SPRDL125R0159-0001.pdf
PDF 26 KB Posted
- Attached to
- Amendment 0001 Clutch, Fan, Engine
- Solicitation number
- SPRDL125R0159
About this file
This is Amendment 0001 to solicitation SPRDL1-25-R-0159, issued by DLA Weapons Support (Warren) on March 5, 2026, for a firm fixed price supply contract. The amendment updates the solicitation to include two primary modifications: the CS8001 Contractor Retention of Supply Chain Traceability Documentation requirement and FAR 52.216-19 Order Limitations clause. The contract is administered by buyer Travis Kelly at ZGBB/(385)591-2859. The amendment does not extend the original offer receipt deadline, and offerors must acknowledge receipt of this amendment prior to the specified deadline using one of three methods: returning two signed copies of the amendment, acknowledging receipt on each copy of the offer submitted, or submitting separate written notice referencing both the solicitation and amendment numbers.
The CS8001 requirement mandates that non-manufacturer contractors confirm they currently possess and will retain comprehensive supply chain traceability documentation, including item description, part number, drawing or specification reference, national stock number, manufacturing source and CAGE code, and identification of all intermediaries in the supply chain. Documentation must include manufacturer batch identification (date codes, lot codes, or serial numbers) where available, inspection and test records, material certifications, and manufacturing process sheets. Contractors must provide this documentation to the contracting officer within three business days upon request and retain it for ten years after final payment. FAR 52.216-19 establishes minimum order thresholds of 60 units and maximum order limitations of 314 units for single items or combinations, with provisions for the contractor to reject orders exceeding maximums within 15 days of issuance. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRDL125R0159-0001.pdf | ||
| SPRDL125R0159 Conformed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2026MAR05
SPRDL1
DLA WEAPONS SUPPORT (WARREN)
WARREN, MI 48397-5000
TRAVIS KELLY
EMAIL: TRAVIS.KELLY@DLA.MIL
SPRDL1-25-R-0159
2026MAR03
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 7
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: TRAVIS KELLY
Buyer Office Symbol/Telephone Number: ZGBB/(385)591-2859
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of this amendment 0001 to solicitation SPRDL1-25-R-0159 is to update CS8001 narrative and input FAR 52.216-19 to the solicitation.
1.
2.
3.
and effect.
CS8001 Contractor Retention of Supply Chain Traceability Documentation (detailed below).
(52.216-19) Order Limitations (detailed below).
All other terms and conditions of solicitation SPRDL1-25-R-0159 remain in full force
*** END OF NARRATIVE A0002 ***
2 7
SPRDL1-25-R-0159
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CS6334 Technical Data Package Information (Contract Opportunities in sam.gov) Version
The following "X"d item applies to this solicitation:
[X] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line-Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN's Web-located TDP. To access the TDP, you will have to copy or type the link's URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the "Text Select Tool," then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: N/A
TDP Link (URL): N/A
[ ] 3. The TDP for this solicitation resides within sam.gov under the Contract Opportunities search function https://sam.gov , and is associated with this solicitation number and can be accessed via this URL: N/A
a. Log on to the sam.gov website.
b. Select Contract Opportunities in the search bar and search by solicitation number.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, login to the Joint Certification Program (JCP) https://www.dla.mil/Logistics-
Operations/Services/JCP/ . Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
c. If technical data is otherwise restricted, click the document title to request access. A window will pop-up, select "Request
Access" to controlled documents and enter the Reason for Access. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access. Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this
Contract Opportunities-TDP access/approval process through sam.gov.
d. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a sam.gov account through https://login.gov . Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/ . Questions related to accounts in sam.gov should be directed to https://sam.gov/content/help . Vendors are responsible for placing correct information in login.gov and sam.gov accounts.
e. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed "Use and Non-
Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.
[ ] 4. The Government requires a "Use and Non-Disclosure Agreement" (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled N/A, and is:
3 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement and email it to the Contract Specialist at -5-. The Contract Specialist will notify the
Contract Opportunities administrator upon receiving the NDA. The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the
TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.
CS7003 Acquisition of Manufacturer's Part Number
This acquisition is restricted to the item description set forth in the Schedule which specifies a manufacturer's part number.
Since complete Government data for the item are not available, it is understood and agreed that references to specifications and drawings herein shall be deemed to include all changes or revisions thereto which the Contractor has made effective as of the date of delivery of any of the items provided for in this contract; provided, that no such change or revision which affects the interchangeability of the item (ability to be interchanged with previous parts or to connect with all mating parts when assembled) shall be effected without the approval of the Procuring Contracting Officer. The Contractor agrees that it will furnish to the Administrative
Contracting Officer or Government Inspector, for the purpose of making inspection under any resulting contract, copies of the applicable specifications and drawings indicating all changes or revisions.
Manufacturer's part number means a product described by the name of an approved source and its corresponding part number cited in the item description; and manufactured by, or under the direction of, that approved source. An offeror of a manufacturer's part number must meet one of the descriptions below.
(1) An approved source offering its part number cited in the item description;
(2) A dealer/distributor offering the product of an approved source and part number cited in the item description;
(3) A manufacturer who produces the offered item under the direction of an approved source; and has authorization from that approved source to manufacture the item, identify it as that approved source's name and part number, and sell the item directly to the
Government.
(4) A dealer/distributor offering the product of a manufacturer that meets the description in subparagraph (3) above.
CS7015 Acquisition of Source-Controlled Part Number
Acquisition under this contract is restricted to:
(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package (TDP); and
(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the TDP; provided (i) that these non-listed part numbers have been furnished to one of the approved manufacturers listed in the TDP, which firm has then, without making any changes in the characteristics or properties of the part, redesignated that part with one of the approved part numbers; and (ii) that firms tendering a non-listed part number as described in this paragraph (2) have completed the REPRESENTATION OF INTENT TO SUPPLY A SOURCE CONTROLLED ITEM narrative and has received approval from the Contracting Office.
CS7004 Configuration Control Engineering Changes
(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
4 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-
1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the
ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the
DOD Forms Website https://www.esd.whs.mil/Directives/forms/dd1500_1999/ or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.
CS7151 Use of Class 1 Ozone Depleting Substances (CIODS)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
CS8001 Contractor Retention of Supply Chain Traceability Documentation
1) By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.
2) Supply Chain Traceability Documentation
i. Supply chain traceability documentation shall include: basic item description, part number; drawing or specification; national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to
Government acceptance. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
5 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ii. Supply chain traceability documentation shall also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/.
iii. In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.
3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
*** END OF NARRATIVE C0003 ***
6 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 CHANGED 52.216-19 ORDER LIMITATIONS OCT/1995
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 60, the
Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of 314;
(2) Any order for a combination of items in excess of 314; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition
Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 15 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
7 7
| SECTION A |
| SECTION C |
| SECTION I |
File details come from the government source that posted it. Updated .