SPRTA1-25-R-0472.pdf

PDF 1 MB Posted

Attached to
GENERATOR, ALTERNATING CURRENT
Solicitation number
SPRTA1-25-R-0472
Issued by

About this file

This is a Solicitation/Contract (Standard Form 1447) issued by DLA Aviation at Oklahoma City for the procurement of an Alternator, Generator with National Stock Number 6115-01-234-5860. The solicitation (SPRTA1-25-R-0472) was issued on 8 September 2025, with offers due by 8 October 2025 at 11:59 PM. The acquisition is unrestricted but has a small business size standard of 1,250 employees for NAICS code 336413. The government requires 276 units (with a minimum of 69 and maximum of 414 units) of a Magnesium Alloy Generator with manufacturer part number 3CPE0 31169-010, to be delivered to DLA Distribution Depot Hill in Utah with various delivery dates ranging from February 2029 through January 2033. The contract will be a firm-fixed price arrangement, with delivery specified as F.O.B. Origin and inspection to occur at the origin.

The solicitation includes detailed packaging requirements specified in military standards (MIL-STD-2073-1 and MIL-STD-129), with specific instructions for preserving, marking, and shipping the generator. The packaging must comply with United Nations restrictions on wood packaging material, requiring heat-treated, debarked wood for all packaging components. The item will be marked with specific identification codes and must follow military packaging and marking standards. Transportation will be managed through DCMA (Defense Contract Management Agency) with specific instructions for shipping documentation and clearance.

View the file

Other files

File Type Posted
SPRTA1-25-R-0472-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRTA1-25-R-0472

6.SOLICITATION ISSUE DATE

8 SEP 2025

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336413

8(A) SIZE STANDARD: 1,250

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 180 days.

Early or partial delivery is acceptable at no additional cost to the Government.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR

INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE CONTRACTOR AGREES TO HOLD

ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO

THE TERMS AND CONDITIONS STATED HEREIN. *180

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRTA1

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing

9. (Agency Use) LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE

UNTIL

8-OCT-2025 11:59PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Michael Hannan/DLA-AOBB michael.hannan.1@us.af.mil Phone: (405) 855- 7126

X

1. THIS CONTRACT IS A RATED ORDER UNDER DPAS

(15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE OF ITEMS

INVOLVED

DATE AND LOCAL TIME 8 OCT 2025 11:59 PM

SOLICITATION NUMBER SPRTA125R0472

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Michael Hannan/DLA-AOBB

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA1-25-R-0472

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

The required quantity may change. Contractors should provide an offer to the following ranges. If the quantity ranges provided in this solicitation do not provide the best pricing option, then the contractor should submit quantity ranges that yield the best prices to the Government based on the Min quantity of (69) each and Max quantity of (414) each including the current required quantity of (276) each. See FAR clause 52.207-4. The final quantity of this solicitation will be re-evaluated upon receipt of the contractor's offer and closing of the solicitation.

New Manufactured Materiel

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price

276 EA

Minimum Quantity Maximum Quantity CLIN ACRN ACRN Total

0001 AA

NSN: 6115-01-234-5860 HY

GENERATOR, ALTERNATING CURRENT

Generator Magnesium Alloy Manufacturer Part Number

3CPE0 31169-010

Associated Document(s) Line Item(s)

FD20302600015ADV 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Receiving Report Required Quality Assurance: Certificate of Conformance Applicability: None ;

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3210 ORIGIN

New Manufactured Materiel

Class I ODS Substance Application/Use Quantity None None None Type / Ship To PACRN Mark For A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09

New Manufactured Materiel

A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09

New Manufactured Materiel

A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09

New Manufactured Materiel

A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09

New Manufactured Materiel

A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09

New Manufactured Materiel

A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 A SW3210 PAA Acct 09 Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A SW3210 1 EA 2 FEB 2029 Non-MilStrip

A SW3210 1 EA 2 MAR 2029 Non-MilStrip

A SW3210 1 EA 2 APR 2029 Non-MilStrip

A SW3210 1 EA 2 MAY 2029 Non-MilStrip

A SW3210 1 EA 2 JUN 2029 Non-MilStrip

A SW3210 1 EA 2 JUL 2029 Non-MilStrip

A SW3210 1 EA 2 AUG 2029 Non-MilStrip

A SW3210 1 EA 2 SEP 2029 Non-MilStrip

A SW3210 1 EA 2 OCT 2029 Non-MilStrip

A SW3210 1 EA 2 NOV 2029 Non-MilStrip

A SW3210 1 EA 2 DEC 2029 Non-MilStrip

A SW3210 1 EA 2 JAN 2030 Non-MilStrip

A SW3210 1 EA 2 FEB 2030 Non-MilStrip

A SW3210 1 EA 2 MAR 2030 Non-MilStrip

A SW3210 1 EA 2 APR 2030 Non-MilStrip

A SW3210 1 EA 2 MAY 2030 Non-MilStrip

A SW3210 1 EA 2 JUN 2030 Non-MilStrip

A SW3210 1 EA 2 JUL 2030 Non-MilStrip

A SW3210 1 EA 2 AUG 2030 Non-MilStrip

A SW3210 1 EA 2 SEP 2030 Non-MilStrip

A SW3210 1 EA 2 OCT 2030 Non-MilStrip

A SW3210 1 EA 2 NOV 2030 Non-MilStrip

A SW3210 1 EA 2 DEC 2030 Non-MilStrip

A SW3210 1 EA 2 JAN 2031 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 FEB 2031 Non-MilStrip

A SW3210 1 EA 2 MAR 2031 Non-MilStrip

A SW3210 1 EA 2 APR 2031 Non-MilStrip

A SW3210 1 EA 2 MAY 2031 Non-MilStrip

A SW3210 1 EA 2 JUN 2031 Non-MilStrip

A SW3210 1 EA 2 JUL 2031 Non-MilStrip

A SW3210 1 EA 2 AUG 2031 Non-MilStrip

A SW3210 1 EA 2 SEP 2031 Non-MilStrip

A SW3210 1 EA 2 OCT 2031 Non-MilStrip

A SW3210 1 EA 2 NOV 2031 Non-MilStrip

A SW3210 1 EA 2 DEC 2031 Non-MilStrip

A SW3210 1 EA 2 JAN 2032 Non-MilStrip

A SW3210 1 EA 2 FEB 2032 Non-MilStrip

A SW3210 1 EA 2 MAR 2032 Non-MilStrip

A SW3210 1 EA 2 APR 2032 Non-MilStrip

A SW3210 1 EA 2 MAY 2032 Non-MilStrip

A SW3210 1 EA 2 JUN 2032 Non-MilStrip

A SW3210 1 EA 2 JUL 2032 Non-MilStrip

A SW3210 1 EA 2 AUG 2032 Non-MilStrip

A SW3210 1 EA 2 SEP 2032 Non-MilStrip

A SW3210 1 EA 2 OCT 2032 Non-MilStrip

A SW3210 1 EA 2 NOV 2032 Non-MilStrip

A SW3210 1 EA 2 DEC 2032 Non-MilStrip

A SW3210 1 EA 2 JAN 2033 Non-MilStrip

A SW3210 1 EA 2 FEB 2033 Non-MilStrip

A SW3210 1 EA 2 MAR 2033 Non-MilStrip

A SW3210 1 EA 2 APR 2033 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 MAY 2033 Non-MilStrip

A SW3210 1 EA 2 JUN 2033 Non-MilStrip

A SW3210 1 EA 2 JUL 2033 Non-MilStrip

A SW3210 1 EA 2 AUG 2033 Non-MilStrip

A SW3210 1 EA 2 SEP 2033 Non-MilStrip

A SW3210 1 EA 2 OCT 2033 Non-MilStrip

A SW3210 1 EA 2 NOV 2033 Non-MilStrip

A SW3210 1 EA 2 DEC 2033 Non-MilStrip

A SW3210 1 EA 2 JAN 2034 Non-MilStrip

A SW3210 1 EA 2 FEB 2034 Non-MilStrip

A SW3210 1 EA 2 MAR 2034 Non-MilStrip

A SW3210 1 EA 2 APR 2034 Non-MilStrip

A SW3210 1 EA 2 MAY 2034 Non-MilStrip

A SW3210 1 EA 2 JUN 2034 Non-MilStrip

A SW3210 1 EA 2 JUL 2034 Non-MilStrip

A SW3210 1 EA 2 AUG 2034 Non-MilStrip

A SW3210 1 EA 2 SEP 2034 Non-MilStrip

A SW3210 1 EA 2 OCT 2034 Non-MilStrip

A SW3210 1 EA 2 NOV 2034 Non-MilStrip

A SW3210 1 EA 2 DEC 2034 Non-MilStrip

A SW3210 1 EA 2 JAN 2035 Non-MilStrip

A SW3210 1 EA 2 FEB 2035 Non-MilStrip

A SW3210 1 EA 2 MAR 2035 Non-MilStrip

A SW3210 1 EA 2 APR 2035 Non-MilStrip

A SW3210 1 EA 2 MAY 2035 Non-MilStrip

A SW3210 1 EA 2 JUN 2035 Non-MilStrip

A SW3210 1 EA 2 JUL 2035 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 AUG 2035 Non-MilStrip

A SW3210 1 EA 2 SEP 2035 Non-MilStrip

A SW3210 1 EA 2 OCT 2035 Non-MilStrip

A SW3210 1 EA 2 NOV 2035 Non-MilStrip

A SW3210 1 EA 2 DEC 2035 Non-MilStrip

A SW3210 1 EA 2 JAN 2036 Non-MilStrip

A SW3210 1 EA 2 FEB 2036 Non-MilStrip

A SW3210 1 EA 2 MAR 2036 Non-MilStrip

A SW3210 1 EA 2 APR 2036 Non-MilStrip

A SW3210 1 EA 2 MAY 2036 Non-MilStrip

A SW3210 1 EA 2 JUN 2036 Non-MilStrip

A SW3210 1 EA 2 JUL 2036 Non-MilStrip

A SW3210 1 EA 2 AUG 2036 Non-MilStrip

A SW3210 1 EA 2 SEP 2036 Non-MilStrip

A SW3210 1 EA 2 OCT 2036 Non-MilStrip

A SW3210 1 EA 2 NOV 2036 Non-MilStrip

A SW3210 1 EA 2 DEC 2036 Non-MilStrip

A SW3210 1 EA 2 JAN 2037 Non-MilStrip

A SW3210 1 EA 2 FEB 2037 Non-MilStrip

A SW3210 1 EA 2 MAR 2037 Non-MilStrip

A SW3210 1 EA 2 APR 2037 Non-MilStrip

A SW3210 1 EA 2 MAY 2037 Non-MilStrip

A SW3210 1 EA 2 JUN 2037 Non-MilStrip

A SW3210 1 EA 2 JUL 2037 Non-MilStrip

A SW3210 1 EA 2 AUG 2037 Non-MilStrip

A SW3210 1 EA 2 SEP 2037 Non-MilStrip

A SW3210 1 EA 2 OCT 2037 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 NOV 2037 Non-MilStrip

A SW3210 1 EA 2 DEC 2037 Non-MilStrip

A SW3210 1 EA 2 JAN 2038 Non-MilStrip

A SW3210 1 EA 2 FEB 2038 Non-MilStrip

A SW3210 1 EA 2 MAR 2038 Non-MilStrip

A SW3210 1 EA 2 APR 2038 Non-MilStrip

A SW3210 1 EA 2 MAY 2038 Non-MilStrip

A SW3210 1 EA 2 JUN 2038 Non-MilStrip

A SW3210 1 EA 2 JUL 2038 Non-MilStrip

A SW3210 1 EA 2 AUG 2038 Non-MilStrip

A SW3210 1 EA 2 SEP 2038 Non-MilStrip

A SW3210 1 EA 2 OCT 2038 Non-MilStrip

A SW3210 1 EA 2 NOV 2038 Non-MilStrip

A SW3210 1 EA 2 DEC 2038 Non-MilStrip

A SW3210 1 EA 2 JAN 2039 Non-MilStrip

A SW3210 1 EA 2 FEB 2039 Non-MilStrip

A SW3210 1 EA 2 MAR 2039 Non-MilStrip

A SW3210 1 EA 2 APR 2039 Non-MilStrip

A SW3210 1 EA 2 MAY 2039 Non-MilStrip

A SW3210 1 EA 2 JUN 2039 Non-MilStrip

A SW3210 1 EA 2 JUL 2039 Non-MilStrip

A SW3210 1 EA 2 AUG 2039 Non-MilStrip

A SW3210 1 EA 2 SEP 2039 Non-MilStrip

A SW3210 1 EA 2 OCT 2039 Non-MilStrip

A SW3210 1 EA 2 NOV 2039 Non-MilStrip

A SW3210 1 EA 2 DEC 2039 Non-MilStrip

A SW3210 1 EA 2 JAN 2040 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 FEB 2040 Non-MilStrip

A SW3210 1 EA 2 MAR 2040 Non-MilStrip

A SW3210 1 EA 2 APR 2040 Non-MilStrip

A SW3210 1 EA 2 MAY 2040 Non-MilStrip

A SW3210 1 EA 2 JUN 2040 Non-MilStrip

A SW3210 1 EA 2 JUL 2040 Non-MilStrip

A SW3210 1 EA 2 AUG 2040 Non-MilStrip

A SW3210 1 EA 2 SEP 2040 Non-MilStrip

A SW3210 1 EA 2 OCT 2040 Non-MilStrip

A SW3210 1 EA 2 NOV 2040 Non-MilStrip

A SW3210 1 EA 2 DEC 2040 Non-MilStrip

A SW3210 1 EA 2 JAN 2041 Non-MilStrip

A SW3210 1 EA 2 FEB 2041 Non-MilStrip

A SW3210 1 EA 2 MAR 2041 Non-MilStrip

A SW3210 1 EA 2 APR 2041 Non-MilStrip

A SW3210 1 EA 2 MAY 2041 Non-MilStrip

A SW3210 1 EA 2 JUN 2041 Non-MilStrip

A SW3210 1 EA 2 JUL 2041 Non-MilStrip

A SW3210 1 EA 2 AUG 2041 Non-MilStrip

A SW3210 1 EA 2 SEP 2041 Non-MilStrip

A SW3210 1 EA 2 OCT 2041 Non-MilStrip

A SW3210 1 EA 2 NOV 2041 Non-MilStrip

A SW3210 1 EA 2 DEC 2041 Non-MilStrip

A SW3210 1 EA 2 JAN 2042 Non-MilStrip

A SW3210 1 EA 2 FEB 2042 Non-MilStrip

A SW3210 1 EA 2 MAR 2042 Non-MilStrip

A SW3210 1 EA 2 APR 2042 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 MAY 2042 Non-MilStrip

A SW3210 1 EA 2 JUN 2042 Non-MilStrip

A SW3210 1 EA 2 JUL 2042 Non-MilStrip

A SW3210 1 EA 2 AUG 2042 Non-MilStrip

A SW3210 1 EA 2 SEP 2042 Non-MilStrip

A SW3210 1 EA 2 OCT 2042 Non-MilStrip

A SW3210 1 EA 2 NOV 2042 Non-MilStrip

A SW3210 1 EA 2 DEC 2042 Non-MilStrip

A SW3210 1 EA 2 JAN 2043 Non-MilStrip

A SW3210 1 EA 2 FEB 2043 Non-MilStrip

A SW3210 1 EA 2 MAR 2043 Non-MilStrip

A SW3210 1 EA 2 APR 2043 Non-MilStrip

A SW3210 1 EA 2 MAY 2043 Non-MilStrip

A SW3210 1 EA 2 JUN 2043 Non-MilStrip

A SW3210 1 EA 2 JUL 2043 Non-MilStrip

A SW3210 1 EA 2 AUG 2043 Non-MilStrip

A SW3210 1 EA 2 SEP 2043 Non-MilStrip

A SW3210 1 EA 2 OCT 2043 Non-MilStrip

A SW3210 1 EA 2 NOV 2043 Non-MilStrip

A SW3210 1 EA 2 DEC 2043 Non-MilStrip

A SW3210 1 EA 2 JAN 2044 Non-MilStrip

A SW3210 1 EA 2 FEB 2044 Non-MilStrip

A SW3210 1 EA 2 MAR 2044 Non-MilStrip

A SW3210 1 EA 2 APR 2044 Non-MilStrip

A SW3210 1 EA 2 MAY 2044 Non-MilStrip

A SW3210 1 EA 2 JUN 2044 Non-MilStrip

A SW3210 1 EA 2 JUL 2044 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 AUG 2044 Non-MilStrip

A SW3210 1 EA 2 SEP 2044 Non-MilStrip

A SW3210 1 EA 2 OCT 2044 Non-MilStrip

A SW3210 1 EA 2 NOV 2044 Non-MilStrip

A SW3210 1 EA 2 DEC 2044 Non-MilStrip

A SW3210 1 EA 2 JAN 2045 Non-MilStrip

A SW3210 1 EA 2 FEB 2045 Non-MilStrip

A SW3210 1 EA 2 MAR 2045 Non-MilStrip

A SW3210 1 EA 2 APR 2045 Non-MilStrip

A SW3210 1 EA 2 MAY 2045 Non-MilStrip

A SW3210 1 EA 2 JUN 2045 Non-MilStrip

A SW3210 1 EA 2 JUL 2045 Non-MilStrip

A SW3210 1 EA 2 AUG 2045 Non-MilStrip

A SW3210 1 EA 2 SEP 2045 Non-MilStrip

A SW3210 1 EA 2 OCT 2045 Non-MilStrip

A SW3210 1 EA 2 NOV 2045 Non-MilStrip

A SW3210 1 EA 2 DEC 2045 Non-MilStrip

A SW3210 1 EA 2 JAN 2046 Non-MilStrip

A SW3210 1 EA 2 FEB 2046 Non-MilStrip

A SW3210 1 EA 2 MAR 2046 Non-MilStrip

A SW3210 1 EA 2 APR 2046 Non-MilStrip

A SW3210 1 EA 2 MAY 2046 Non-MilStrip

A SW3210 1 EA 2 JUN 2046 Non-MilStrip

A SW3210 1 EA 2 JUL 2046 Non-MilStrip

A SW3210 1 EA 2 AUG 2046 Non-MilStrip

A SW3210 1 EA 2 SEP 2046 Non-MilStrip

A SW3210 1 EA 2 OCT 2046 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 NOV 2046 Non-MilStrip

A SW3210 1 EA 2 DEC 2046 Non-MilStrip

A SW3210 1 EA 2 JAN 2047 Non-MilStrip

A SW3210 1 EA 2 FEB 2047 Non-MilStrip

A SW3210 1 EA 2 MAR 2047 Non-MilStrip

A SW3210 1 EA 2 APR 2047 Non-MilStrip

A SW3210 1 EA 2 MAY 2047 Non-MilStrip

A SW3210 1 EA 2 JUN 2047 Non-MilStrip

A SW3210 1 EA 2 JUL 2047 Non-MilStrip

A SW3210 1 EA 2 AUG 2047 Non-MilStrip

A SW3210 1 EA 2 SEP 2047 Non-MilStrip

A SW3210 1 EA 2 OCT 2047 Non-MilStrip

A SW3210 1 EA 2 NOV 2047 Non-MilStrip

A SW3210 1 EA 2 DEC 2047 Non-MilStrip

A SW3210 1 EA 2 JAN 2048 Non-MilStrip

A SW3210 1 EA 2 FEB 2048 Non-MilStrip

A SW3210 1 EA 2 MAR 2048 Non-MilStrip

A SW3210 1 EA 2 APR 2048 Non-MilStrip

A SW3210 1 EA 2 MAY 2048 Non-MilStrip

A SW3210 1 EA 2 JUN 2048 Non-MilStrip

A SW3210 1 EA 2 JUL 2048 Non-MilStrip

A SW3210 1 EA 2 AUG 2048 Non-MilStrip

A SW3210 1 EA 2 SEP 2048 Non-MilStrip

A SW3210 1 EA 2 OCT 2048 Non-MilStrip

A SW3210 1 EA 2 NOV 2048 Non-MilStrip

A SW3210 1 EA 2 DEC 2048 Non-MilStrip

A SW3210 1 EA 2 JAN 2049 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 FEB 2049 Non-MilStrip

A SW3210 1 EA 2 MAR 2049 Non-MilStrip

A SW3210 1 EA 2 APR 2049 Non-MilStrip

A SW3210 1 EA 2 MAY 2049 Non-MilStrip

A SW3210 1 EA 2 JUN 2049 Non-MilStrip

A SW3210 1 EA 2 JUL 2049 Non-MilStrip

A SW3210 1 EA 2 AUG 2049 Non-MilStrip

A SW3210 1 EA 2 SEP 2049 Non-MilStrip

A SW3210 1 EA 2 OCT 2049 Non-MilStrip

A SW3210 1 EA 2 NOV 2049 Non-MilStrip

A SW3210 1 EA 2 DEC 2049 Non-MilStrip

A SW3210 1 EA 2 JAN 2050 Non-MilStrip

A SW3210 1 EA 2 FEB 2050 Non-MilStrip

A SW3210 1 EA 2 MAR 2050 Non-MilStrip

A SW3210 1 EA 2 APR 2050 Non-MilStrip

A SW3210 1 EA 2 MAY 2050 Non-MilStrip

A SW3210 1 EA 2 JUN 2050 Non-MilStrip

A SW3210 1 EA 2 JUL 2050 Non-MilStrip

A SW3210 1 EA 2 AUG 2050 Non-MilStrip

A SW3210 1 EA 2 SEP 2050 Non-MilStrip

A SW3210 1 EA 2 OCT 2050 Non-MilStrip

A SW3210 1 EA 2 NOV 2050 Non-MilStrip

A SW3210 1 EA 2 DEC 2050 Non-MilStrip

A SW3210 1 EA 2 JAN 2051 Non-MilStrip

A SW3210 1 EA 2 FEB 2051 Non-MilStrip

A SW3210 1 EA 2 MAR 2051 Non-MilStrip

A SW3210 1 EA 2 APR 2051 Non-MilStrip

New Manufactured Materiel

A SW3210 1 EA 2 MAY 2051 Non-MilStrip

A SW3210 1 EA 2 JUN 2051 Non-MilStrip

A SW3210 1 EA 2 JUL 2051 Non-MilStrip

A SW3210 1 EA 2 AUG 2051 Non-MilStrip

A SW3210 1 EA 2 SEP 2051 Non-MilStrip

A SW3210 1 EA 2 OCT 2051 Non-MilStrip

A SW3210 1 EA 2 NOV 2051 Non-MilStrip

A SW3210 1 EA 2 DEC 2051 Non-MilStrip

A SW3210 1 EA 2 JAN 2052 Non-MilStrip

Proposed Delivery

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

New Manufactured Materiel

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

A SW3210 1 EA

UID REQUIREMENT: The Government does not intend to tell contractors the specific data to be put into each mark.

International Standards and MIL-STD-130 provide the guidance needed by the contractor to determine what information is required within the mark and acceptable formats for applying the mark. It is the contractor's discretion on which UID construct to use according to current business practices. Still, "The preferred format for Unique Identification (UID) is Construct 2 (Issuing Agency Code, Enterprise Identification [CAGE Code], Original Part Number, and Serial Number) as set forth by MIL-STD-130N (or later revision) and the DOD Guide to Uniquely Identifying Items, version 3.0, December 2014 (or later revision). UID shall be in addition to the original Human Readable Information and applied using comparable marking methods. Application of UID markings shall in no way compromise item integrity."

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A SW3210

DLA DISTRIBUTION DEPOT HILL

DDHU CML 385-519-8103

7537 WARDLEIGH RD BLDG 849W

HILL AFB UT 84056-5734

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

Note: For Shipping/Packaging Instructions – See attached Form AFMC 158

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)

(IAW FAR 46.315, FAR 46.504)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six-position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

SEE DFARS CLAUSE 252.232-7003 (b)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

SEE SCHEDULE, SECTION B

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SEE FRONT PAGE OF AWARD Issue By DoDAAC SEE FRONT PAGE OF AWARD Admin DoDAAC SEE FRONT PAGE OF AWARD Inspect By DoDAAC SEE SCHEDULE SECTION B Ship To Code SEE SCHEDULE SECTION B Ship From Code SEE SCHEDULE SECTION B Mark For Code SEE SCHEDULE SECTION B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC SEE SCHEDULE SECTION E LPO DoDAAC N/A DCAA Auditor DoDAAC CONTACT LOCAL DCMA OFFICE Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

SEE FRONT PAGE OF AWARD

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

CONTACT LOCAL DCMA OFFICE

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(The above Clause/Provision has been modified.)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 5 47 GT 15328E 01N000 00000 GGGTTT 503000 F03000 $0.00

PSR: K38816 FSR: 013352

REFERENCE:

AA FD20302600015

ACRN TOTAL $ 0.00

Note: For Transportation Instructions – See attached DD Form 1653

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION/AOB’s CA/ombudsman can be reached at (405) 855-3552.

Complaints which cannot be so resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the contracting officer.

(The above Clause/Provision has been modified.)

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)

(IAW FAR 3.1004(a))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)

(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))

252.203-7004 DISPLAY OF HOTLINE POSTERS (JAN 2023)

(IAW DFARS 203.1004(b)(2)(ii))

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(OCT 2024)

(IAW DFARS 205.470)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(NOV 2021)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.210-1 MARKET RESEARCH (NOV 2021)

(IAW FAR 10.003)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h))

52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA

(AUG 2011)

(IAW FAR 15.408(b))

52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2022-O0001

(OCT 2021)

(IAW DEVIATION 2022-O0001 REV. 1)

(a) Before awarding any subcontract expected to exceed $2 million, on the date of agreement on price or the date of award, whichever is later; or before pricing any subcontract modification involving a pricing adjustment expected to exceed $2 million, the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), in accordance with Federal Acquisition Regulation (FAR) 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor’s estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies. If the $2 million threshold for submission of certified cost or pricing data is adjusted for inflation as set forth in FAR 1.109(a), then pursuant to FAR 1.109(d) the changed threshold applies throughout the remaining term of the contract, unless there is a subsequent threshold adjustment.

(b) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (a) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.

(c) In each subcontract that, when entered into, exceeds $2 million, the Contractor shall insert either—

(1) The substance of this clause, including this paragraph (c), if paragraph (a) of this clause requires submission of certified cost or pricing data for the subcontract; or

(2) The substance of the clause at 52.215-13, Subcontractor Certified Cost or Pricing Data—Modifications (DEVIATION 2022-O0001).

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.215-14 INTEGRITY OF UNIT PRICES -- ALTERNATE I (OCT 1997)

(IAW FAR 15.408(f)(2))

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

(IAW FAR 15.408(g))

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

(IAW FAR 15.408(j))

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(IAW FAR 15.408(k))

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)

(IAW FAR 15.408(n)(2))

252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)

(IAW DFARS 215.408(1))

252.215-7014 EXCEPTION FROM CERTIFIED COST OR PRICING DATA REQUIREMENTS FOR

FOREIGN MILITARY SALES INDIRECT OFFSETS (DEC 2022)

(IAW DFARS 215.408 (8))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)

(IAW FAR 19.708(b))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN - ALTERNATE III (JUN 2020)

(IAW FAR 19.708(b)(1))

52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (SEP 2021)

(IAW FAR 19.708(b)(2))

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)

(IAW FAR 19.309(c))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.]

The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.

[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer’s name and title.]

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019) (IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1))

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I

(DEC 2019)

(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))

252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (DEC 2022)

(IAW DFARS 219.708(b)(1)(B))

52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2024)

(IAW FAR 22.1505(b))

52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT (JUN 2020)

(IAW FAR 22.610)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

(a) Definitions. As used in this clause-- “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.

(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.

(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor.

The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

(IAW FAR 22.1408(a))

(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .