This solicitation requests power distribution and specialty transformer manufacturing products and services for the Defense Logistics Agency Aviation. Key requirements include the delivery of 14 cable assemblies and counterfeit prevention plans. Responses are due by September 13, 2021, with delivery of first article units required within 120 days of award and production items by December 7, 2021. The solicitation is a total small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to ICBM Cable, newest first.
File Type Posted
3166934_ATTACH_EDA.PDF PDF
SPRHA221Q0300_______0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRHA2-21-R-0300

X

X

6.SOLICITATION ISSUE DATE

27 AUG 2021

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 335311

8(A) SIZE STANDARD: 750

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

100% SMALL BUSINESS SET ASIDE

Less than a truckload shipment is acceptable and authorized.

Early and partial deliveries are acceptable at no increase in cost to the government.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRHA2

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:C

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Power, Distribution and Specialty Transformer Manufacturing

9. (Agency Use)

Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein.

All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*

13-SEP-2021 2:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 84056-5820

BUYER: Karen Wright/DLA karen.wright.4@us.af.mil Phone: (385) 519- 8180 Fax: (000) 000-0000

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 13 SEP 2021 2:00 PM

SOLICITATION NUMBER SPRHA221R0300

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Karen Wright/DLA

DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 84056-5820

SPRHA2-21-R-0300

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No.

NSN: 6150-00-005-1715 AH

CABLE ASSEMBLY,SPEC

Connect Aft Shroud W6B J2593 to Fwd Shroud rocket motor P2561 Foil tape over standard cable, rubber cable covering.

Manufacturer Part Number 98747 71D46266G1 Associated Document(s) Line Item(s)

FD20202100300 0001

Priority: R Applicability: None ;

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Class I ODS Substance Application/Use Quantity

NONE NONE NONE

Bid A - First Article Required Item No.

0001AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

CPP

COUNTERFEIT PREVENTION PLAN

Associated Document(s) Line Item(s)

FD20202100300 0003

Priority: C THIS IS AN EXTREMELY URGENT REQUIREMENT CONCERNING PUBLIC EXIGENCY.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: IN ACCORDANCE WITH THE 1423-1

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

Bid A - First Article Required

+ IAW1423 DESTINATION

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *60 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

Bid A - First Article Required Item No.

0001AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

FATR

First Article Test Report

FIRST ARTICLE TEST REPORT

TEST REPORT IAW DD 1423-1 ATTACHED HERETO

Associated Document(s) Line Item(s)

FD20202100300 0002

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AB Quality Assurance: IN ACCORDANCE WITH THE 1423-1

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ IAW1423 DESTINATION

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *120 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

The First Article Test Report is to be submitted concurrently with the First Article.

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

Bid A - First Article Required

0001AC AA

FA

First Article

FIRST ARTICLE

IAW DD 1423-1

Associated Document(s) Line Item(s)

FD20202100300 0001

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FB2029 DESTINATION

Type / Ship To PACRN Mark For B FB2029 PAB Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST

ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY.

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery

B FB2029 1 EA *120 Calendar Days

Proposed Delivery

B FB2029 1 EA

Bid A - First Article Required Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

13 EA

CLIN ACRN ACRN Total

0001AD AA

PROD

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202100300 0001

Priority: C THIS IS AN EXTREMELY URGENT REQUIREMENT CONCERNING PUBLIC EXIGENCY.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Bid A - First Article Required

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For

A FB2029 PAB ACCOUNT 09

Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A FB2029 13 EA 7 DEC 2021

Proposed Delivery

A FB2029 13 EA

Bid B - First Article NOT Required Item No.

0001AE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

CPP

COUNTERFEIT PREVENTION PLAN

Associated Document(s) Line Item(s)

FD20202100300 0003

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: IN ACCORDANCE WITH THE 1423-1

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ IAW1423 DESTINATION

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *60 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

Bid B - First Article NOT Required Item No.

0001AF

Firm Fixed Price Quantity U/I Unit Price Amount

Bid B - First Article NOT Required

14 EA

CLIN ACRN ACRN Total

0001AF AA

PROD

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Associated Document(s) Line Item(s)

FD20202100300 0001

Priority: C THIS IS AN EXTREMELY URGENT REQUIREMENT CONCERNING PUBLIC EXIGENCY.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 PAB Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

A FB2029 14 EA 7 DEC 2021

Proposed Delivery

A FB2029 14 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FB2029

FB2029 OO ALC DDHU CNTRL RCV

CP 385 519 8898

5851 F AVE BLDG 849W

HILL AFB UT 84056

HILL AFB UT 84056 49 84056-5713

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: B FB2029

809 MXSS/MXDEB

BLDG 849 ATTN: NON-ACCOUNTABLE BAY

(DEAR JOHN BAY)

TRANSPORTATION OFFICE

HILL AIR FORCE BASE UT 84056-5713

UNITED STATES

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

SHIPPING CONTAINER MARKING

All shipping containers shall be marked meeting the following criteria:

(a) MIL-STD-129 R, Standard Practice for Military Marking.

(b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL-STD-129 R.

(c) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 R , e.g., unit serial numbers, original equipment manufacturer’s (OEM) name, or OEM model number, as specified on the AFMC Form 158:

PACRN(s) Applicable

Additional Bar Coding or Marking Requirements (if applicable)

PAA Not Applicable

MIL-STD-130: Items shall be marked in accordance with MIL-STD-130. The National Stock Number (NSN), and when assigned, the Configuration Item Identifier (CII), serial number, and military type designation information shall be marked on major assemblies, units, groups, and sets. Special attention must be given to requirements governing the application of the actual manufacturer's Federal Supply Code for Manufacturers (FSCM) to the physical item. Items which are excluded in accordance with paragraph 1.1 of MIL-STD-130, Revision M, shall be marked in accordance with the appropriate document.

2. PACKAGE AND CONTAINER MARKING: Shipments will not be made until the NSN has been assigned, unless specifically authorized by the Contracting Officer.

MIL-STD-129/ASTM-D-3951:

a. Interior packages and shipping containers shall be marked in accordance with MIL-STD-129 when Military packing is specified and ASTM-D-3951 when commercial packaging is specified. The requirements of paragraph 2.h apply regardless of which packaging is utilized.

(1) Design manufacturer's name, trademark or manufacturer's code (from Cataloging Handbook H4-1 or H4-2), identifying number, and serial number, when applicable, shall be included in the identification marking.

(2) When applicable, the Air Force project designator code shall be included as the last line of the address marking and the project name related to the project code shall be marked in the clear on the exterior shipping container.

b. Tags and labels, when required, shall be contractor's tags or labels conforming to the requirements of MIL-STD-129 or as approved by the procuring activity. Contractor's forms which indicate serviceable condition shall not be any shade of green or red. Labels are authorized to be used on metal containers.

Items requiring technical order (T.O.) certification shall be annotated on inner and outer container tags or label with T.O. compliance.

c. When dummy containers are used in a unitized load, the dummy containers shall be clearly marked "DUMMY CONTAINER" and located in the load so that the marking will be plainly visible to receiving and storage personnel.

d. All interior packages and shipping containers for articles and materials classified as hazardous or restricted under provisions of Title 49, Code of Federal Regulations, or AFR 71-4/DLAM 4145.3/TM 38-250/NAVSUP PUB 505/MCO P 4030.19 shall be marked, regardless of exemption for mode of transportation, with proper shipping name of item; flash point of all liquids having a flash point of 200 degrees F. or below; and percentage concentration of acids and corrosive liquids. In addition, the quantity of each hazardous or restricted material included in a container shall be annotated adjacent to the shipping name of the item, e.g., Acetic Acid (80% concentration) -- 1 qt.

e. On shipments of firearms regardless of mode of transportation, selected elements of identification and contractor data markings shall be omitted or obliterated in accordance with the requirements of MIL-STD-129 regarding sensitive items and packing lists shall be placed only inside the containers.

f. Special markings for packages and containers when specified on AFMC Form 158 shall be complied with as a part of MIL-STD-129.

g. All special coated terneplate containers shall be marked with the legend "CAUTION--DO NOT REUSE AS

FOOD CONTAINERS."

h. Bar code markings in accordance with MIL-STD-129 shall apply to all units, intermediate and exterior containers for all items going into stock regardless of package size or levels of package specified (including commercial packaging). In addition to the NSN/NATO stock number, the exterior shipping container shall include the 13 digit contract number (plus, if applicable, the four digit call number). Excluded from Bar Code Marking are:

(1) Foreign Military Sales.

(2) Direct Vendor Delivery (DVD)/Government Furnished Equipment (GFE) shipments.

(3) Multipack Exterior Shipping Containers. (Unit and intermediate containers do require a bar coded NSN/NATO stock number. However, the next container (unit or intermediate) inside the multipack will also require a bar coded NSN/NATO stock number and contract number with call number, if applicable, in the lower right hand corner).

(4) All unpacked or uncrated items; e.g., vehicles, tires, etc.

i. Shipments of wheeled items weighing 2,000 pounds or more and scheduled for transportation by military aircraft will be marked with the individual axle weights in accordance with MIL-STD-129.

3. WARRANTED ITEMS: When the contract contains warranty requirements, warranty information shall be applied on containers and items as follows:

a. Container markings shall be as specified in MIL-STD-129. The period or conditions of the warranty shall be specifically stated, i.e., landings, flight hours, operating hours, days from shipping date, etc.

b. Items shall be marked in accordance with requirements of MIL-STD-130. Markings shall be located in a manner so as to be conspicuous to the person removing the item from service. When no deleterious effect or functional degradation is caused, the markings shall be black letters on yellow FED-STD-595 color 13655) background. The marking shall include the same period or condition required on the containers.

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements 0001AC Performance or other characteristics which the First Articles must meet are in drawing 71D46266 and sub-tier engineering documents.

Lot/Item Contractor Test/Inspection Requirements

NA

Disposition of the First Article shall be as follows:

Lot/Item Approved 0001AC Forwarded to supply

Lot/Item Disapproved 0001AC Will be retained pending disposition instructions from the contractor

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0001AA, 0001AB, 0001AC, 0001AE

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

COMMERCIAL BILL OF LADING SHIPMENTS – CARRIER’S RATES

The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government. Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing.

Failure to properly annotate the invoice and provide a copy of the carrier’s billing may result in those cost not being reimbursed or only partially reimbursed.

UNILATERAL AMENDED SHIPPING INSTRUCTIONS (ASIs), F.O.B. ORIGIN

(a) An ASI is a change to the shipping instructions of one or more units or shipment lots of a contract line item.

Multiple ASIs for multiple contract line items may be issued under one document.

(b) Unilateral ASIs with changes only to the "Ship To and Mark For" instructions, issued 20 calendar days or more before the contract scheduled delivery date, shall be accepted by the Contractor at no change in contract price.

(c) All other ASIs, including those requiring a change to the "Ship To and Mark For" which are issued 19 days or less before the contract scheduled delivery date; and those for changes to the preservation, packaging, and packing requirements or the f.o.b. point, shall be subject to the negotiation of an equitable adjustment under the contract.

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2))

(a) The Government requires delivery to be made according to the following schedule:

DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE

ITEM.

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH

UNDER EACH ITEM IN THE SCHEDULE.

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

52.211-8 TIME OF DELIVERY -- ALTERNATE I (APR 1984)

(IAW FAR 11.404(a)(2)) If the delivery schedule is expressed in terms of specific calendar dates or specific periods and is based on an assumed date of award, the contracting officer may substitute the following paragraph (b) for paragraph (b) of the basic clause. The time may be expressed by substituting "on or before"; "during the months ..."; or "not sooner than ...

or later than ..." as headings for the third column of paragraph (a) the basic clause.

(b) The delivery dates or specific periods above are based on the assumption that the Government will make award by . Each delivery date in the delivery schedule above will be extended by the number of calendar days after the above date that the contract is in fact awarded. Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-34 F.O.B. DESTINATION (NOV 1991)

(IAW FAR 47.303-6(c))

52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT (FEB 1999)

(IAW FAR 47.305-4(c)) Applicable Item No(s)

0001AA 0001AB 0001AC 0001AE

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

TRANSPORTATION APPROPRIATION CHARGEABLE

The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".

FMS TRANSPORTATION ALLOTMENT SHALL BE USED ONLY WHEN SHIPMENT ON GOVERNMENT BILL OF

LADING IS AUTHORIZED

TAI ATAC FMS ALLOTMENT / NOTE

TAA FRS3

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 1 47 GH 25133G 01N000 00000 EERRCT 503000 F03000 $0.00

PSR: K24755 FSR: 001679 DSR: 329098 CIN: F2DCCW1021A1010000AA

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (OCT 2019)

(IAW AFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Michael Wood at 385 519 -8189 , FAX 000 000 -0000 , email michael.j.wood@dla.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

(IAW DFARS 203.970)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(JUN 2016)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES (JUL 2018)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

(IAW 4.2105(b))

252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)

(IAW DFARS 204.404-70(a))

252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)

(IAW DFARS 204.7109(a))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (DEC 2019)

(IAW DFARS 204.7304(c))

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (MAY 2016)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

First Article Item **Quantity ***Calendar Days ****Type/Location

0001AC 1 120 BFB2029

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

0001AB 120

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING -- ALTERNATE I (JAN 1997)

(IAW FAR 9.308-2(a)(2), FAR 9.308-2(b)(2))

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(JUN 2020)

(IAW FAR 9.409)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.304)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (JUN 2020)

(IAW FAR 15.408(f)(1))

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIATION 2020-O0008)

(OCT 2020)

(IAW Deviation 2020-O0008 Rev. 2)

(a) Definition. “Small business concern,” as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(b) Applicability. This clause applies only to—

(1) Contracts that have been totally set aside for small business concerns; and

(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General.

(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

(d) Agreement.

(1) For a contract or an order at or below the simplified acquisition threshold, a small business concern may provide the end item of any firm. For a contract or an order exceeding the simplified acquisition threshold, unless the Small Business Administration has waived the requirements of paragraphs (d)(1)(i) through (iii) of this clause in accordance with 13 CFR 121.1204, a small business concern that provides an end item it did not manufacture, process, or produce, shall—

(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;

(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and

(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.

(2) For contracts or orders for multiple end items, at least 50 percent of the total value of the contract or order shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.

(3) Paragraphs (d)(1) through (2) of this clause do not apply to construction or service contracts.

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)

(IAW FAR 19.708(a))

52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2020-O0008) (MAR 2020)

(IAW Deviation 2020-O0008 Rev. 2)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. “Similarly situated entity,” as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for small business concerns or 8(a) participants;

(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants;

(3) Contracts that have been awarded on a sole-source basis in accordance with subpart 19.8;

(4) Orders set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), if the order amount is expected to exceed the simplified acquisition threshold;

(5) Orders competed among 8(a) participants in accordance with subpart 19.8 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F), regardless of dollar value;

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference; and

(7) Orders issued directly to small business concerns or 8(a) participants under multiple-award contracts as described in 19.504(c)(1)(ii).

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a NAICS code for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs are excluded to the extent they are not the principal purpose of the contract and cannot be obtained from small business concerns;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractor’s 75 percent subcontract amount that cannot be exceeded.

(f) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph

(e) of this clause will be performed by the aggregate of the joint venture participants.

(g) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1) and (2) of this clause—

[Contracting Officer check as appropriate.] [ ] By the end of the base term of the contract and then by the end of each subsequent option period; or [ ] By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(3) and (4) of this clause, by the end of the performance period for the order.

(End of clause)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)

(IAW FAR 19.309(c))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.

[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.

[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _______________________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(5) Economically disadvantaged women-owned small business (EDWOSB) concern.

[Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.

[The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___________________________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.]

The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .