SPRHA326R0438.pdf
PDF 152 KB Posted
- Attached to
- SCS - Amplifier, Trigger
- Solicitation number
- SPRHA3-26-R-0438
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Request for Proposal (RFP) solicitation document issued by DLA Aviation – Ogden for the procurement of an Amplifier, Trigger P (NSN 5996-01-454-4605 ZA).
The solicitation, numbered SPRHA3-26-R-0438, is for a firm fixed-price contract with an offer acceptance period of 120 calendar days from the solicitation issue date. The acquisition is restricted to qualified sources: US Technologies (CAGE 1D8S5), VPI Technologies (CAGE 1V7Q3), Comtech PST (CAGE 31196), and Ensil Technologies Inc. (CAGE 52GG4). Offerors must all be US Contractors. The requirement includes both a First Article Test Plan (CDRL A001) and First Article Test Report (CDRL A002), with government in-system testing to be conducted at the AN/FPS-85 or AN/FPS-85 test station engineering facility in accordance with specified MTS CSOM documentation. The solicitation presents two bid options: Bid A requires first article approval before production of 52 units, with delivery required by July 9, 2026; Bid B waives the first article requirement for 53 production units with the same delivery date. All items must meet requirements in drawing 9477861 (31196) and successfully complete government testing. The acquisition is a rated order under the Defense Priorities and Allocations System (DPAS) at 15 CFR 700. Deliveries are F.O.B. Origin with surface transportation to Hill Air Force Base, Utah (DLA Distribution Depot Hill). The contract includes comprehensive requirements for supply chain traceability documentation, counterfeit prevention planning, military packaging per MIL-STD-2073-1E, and marking per MIL-STD-129R. Evaluation will be price-based as the primary factor, with first article testing costs of $20,000.00 factored into evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA326R0438_______0001.pdf | ||
| CDRLCPP.pdf | ||
| CDRLFATR.pdf | ||
| EDL.pdf | ||
| SOW.pdf | ||
| CDRLFATP.pdf | ||
| MQR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
9. (Agency Use)
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN
CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A
DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE
CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE
ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT
SUBJECT TO THE TERMS AND CONDITIONS STATED HEREIN.
12. ADMINISTERED BY CODE
13. CONTRACTOR
OFFEROR
CODE FACILITY
CODE
14. PAYMENT WILL BE MADE BY CODE
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:
15. PROMPT PAYMENT DISCOUNT
16. AUTHORITY FOR USING OTHER
THAN FULL AND OPEN COMPETITION
10 U.S.C. 3204(a) 41 U.S.C. 253
UNDER THE UNITED STATES CODE AT: ( ) ( )
17.
ITEM NUMBER
18.
SCHEDULE OF
SUPPLIES/SERVICES
19.
QUANTITY
20.
UNIT
21.
UNIT PRICE
22.
AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT
(For Government Use Only)
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION
NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
27. SIGNATURE OF OFFEROR/CONTRACTOR 28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
NAME AND TITLE OF SIGNER (Type or Print) DATE SIGNED NAME OF CONTRACTING OFFICER
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
STANDARD FORM 1447 (REV. 12/2022)
DO: A7
X
X
DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE UT 84056-5820
BUYER: Travis R Bodily/AUBA travis.bodily@us.af.mil Phone: (385) 591- 0001 Fax: (000) 000-0000
SPRHA3
CLASSIFICATION
335999
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE
BLOCKS 11, 13, 15, 21, 22, and 27
1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at
15 CFR 700.
RATING PAGE OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. SOLICITATION NUMBER 5. SOLICITATION TYPE
SEALED BIDS
(IFB) INVITATION
FOR BID
NEGOTIATED
(RFP) REQUEST
FOR PROPOSAL
6. SOLICITATION
ISSUE DATE
7. ISSUED BY CODE 8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
NO COLLECT CALLS
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
HISTORICALLY ELIGIBLE UNDER THE WOSB PROGRAM
UNDERUTILIZED ECONOMICALLY DISADVANTAGED
BUSINESS ZONE WOMEN-OWNED SMALL BUSINESS (EDWOSB)
(HUBZone) SMALL BUSINESS NORTH AMERICAN INDUSTRY CLASSIFICATIO
SERVICE-DISABLED VETERAN- SYSTEM (NAICS):
OWNED SMALL BUSINESS
8(A) SIZE STANDARD:
Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*
26-MAY-2026 11:59PM
All Other Miscellaneous Electrical Equipment and Component Manufacturing X
SCD:C
(SEE ESP CLAUSE 252.232-7003.)
EFT:T14
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
- This acquisition is restricted to qualified source(s): US Technologies - CAGE 1D8S5 / VPI Technologies - CAGE 1V7Q3 Comtech PST - CAGE 31196 / Ensil Technologies Inc. - CAGE 52GG4
- See Page 3 for additional Front Page Notes
SEE LINE ITEM SCHEDULE
Total
SEE SCHEDULE
X
DATE SIGNED
Prescribed by GSA - FAR (48 CFR) 53.214(d) 53.214(d
NO RESPONSE FOR REASONS CHECKED
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
UNABLE TO IDENTIFY THE ITEM(S)
DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
OTHER (Specify)
WE DO
WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE
OF ITEMS INVOLVED
NAME AND ADDRESS OF FIRM (Include ZIP Code) SIGNATURE
TYPE OR PRINT NAME AND TITLE OF SIGNER
FROM: AFFIX
STAMP
HERE
TO:
SOLICITATION NUMBER
DATE AND LOCAL TIME
ATTN: Travis R Bodily/AUBA
DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE UT 84056-5820
SPRHA326R0438
26 MAY 2026 11:59 PM
STANDARD FORM 1447 (REV. 12/2022) BACK
SPRHA3-26-R-0438
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Front Page Notes
- Contractors desiring to become a qualified source must submit a qualification package. Please see clause 52.209-1 and the attached Manufacturing Qualification Requirement for additional details.
- Less than a truckload shipment is acceptable and authorized.
- Early and partial deliveries are acceptable at no increase in cost to the Government.
- US Contractors Only
On Time Delivery Improvement
In accordance with the 448th Supply Chain Management Wing (448th SCMW), Air Force Sustainment Center Contracting Directorate (AFSC/OK) and Defense Logistics Agency (DLA) Aviation Contracting On-Time Delivery (OTD) Improvement Initiative.
DLA Contracting has established the following OTD requirements with the intent to improve OTD.
As detailed in section B of the Solicitation, the government has developed a Required Delivery Schedule (RDS), which is reflective of the customer need date as well as projected Production Lead Time (PLT). The government RDS considered such factors as historical data and active contracts. In developing your response, the government requests your company review the RDS provided and propose an achievable delivery schedule based on your internal PLT review.
With input from suppliers, the Contracting Officer may negotiate an updated RDS representative of all factors stated above along with any new information that may become available.
Contractor Bench Testing
The contractor will be required to Bench Test the First Article prior to sending to the Government for additional First Article testing. The First Article must meet the requirements in drawing 9477861 (31196) and then successfully complete Government in-system tesing at the AN/FPS-85 or the AN/FPS-85 test station engineering facility.
For contractor testing, a DCMA representative must be on-site to witness the testing. Contractor will notify the Government 60 days prior to testing at contractor facility.
Government in-system Testing
Government in-system testing will be conducted at the AN/FPS-85 or the AN/FPS-85 test station engineering facility and in accordance with AN/FPS Phased Array Radar MTS CSOM (Document # EGL-D-CSOM-MTSPPS01-C135-Eglin Rev C)
For Government testing, a DCMA engineer must be on site to conduct the testing. Contractor representative is also required to be on site for testing. Contractor should notify the Government 60 day prior to Government testing at the AN/FPS-85 or the AN/FPS-85 test station engineering facility.
Item No.
NSN: 5996-01-454-4605 ZA
AMPLIFIER,TRIGGER P
SCS
Manufacturer Part Number
1D8S5 DB060685-2
1V7Q3 DB060685-2
31196 DB060685-2
52GG4 DB060685-2
Associated Document(s) Line Item(s)
FD20202600438 0001
Priority: R Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Class I ODS Substance Application/Use Quantity None None None
Bid A - First Article Required Item No.
0001AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATP
First Article Test Plan First Article Test Plan
CDRL A001
Associated Document(s) Line Item(s)
FD20202600438 0002
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW 1423 ( A001 ) Type / Ship To PACRN Mark For
+ IAW1423 IAW 1423
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *450 Calendar Days
Proposed Delivery
Bid A - First Article Required
+ IAW1423 1 LO
The Contractor shall deliver the First Article Test Plan a minimum of 30 days prior to first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.
Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report. Contractor will coordinate submission with contract administrator.
Bid A - First Article Required Item No.
0001AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATR
First Article Test Report
FIRST ARTICLE TEST REPORT
CDRL A002
Associated Document(s) Line Item(s)
FD20202600438 0002
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW 1423 (A002) Type / Ship To PACRN Mark For
+ IAW1423 IAW 1423 ( A002 )
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *540 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
The Contractor shall deliver the First Article Test Report NLT 15 days after first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments. First Article is NOT considered accepted by the government until First Article Test Report is approved.
0001AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AC AA
FA
Bid A - First Article Required First Article
FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20202600438 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Type / Ship To PACRN Mark For A FY2506 PAC First Article Do Not Post Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A FY2506 1 EA *480 Calendar Days
Proposed Delivery
A FY2506 1 EA
Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT
PLACE IN AIR FORCE SUPPLY.
Contractor shall notify the Government 30 days prior to shipment.
0001AD
Firm Fixed Price Quantity U/I Unit Price Amount
52 EA
CLIN ACRN ACRN Total
0001AD AA
PROD
Production Article
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20202600438 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Bid A - First Article Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGIN
Type / Ship To PACRN Mark For A SW3210 PAC Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
A SW3210 52 EA 9 JUL 2026
Proposed Delivery
A SW3210 52 EA
Bid B - First Article NOT Required Item No.
0001AE
Firm Fixed Price Quantity U/I Unit Price Amount
53 EA
CLIN ACRN ACRN Total
0001AE AA
PROD
Production Article
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Associated Document(s) Line Item(s)
FD20202600438 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGIN
Type / Ship To PACRN Mark For A SW3210 PAC Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
A SW3210 53 EA 9 JUL 2026
Proposed Delivery
Bid B - First Article NOT Required
A SW3210 53 EA
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data A005 Counterfeit Prevention Plan Associated Document(s) Line Item(s)
FD20202600438 0003
Priority: R
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW 1423 A005 Type / Ship To PACRN Mark For
+ IAW1423 IAW 1423 (A005)
Type / Ship To Quantity (U/I) IAW DD1423-1 Req No / Pri
Required Delivery
+ IAW1423 1 LO IAW DD1423-1
Proposed Delivery
+ IAW1423 1 LO
“Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report.
Contractor will coordinate submission with contract administrator.”
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A FY2506
20 SPCS MAFS
5001 SITE C 6 ROAD BLDG 8640
FREEPORT FL 32429-2607
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3210
DLA DISTRIBUTION DEPOT HILL
DDHU CML 385-519-8103
7537 WARDLEIGH RD BLDG 849W
HILL AFB UT 84056-5734
HILL AFB UT 84056-5734 49 84056-5734
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C01 Superseded Part Numbered Items (FEB 2025) When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.
C02 Manufacturing Phase Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components
(DEC 2016)
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phaseout or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phaseout to DLA DMSMS at dscc.dmsms@dla.mil.
4.703 - C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2020)
(1) By submitting a quotation or offer, the contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph (2) of this procurement note, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source’s Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) Website ( http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- Avoidance-Program/ ).
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
MIL-STD-130: Items shall be marked in accordance with MIL-STD-130. The National Stock Number (NSN), and when assigned, the Configuration Item Identifier (CII), serial number, and military type designation information shall be marked on major assemblies, units, groups, and sets. Special attention must be given to requirements governing the application of the actual manufacturer's Federal Supply Code for Manufacturers (FSCM) to the physical item. Items which are excluded in accordance with paragraph 1.1 of MIL-STD-130, Revision M, shall be marked in accordance with the appropriate document.
2. PACKAGE AND CONTAINER MARKING: Shipments will not be made until the NSN has been assigned, unless specifically authorized by the Contracting Officer.
MIL-STD-129/ASTM-D-3951:
a. Interior packages and shipping containers shall be marked in accordance with MIL-STD-129 when Military packing is specified and ASTM-D-3951 when commercial packaging is specified. The requirements of paragraph 2.h apply regardless of which packaging is utilized.
(1) Design manufacturer's name, trademark or manufacturer's code (from Cataloging Handbook H4-1 or H4- 2), identifying number, and serial number, when applicable, shall be included in the identification marking.
(2) When applicable, the Air Force project designator code shall be included as the last line of the address marking and the project name related to the project code shall be marked in the clear on the exterior shipping container.
b. Tags and labels, when required, shall be contractor's tags or labels conforming to the requirements of MIL-STD-129 or as approved by the procuring activity. Contractor's forms which indicate serviceable condition shall not be any shade of green or red. Labels are authorized to be used on metal containers. Items requiring technical order (T.O.)
certification shall be annotated on inner and outer container tags or label with T.O. compliance.
c. When dummy containers are used in a unitized load, the dummy containers shall be clearly marked "DUMMY CONTAINER" and located in the load so that the marking will be plainly visible to receiving and storage personnel.
d. All interior packages and shipping containers for articles and materials classified as hazardous or restricted under provisions of Title 49, Code of Federal Regulations, or AFR 71-4/DLAM 4145.3/TM 38-250/NAVSUP PUB 505/MCO P
4030.19 shall be marked, regardless of exemption for mode of transportation, with proper shipping name of item;
flash point of all liquids having a flash point of 200 degrees F. or below; and percentage concentration of acids and corrosive liquids. In addition, the quantity of each hazardous or restricted material included in a container shall be annotated adjacent to the shipping name of the item, e.g., Acetic Acid (80% concentration) -- 1 qt.
e. On shipments of firearms regardless of mode of transportation, selected elements of identification and contractor data markings shall be omitted or obliterated in accordance with the requirements of MIL-STD-129 regarding sensitive items and packing lists shall be placed only inside the containers.
f. Special markings for packages and containers when specified on AFMC Form 158 shall be complied with as a part of
MIL-STD-129.
g. All special coated terneplate containers shall be marked with the legend "CAUTION--DO NOT REUSE AS FOOD
CONTAINERS."
h. Bar code markings in accordance with MIL-STD-129 shall apply to all units, intermediate and exterior containers for all items going into stock regardless of package size or levels of package specified (including commercial packaging). In addition to the NSN/NATO stock number, the exterior shipping container shall include the 13 digit contract number (plus, if applicable, the four digit call number). Excluded from Bar Code Marking are:
(1) Foreign Military Sales.
(2) Direct Vendor Delivery (DVD)/Government Furnished Equipment (GFE) shipments.
(3) Multipack Exterior Shipping Containers. (Unit and intermediate containers do require a bar coded NSN/NATO stock number. However, the next container (unit or intermediate) inside the multipack will also require a bar coded NSN/NATO stock number and contract number with call number, if applicable, in the lower right hand corner).
(4) All unpacked or uncrated items; e.g., vehicles, tires, etc.
i. Shipments of wheeled items weighing 2,000 pounds or more and scheduled for transportation by military aircraft will be marked with the individual axle weights in accordance with MIL-STD-129.
3. WARRANTED ITEMS: When the contract contains warranty requirements, warranty information shall be applied on containers and items as follows:
a. Container markings shall be as specified in MIL-STD-129. The period or conditions of the warranty shall be specifically stated, i.e., landings, flight hours, operating hours, days from shipping date, etc.
b. Items shall be marked in accordance with requirements of MIL-STD-130. Markings shall be located in a manner so as to be conspicuous to the person removing the item from service. When no deleterious effect or functional degradation is caused, the markings shall be black letters on yellow FED-STD-595 color 13655) background. The marking shall include the same period or condition required on the containers.
SHIPPING CONTAINER MARKING
All shipping containers shall be marked meeting the following criteria:
(a) MIL-STD-129 R, Standard Practice for Military Marking.
(b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL-STD-129 R.
(c) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 R , e.g., unit serial numbers, original equipment manufacturer’s (OEM) name, or OEM model number, as specified on the AFMC Form 158:
PACRN(s) Applicable
Additional Bar Coding or Marking Requirements (if applicable)
PAC Not Applicable
MILITARY PACKAGING AND MARKING
Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.
PACRN QUP ICQ PS
MT
C D
PS
ML
WP
ML
CU
DU
C T
U C
I C
U C L
SM
PAC 001 000 GX 1 00 K3 P6 A NS 00 B 39
WGT LGTH WDTH DPTH CUBE O
P I
6.50 16.5 16.5 4.0 0.630 M
PACRN PACK
LVL
PRES
LVL
SUPPLEMENTAL PACKAGING
PAC B MIL <37> ESD PROTECTION REQUIRED F000009XD2
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)
(IAW FAR 9.308-2)
Test criteria are as follows:
Lot/Item Contractor Test/Inspection Requirements 0001AC Performance or other characteristics which the First Articles must meet are:
The First Article must meet the requirements in drawing 9477861 (31196) and successfully complete government in-system testing at the AN/FPS-85 or the AN/FPS-85 test station Engineering Facility.
Lot/Item Government Test/Inspection Requirements 0001AC Government testing will be in accordance with AN FPS Phased Array Radar MTS CSOM.
(Document #EGL-D-CSOM-MTSPPS01 Rev C)
Disposition of the First Article shall be as follows:
Lot/Item Approved 0001AC Approved First Articles will be forwarded to Supply
Lot/Item Disapproved 0001AC Disapproved First Articles will be returned to Contractor
(The above Clause/Provision has been modified.)
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001AA, 0001AB, 0002
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c))
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f))
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:
F.O.B. Address:
[CONTRACTOR FILL-IN]
COMMERCIAL BILL OF LADING SHIPMENTS – CARRIER’S RATES
The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government. Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing. Failure to properly annotate the invoice and provide a copy of the carrier’s billing may result in those cost not being reimbursed or only partially reimbursed.
UNILATERAL AMENDED SHIPPING INSTRUCTIONS (ASIs), F.O.B. ORIGIN
(a) An ASI is a change to the shipping instructions of one or more units or shipment lots of a contract line item. Multiple ASIs for multiple contract line items may be issued under one document.
(b) Unilateral ASIs with changes only to the "Ship To and Mark For" instructions, issued 20 calendar days or more before the contract scheduled delivery date, shall be accepted by the Contractor at no change in contract price.
(c) All other ASIs, including those requiring a change to the "Ship To and Mark For" which are issued 19 days or less before the contract scheduled delivery date; and those for changes to the preservation, packaging, and packing requirements or the f.o.b.
point, shall be subject to the negotiation of an equitable adjustment under the contract.
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(a) Defin it ions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a s ix position code that uniquely identifies a unit, activ ity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certif icat ion when payment cert if ication is done external to the entit lement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing . The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisit ion Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access . To access WAWF, the Contractor shal l—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training . The Contractor should fol low the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitt ing payment requests through WAWF.
Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission . Document submissions may be via web entry, E lectronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions . The Contractor shall use the following information when submitt ing payment requests and receiving reports in WAWF for this contract or task or del ivery order:
(1) Document type . The Contractor shall submit payment requests using the fol lowing document type(s) :
( i) For cost-type l ine items, inc luding labor-hour or time-and-materials, submit a cost voucher.
( i i) For f ixed price line items—
(A) That require shipment of a del iverable, submit the invoice and receiving report specified by the Contracting Off icer. _____________Combination__________________________________________
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the appl icable invoice and receiving report, as specif ied by the Contracting Officer. ______Not Applicable
(ii i) For customary progress payments based on costs incurred, submit a progress payment request.
( iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing . The Contractor shal l use the information in the Routing Data Table below only to fi l l in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table
Field Name in WAWF Data to be entered in
WAWF
Pay Offic ial DoDAAC See front page
Issue By DoDAAC See front page
Admin DoDAAC See front page
Inspect By DoDAAC See Section B
Ship To Code See Section B
Ship From Code See Section B
Mark For Code See Section B
Service Approver (DoDAAC)
N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shal l ensure a payment request inc ludes documentation appropriate to the type of payment request in accordance with the payment c lause, contract f inancing c lause, or Federal Acquisition Regulation 52.216-7, Al lowable Cost and Payment, as applicable.
(5) Receiving report . The Contractor shal l ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarif icat ion regarding invoicing in WAWF from the following contracting activ ity’s WAWF point of contact. ______________ Not Applicable ______________________________
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 97 X4930 .FC04 64 6 47 GH 8M496L 01N000 00000 EERRCT 503000 F03000 $0.00
PSR: K42311 FSR: 001679 DSR: 181890 CIN: F2DCCW6050A1030000AA
ACRN TOTAL $ 0.00
TRANSPORTATION APPROPRIATION CHARGEABLE
The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".
TAI ATAC
TAA FRS3
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (JUN 2023)
(IAW DAFFARS 5301.9103)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.
The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Tyler Ouellette at 385 519 -8206 , FAX 000 000 -0000 , email tyler.ouellette@dla.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary
(ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.
Such inquiries shall be directed to the contracting officer.
52.202-1 DEFINITIONS (JUN 2020)
(IAW FAR 2.201)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-
CONTRACT-RELATED FELONIES (JAN 2023)
(IAW DFARS 203.570-3)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(DEC 2022)
(IAW DFARS 203.970)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(IAW FAR 4.1804(c), FAR 12.301(d))
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
(IAW FAR 4.1903)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)
(IAW FAR 4.2004)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(IAW 4.2105(b))
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
(IAW FAR 4.2203)
52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION
(DEC 2023)
(IAW FAR 4.2306(c))
252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)
(IAW DFARS 204.7109(a))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)
(IAW Class Deviation 2024-O0013 Rev. 1)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (JAN 2023)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
(IAW DFARS 204.2105(c))
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)
(IAW DFARS 204.7304(e))
252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)
(IAW DFARS 204.804-70)
(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.
(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.
(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(IAW FAR 9.206-2)
(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
Item No Agency Name/Address travis.bodily@us.af.mil
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name ______________________________
Manufacturer's Name _________________________
Source's Name ______________________________
Item Name _________________________________
Service Identification _________________________
Test Number _______________________________ (to the extent known)
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.
(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity
0001AC 60 1
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
0001AC 30
FA Test Report Item ***Type/Location **Calendar Days
0001AB IAW1423 540
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))
(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
First Article Item **Quantity ***Calendar Days ****Type/Location 0001AC 1 See CLIN 0001AC FY2506
(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.
A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item **Approval Days ELIN No.
0001AC 30
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor—
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR
VOLUNTARILY (JAN 2025)
(IAW FAR 9.409)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.302)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .