SPRDL1-21-R-0058 Solicitation.pdf
PDF 176 KB Posted
- Attached to
- Enclosure Assembly, Electrical Installation Federal contract opportunity
- Solicitation number
- SPRDL1-21-R-0058
About this file
This solicitation notice is for an enclosure assembly for an electrical installation. The government requires six units of Enclosure Assembly Part #11B364200 from CAGE 59678. A first article test is required within 90 days of award, with full delivery due 120 days after award. Inspection and acceptance will occur at origin. Packaging and marking must follow commercial standards. This opportunity is set aside for woman-owned small businesses. Interested contractors should contact the named contracting specialist at Defense Logistics Agency Land and Maritime for additional details or to submit an offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment SPRDL121R0058-0003.pdf | ||
| EH0C0874EH Addendum Quality Requirements.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRDL1-21-R-0058
X
2021MAY21
2021JUN2205:00pm
DOA4
2021MAY21 SEE SCHEDULE
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
DRAKE MARTINEZ
(586)467-1249
ZGBC
DRAKE.G.MARTINEZ.CIV@MAIL.MIL
1 76
X 1
X 4 X 8
X 12 X 14 X 18
X 26
X 28
X 29
X 45
X 46
X 67
X 75
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DRAKE MARTINEZ
Buyer Office Symbol/Telephone Number: ZGBC/(586)467-1249
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.2 Women Owned Small Business (WOSB) Program Repository________________________________________________________
This solicitation is set-aside for either Economically Disadvantaged Women Owned Small Business (EDWOSB) or Women Owned Small Business
(WOSB) concerns.
To be eligible for award, the offeror must have received certification from the U.S. Small Business Administration (SBA), or an approved third-party certifier, and the offerors profile in the SBA Dynamic Small Business Search (DSBS) https://web.sba.gov/pro-net/search/dsp_dsbs.cfm must be updated to reflect certification.
Guidance for the WOSB Program and Certification can be found on the SBA webpage: http://www.sba.gov/WOSB .
************ End of Narrative A.2 ************
A.4 Acknowledgment of Amendments________________________________
Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:
Amendment Number Date
************ End of Narrative A.4 ************
A.8 Electronic Contracting Provision____________________________________
(a) Vendors should be aware that FedBizOpps (FBO) has moved to https://beta.SAM.gov and is now known as Contracting Opportunities.
(b) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website https://beta.sam.gov . Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.
(c) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract _________
Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.
(d) Requirements for tracking solicitations and submitting bid submissions:
1. Vendors must be registered for a beta.sam.gov account through https://login.gov in order to manage searches and track
2 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
solicitations. Using the Contract Opportunities search function in beta.sam.gov, vendors will to be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.
2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request
TDPs via email to the Contracting Specialist as directed in Section C of this solicitation. __________
3. All bids and proposals must be submitted via email to the Contract Specialist on record. _________
(e) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on beta.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.
(f) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at https://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
************ End of Narrative A.8 ************
A.9 All or None________________
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
************ End of Narrative A.9 ************
*** END OF NARRATIVE A0001 ***
3 76
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 ENCLOSURE ASSEMBLY, ELECTRIC
NSN: 4940-01-551-7977
Mfr CAGE: 59678
Mfr Part Number: 11B364200
0001AA PRODUCTION QUANTITY 6 EA $ $ _____________________________ ______________ __________________
COMMODITY NAME: ENCLOSURE ASSEMBLY, ELECTRIC
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH0C0874EH PRON AMD: 01
AMS CD: SM2B1100000
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11B364200:59678
DATE: 01-SEP-2020
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H090233W801 W62G2X J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 6 0120
FOB POINT: Destination
SHIP TO:
(W62G2X) SR US ARMY DEPOT SIERRA
US ARMY SIERRA ARMY DEPOT
74 CURRANT STREET
HERLONG,CA,96113-5520
4 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1 EA = 1 each Test Report on Contractor performed____
First Article Test (FAT)
NSP = Not Separately Priced___
(End of narrative A001)
FIRST ARTICLE TEST REPORT, PURSUANT TO THE
REQUIREMENTS OF THE CLAUSE ENTITLED "FIRST
ARTICLE APPROVAL - CONTRACTOR TESTING".
THE PRICE FOR FIRST ARTICLE TESTING IN THE
TOTAL AMOUNT OF $______________________, IS
INCLUDED IN THE TOTAL AMOUNT(S) FOR ITEM
0001AA.
The reason we are asking offerors to fill in the dollar amount in the preceding paragraph is so that we will know how much to subtract from the production CLIN if we waive the First
Article Test.
(End of narrative A002)
0001AB FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: FAT REPORT
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0090
FOB POINT: Destination
SHIP TO:
(Y00009) SEE BELOW
5 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 ENCLOSURE ASSEMBLY, ELECTRIC
NSN: 4940-01-551-7977
Mfr CAGE: 59678
Mfr Part Number: 11B364200
OPTION QUANTITY, PURSUANT TO SECTION
I CLAUSE ENTITLED "SEPARATELY PRICED
OPTION FOR INCREASED QUANTITY"
The quantity stated for the option CLIN
DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The option expiration date is 365 days __________ after contract award.
(End of narrative A001)
0002AA UNEXERCISED OPTION QUANTITY 6 EA $ $ _____________________________ ______________ __________________
COMMODITY NAME: ENCLOSURE ASSEMBLY, ELECTRIC
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11B364200: 59678
DATE: 01-SEP-2020
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 6 0120
FOB POINT: Destination
6 76
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
7 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.3 Drawings - Specifications_____________________________
In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
Drawings and Specifications in accordance with Technical Data Package/Technical Data Package Listing 11B364200 (CAGE 59678), with ______________________ revisions in effect as of 01 Sep 2020, are applicable to this procurement with the following exceptions: ___________
1. Responsibility for inspection.
Unless otherwise specified in the contract, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspection set forth in the specifications where such inspection are deemed necessary to assure supplies and services conform to prescribed requirements.
2. Quality conformance inspection.
Quality conformance inspection shall be applied to production units being offered for acceptance under the contract. The inspection shall consist of a and b as follows and failure of any unit to pass these inspection or tests shall be cause for rejection.
a. Product examination (2.1)
b. Packaging inspection (2.2)
2.1. Product Examination.
The production units shall be examined to determine compliance with Army drawings, parts lists, and specifications in the contract including any exception and additions noted in the Product Engineering Requirements, Part I - Section C -
Description/Specifications.
2.2. Packaging Inspection.
The items shall be inspected before and after packaging to determine compliance with the preservation, packaging, packing and marking requirements specified in Section D of the contract.
3. Inspection lot formation. Lot formation shall be in accordance with Section 4 of MIL-STD-1916, unless the contract specifies otherwise, or 100% inspection is specified.
4. Sampling plan determination. Conformance verification methods are specified in paragraphs 2.1 and 2.2. Attribute-sampling inspections shall be conducted in accordance with MIL-STD-1916 using Verification Level IV for Product examination and Level II for Packaging.
************ End of Narrative C.3 ************
C.5 Technical Data Package Information (Contract Opportunities in beta.sam.gov) Version________________________________________________________________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: N/A ___
TDP Link (URL): N/A ___
[ X ] 3. The TDP for this solicitation resides within beta.sam.gov under the Contract Opportunities search function https://beta.sam.gov , and is associated with this solicitation number and can be accessed via this URL:
8 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
https://beta.sam.gov/opp/8de62ab8d1a549859fc07e64e085a547/view
a. Log on to the beta.sam.gov website.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Select Contract Opportunities in the search bar and search by solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, login to the Joint Certification Program (JCP) https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx . Click on documents and follow instructions provided.\~ Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Pending Access to controlled documents. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access.
Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download
TDP items. Allow 2 3 working days to complete this Contract Opportunities-TDP access/approval process through beta.sam.gov.
f. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical
Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a beta.sam.gov account through https://login.gov . Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/ . Questions related to accounts in beta.sam.gov should be directed to https://beta.sam.gov/help/ . Vendors are responsible for placing correct information in login.gov and beta.sam.gov accounts.
g. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled N/A, and is: ___
[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email it to the Contract Specialist at N/A. The Contract Specialist will notify the ___
Contract Opportunities administrator upon receiving the NDA. The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the
TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.
************ End of Narrative C.5 ************
C.11 Drawing Limitations________________________
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___
9 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the _____________________________ manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited _____________________________ in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the
Contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Procuring Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
************ End of Narrative C.11 ************
C.13 Configuration Control Engineering Changes_______________________________________________
(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD
Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the
Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the
DOD Forms Website https://www.esd.whs.mil/Directives/forms/dd1500_1999/ or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.
************ End of Narrative C.13 ************
10 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.18 Use of Class 1 Ozone Depleting Substances (CIODS)______________________________________________________
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
(a)\*()No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.
************ End of Narrative C.18 ************
C.19 Notice of Light Phosphate Requirement__________________________________________
This solicitation and any resulting contract or purchase order are subject to Federal Specification TT-C-490, Type I, Cleaning Methods for Ferrous Surfaces and Pretreatments for Organic Coatings. See submission requirements per Contract Data Requirement List (CDRL) as listed in Subject J.
************ End of Narrative C.19 ************
C.22 Contractor Retention of Supply Chain Traceability Documentation_____________________________________________________________________
1) By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has, or will obtain before delivery, and shall retain documented evidence (supply chain traceability documentation), as described in paragraph
(2) below, demonstrating the item is from the approved manufacturer and conforms to the technical requirements.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing sources Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
(3) Contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance
Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/ .
(4) The contractor shall immediately make documentation available to the contracting officer upon request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for six years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
************ End of Narrative C.22 ************
*** END OF NARRATIVE C0001 ***
11 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.4 Packaging Requirements (Commercial)_______________________________________
The preservation, packing, and marking requirements for the item identified above shall be accomplished in accordance with the performance requirements defined herein.
The following Packaging requirements shall apply:
Preservation: COMMERCIAL
Level of Packing: COMMERCIAL
Quantity Per Unit Package: 001
1. Packaging - Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.
1.1 Cleanliness - Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants. Cleaning may be any suitable process that is not injurious to the item or the protective finish.
1.2 Preservation - Items susceptible to corrosion or deterioration shall be provided protection by means of preservative coatings, volatile corrosion inhibitors, desiccants, waterproof and/or water vapor-proof barriers.
1.3 Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, material critical) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration to prevent damage during handing and shipment. Items of a delicate nature shall not be subjected to damage from rugged items contained within the kit. Non-critical items of odd shapes or having sharp protrusions will not damage other items or protective barriers.
2. Unit Package. A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of a unit package shall be a container such as a sealed bag, carton or box. Unit packs shall be designed to have minimum size and weight while retaining the protection required and enhancing standardization.
3. Unit Package Quantity - Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.
4. Intermediate Package (as applicable)- Intermediate packaging is required whenever one or more of the following conditions exist:
a. the quantity is over one (1) gross of the same national stock number,
b. use enhances handling and inventorying,
c. the exterior surfaces of the unit pack is a bag of any type, regardless of size,
d. the unit pack is less than 64 cubic inches,
e. the weight of the unit pack is less than five (5) pounds and no dimension is over twelve (12) inches.
Intermediate containers shall be limited to a maximum of 100 unit packs, a net load of 40 pounds, or a maximum volume of 1.5 cubic feet, whichever occurs first.
5. Shipping Containers.
Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed in shipping containers.
All shipping containers shall be the most cost effective and shall be of minimum cube to contain and protect the items.
The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.
6. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads shall be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two pallet loads high and wide in a conveyance. The weight capacity of the pallet shall be adequate for the load. The preferred commercial expendable pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the contracting office prior to implementation. The load shall be contained in a manner that will permit safe handling during shipment and storage.
12 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
7. Marking:
All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129 including bar coding and a MSL label. The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006.
Contractors shall check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan.
If the item has Unique Item Identifier (UII) markings then the UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the unit load.
8. Hazardous Materials (as applicable):
Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
When applicable, the packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
--International Air Transport Association (IATA) Dangerous Goods Regulations
--International Maritime Dangerous Goods Code (IMDG)
--Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
--Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
9. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. . Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program.
In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
10. Quality Assurance: The Contractor is responsible for establishing a quality system. Full consideration to examinations, inspections, and tests will be given to ensure the acceptability of the commercial package. All items, packing configurations, and markings supplied under this contract shall be identical to the first article.
11. SUPPLEMENTAL INSTRUCTIONS: N/A
************ End of Narrative D.4 ************
*** END OF NARRATIVE D0001 ***
13 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.2 Use of MIL-STD 1916_______________________
a. The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the Procuring Contracting Officer (PCO). The Contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of
Product. The Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.
b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
************ End of Narrative E.2 ************
E.4 First Article Test (Contractor Testing)___________________________________________
a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance
Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the Contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the Contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the Contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.ccdc-ac.mbx.rdar-qep@mail.mil. __________________________________________
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the Contractor and not due to changes directed by the Government shall be borne by the Contractor.
************ End of Narrative E.4 ************
14 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.12 Notice Regarding First Article Test Sample_______________________________________________
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 0 each that will be consumed or ______ destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 3 each that successfully passes all specified tests, less the destructive tests, if any, shall serve as a ______ _____ manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design, 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the Contractor will notify the Procuring Contracting Officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
************ End of Narrative E.12 ************
E.13 Inspection and Acceptance First Article Approval_____________________________________________________
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data
Package.
(2) The First Article Test Report (FATR) shall be compiled by the Contractor to the Contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the Contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
************ End of Narrative E.13 ************
E.18 Inspection and Acceptance Points - Origin______________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
15 76
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(Name) (CAGE)
Address) (City) (State) (Zip)
************ End of Narrative E.18 ************
E.26 Interchangeability of Components_____________________________________
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOVERNMENT DESIGN CONTROL. Once the Government accepts the first production test item, or ___________________________________________________________ accepts the…