Attachment_0002_CONTRACT_DATA_REQUIREMENTS_LIST.pdf
PDF 156 KB Posted
- Solicitation number
- SPRBL118R0004
About this file
Attachment 0002 - Contract Data Requirements List (CDRL)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRBL118R0004-0003.pdf | ||
| SPRBL118R0004-0002.pdf | ||
| Attachment_0001_-_Technical_Requirements_SPRBL118R0004.pdf | ||
| SPRBL118R0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, 1 Jun 90
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Scientific and Technical Reports Configuration Control
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A Departure from CB RDER-PRI-NR INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
LT ASREQ SEE ITEM 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A ASREQ Reg Repro
16. REMARKS:
Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in Technical Requirements.
Item 12 &13: The contractor shall prepare and submit Configuration Control Documents in accordance with the Technical Requirements section for Configuration Control when a change to or departure from a contractual baseline document is deemed necessary.
Item 14: Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
RDER-PRI-NR
PCO
ACO
QAR
CECOM LRC
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
James McArthur, PRD Engineer, 443-861-3029
05/15/2017 Michael Heussner Branch Chief, 443-861-3473
05/15/2017
A001
Based upon DD Form 1423-1, 1 Jun 90
(1 Data Item)
Original Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Advise Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A002 TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Engineering Change Proposals ECP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80639D
ENGINEERING
CHANGE PROPOSAL
RDER-PRI-NR INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ see item 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final see item 16 ASREQ Reg
Repro
16. REMARKS:
Block 12: As required. Allow 30 days for Government to review and determine acceptance on Class I. Allow 10 days for Government to review and determine acceptance on Class II.
Block 13: As required. Allow 30 days for Government to review and determine acceptance on Class I. Allow 10 days for Government to review and determine acceptance on Class II.
Block 14: A cover letter shall accompany the report with date of submission. Both cover letter and the ECP shall be submitted and exchanged electronically in Microsoft Office applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
RDER-PRI-NR
CECOM LRC
ACO
PCO
15. TOTAL 2 4 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
James McArthur, PRD Engineer, 443-861-3029
05/15/2017 Michael Heussner Branch Chief, 443-861-3473
(1 Data Item)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Advise Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A003 TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Request for Variance RFV
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80640D
REQUEST FOR
VARIANCE
RDER-PRI-NR INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ see item 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A ASREQ
Block 12: As required. Allow 30 days for Government to review and determine acceptance.
Block 13: As required. Allow 30 days for Government to review and determine acceptance.
Block 14: A cover letter shall accompany the report with date of submission. Both cover letter and the RFV shall be submitted and exchanged electronically in Microsoft Office applications (MS
PCO
15. TOTAL 3 0
James McArthur, PRD Engineer, 443-861-3029
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Advise Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A004 TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 Notice of Revision Notice of Revision
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80642D
NOTICE OF REVISION RDER-PRI-NR INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ see item 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
Block 12: As required. Allow 30 days for Government to review and determine acceptance.
Block 13: As required. Allow 30 days for Government to review and determine acceptance.
Block 14: A cover letter shall accompany the report with date of submission. Both cover letter and the NOR shall be submitted and exchanged electronically in Microsoft Office applications (MS
ACO
PCO
James McArthur, PRD Engineer, 443-861-3029
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Advise Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
B001 TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B001 Scientific and Technical Reports IUID Marking Diagram/Instructions
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80711A
(SEE BLOCK 16)
REQUIRMENTS FOR
IUID MARKING
RDER-PRI-NR INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ see item 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A see item 16
Item 4: Delete Block 10.2 of Data Item Description (DID) and prepare in accordance with this CDRL & Technical Requirements.
Item 12: Delivery of draft shall be 120 DAC award. Government has 30 days to review/comment.
Item 13: Delivery of final shall be 30 days after receipt of Government comments. Government has 60 days to determine acceptance. Contractor to submit DD250 upon acceptance of IUID Marking Diagram/Instructions.
Item 14:
All digital files will be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM, readable by computers running Microsoft Windows.
RDER-PRI-NR
CECOM LRC
ACO
PCO
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
James McArthur, PRD Engineer, 443-861-3029
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Advise Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
C001 TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
C001 Bill of Materials (BOM) for Logistics and Supply Change Risk Management
DMSMS Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-PSSS-81656B
OBSOLESCENCE
REPORTING
RDER-PRI-NR INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
LT ASREQ see item 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
Item 12: As required. Allow Government 60 days to review and determine acceptance.
Item 13: As required. Allow Government 60 days to review and determine acceptance.
See DI-SESS-81656 for DMSMS Data format and content requirements. Contractor to submit DD250 upon acceptance of DMSMS Data.
ACO
PCO
Data shall be submitted and exchanged electronically in Microsoft Office applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
James McArthur, PRD Engineer, 443-861-3029
(1 Data Item)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
D001 TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DVE Spares
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
D001 Operation Security (OPSEC) Plan Security
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80934C OPSEC CECOM G2 , ATTN: AMSEL-MI
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION
DD ONE/R SEE BLK 16 b. COPIES
8. APP CODE SEE BLK 16 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A SEE BLK 16 AS REQ
-Plan shall provide information from the Technical Requirements Document (TRD) Security Requirement paragraph 2.0 and the associated DD Form 254. Plan shall be complete, stand-alone, and address all the concerns in the TRD and DD Form 254 and AR.
-Deliverables shall be submitted and exchanged electronically through Microsoft outlook whenever possible. The Requiring Office identified in Block 6 may specify alternate or additional formats or copies.
-Block 9. Distribution authorized to U.S. Government Agencies only. To protect technical or operation data or information from automatic dissemination under the International Exchange Program or by other means. This protection covers publications required solely for official use or strictly for administrative or operation purposes. This statement may be applied to manuals, pamphlets technical orders, technical reports, and other publications containing valuable technical or operational data.
Other requests for this document shall be referred to GTL.
Name and electronics address of Government Task Leader shall be specified at time of award.
-Block 12. OPSEC Plan is due 90 days post contract award. The contractor shall provide plan on the date due as an electronic file that will be finalized after government review.
The government will have 10 days to review, accept, and/or comment on the draft deliverable.
After the government reviews and comments on the deliverable, the contractor shall incorporate government comments/submit change pages into the final electronic deliverable within 3 workdays after the receipt of the comments/need for revision is identified unless extended by the GTL.
DLA SECURITY
CECOM LRC
ACO
PCO
15. TOTAL 3 5 0
James McArthur Electronics Engineer
11/15/2017 Michael Heussner Chief, NV/RSTA Branch
11/15/2017