This document is a federal solicitation for a power supply contract (Solicitation Number SPRTA1-25-R-0399) issued by the Defense Logistics Agency Aviation. The solicitation is for 41 power supplies (NSN: 6130-01-209-9062HY, Part Number: 709290-2) that provide regulated 28 VDC for electronic components, with a total quantity of 38 units to be delivered by 15 November 2026 and 3 additional first article units. The contract is a firm fixed-price competitive acquisition with a small business set-aside, under NAICS code 336413 with a size standard of 1,250 employees.

The solicitation includes requirements for first article testing, with an evaluation cost of $13,500 per unit. The current qualified source is Symetrics Industries (CAGE: 22830), and the government intends to solicit and negotiate with a limited number of sources under FAR 6.302. The approximate solicitation issue date is 26 June 2025, with a response deadline of 28 July 2025 and an anticipated award date of September 2025. The last procurement of similar items was in September 2017 to GE Aviation Systems, with a purchase of 6 units.

View the file

Other files

File Type Posted
SPRTA1-25-R-0399-0001.pdf PDF
1578504_ATTACH.pdf PDF
4120072_ATTACH.pdf PDF
4159942_PKGRQMT_REPORT.pdf PDF
4159943_TRNSPDATA_REPORT.pdf PDF
4116357_CDRL1_REPORT.pdf PDF
2237761_UIIEC_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRTA1-25-R-0399

6.SOLICITATION ISSUE DATE

30 JUN 2025

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336413

8(A) SIZE STANDARD: 1,250

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRTA1

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing

9. (Agency Use)

LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.

SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

30-JUL-2025 3:00PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: David Garcia/DLA-AOBA david.garcia.59@us.af.mil Phone: (405) 739- 5501

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 30 JUL 2025 3:00 PM

SOLICITATION NUMBER SPRTA125R0399

FROM: AFFIX

STAMP

HERE

TO:

ATTN: David Garcia/DLA-AOBA

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA1-25-R-0399

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

NOTES APPLICABLE TO FIRST ARTICLE 0001AA - 0001AC

There is a requirement for a First Article Exhibit and First Article Test Report. After the Non-Expended Testing has been performed by the contractor in accordance with 52.209-3 (Contractor Test), the FA item is to be shipped to Tinker AFB (FY2303). The Government will perform a Proper Fit/Function Test in accordance with 52.209-4 (Government Test). If the First Article Test Report and First Article Exhibits are approved, these exhibits will be forwarded to USAF supply and will be considered part of the contract quantity. The contractor shall not proceed with production quantities until notice of First Article approval is received from the Contracting Officer.

Contractor's notification to ACO and tinker.first.article@us.af.mil of test time and location due 30 days prior to start of testing

The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

Ship first article to address below:

DDOO-SOP/FIRST ARTICLES

BLDG 18, DR 16

8080 PERIMETER RD

TINKER AFB, OK 73145-8000

DODAAC: FY2303

PHONE: 405-739-5090

The Contractor shall notify the Government 30 days prior to shipping the asset by notifying:

tinker.first.article@us.af.mil.

MARK FOR FIRST ARTICLES

ATTN: DDOO-SOP

DO NOT POST, NON-ACCOUNTABLE; DO NOT PUT INTO SUPPLY

DODAAC: FY2303

ENSURE THE WORDS "FIRST ARTICLE" ARE MARKED ON THE OUTSIDE OF THE BOX IN

LARGERED CONSPICUOUS LETTERS.

INFORMATIONAL CLIN

Bid A - First Article Required Item No.

Firm Fixed Price

NSN: 6130-01-209-9062 HY

POWER SUPPLY

provides regulated 28 VDC electronic components Manufacturer Part Number 22830 709290-2 Associated Document(s) Line Item(s)

FD20302500953 0001

Priority: R IUID Required: Yes Physical Item Markings:

FIRST ARTICLE EXHIBIT

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

3 EA

CLIN ACRN ACRN Total

0001AA AA

NSN: 6130-01-209-9062 HY

POWER SUPPLY

Manufacturer Part Number 22830 709290-2 Associated Document(s) Line Item(s)

FD20302500953 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2303 ORIGIN

Type / Ship To PACRN Mark For A FY2303 PAB Acct 09 Type / Ship To Quantity (U/I) *ARO Written Notice of Award Req No / Pri

FIRST ARTICLE EXHIBIT

Bid A - First Article Required Required Delivery

A FY2303 3 EA *180 Calendar Days Non-MilStrip

Proposed Delivery

A FY2303 3 EA

FIRST ARTICLE TEST REPORT

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0001AB AA

Data

FIRST ARTICLE CONTRACTOR AND GOVERMENT TEST REPORT

Associated Document(s) Line Item(s)

FD20302500953 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FA8111 ORIGIN

Type / Ship To PACRN Mark For

A FA8111 FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) *ARO Written Notice of Award Req No / Pri

Required Delivery

A FA8111 1 LO *180 Calendar Days

Proposed Delivery

A FA8111 1 LO

FIRST ARTICLE PRODUCTION

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price From Quantity U/I To Quantity Unit Price

38 EA

Quantity Range A

10 EA 25 EA

Quantity Range B

26 EA 41 EA

Quantity Range C

42 EA 57 EA

CLIN ACRN ACRN Total

0001AC AA

NSN: 6130-01-209-9062 HY

POWER SUPPLY

provides regulated 28 VDC electronic components Manufacturer Part Number 22830 709290-2 Associated Document(s) Line Item(s)

FD20302500953 0001

Priority: R

Inspection: Origin Acceptance: Origin Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAB Acct 09 Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A SW3211 38 EA 13 NOV 2026 Non-MilStrip

Proposed Delivery

A SW3211 38 EA

The contractor shall not proceed with production quantities until notice of First Article approval is received from the Contracting Officer

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A FA8111

FA8111 AFLCMC LZPED

CP 405 736-7455

3001 STAFF DR STE 1AF1 105A

TINKER AFB OK 73145-3303 73145-3303

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FY2303

FY2303 DDOO SOP FIRST ARTICLE

CP 405-855-3961

7330 SENTRY BLVD BLDG 469 DOOR 12

TINKER AFB OK 73145-8000

TINKER AFB OK 73145-8000 OK

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A SW3211

DLA DISTRIBUTION DEPOT OKLAHOMA

3301 F AVE CEN REC BLDG 506 DR 22

TINKER AFB OK 73145-8000 OK 73145-8000

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements ea (See Below) ea (See Below) ea (See Below)

Lot/Item Contractor Test/Inspection Requirements ea (See Below) ea (See Below) ea (See Below)

Contractor Testing Requirements

Government: Form, Fit, Function testing to take place in organic backshop per Acceptance Test Procedure IAW TO 8C11-8-20-3 and 8C11-8-20-8-1. Contractor Test: Successful testing per GE's Specification Control Drawing, design, and technical documentation.

Contractor Testing Requirements

Government: Form, Fit, Function testing to take place in organic backshop per Acceptance Test Procedure IAW TO 8C11-8-20-3 and 8C11-8-20-8-1. Contractor Test: Successful testing per GE's Specification Control Drawing, design, and technical documentation.

Government Testing Requirements

GE's Specification Control Drawing for PN 709290-2, design, and technical documentation.

Government Testing Requirements

GE's Specification Control Drawing for PN 709290-2, design, and technical documentation.

Disposition of the First Article shall be as follows:

Lot/Item Approved ea Forwarded to: USAF supply ea Forwarded to: USAF supply ea Forwarded to: USAF supply

Lot/Item Disapproved ea Returned to the contractor ea Returned to the contractor ea Returned to the contractor

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0001AB

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 FC04 64 5 47 GT 15F16Z 01N000 00000 GGGTTT 503000 F03000 $0.00

PSR: K38836 FSR: 013352 DSR: 120860 CIN: F3YCAB5126A0030000AA

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION/AOCA’s CA/ombudsman can be reached at (405) 855-3552.

Complaints which cannot be so resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the Contracting Officer.

(The above Clause/Provision has been modified.)

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(OCT 2024)

(IAW DFARS 205.470)

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))

(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

*Lot/Item ***Calendar Days Before Test **Quantity 30 1

(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item ****Approval Days ELIN No.

FA Test Report Item ***Type/Location **Calendar Days

FA8111 180

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(The above Clause/Provision has been modified.)

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

First Article Item **Quantity ***Calendar Days ****Type/Location

3 180 FY2303

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(The above Clause/Provision has been modified.)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b))

This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h))

52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA

(AUG 2011)

(IAW FAR 15.408(b))

52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2022-O0001

(OCT 2021)

(IAW DEVIATION 2022-O0001 REV. 1)

(a) Before awarding any subcontract expected to exceed $2 million, on the date of agreement on price or the date of award, whichever is later; or before pricing any subcontract modification involving a pricing adjustment expected to exceed $2 million, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with Federal Acquisition Regulation (FAR) 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor’s estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies. If the $2 million threshold for submission of certified cost or pricing data is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.

(b) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (a) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(c) In each subcontract that, when entered into, exceeds $2 million, the Contractor shall insert either—

(1) The substance of this clause, including this paragraph (c), if paragraph (a) of this clause requires submission of certified cost or pricing data for the subcontract; or

(2) The substance of the clause at 52.215-13, Subcontractor Certified Cost or Pricing Data—Modifications (DEVIATION 2022-O0001).

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.215-14 INTEGRITY OF UNIT PRICES -- ALTERNATE I (OCT 1997)

(IAW FAR 15.408(f)(2))

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

(IAW FAR 15.408(g))

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

(IAW FAR 15.408(j))

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(IAW FAR 15.408(k))

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)

(IAW FAR 15.408(n)(2))

252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)

(IAW DFARS 215.408(1))

252.215-7014 EXCEPTION FROM CERTIFIED COST OR PRICING DATA REQUIREMENTS FOR

FOREIGN MILITARY SALES INDIRECT OFFSETS (DEC 2022)

(IAW DFARS 215.408 (8))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)

(IAW FAR 19.708(b))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN - ALTERNATE III (JUN 2020)

(IAW FAR 19.708(b)(1))

52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (SEP 2021)

(IAW FAR 19.708(b)(2))

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)

(IAW FAR 19.309(c))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.

[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer’s name and title.]

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019) (IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1))

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I

(DEC 2019)

(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))

252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (DEC 2022)

(IAW DFARS 219.708(b)(1)(B))

52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2024)

(IAW FAR 22.1505(b))

52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT (JUN 2020)

(IAW FAR 22.610)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor.

The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

(IAW FAR 22.1408(a))

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.

(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

(IAW FAR 22.1310(b))

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

(IAW FAR 22.1705(a)(1))

252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS

(JAN 2023)

(IAW DFARS 222.7405)

52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION 2025-O0004) (MAR 2025)

(IAW 23.109(a))

252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023)

(IAW DFARS 223.7306, DFARS 212.301(f)(xxi))

252.223-7009 PROHIBITION OF PROCUREMENT OF FLUORINATED AQUEOUS FILM-FORMING

FOAM FIRE-FIGHTING AGENT FOR USE ON MILITARY INSTALLATIONS

(MAR 2024)

(IAW DFARS 223.7404)

52.224-3 PRIVACY TRAINING (JAN 2017)

(IAW FAR 24.302(a))

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

(IAW FAR 25.1103(a))

252.225-7009 RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES CONTAINING SPECIALTY

METALS (JAN 2023)

(IAW DFARS 225.7003-5(a)(2), DFARS 212.301(f)(xxv))

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)

(IAW DFARS 225.7002-3(a))

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND

TUNGSTEN (MAY 2024)

(IAW DFARS 225.7018-5)

252.225-7061 RESTRICTION ON THE ACQUISITION OF PERSONAL PROTECTIVE EQUIPMENT

AND CERTAIN OTHER ITEMS FROM NON-ALLIED FOREIGN NATIONS (JAN 2023)

(IAW DFARS 225.7023-4)

252.225-7967 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS

(DEVIATION 2024-O0006, REVISION 1) (FEB 2024) (FEB 2024)

(IAW CLASS DEVIATION 2024-O0006, REVISION 1)

252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)

(IAW Deviation 2024-O0014)

(a) Definition. As used in this clause—

Covered foreign country means any of the following:

(1) The People’s Republic of China.

(2) The Russian Federation.

(3) The Islamic Republic of Iran.

(4) The Democratic People’s Republic of Korea.

(b) Prohibition. In accordance with section 848 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2020 and section 817 of the NDAA for FY 2023, the Contractor shall not—

(1) Provide or use an unmanned aircraft system (UAS), or any related services or equipment, that—

(i) Is manufactured in a covered foreign country, or by an entity domiciled in a covered foreign country;

(ii) Uses flight controllers, radios, data transmission devices, cameras, or gimbals manufactured in a covered foreign country, or by an entity domiciled in a covered foreign country;

(iii) Uses a ground control system or operating software developed in a covered foreign country, or by an entity domiciled in a covered foreign country; or

(iv) Uses network connectivity or data storage located in, or administered by an entity domiciled in, a covered foreign country;

(2) Provide or use a system for the detection or identification of a UAS, or any related services or equipment, that is manufactured in a covered foreign country or by an entity domiciled in a covered foreign country; or

(3) On or after October 1, 2024, be an entity that operates equipment, as determined by the Secretary of Defense, from—

(i) Da-Jiang Innovations, or any subsidiary or affiliate of Da-Jiang Innovations;

(ii) Any entity that produces or provides unmanned aircraft systems and is included on the Consolidated Screening List maintained by the International Trade Administration of the Department of Commerce (https://www.trade.gov/consolidated-screening-list); or

(iii) Any entity that produces or provides unmanned aircraft systems and—

(A) Is domiciled in a covered foreign country; or

(B) Is subject to unmitigated foreign ownership, control, or influence by a covered foreign country, as determined by the Secretary of Defense in accordance with the National Industrial Security Program.

(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts or other contractual instruments, including subcontracts for the acquisition of commercial products and commercial services.

(End of clause)

52.226-7 DRUG-FREE WORKPLACE (MAY 2024)

(IAW FAR 26.506)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (MAY 2024)

(IAW FAR 26.605)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS

(JAN 2023)

(IAW DFARS 226.104)

52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

(IAW FAR 27.201-2(a)(1))

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (JUN 2020)

(IAW FAR 27.201-2(b))

52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)

(FEB 2013)

(IAW FAR 29.401-3(b))

252.229-7014 FULL EXEMPTION FROM TWO-PERCENT EXCISE TAX ON CERTAIN FOREIGN

PROCUREMENTS. (OCT 2022)

(IAW DFARS 229-402(k))

52.230-2 COST ACCOUNTING STANDARDS (JUN 2020)

(IAW FAR 30.201-4(a)(1))

52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)

(IAW FAR 30.201-4(d)(1))

252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

(IAW DFARS 231.100-70)

52.232-1 PAYMENTS (APR 1984)

(IAW FAR 32.111(a)(1))

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

(IAW FAR 32.111(b)(1))

52.232-11 EXTRAS (APR 1984)

(IAW FAR 32.111(c)(2))

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b))

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1))

52.232-25 PROMPT PAYMENT (JAN 2017)

(IAW FAR 32.908(c))

(a) Invoice payments—

(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

(IAW FAR 32.1110(a)(1))

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

(IAW FAR 32.706-3)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (MAR 2023)

(IAW FAR 32.009-2)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

(IAW DFARS 232.7004(a))

(a) Definitions. As used in this clause—

“Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.

(1) Contract financing payments include—

(i) Advance payments;

(ii) Performance-based payments;

(iii) Commercial advance and interim payments;

(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;

(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.

(2) Contract financing payments do not include—

(i) Invoice payments;

(ii) Payments for partial deliveries; or

(iii) Lease and rental payments.

“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.

“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.

(1) Invoice payments include—

(i) Payments for partial deliveries that have been accepted by the Government;

(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;

(iii) For purposes of subpart 32.9 only, all payments made under the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .