUP-WSS 1
30677790 Date: 2019.06.24 08:14:19 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:33:42 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Technical Manual Contract Requirement (TMCR)
3. SUBTITLE
Technical Manuals
4. AUTHORITY (Data Acquisition Document No.)
TM-86-01Q/T
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
406 SCMS/GUEE
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
Blk 16
10. FREQUENCY
BLK 16
12. DATE OF FIRST SUBMISSION
TM-86-01Q
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
BLK 4: General and specific Technical Manual requirements are contained in the
TM-86-01Q
BLK 7: The Wide Area Workflow (WAWF) is to be used for final inspection and acceptance by the 406 SCMS/GUEE.
BLK 8: Approval IAW TM-86-01Q, Para 16.
Blk 9: Distribution Statement provided in TM-86-01Q, Paragraph 9.
Final delivery due 45 days prior to production hardware delivery to USAF.
Blks 10 - 15, See TM 86-01Q
Data Call GUEE-19-017
NSN:
MIPR #
NOTE: TECHNICAL DATA SHALL NOT BE TRANSMITTED VIA EMAIL. ALL
TRANSMISSION OF TECHNICAL DATA SHALL BE VIA MAIL OR EXPRESS
DELIVERY SERVICES.
See TM-86-01
Section 2, Part B Delivery Matrix
15. TOTAL 0 0 0
G. PREPARED BY
406 SCMS/GUEE
GIBSON.KENNETH.D.106646573 Digitally signed by
GIBSON.KENNETH.D.1066465736
6 Date: 2019.04.18 08:58:23 -04'00'
H. DATE
18 Apr 2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:34:18 -04'00'
J. DATE
24 Jun 2019
A00H
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER QCIC
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00J
Test Plan
3. SUBTITLE
Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80553A/T
5. CONTRACT REFERENCE
Para 4.1.2
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
30DAC
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: The contractor shall submit data electronically in contractor's format using current Microsoft Office® or Adobe Acrobat® Portable Document Format (PDF). Submittal applies to ATP Plans - require Government approval, as per US DoD Performance Specifications.
Block 8: Government shall have ten (10) days to review/approve ATP plans.
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, Blocks 10, 11, 12 ,13: ATP Plans: Supply current versions at contract award; Submit updated versions in accordance with class II ECP/ECN.
Note: ECP/ECN supplied in accordance with CDRL A006. In advance of updated plan availability, Contractor shall continue ATP using current plan and approved ECP/ECN.
be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
See Blk 16 1
30677790 Date: 2019.06.24 08:16:04 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:55:00 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00K
Notice of Revision (NOR)
3. SUBTITLE
Notice of Revision (NOR)
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80642D/T
5. CONTRACT REFERENCE
PWS 4.1.4
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: The contractor shall submit data electronically in contractor's format using current Microsoft Office® or Adobe Acrobat® Portable Document Format (PDF).
205-1, Information Security Program, Chapter IX. For unclassified, limited documents, be submitted electronically via AMRDEC SAFE (https://safe.amrdec.army.mil/safe/). All official submittals shall be accompanied with a corresponding transmittal letter and an
30677790 Date: 2019.06.24 08:16:35 -04'00'
H. DATE
24-Jun-2019
I. APPROVED BY
PHAM.CHUONG.VAN.1232 Digitally signed by
PHAM.CHUONG.VAN.1232216715
216715 Date: 2019.06.24 12:57:51 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER SDMP
D. SYSTEM/ITEM
GAS-1 / ADAP
E. CONTRACT/PR NO.
PR# FD2060-19-33011
F. CONTRACTOR
A00L
Performance Specification Documents
3. SUBTITLE
Performance Specification Documents
4. AUTHORITY (Data Acquisition Document No.)
DI-SDMP-81465A/T
5. CONTRACT REFERENCE
PWS 4.1.9
6. REQUIRING OFFICE
AFLCMC/WNY PNT-PO
7. DD 250 REQ
LT
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Format and content as per established documents (US DoD Performance Specifications MIL-PRF-ADAP-400 and associated Appendices for AE, CRPA, GPA -excluding classified Appendix which is maintained by US DoD).
Block 9: Distribution and other statements specified by US DoD on the CCB-signed front sheet(s) provided with approved ECP.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .