This is Amendment 0003 to Solicitation SPRDL1-26-R-0032 issued by DLA Weapons Support (Warren), located in Warren, Michigan. The amendment fundamentally restructures the contract requirement from a five-year Indefinite Delivery Indefinite Quantity (IDIQ) arrangement to a base plus one-year option format, with the solicitation closing date extended from June 15, 2026, to August 20, 2026, at 1:00 PM. The contract is Firm Fixed Price and covers supply of rotary pumps (NSN 4320-01-706-5281, manufacturer part number 12581994-3 by Crane Pumps & Systems PFT Corp., CAGE 96046, OEM part number 0ZDCL-00L33-291AMP).

The restructured CLINs consist of: 0001AA (Base Production Quantity of 140 units), 0001AB (First Article Test and Report, not separately priced, quantity 1), and 0002AA (Unexercised Option Quantity of 140 units). The original CLINs for ordering years one through five and separately priced first article test have been deleted. Delivery is FOB Destination to DLA Distribution Anniston, Alabama, with the base quantity due 280 days after award if First Article Test is waived, or 370 days with FAT approval (60 days for FAT delivery). The option quantity delivery is due 280 days upon exercise. First Article Test approval per FAR 52.209-3 is required per the Technical Data Package dated October 6, 2025, with waiver provisions available. The procurement requires Level 2 CMMC certification and includes standard government contract clauses addressing cybersecurity, electronic communications, quality assurance systems, source-controlled components, and contractor responsibility criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0003 2026JUL10

SPRDL1

DLA WEAPONS SUPPORT (WARREN)

WARREN, MI 48397-5000

SABRINA KRAFFT

EMAIL: SABRINA.KRAFFT@DLA.MIL

SPRDL1-26-R-0032

2026MAR31

X

X 2026AUG20 01:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 24

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: SABRINA KRAFFT

Buyer Office Symbol/Telephone Number: ZGAB/(385)591-2852

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

Solicitation: SPRDL1-26-R-0032

Amendment: 0003

1. The purpose of Amendment 0003 to Solicitation SPRDL1-26-R-0032, is to change the requirement type from a 5 year Indefinite Delivery

Indefinite Quantity (IDIQ)to a base plus one option year requirement, extend the solicitation closing date and to update, remove and add narratives and clauses accordingly.

2. The following changes have been made at the CLIN Level:

Removed

0011AA Ordering Year One

0012AA Ordering Year Two

0013AA Ordering Year Three

0014AA Ordering Year Four

0015AA Ordering Year Five

0016AA First Article Test and Report (Separately Priced)

Added

0001AA Base Production CLIN

0001AB First Article Test and Report (Not Separately Priced)

0002AA Unexercised Option Quantity

3. The solicitation closing date is being updated as follows:

From: 15 June 2026

To: 20 August 2026

4. All narratives and clauses that pertain to IDIQ requirements have been removed/replaced and updated with option requirements. A summary of the narrative and clause changes will be posted with this amendment for ease of reference.

5. All other terms and conditions remain unchanged.

*** END OF NARRATIVE A0005 ***

2 24

SPRDL1-26-R-0032

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PUMP,ROTARY

NSN: 4320-01-706-5281

Mfr CAGE: 19207

Mfr Part Number: 12581994-3

0001AA Production Quantity 140 EA $ $ ___________________ ______________ __________________

COMMODITY NAME: PUMP,ROTARY

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH5L0337EH PRON AMD: 01

AMS CD: SM2B1100000

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 12581994-3

DATE: 06-OCT-2025

The Technical Data Package (TDP) is Source Controlled to

Contractor: Crane Pumps & Systems PFT Corp.

CAGE: 96046

Part Number: 0ZDCL-00L33-291AMP

Approved Sources must meet the requirements of the

TDP.

(End of narrative C001)

The USG Part Number: 12581994-3

USG CAGE: 19207

OEM Part Number: 0ZDCL-00L33-291AMP

OEM CAGE: 96046

(End of narrative C002)

A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE

WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL--

CONTRACTOR TESTING",

FAR 52.209-3.

3 24

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

First Article Test is required. Waiver may be authorized; see waiver provision in Section L.

(End of narrative C003)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING NARRATIVE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 30

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV5273021V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 140 0370

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

4 24

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0001AB FIRST ARTICLE TEST AND REPORT 1 EA $ ** NSP ** $ ** NSP ** _____________________________ ______________ __________________

COMMODITY NAME: PUMP, ROTARY

CLIN CONTRACT TYPE:

Firm Fixed Price

A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE

WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL--

CONTRACTOR TESTING",

FAR 52.209-3.

THE PRICE FOR FIRST ARTICLE TESTING IN THE TOTAL

AMOUNT OF $_______________ IS INCLUDED IN THE TOTAL

AMOUNT FOR CLIN 0001AA.

(End of narrative B001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0060

FOB POINT: Destination

SHIP TO:

(SPRDL1) DLA LAND WARREN

ZGA

6501 EAST ELEVEN MILE ROAD

WARREN,MI,48397

Ship to Location listed on this CLIN is for WAWF

Invoice Purposes only.

See clause 52.209-3 for First Article Test and Report for submission information.

(End of narrative F001)

5 24

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 PUMP, ROTARY

NSN: 4320-01-706-5281

Mfr CAGE: 19207

Mfr Part Number: 12581994-3

0002AA UNEXERCISED OPTION QUANTITY 140 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: PUMP, ROTARY

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY,

PURSUANT TO THE NARRATIVE ENTITLED 'SEPARATELY PRICED

OPTION FOR INCREASED QUANTITY' IN SECTION I OF THE

BASIC CONTRACT.

The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract IAW option narrative entitled "Separately Priced Options for Increased Quantity", at the discretion of the

Government.

The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 12581994-3

DATE: 06-OCT-2025

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING NARRATIVE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected

6 24

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 140 0280

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

0011AA DELETED _______

0012AA DELETED _______

0013AA DELETED _______

0014AA DELETED _______

0015AA DELETED _______

0016AA DELETED _______

7 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

FS6051

Delivery Schedule

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The Contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires delivery to be made according to the following schedule:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 140 370

0001AB 001 60

0002AA 140 280 (Upon Exercise of Option)

(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

0001AA 140 280

0002AA 140 280 (Upon Exercise of Option)

(d) Accelerated delivery schedule is acceptable.

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:

(1) OFFEROR'S PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

8 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) OFFEROR'S PROPOSED ACCELERATED DELIVERY SCHEDULE WITHOUT FIRST ARTICLE TEST (FAT), or IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

************ End of Narrative ************

FS7003

Depot Addresses for the Applicable Mode of Shipments: In-The-Clear Addresses

For Delivery, consult the Transportation Office for the applicable Depot as referenced below or Commercial carriers should consult the

Transportation Facilities Guide (TFG) within the Global Freight Management (GFM) system for detailed instructions.

DLA Distribution- Susquehanna

Defense Dist. Depot

Susquehanna

New Cumberland, PA 17070-5001

Rail/ Motor SPLC*: 206721 and 209405

MILSTRIP Address Code: W25G1U

Transportation Office: (717) 770-6091 or 1-800-307-8496

DLA Distribution- San Joaquin

XU Def Dist. Depot

San Joaquin

25600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95304-5000

Rail/ Motor SPLC*: 875670 / 875675 / 875694

MILSTRIP Address Code: W62G2T

Transportation Office: (209) 839-5396

DLA Distribution- Anniston

Anniston Army Depot

Bynum, AL 36201-5021

Rail/ Motor SPLC*: 471995 / 471996 / 471974

MILSTRIP Address Code: W31G1Z

Transportation Office: (256)676-2574 or (256) 676-2712

DLA Distribution- Letterkenny

Letterkenny Army Depot

Chambersburg, PA 17201-4150

Rail/ Motor SPLC*: 209741 / 209770 / 209740

MILSTRIP Address Code: W25G1R

Transportation Office: (717) 267-5220

DLA Distribution- Red River

Red River Army Depot

Texarkana, TX 75507-5000

Rail/ Motor SPLC*: 661136 / 661157 / 661150

MILSTRIP Address Code: W45G19 / W562RM / SW3227

Prior to delivery, contact DLA Distribution Red River, TX Truck Control for an appointment: 903-716-3577 or ddrt.truck@dla.mil

For Truck Deliveries, enter the following address for GPS:

RRAD Commercial Truck Entrance

100 Armory Dr. BLDG 740

New Boston, TX 75570

9 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(903) 334-1246 / 1245

DLA Distribution- Tooele

Tooele Army Depot

Warner, UT 84074-5003

Rail/ Motor SPLC*: 764538 and 764535

MILSTRIP Address Code: W67G23

Transportation Office: (435) 833-2992 or (435) 833-5117

*SPLC indicates Standard Point Locator Code.

NOTE: The following is applicable only when so specified in an individual order or delivery increment:

This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:

New Cumberland Army Depot

Red River Army Depot

Sharpe Army Depot (San Joaquin) prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.

Appointments for FOB Origin shipments should be coordinated with DCMA Transportation. For FOB Origin shipments, or for FOB Destination shipments outside of the Continental United States, Contractors performing under DCMA Administered contracts may request support with shipment and labeling via the Shipping Instructions Request (SIR) Module found at https://www.dcma.mil. This module is available under the eTools tab and can be used by suppliers to send requests for shipping instructions to the DCMA Transportation Office. Contractor user permission is gained via the External Web Access Management (EWAM) within DCMA eTools at https://www.dcma.mil/aboutetools/ utilizing a commercial user account. Once registered, when preparing for shipment a contractor can use the SIR module to request shipping instruction assistance from the cognizant DCMA Transportation Officer (TO) at the responsible Contract Management Office (CMO).

The DCMA Transportation Officer reviews contractor request for shipping instructions and determines the necessary shipping documents needed. Upon completion of processing, the applicable documents and labels will be available for retrieval within the DCMA SIR tool. For further assistance, online training is available at https://www.dcma.mil/eTools/Training-A-Z/, or by contacting the DCMA IT Help Desk at

888-576-3262.

************ End of Narrative ************

FS7201

Delivery of Supplies from Foreign Firms to U.S. Port of Entry

This clause applies only to foreign firms when shipments are required to destinations within the Continental United States (CONUS).

(1) The FOB point for this acquisition is DESTINATION. You must arrange and pay for (i) transportation to the U.S. port of entry, (ii) port handling, (iii) customs clearance, and (iv) all transportation from the port of entry to the consignee(s) listed in this solicitation.

(2) Acceptance will be at destination if the awardee is an OCONUS (Outside Continental United States) foreign firm.

(3) Identification of shipment. The Contractor must insure that all shipments be clearly marked in accordance with MIL-STD-

129 and other marking requirements specified in the Schedule. The Duty-Free Entry clauses in this contract contain instructions on the documentation required to accompany the shipment for duty-free entry.

(4) Notification of Shipment. The Contractor shall send electronic notification to the Procuring Contracting Officer (PCO) when shipment is made, which includes the following information:

10 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(i) Mode of transportation, carrier, bill of lading number, customs broker (if any), and estimated time of arrival of materiel at OCONUS port authority

(ii) Mode of transportation, carrier, bill of lading number, and estimated dates for pick-up from CONUS port authority and delivery to final destination.

(5) You assume all responsibility for risk of loss or damage to the supplies until received at the destination. See the clause entitled RESPONSIBILITY FOR SUPPLIES (FAR 52.246-16).

************ End of Narrative ************

*** END OF NARRATIVE F0001 ***

11 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 CHANGED 252.204-7025 NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL (NOV 2025) NOV/2025

(a) Definitions. As used in this provision, "controlled unclassified information (CUI)," "current," "Cybersecurity Maturity Model

Certification (CMMC) status," "Cybersecurity Maturity Model Certification unique identifier (CMMC UID)," "Federal contract information

(FCI)", and "plan of action and milestones" have the meaning given in the Defense Federal Acquisition Regulation Supplement 252.204-

7021, Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements, clause of this solicitation.

(b)(1) Cybersecurity Maturity Model Certification (CMMC) level. The CMMC level required by this solicitation is: Level 2 (Self). This

CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.

(2) The Offeror will not be eligible for award of a contract, task order, or delivery order resulting from this solicitation if the

Offeror does not have, for each of the contractor information systems that will process, store, or transmit FCI or CUI and that will be used in performance of a contract resulting from this solicitation

(i) The current CMMC status entered in the Supplier Performance Risk System (SPRS) (https://piee.eb.mil) at the CMMC level required by paragraph (b)(1) of this provision; and

(ii) A current affirmation of continuous compliance with the security requirements identified at 32 CFR part 170 in SPRS.

(c) Plan of action and milestones. If the Offeror has a CMMC Status of Conditional, the Offeror shall successfully close out a valid plan of action and milestones (32 CFR 170.21) to achieve a CMMC Status of Final.

(d) CMMC unique identifiers. The Offeror shall provide, in the proposal, the CMMC unique identifier(s) (CMMC UIDs) issued by SPRS for each contractor information system that will process, store, or transmit FCI or CUI during performance of a contract, task order, or delivery order resulting from this solicitation. The Offeror also shall update the list when new CMMC UIDs are generated in SPRS. The

CMMC UIDs are provided in SPRS after the Offeror enters the results of self-assessment(s) for each such information system.

(End of provision)

I-2 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989

I (JAN 1997) AND ALTERNATE II (SEP 1989)

(a) The Contractor shall test 03 unit(s) of Lot/Item 0001AA as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

(b) The Contractor shall submit the first article test report within 60 calendar days from the date of this contract to ACO marked

"First Article Test Report: Contract No. __________________, Lot/Item No. ______". Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the

Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the

Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

12 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

(End of Clause)

I-3 DELETED 52.216-18 ORDERING AUG/2020

I-4 DELETED 52.216-19 ORDER LIMITATIONS OCT/1995

I-5 DELETED 52.216-22 INDEFINITE QUANTITY OCT/1995

IS6230

Separately Priced Option for Increased Quantity

(a) The Government may require the delivery of the numbered item, identified in the schedule as an option item, in the quantity and at the price stated in the schedule. This option may be exercised by the Government at any time, but in any event not later than 365 days after either (i) award or, if FAT is required, (ii) after FAT approval. In addition, such option may be exercised in increments, subject to the stated total additional quantity limitations, price(s), and the above-stated time for exercise of the option.

(b) Delivery of the items added by the exercise of this option shall continue immediately after, and at the same rate as, delivery of like items called for under this contract, unless the parties hereto otherwise agree.

(c) Additionally, prior to the expiration of the original option period identified in paragraph (a) above, the Government may seek a bilateral extension of the option period for an additional period not to exceed 90 days from the expiration date of the original option period.

************ End of Narrative ************

IS7002

Mandatory Use of Contractor to Government Electronic Communication

(a) All references in the contract to the submission of written documentation shall mean electronic submission.

(b) This shall include all written unclassified communications between the Government and the Contractor except contract awards and contract modifications which shall be posted on the internet. Return receipt shall be used if a commercial application is available.

Classified information shall be handled in full accordance with the appropriate security requirements.

(c) Upon award, the Contractor shall designate the personnel with signature authority who can contractually bind the Contractor.

Additionally, the Contractor shall provide the Procuring Contracting Officer (PCO) with a list of e-mail addresses for all

13 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

administrative and technical personnel assigned to this contract.

(d) Unless exempted by the PCO in writing, all unclassified written communication after contract award shall be transmitted electronically.

************ End of Narrative ************

*** END OF NARRATIVE I0001 ***

14 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

L-1 DELETED 252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS NOV/2023

LS6305

Contract Price Reduction for Waiver of First Article Test (FAT)

(a) All offerors are required to insert an amount for 0001AA which includes the full price for FAT.

(b) In addition, those offerors intending to request a waiver of the First Article approval requirement, as described elsewhere in this Section L, shall insert the total price for FAT under Item 0001AB (See Section B of this solicitation). If the successful Offeror requests and is granted a FAT waiver, the dollar amount entered for item 0001AB will be deducted from the total amount cited for 0001AA.

The remaining dollar amount will constitute the price at which award will be made.

************ End of Narrative ************

LS7006

Data and Communications Submitted to the Government Electronically

(a) The Government often employs Contractors as system administrators to operate and maintain Government computer systems. These systems include local area networks, web sites, databases, other electronic records, e-mail accounts, other electronic data transfer mechanisms and computer software. The employees of these contracted system administrators sign nondisclosure agreements obligating them not to reveal information contained in files, documents, computers or systems that they administer. However, unless such information is protected in some way, contracted system administrators do have the ability to access such information.

(b) Potential Contractors as well as any other parties are thus advised to take steps needed to prevent access by contracted system administrators to information submitted electronically to the Government. Absent such steps, it is assumed that contracted system administrators are permitted the capability to access the data. The access will be limited to that which is necessary for the contract system administrator to perform its duties for the Government. The access shall be subject to the condition that third party information is not to be revealed by the contracted system administrator.

************ End of Narrative ************

LS7017

Source Notes on Drawings Conform to Mil Tech Data Requirements

Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Offerors shall bear the responsibility of verifying that the approved part as supplied will conform with all such specific technical requirements.

************ End of Narrative ************

LS7021

Notice Regarding Required Manufacturer's Part Number / Source Controlled Components / Source Controlled Contract Items

(a) This acquisition may contain one of the following:

15 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(i) It may be restricted to the manufacturer's part number or numbers identified in the Schedule (Section B), or in the

Technical Data Package. Please see the narrative entitled ACQUISITION OF MANUFACTURER'S PART NUMBER in this solicitation.

(ii) It is possible at least one component of the item to be purchased under this acquisition is restricted to specified manufacturer's part numbers as set forth in the Technical Data Package. Please see the narrative entitled ACQUISITION OF MANUFACTURER'S

PART NUMBER: COMPONENTS in this solicitation.

(iii) The drawings in the Technical Data Package for this requirement may contain reference notes indicating one or more sources of supply that have previously furnished the items depicted on the drawings.

(b) With the exceptions described in paragraph c below, and in the narrative entitled REPRESENTATION OF INTENT TO SUPPLY A

SOURCE-CONTROLLED ITEM, offers that propose to furnish any alternative to the required manufacturer's part number(s) will not be considered for contract award. It is understood that, by submitting an offer under this solicitation, Offeror agrees to supply one of the required part numbers unless the conditions set forth either in paragraph (c) below or in the narrative entitled REPRESENTATION OF

INTENT TO SUPPLY A SOURCE-CONTROLLED ITEM are met.

(c) Required Approval for Equivalent Items

(1) If a firm manufactures an item which it believes to be totally equivalent to the required item(s), it may submit an offer based on the equivalent item if the following conditions are met:

i. Prior to receipt of this solicitation, the firm must have received written Government Engineering approval of a test procedure on its non-listed item.

ii. The firm must indicate in its offer the date of the written Government Engineering approval of its test procedure, and the name and title of the approving official.

iii. The firm indicates in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already approved part cited in this solicitation, or that it is awaiting final Government Engineering approval of the summary report furnished at the conclusion of independent testing; and

iv. The firm must have secured final written approval of its part from Government Engineering by the time of bid opening (in the case of formally advertised acquisitions) or by the time of contract award (in the case of negotiated acquisitions).

v. Notwithstanding the foregoing, the Government expressly reserves to the Procuring Contracting Officer the right to waive the conditions set forth in paragraph (c)1 above in making an award when it is clearly established that written approval from Government Engineering of a non-listed part number can be obtained without delay in the anticipated date of award.

(2) When the foregoing conditions are met, the Government reserves the right to make an award for a non-listed item. In no other instance will award be made to any firm that does not agree to furnish one of the required part numbers listed in this solicitation.

(3) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required part numbers, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required part, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this Section

L.

(d) It is the responsibility of each Offeror to ensure the availability of sufficient quantities of source-controlled components before making an offer in response to this solicitation. Except as described in paragraph (e) below, offers that propose to substitute alternatives to the source-controlled components, even if the substitute items are represented as equivalent in all respects to the source-controlled components, will not be considered for contract award.

(e) Required Approval for Alternatives to the Source-Controlled Component:

(1) By meeting the following conditions, a firm may submit an offer conditioned on acceptance by the Government of alternatives to the source-controlled component(s) listed in the Technical Data Package:

-- Prior to receipt of this solicitation, the firm must have received written Government Engineering approval of a test procedure on its proposed equivalent component.

-- The firm must indicate in its offer the date of the written Government Engineering approval, and the name and title of the approving official.

-- The firm must certify in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already-approved part

16 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

cited in this solicitation, or that it is awaiting final Government Engineering approval of the summary report furnished at the conclusion of testing; and

-- The firm must have secured final written approval of its part from Government Engineering by the time of bid opening (in the case of formally advertised acquisitions) or by the time of contract award (in the case of negotiated acquisitions).

(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established that written approval of a non-listed part from Government Engineering can be obtained without delay in the anticipated date of award.

When either of the foregoing conditions are met, the Government reserves the right to make an award where use of the equivalent item is authorized in lieu of the source-controlled item. Where the foregoing conditions are not met, Offeror will not be eligible for award unless agreeing to furnish the source-controlled item(s) from the indicated source(s).

(3) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required components, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required component, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this

Section L.

(f) If the drawings in the Technical Data Package for this requirement contain reference notes indicating one or more sources of supply have previously furnished the items depicted on the drawings, these notes also specify some sort of approval requirement, typically phrased in one of the following ways:

(1) or equal

(2) or approved substantial equal

(3) Ordnance Corps approval required

(4) Ordnance Corps Engineering approval required

(g) With the exceptions described in paragraph (h) below, and in the narrative entitled REPRESENTATION OF INTENT TO SUPPLY A

SOURCE-CONTROLLED ITEM), the listing of sources of supply on drawings with such approval requirements means that only those listed sources may furnish the items depicted on such drawings. Thus, any Offeror responding to this solicitation and not meeting the exception criteria set forth herein will be deemed to have agreed to furnish the contract item from a listed source.

(h) Required Approval for Non-listed Part Number:

(1) When the following conditions are met, the Government reserves the right to consider and accept an offer conditioned on a manufacturer's part number not cited in the Technical Data Package. In order to be eligible for such consideration, any firm offering a non-listed part number must:

-- have received, prior to receipt of this solicitation, written TACOM approval of a test plan on its item, designed to demonstrate that the non-listed part is physically, functionally, and mechanically interchangeable with the listed part number(s) cited herein;

-- indicate in its offer the date of the formal Government Engineering approval of the test plan, and the name and title of the approving official;

-- be in the process of having its non-listed part number tested by an independent testing facility under the terms of the approved plan, or be awaiting final Government Engineering approval of the summary report furnished at the conclusion of testing;

and

-- have secured final written approval of its part from Government Engineering by the time of bid opening (in the case of formally advertised acquisitions) or by the time of contract award (in the case of negotiated acquisitions).

(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established that written approval from Government Engineering can be obtained without delay in the anticipated date of award.

(3) Any firm that cannot comply with conditions in paragraph (c) above upon submission of its offer under this solicitation, but that believes one of its part numbers to be equivalent to the approved part number(s) cited in this solicitation, is invited to begin the qualification procedure to gain approval of such non-listed part number for purposes of future acquisition action. Please see the narrative entitled PART NUMBERS NOT CURRENTLY APPROVED, which is located elsewhere in this Section L.

************ End of Narrative ************

17 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

LS7055

Acquisition of New Facilities, Special test Equipment or Special Tooling

It is not the intent of the Government to acquire, or to have acquired for its account, any facilities, special test equipment, or special tooling. The Government shall under no circumstances reimburse the Offeror for the cost of any new facilities, special test equipment, or special tooling as a separate item. An Offeror may, however, amortize the cost of any such facilities, special test equipment, or special tooling it may require in the submitted price of the items. Such facilities, special test equipment or special tooling shall not be subject to Government option rights to take title to the same except as specified in the DEFAULT, TERMINATION FOR

THE CONVENIENCE OF THE GOVERNMENT, and/or PROGRESS PAYMENT clauses of this contract.

************ End of Narrative ************

LS7091

Part Numbers Not Currently Approved

As specified elsewhere in this solicitation, part or all of the contract item to be procured is restricted to certain approved manufacturer's part numbers as set forth in the Schedule and/or the Technical Data Package. Any firm that produces an item which it believes to be equivalent to one of these approved part numbers is encouraged to have such item tested and approved, so that the item will be eligible to be bought on future acquisitions. Please write to the attention of the Contract Specialist at the email address indicated on the cover page of this solicitation and request a statement of the procedures by which items can be tested and approved for procurement. Such an inquiry should cite the applicable National Stock Number (NSN), the already approved part number, the part number of the item which the enquirer believes to be identical to our approved item, and a brief statement of the basis on which the new item is believed to be equivalent to the already approved item.

************ End of Narrative ************

LS7233

Agency Protests

Companies protesting this procurement may file a protest 1) with the Procuring contracting officer, 2) with the General Accounting

Office, or 3) pursuant to Executive Order No. 12979, with the Agency for a decision by the Activity's Chief of the Contracting Office.

Protests filed with the agency should clearly state that they are an "Agency Level Protest under Executive Order No. 12979." (Note: DLA procedures for Agency Level Protests filed under Executive Order No. 12979 allow for a higher level decision on the initial protest than would occur with a protest to the Procuring Contracting Officer; this process is not an appellate review of a Procuring Contracting

Officer's decision on a protest previously filed with the Procuring Contracting Officer). Absent a clear indication of the intent to file an agency level protest, protests will be presumed to be protests to the Procuring contracting officer.

NOTE: DLA Agency Protests for DLA Weapons Support (Warren) shall be filed with:

Chief of the Contracting Office

DLA Weapons Support (Warren)

Mail Stop 729; ZG

6501 E. Eleven Mile Road

Warren, MI 48397-5000

Contracting Officer Protests shall be submitted to the Contracting Officer designated in the solicitation or award.

************ End of Narrative ************

LS7304

Provision for Waiver of Required First Article Approval

18 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) The requirement entitled FIRST ARTICLE APPROVAL in Section I of this solicitation may be waived by the Government, provided that the Offeror meets the conditions identified below.

(1) Offerors who intend to request a waiver or partial waiver of the First Article Test (FAT) must provide sufficient information in order for the Government to determine whether the request is to be approved. If the Offeror intends to request a waiver, a First Article Waiver Worksheet must be completed and submitted to the Government along with any supporting documentation. The worksheet can be found as an attachment/exhibit to the solicitation or by contacting the Contract Specialist on page 1.

The Offeror's request will not be considered if the worksheet and any supporting documentation is not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable).

To substantiate or clarify information provided by the Offeror, the Government may request additional information

(2) Offerors should not assume that the FAT waiver request will be granted even if the completed worksheet and any supporting information is submitted to the Government.

(3) The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.

(4) The Offeror may request a waiver for only a portion of the First Article Test, such as a vibration test or a salt water spray test, or the test on a component or subassembly of the procured item.

(5) The Offeror shall list specifically on the worksheet, by technical data package reference, that portion of the test requested to be waived. The references shall include but may not be limited to the following as applicable:

(i) Identification of the specification or standard along with the specific specification or standard paragraph(s)

(ii) Identification of the drawing with specific references to the drawing notes.

(iii) Identification of the Quality Assurance Provision (QAP), or Quality Assurance Requirement (QAR) or Supplemental

Quality Assurance Provision (SQAP) with specific references to the specific paragraph.

(6) Supporting documentation.

(i) The request for waiver must be accompanied by documentation in support of the request. The documentation may include information such as the following; (1) Copy of the Administrative Contracting Officer's (ACO's) or Procuring Contracting Officer's (PCO) letter approving a First Article Test report on a recent contract for the same or similar item. (2) Copy of a FAT report for the same or a similar item as that herein solicited. (3) Copy of an ACO or PCO letter approving a prior waiver request. (4) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.

(ii) If a copy of a FAT report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.

(iii) The FAT report and all supporting documentation should be submitted by electronic media and should accompany the

Offeror's proposal. If the FAT report and supporting documentation cannot be transmitted by electronic media, the Offeror shall contact the PCO for further instruction.

(b) Note that if a waiver is granted to the successful offeror, an accelerated delivery schedule will apply. See Section F of this solicitation.

(c) Note: Cost considerations shall apply for approving a waiver or a portion thereof of a FAT.

************ End of Narrative ************

LS7425

Offeror's Quality Assurance System

(a) This solicitation will result in a contract that will require the Contractor to use a quality-assurance system to ensure the quality of the contract items.

(b) To allow DLA Weapons Support (Warren) to analyze your proposed quality system, especially if that system is not based on a national or international standard, you must identify your system as part of your response to this solicitation.

(1) If the Government is requiring ISO 9001:2015 (tailored: delete paragraph 7.3) where you will be required to supply conforming product to an established design, and your quality system conforms to ISO 9002, MIL-I-45208 or another comparable specification or standard, this is sufficient description: you need not further describe your quality system in response to this

19 24

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

solicitation.

(2) If the Government is requiring ISO 9001:2015 (untailored) where your capability to design and supply conforming product needs to be demonstrated, and your quality system conforms to ISO 9001, MIL-Q-9858, or another comparable specification or standard, this is sufficient description: you do not need to further describe your quality system in your response to this solicitation.

Note: If the Government is requiring ISO 9001:2015 (untailored), quality systems conforming to ISO 9002 or MIL-I-45208 or comparable quality systems are not acceptable for this contract.

(3) If your quality system does not conform to any of the standards listed immediately above, identify the name of the quality system you intend to use and provide a description of your proposed system in enough detail to let us assess its suitability for use in performing the resulting contract. This is of particular importance if your proposed system is unique, using quality control methods and techniques that your company has developed in-house.

(4) If you provide a description of your quality system, make sure that your description covers how your system:

(i) Achieves defect prevention, and

(ii) Provides process control, and

(iii) Ensures adequate quality controls throughout all areas of contract…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .