About this file

This document contains an inventory list of buildings at the VA Walla Walla campus including square footage and sprinkler system details, as well as information for a related federal contract opportunity for fire alarm and suppression inspection, repair, and maintenance services. The inventory list provides building identifiers, number of floors, exterior square footage, and whether the sprinkler system is dry or wet for 20 buildings at the VA Walla Walla campus totaling over 400,000 square feet. It also includes square footage for community based outpatient clinics in Yakima, La Grande, and Lewiston. The federal contract opportunity is solicitation number 36C26023Q0120 for master fire alarm and suppression inspection, repair, and maintenance services at the Walla Walla, Lewiston CBOC, and La Grande CBOC locations. The period of performance for the services is February 1, 2023 through January 31, 2024. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20.

View the file

Other files

File Type Posted
36C26023Q0120.docx DOCX document
VA Fire systems devices rev1.xlsx XLSX spreadsheet
CLINs for Fire Systems rev1.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Walla Walla Inventory of buildings including square footage and type of Sprinkler System:

Bldg.
Floors (Sprinkled)
Exterior Gross Sq Ft
Dry/wet
WW-01
3
4,572
None
WW-31
1
4,288
4” Dry
WW-41
1
6,070
4” Dry
WW-48
3
3,356
3” Wet
WW-49
3
3,323
3” Wet
WW-63
1
2,184
4” Dry
WW-65
1
5,298
4” Dry
WW-66
2
8,760
4” Wet
WW-68
4
46,865
4” Wet & 4” Dry
WW-69
4
47,725
4” Wet & 4” Dry
WW-74
2
26,781
4” Wet & 4” Dry
WW-75
2
6,584
2” Wet & 4” Dry
WW-76
1
7,610
4” Wet
WW-77
1
4,398
4” Dry
WW-78
3
13,052
3” Wet, 2” Wet, 4” Dry, & 6” Dry
WW-80
2
20,743
4” Wet
WW-81
1
6,071
4” Wet
WW-82
3
8,647
4” Wet, 2” Wet, & 4” Dry
WW-86
5
50,416
6” Wet
WW-135
1
2,475
2” Wet
WW-140
2
21,333
4” Wet & 4” Dry + Electric Fire Pump
WW-143
2
71,160
6” Wet
WW-145
2
20,910
3” Wet

WW-148

100,000-gallon water tower

WW-T-1/T-2
2 Spaces 1 Valve
3,399
2x3” Dry
WW-T-7
2
6,288
4” Dry
Subtotal WW Campus
402,306 SF
Yakima CBOC
1
8,024
3” Dry
La Grande CBOC
1
8,682
3” Dry
Lewiston CBOC
2
6,620
3” Dry

File details come from the government source that posted it. Updated .