LPF-QAR-003: LPFR Quality Assurance Requirements for First Article Test Plans & Reports

This document is a U.S. Air Force quality assurance specification establishing mandatory requirements for the preparation and testing of first article test plans and reports for F100 engine parts under federal contracts. The specification applies to all first articles and production articles, requiring comprehensive testing to verify dimensional conformance, material properties, and compliance with engineering specifications and standards. Testing requirements include dimensional inspection (100% measurement of all dimensions with tabular reporting), nondestructive inspections (FPI, ultrasonic, eddy current, x-ray, and visual inspections), and material properties testing (mechanical, metallurgical, and chemical analysis). All tooling and gaging must maintain NIST-traceable calibrations per ISO 10012-1, and inspection results must be documented in detailed tables showing measured features, tolerances, actual readings, and instrument serial numbers.

Contractors must submit a First Article Test Plan (FATP) to the Contracting Officer prior to testing and a comprehensive First Article Test Report (FATR) upon completion, including all laboratory test results from contractor facilities and sub-vendors. All first articles must be serialized and receive 100% inspection with no sampling allowed. Visual inspections must reference applicable Pratt & Whitney Visual Inspection Standards with photographic documentation where required. Material testing must include composition, heat treat conditions, metallurgical microanalysis with photomicrographs, and mechanical testing per specifications. Contractors must use previously identified subcontractors and sources approved by OC-ALC/LPFR for laboratory testing, with OEM approval required for any alternate sources. Engineering Instructions take precedence over all other technical instructions. When required by contract, one tested article marked "UNSERVICEABLE - Condition Code R" shall be delivered with the FATR, with remaining articles handled per contract requirements.

View the file

Other files

File Type Posted
24-00825_PKGRQMT_REPORT Amend 03.pdf PDF
24-00825_CDRL1_REPORT - Contract Data Reqs List.pdf PDF
24-00825_TRNSPDATA_REPORT.pdf PDF
SPRTA126Q0094_01.pdf PDF
24-00825_IUID_REPORT.pdf PDF
24-00825_MQR-PSD-1.pdf PDF
4127309_TRNSPDATA_REPORT.pdf PDF
SOL_SPRTA126Q0094.pdf PDF
MQR-PSD-1.pdf PDF
4127308_PKGRQMT_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .