This addendum to a federal contract outlines quality assurance requirements for an enclosure assembly electrical installation. The contractor must specify inspection and acceptance points for the supplies, including the name, CAGE code, and address of the facility where inspection and acceptance will occur. First article testing will be conducted by the contractor at origin according to drawings, specifications, and quality assurance provisions. The first article test report must document all inspection and test results, and be provided to the contracting agency. Nonconformances must be documented and approved by the contracting officer. Military standard 1916 will be followed, using verification level III for major characteristics and verification level II for minor characteristics.

The related federal contract opportunity is a solicitation for an enclosure assembly electrical installation. It is a 100% woman-owned small business set-aside, with a quantity of 6 units and an optional increase to 100 units. The delivery schedule is 120 days with a first article test due in 90 days. Inspection and acceptance will occur at origin, with packaging and freight terms to destination. The contracting specialist is Drake Martinez at the Defense Logistics Agency Land and Maritime, and offers are to be sent directly to him.

View the file

Other files for this federal contract opportunity

Other files attached to Enclosure Assembly, Electrical Installation, newest first.
File Type Posted
Solicitation Amendment SPRDL121R0058-0003.pdf PDF
SPRDL1-21-R-0058 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision: 21 July 2020

CONTRACT ADDENDUM

QUALITY ASSURANCE REQUIREMENTS

FCDD-ACE-QP 367 REQ Selection #1

INSPECTION AND ACCEPTANCE POINTS: ORIGIN

The Government's inspection of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility, or subcontractor's facility, where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

ACCEPTANCE POINT: ORIGIN

a. NAME

b. CAGE

c. ADDRESS, CITY, STATE, ZIP

FIRST ARTICLE TEST REPORT (FATR) ACCEPTANCE: DESTINATION

The Government's acceptance of the First Article Test Report (if required) offered under this order shall take place at DESTINATION.

FCDD-ACE-QP 367 REQ Selection #21

FIRST ARTICLE TEST (CONTRACTOR TESTING)

a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

c. The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.

d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

e. A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to USARMY RIA CCDC AC Mailbox RDAR-QEP: usarmy.ria.ccdc-ac.mbx.rdar-qep.

Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the Contractor.

FCDD-ACE-QP 367 REQ Selection #29

USE OF MIL-STD 1916

a. The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The Verification Level (VL) shall be:

VL for major characteristics and VL for minor characteristics.

b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.

END OF QUALITY ASSURANCE REQUIREMENTS