MQR.pdf
PDF 197 KB Posted
- Attached to
- SCS - Amplifier, Trigger
- Solicitation number
- SPRHA3-26-R-0438
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Manufacturing Qualification Requirements document for a Pulsed Amplifier (NSN 5996-01-454-4605, P/N 9477861-01) used in the AN/FPS-85 Eglin Radar system. The document establishes mandatory qualification standards that potential offerors must satisfy to become approved sources for this item, effective February 10, 2026.
Offerors must complete seven qualification requirements to achieve approved source status: (1) notify the appropriate government Small Business Office or contracting officer of intent to qualify; (2) certify possession of required facilities, equipment, tooling, and personnel for manufacturing, inspection, testing, packaging, and storage, with facilities available for government evaluation; (3) verify possession of a complete data package including U.S. Air Force drawing 9477861 and all associated procedures, drawings, specifications, and change notices; (4) manufacture the item conforming to ESA-approved engineering data and provide quality, performance, and environmental evaluation results demonstrating compliance per 415 SCMS standards; (5) prepare and submit a qualification test plan to 415 SCMS for approval, conduct testing with 30 days' advance notice to allow government on-site witnessing, and submit complete test results for approval prior to contract award; (6) provide at their own expense a pre-contract award qualification article for form, fit, and function evaluation demonstrating weapon system compatibility and manufacturing capability, with notification of pass/fail results within 30 days; and (7) acknowledge that successful qualification testing does not guarantee contract award. The estimated qualification cost is $19,000 with a 90-day completion estimate. The document also specifies that offerors cannot be denied the opportunity to submit offers if they can demonstrate qualification capability before the contract award date, and fully qualified offerors will be listed as approved sources, though approval does not guarantee subsequent contract award. Additionally, seven source qualification waiver criteria are available for sources meeting specific conditions, including prior government supply, mirror-image articles, assembly-to-component relationships, earlier dash number provision, similar item qualification, business succession scenarios, with one criterion marked not applicable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA326R0438_______0001.pdf | ||
| CDRLCPP.pdf | ||
| SPRHA326R0438.pdf | ||
| CDRLFATR.pdf | ||
| EDL.pdf | ||
| SOW.pdf | ||
| CDRLFATP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURING QUALIFICATION REQUIREMENTS
NSN: 5996-01-454-4605
P/N: 9477861-01 Noun: Amplifier, Pulsed Application: AN/FPS-85 Eglin Radar
10 Feb 2026 Section C 1/3
SECTION C:
1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE
a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Amplifier, Pulsed.
b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum U.S. Air Force (98749) drawing 9477861. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.
d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS. The offeror shall also identify its sources for materials and its standards for internally used processes.
e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 9477861. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 415 SCMS for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror’s facilities shall be made available for government inspection during these tests.
f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 9477861. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 30 days of
P/N: 9477861-01
10 Feb 2026 Section C 2/3 submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.
g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $19000.
h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 90 days. This is based on complexity of the Amplifier, Pulsed and other factors.
i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.
j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
P/N: 9477861-01
10 Feb 2026 Section C 3/3
2. SOURCE QUALIFICATION WAIVER REQUIREMENTS
Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:
a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).
b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.
c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
g. QWC7: N/A.
File details come from the government source that posted it. Updated .