QASP_SPRBL119R0060.pdf
PDF 1 MB Posted
- Attached to
- Navigation Control Unit - Spares/Repairs Federal contract opportunity
- Solicitation number
- SPRBL119R0060
About this file
QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRBL119R0060.pdf | ||
| CDRLs_SPRBL119R0060.pdf | ||
| Technical_Requirements_Document_SPRBL119R0060.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0002 RFP#SPRBL119R0060 Page 1 of 15 Issue 26 JUNE 2019
Quality Assurance Surveillance Plan
For
AN/TPQ-50(V)/Q50 (V) COUNTERFIRE TARGET ACQUISITION RADAR SYSTEMS
Sustainment Spare Parts Acquisition & Hardware Repairs Services
For Inertial Navigation Unit (INU), gTALIN
NSN: 6605-01-660-2459
Honeywell P/N: HG9740DU4
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is created by the Government to determine and assess the Contractor’s compliance with metrics established for all Delivery Orders (DOs) and/or Task Orders (TOs) performance against technical and contract requirements. The QASP correlates to the contract Technical Requirements Document (TRD) and the Contractor shall apply both documents in concert during performance on each DO or TO efforts as applicable to the contract scope in effect: Requirements for Spare Parts Acquisition and Hardware Repairs Services for Honeywell Inertial Navigation Units (INUs) Part #: HG9740DU4 which final configuration includes Government Furnished Property (GFP) GB-GRAM Card 987- 9705-001. Also included is a Contract Line Item (CLIN) for Engineering Services to be used on contingency basis should need for such services surface during the contract ordering years.
The INU is a part of the AN/TPQ-50(V)/Q50 (V) Counterfire Target Acquisition Radar Systems (CTARS) and is required for maintainability and operational readiness of these radars.
The QASP establishes processes and procedures by which quality, inspection and performance assessment will be conducted for all orders placed on contract and continuous oversight. In this context, process is defined as set of interrelated or interacting activities which will transform the U.S Government (USG) goals and inputs into Contractor’s performance outputs while procedure is herein defined as manner through which activities or processes will be carried out by both parties, the USG and the Contractor. The key driving elements of this QASP process for each Delivery Order (DO) and/or Task Order (TO) to be placed on contract during the overall ordering and performance periods are:
a. What will be monitored?
b. How will monitoring occur?
c. Who will conduct the monitoring?
d. How monitoring efforts and results will be documented?
e. What is the resulting output vs contract performance metrics as inputs?
Established factors for key driving elements of this QASP include but not limited to:
1. Quality
2. Completeness
3. Timeliness
4. Cost Savings
For Official Use Only - Source Selection Information - See FAR 2.101 & 3.104
Attachment 0002 RFP#SPRBL119R0060 Page 2 of 15 Issue 26 JUNE 2019
5. Accuracy
6. Efficiency
7. Effectiveness
1.1.
The Contractor shall implement and deliver performance that meets at a minimum or exceeds contract standards using its Quality Control Plan in accordance with (IAW) a Quality Assurance System that meet an American National Standard Quality Management Systems, (Ref TRD Para. 3.5), to ensure integrity of products that meets or exceeds the contract requirements.
The QASP establishes the structure for the USG’s surveillance of the Contractor’s performance for all DOs and TOs efforts to assure that they meet contract requirements and standards. The USG’s goal and intent is to be objective, fair, and reasonable in evaluating the Contractor’s performance and collaborate with the Contractor to mitigate and resolve all surfaced matters inhibiting successful DOs and/or TOs contract completion.
1.2.
This QASP is a living document, subject to update for currency over the life of the contract ordering and performance period. Update or revisions to QASP over the course of the contract will incorporate necessary changes or improvements to achieve optimum performance and to facilitate subject matter experts judgement in conducting evaluation to determine necessary adjustments, whether an increase or decrease as applicable, to the level of program surveillance based on Contractor’s performance on each DO and/or TO. The QASP is designed to bring full transparency, foster early and open communication for team collaboration to mitigate schedule and cost risk with Contractor’s performance that may adversely impact the USG’s mission to achieve performance success. In addition, the QASP is designed to assist the Contractor with advanced planning and considerations to recognize and address potential foreseen and unforeseen or uncontrollable circumstances that may occur outside of the Contractor’s or the USG’s control for advanced mitigation to develop and implement alternate solutions.
1.3.
The Contractor shall use the QASP in implementing the applicable TRD requirements for each executed contract DO and TO performance efforts for transparency and early identification of performance issues for discussions and resolution to prevent or at least minimize risk on program cost, schedule, final outputs and the USG’s mission. The Contractor shall immediately report and address all matters inhibiting Contractor’s performance to the Contracting Authority (Contracting Officer) in writing to include the Contract Specialist and the Contracting Officer Representative (COR) and identified Program Lead under distribution/copy furnished.
2. Authority
This QASP is issued for implementation IAW the Federal Acquisition Regulation (FAR) Subparts 37-6, Performance-Based Acquisition, and Part 46, Inspection of Services clauses, Attachment 0002 RFP#SPRBL119R0060 Page 3 of 15 Issue 26 JUNE 2019 which provide for inspection, acceptance and documentation of the service called for in the contract.
3. Roles and Responsibilities
Upon contract award, the Contractor shall identify to the Procuring Contracting Officer (PCO), Contract Specialist (CS), Contracting Officer Representative (COR) and Administrative Contracting Officer (ACO) its Project Manager/Lead, Quality Assurance Manager/Lead, and respective Lead Engineer for each DO and/or TO effort in writing. The following personnel shall oversee and coordinate surveillance activities.
3.1. COR
The COR has been nominated by the Requiring Activity, CECOM ILSC IEWS, and trained to perform associated duties in support of the Contracting Authority (Contracting Officer), in monitoring contract activities and Contractor’s performance for all orders placed on contract.
Nominating Requiring Activity Representative:
3.2. Contracting Officer
The PCO is responsible for monitoring contract compliance, contract administration, and cost control as well as for resolving any differences between the observations documented by the initially assigned Communications-Electronics Command Integrated Logistics Support Center (CECOM ILSC) COR: Theresa Baugh, theresa.a.baugh.civ@mail.mil; PCO, CS and the Contractor. The PCO will designate one full-time COR: Theresa Baugh, theresa.a.baugh.civ@mail.mil, as the Government authority for performance management.
The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the PCO. The Government reserves the right to assign multiple CORs if deemed necessary during the course of the period of performance based on the total number of active DOs and/or TOs and the Contractor will be advised accordingly.
3.3. Contracting Officer’s Representative
The COR is designated in writing by the PCO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR will be supported by a team of Government personnel in carrying contract surveillance and assessment responsibilities. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf as this function lies strictly with the PCO and accordingly any changes that the Contractor deems may affect contract price, terms or conditions shall be addressed to the PCO in writing followed by confirmation of receipt for immediate attention and action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any hardware and/or service relating to the contract.
For Official Use Only - Source Selection Information - See FAR 2.101 & 3.104
For Official Use Only - Source Selection Information - See FAR 2.101 & 3.104 mailto:theresa.a.baugh.civ@mail.mil
Attachment 0002 RFP#SPRBL119R0060 Page 4 of 15 Issue 26 JUNE 2019
4.0. Performance Requirements and Method of Surveillance
4.1 Contract Surveillance
The COR will use the methods contained in this QASP to ensure the Contractor is in compliance with contract requirements. The COR is responsible for a wide range of surveillance requirements that effectively measure and evaluate the Contractor’s hardware acquisition performance meeting design specification Form, Fit, Function and Interface (F3I) requirements in addition to agree upon service TOs goals and objectives with their associated contract performance schedule. Additionally, this QASP is based on the premise that the Contractor, not the Government, is responsible for management and satisfactory resolution of all quality control and quality assurance failures/deficiencies and satisfactory corrective actions to successfully meet the terms of each DO and/or TO contract requirements.
4.2. Methods of Surveillance and Surveillance Matrix
The Government will use the surveillance methods described below to evaluate Contractor.
4.2.1 DIRECT OBSERVATION. Government personnel will rely on first hand observations of Contractor’s performance during test events, conference calls and/or meetings if held to address contractual issues, or through review of contract deliverables to assess compliance with contract requirements. This method may include Government DCMA Representative witnessing test, configuration audit, teleconference, transparency in communicating and timely reporting of issues, responsiveness in addressing USG raised issues and/or concerns, etc.
4.2.2 PERFORMANCE REVIEWS/PROGRESS REPORTING. The COR will review all submitted reports or Emails upon receipt and for assessment of data from various delivered technical, management and cost reports to verify accuracy of claimed progress against demonstrated performance and compliance with contract requirements. Progress reports and status reported during program reviews, if conducted, will be verified in conjunction with other surveillance methods such as direct observation and random sampling if and when deemed necessary.
4.2.3 PERIODIC AND RANDOM SAMPLING. The Government may choose to evaluate Contractor’s process on a random basis if and when a deficiency is suspected or reported and this may be scheduled either through DCMA, the COR or other designated Government Representative(s).
4.2.4 INSPECTION. During each DO and/or TO contractual performance, the Government may choose to conduct periodic inspection of parts and deliverables for conformance to requirements to include audit of completed TO services.
4.2.5 TESTING. First Article Test is not applicable as the Contractor is the original equipment manufacturer and has been continuously producing the item which is its commercial part. Contractor’s Test & Inspect data and Final Inspection and Acceptance Test shall be used as additional methods of surveillance to verify and confirm compliance
Attachment 0002 RFP#SPRBL119R0060 Page 5 of 15 Issue 26 JUNE 2019 of deliverable units IAW the item F3I design performance specifications acceptance criterion as approved by the Government to meet operational requirements in the Q50(V)
CTARS.
4.3 Customer Feedback
The Contractor is expected to establish and maintain professional communication between its employees and customers with primary focus on meeting the Government’s DO and/or TO contract requirements. The primary objective of this communication is collaboration to mitigate measurable customer complaints and achieve utmost customer satisfaction which is the most significant external indicator of the success and effectiveness of all hardware performance and services provided.
Performance management drives the Contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR: Theresa Baugh, theresa.a.baugh.civ@mail.mil, as opposed to the Contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing to detail nature of the complaint, which must be signed and forwarded to the COR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 2.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.4 Acceptable Quality Levels
The Acceptable Quality Levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for Contractor’s performance are structured to allow the Contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving repair of inoperable units, final acceptance test and repair Turn-around-Time (TAT), the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the DO and/or TO efforts in respect to the overall mission performance at Communications- Electronics Command Integrated Logistics Support Center (CECOM ILSC).
4.5 Contractor Performance Assessment Report System (CPARS)
The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under the basic contract and resulting DOs and/or TOs. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance.
The Government will address the quality of hardware products or services delivered, associated schedule, cost control, business relations, and management for all DO and/or TO procurement contractual actions as this information may affect the continuation of the contract, and future contract awards throughout DoD. The annual Government assessment will be used
For Official Use Only - Source Selection Information - See FAR 2.101 & 3.104
Attachment 0002 RFP#SPRBL119R0060 Page 6 of 15 Issue 26 JUNE 2019 appropriately as an additional performance oversight and communication tool along with the
QASP.
Surveillance results must be able to support action taken by the COR, CS/PCO whenever non-performance or unacceptable performance occurs.
Acceptable Performance: The Government shall document positive performance. The COR shall document positive performance in the Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.csd.disa.mil/cparsmain.htm.
Unacceptable Performance: The Contractor’s performance shall be considered unacceptable when the Contractor receives a justifiable rating of unsatisfactory from the COR’s evaluation of the DO and/or TO deliverables or when a Contract Discrepancy Report (CDR) is submitted.
When unacceptable performance occurs, the COR shall inform the Contractor within reasonable timeframe which will normally be in writing unless circumstances necessitate verbal communication. In such case the COR shall document the discussions and place the record in the COR file then notify the PCO for awareness and confirmation on such matters.
When an assigned COR determines formal written communication is required, the COR shall prepare a CDR, and present it to the Contractor's DO and/or TO Task Manager or appropriate on-site representative. A CDR template is attached to this QASP as Attachment 3.
The Contractor shall acknowledge receipt of the CDR in writing to the COR, Contract Specialist and PCO. The CDR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor has to present this corrective action plan to the COR, Contract Specialist and KO. The Government’s team shall review the Contractor's corrective action plan to determine acceptability or non-satisfactory with follow-up notification to the Contractor.
Unacceptable performance shall be documented in CPARS and any CDRs may become a part of the performance reports entered in CPARS.
5.0 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the contract TRD and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
Attachment 0002 RFP#SPRBL119R0060 Page 7 of 15 Issue 26 JUNE 2019
The Government’s QA surveillance, accomplished by the DCMA will be reported using the monitoring forms in Attachments 2. The forms, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure that the required hardware results of 100% inspection and zero defects and/or TO service satisfaction are being achieved.
The COR, QAR. Contracting Specialist and PCO will retain a copy of all completed QA surveillance forms
6.0 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, the Government reserves the right to request the Contractor develop a corrective action plan to demonstrate by a specified date efforts to be implemented to bring its performance up to the required levels.
6.1.1 Cost. The COR will closely monitor all CDRLs deliverables and inform the PCO of all cost concerns. Additionally, FAR clause 52.232-22, Limitation of Funds, will be included in the contract and the Contractor shall be required to notify the KO in accordance with the clause.
6.1.2 Technical. The COR, in collaboration with a Government Integrated Process Team, will review all deliverables submitted by the Contractor to ensure compliance with the stated requirements and to evaluate the Contractor’s performance on a monthly basis. The COR will document the results within monthly reports, which will be submitted to the PCO in accordance with the QASP. The COR will monitor the contract for obsolescence issues IAW the QASP.
Additionally, the Government will complete evaluations within CPARS of the Contractor’s technical competence. The evaluations will record the Contractor’s performance under the proposed contract.
6.1.3 Schedule. The COR will monitor all delivery schedules to ensure compliance with the requirements within each DO/TO and TRD. Additionally, the COR will notify the PCO of any potential delays. The PCO will contact the Contractor and request submission of a Corrective Action Plan detailing the actions necessary to remedy schedule delay or address foreseen risk to schedule.
6.1.4 Performance. The COR will monitor performance risk through proper Government oversight of the Contractors performance as detailed in the QASP and TRD with Government review of Contractor’s deliverables. Additionally, the COR will promptly inform the PCO of any performance issues, for collaborative discussions and timely satisfactory resolutions.
Furthermore, the Government shall evaluate the Contractor’s performance within CPARS for each appropriate performance periods. Monthly, the COR shall document/report any potential performance issues per the QASP. Early intervention by the COR, Contract Specialist and PCO will mitigate hardware and service performance and associated quality concerns.
Attachment 0002 RFP#SPRBL119R0060 Page 8 of 15 Issue 26 JUNE 2019
6.2 Reporting
At the end of each month, the QAR will prepare a written report for the Communications-Electronics Command Integrated Logistics Support Center (CECOM ILSC): The COR: Theresa Baugh, theresa.a.baugh.civ@mail.mil; summarizing the overall results of the quality assurance surveillance of the Contractor’s performance.
This written report, form (Attachment 2), will be uploaded in the Wide Are Work Flow Contracting Officer Representative Tracking (CORT) Tool and will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting contract DOs and/or TOs stated objectives and/or performance standards, including cost/technical/scheduling and quality level of service.
6.3 Reviews and Resolution
The COR may require the Contractor’s Project Manager/Lead, or a designated alternate, to meet with the QAR and/or PCO and other Government IPT personnel as deemed necessary to discuss performance evaluation. The QAR will define a frequency of in-depth reviews with the Contractor, including appropriate Contractor’s self-assessments however, if the need arises, the Contractor will meet with the COR, Contract Specialist, PCO and/or QAR as often as required or per the Contractor’s request. The agenda of the reviews may include but not limited to:
a. Monthly performance data assessment and trend analysis
b. Issues and concerns of both parties
c. Projected outlook for upcoming months and progress against expected trends, including corrective action plan analysis
d. Recommendations for improved efficiency and/or effectiveness
e. Issues and/or concerns regarding obsolescence
The QAR/COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The QAR, COR, Contract Specialist, KO and Contractor should jointly formulate tactical and long-term courses of action for optimum contract DO and/or TO performance. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.
Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the Procuring Contracting Officer / Administrative Contracting Officer.
6.3.4 Unsatisfactory contract performance will be reported on DA Form 5479-R, Contract Discrepancy Report (CDR). This form is used to notify the Contractor of discrepancies found by the COR. The Contractor may use this form to address how the discrepancy will be corrected and plan to mitigate or avoid reoccurrence. If unsatisfactory performance occurs in an area based on the COR’s surveillance and concurrence by Government technical personnel, the Contractor will be issued a CDR. This completed and signed CDR along with
For Official Use Only - Source Selection Information - See FAR 2.101 & 3.104
Attachment 0002 RFP#SPRBL119R0060 Page 9 of 15 Issue 26 JUNE 2019 the supporting documentation will be forwarded to the Procuring Contracting Officer for disposition with a copy recorded in the COR file.
Attachment 0002 RFP#SPRBL119R0060 Page 10 of 15 Issue 26 JUNE 2019
Attachment 1: Performance Requirements Summary AN/TPQ-50 (V)/Q50 (V) CTARS Program Surveillance Matrix
REQUIREMENT PERFORMANCE
OBJECTIVES
PERFORMANCE
STANDARD
SURVEILLANCE
METHODS
FREQUENCY
CONTRACTOR
PERFORMS/
FREQUENCY
INSPECTED
Configuration Management
The Contractor shall maintain a Configuration
Management (CM) process delineated in its internal CM Plan that should be made available for Government review if and when requested during the contract performance period as specified in TRD Para 3.1
Changes to Configuration Baseline shall be submitted
IAW CDRL DI-SESS-
80640D, RFV per TRD Para
3.1.7
The USG shall be notified of departures from Contractor’s CB CIPN IAW CDRL for DI-
MISC-80711A per TRD Paras. & 3.1.10
100% Compliance to
USG
Configuration
Control Requirements
Random, Periodic and/or
100% Inspection
As required by contract to prevent and/or eliminate CM discrepancies or defects
TDP Delivery upon Triggering
Event
The Contractor shall implement execution of USG TDP Delivery IAW 3 CDRLs for DID DI-SESS-81000E:
Product Drawings/Models and Associated Lists, Special Inspection Equipment (SIE)
Drawings/Models and Associated Lists, and Special
Tooling (ST) Drawings/Models and
Associated Lists as well as
Attachment 0002 RFP#SPRBL119R0060 Page 11 of 15 Issue 26 JUNE 2019 the CDRLs for DIDs: DI-
IPSC-81441, DI-IPSC-
80590B, DI-MISC-80508B
per TRD Para. 3.1.1.1
GFP GB-GRAM
Integration
The Contractor shall maintain a standard process for the acceptance and integration of the GB-GRAM card, provided as GFP that should be made available for Government review if and when requested during the contract performance period as specified in TRD Para. #s
3.1.3. & 3.1.4
100% Compliance to
USG
Configuration
Control Requirements
Random, Periodic and/or
100% Inspection
Source Code Review to
Inspect Line of Codes
As required by contract to ensure FW integration is completed per LRU F3 and integration requirement.
Maintenance of Quality
Management System (QMS)
The Contractor shall implement and maintain a Quality Assurance System that meets an American National Standard Quality
Management Systems, such as ISO 9001:2015 or equivalent IAW TRD Para.
3.5.
100% Compliance to QMS Standard
Direct Observation, Performance
Reviews/ Progress
Reporting, Periodic & Inspection
As required by contract to prevent and/or eliminate discrepancies or defects
Final Inspection & Acceptance Test of New &/or Repair INUs
The Contractor shall perform final inspection and test of INUs produced per TRD
Para. 3.3 and/or repaired per TRD Para. 3.4 as applicable IAW current tech data and
F3I Specifications to verify all units meet technical requirements as specified in TRD Para. 3.6.
100% Compliance with Government approved CB and Technical Requirements
Direct Observation, Periodic/Rando m Sampling, 100% Inspection, Testing to
Include Software
Integration
As required by contract to prevent and/or eliminate hardware configurations discrepancies, and software errors/bugs or defects
Attachment 0002 RFP#SPRBL119R0060 Page 12 of 15 Issue 26 JUNE 2019
Test, System Test, Periodic
Inspection
Task Order (TO) Engineering Services if exercised
The Contractor shall perform services to meet requirements to be specified in each TO for Engineering
Services and ensure all services delivered meet and confirm with respective TO requirements - Ref this TRD Para. 3.12 and
Supplemental Requirement Document to be placed on contract when need arises
100% Compliance with Government
Technical Requirements
Direct Observation, Periodic/Rando m Sampling, 100% Inspection, Final Test Results as applicable, Periodic Inspection
As required by contract to prevent and/or eliminate discrepancies and mitigate unsatisfactory performance
Status Reporting
Contractor shall submit a Contractor Status Report per identified CDRL (DI-MGMT- 81238. Report shall address accountability and status for all GFP GB – GRAM Card assets at Contractor’s facility IAW TRD Para. 3.8
100% Compliance with reporting requirements cited in Box 16 CDRL for DID, DI-MGMT-
81238
Direct Observation, Performance
Reviews/Progr ess Reporting, 100% Inspection, As required by contract/ monthly/
Contractor Discrepancy
Report
Attachment 0002 RFP#SPRBL119R0060 Page 13 of 15 Issue 26 JUNE 2019
Attachment 2: Sample Quality Assurance Monitoring Form
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______% Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards Narrative of Performance during Survey Period:
PREPARED BY: ______________________________ DATE: _________________
Attachment 0002 RFP#SPRBL119R0060 Page 14 of 15 Issue 26 JUNE 2019
Attachment 3: Contract Discrepancy Report (CDR)
1. Contract Number to include Specific Delivery/Task Order #:
2. To: (Contractor Task Manager or on-site representative)
3. From: (Name of Contracting Officer Representative - COR)
4. Date(s) and Time of Surveillance:
5. Contract Requirements: (Technical Requirement Document (TRD) Paragraph numbers and titles or Contract Data Requirement List (CDRL) numbers and titles)
6. Discrepancies Identified: (state surveillance method and why the evaluation concluded unacceptable performance by the Contractor)
7. Corrective Action Plan (CAP) Required? (Yes, No).
No – Provide supporting rationale:
Yes - The Contractor shall provide a written CAP to the PCO and COR on (dd-mmm-yyyy).
The Contractor, at a minimum, shall include the following types of information in the CAP e.g.:
- Contract Deficiency Identified vs Contract Requirements
- Date of Discovery
- Corrective Actions Required to Resolve Stated Deficiencies
- Lead Time to Implement Corrective Action
- Identify Impact to Contract Schedule
- Indicate impact on Contract Cost
- Indicate if Considerations is warranted
- Indicate if Contract Modification is required
8. Signatures:
Contracting Officer’s Representative Date
Program Manager Date
Attachment 0002 RFP#SPRBL119R0060 Page 15 of 15 Issue 26 JUNE 2019
Attachment 4: Contractor Performance Report
1. Contract Number to include Specific Delivery/Task Order Number:
2. Date(s) of Surveillance:
3. Specific Action(s) Taken:
4. Surveillance Results:
a. Contract Requirements (for which Contractor’s performance was evaluated (Technical Requirements Document (TRD) Paragraph #s and Title(s) or Contract Data Requirements List (CDRL) #(s) with Title(s) vs Contractor’s Performance Output(s):
b. Methods of Surveillance:
c. Surveillance Personnel:
d. Performance Evaluation Rating (Acceptable, Marginal, or Unsatisfactory):
e. Supporting Rationale:
f. Impact on Contract and Program:
5. Signature:
Contracting Officer’s Representative Date
| The Government will use the surveillance methods described below to evaluate Contractor. |
| 4.2.1 DIRECT OBSERVATION. Government personnel will rely on first hand observations of Contractor’s performance during test events, conference calls and/or meetings if held to address contractual issues, or through review of contract deliverables to ... |
| 4.2.2 PERFORMANCE REVIEWS/PROGRESS REPORTING. The COR will review all submitted reports or Emails upon receipt and for assessment of data from various delivered technical, management and cost reports to verify accuracy of claimed progress against de... |
| 4.2.3 PERIODIC AND RANDOM SAMPLING. The Government may choose to evaluate Contractor’s process on a random basis if and when a deficiency is suspected or reported and this may be scheduled either through DCMA, the COR or other designated Government R... |
| 4.2.4 INSPECTION. During each DO and/or TO contractual performance, the Government may choose to conduct periodic inspection of parts and deliverables for conformance to requirements to include audit of completed TO services. |
| 4.2.5 TESTING. First Article Test is not applicable as the Contractor is the original equipment manufacturer and has been continuously producing the item which is its commercial part. Contractor’s Test & Inspect data and Final Inspection and Acceptan... |
| 4.3 Customer Feedback |
| 4.4 Acceptable Quality Levels |
| 4.5 Contractor Performance Assessment Report System (CPARS) |
| 5.0 QUALITY ASSURANCE DOCUMENTATION |
| 5.1 The Performance Management Feedback Loop |
| 5.2 Monitoring Forms |
| The Government’s QA surveillance, accomplished by the DCMA will be reported using the monitoring forms in Attachments 2. The forms, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure ... |
| 6.0 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| 6.1 Determining Performance |
| Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, the Government reserves the right to request the Contractor dev... |
| 6.1.1 Cost. The COR will closely monitor all CDRLs deliverables and inform the PCO of all cost concerns. Additionally, FAR clause 52.232-22, Limitation of Funds, will be included in the contract and the Contractor shall be required to notify the KO i... |
| 6.2 Reporting |
| At the end of each month, the QAR will prepare a written report for the Communications-Electronics Command Integrated Logistics Support Center (CECOM ILSC): The COR: Theresa Baugh, theresa.a.baugh.civ@mail.mil; summarizing the overall results of the q... |
| 6.3 Reviews and Resolution |
| The COR may require the Contractor’s Project Manager/Lead, or a designated alternate, to meet with the QAR and/or PCO and other Government IPT personnel as deemed necessary to discuss performance evaluation. The QAR will define a frequency of in-dept... |
| The QAR/COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance. |
| The QAR, COR, Contract Specialist, KO and Contractor should jointly formulate tactical and long-term courses of action for optimum contract DO and/or TO performance. Decisions regarding changes to metrics, thresholds, or service levels should be clea... |
Attachment 2: Sample Quality Assurance Monitoring Form