Exhibit_A_Statement_of_Work_CMWS.pdf

PDF 76 KB Posted

Attached to
Solicitation - 29 parts related to the AN/AAR-57A(V) Warning Receiver System, Countermeasure (CMWS )
Solicitation number
SPRBL1-18-R-0002
Issued by

About this file

This statement of work outlines the requirements for the acquisition of spare parts and repair services for the AN/AAR-57A(V) Warning Receiver System, Countermeasure (CMWS). The government will issue a request for proposal on September 28, 2017 for a five-year indefinite-delivery/indefinite-quantity contract estimated at $77,399,674. The contract will include 29 line items for spare parts to be procured on a firm-fixed-price basis and repair services for 6 items to be provided on a cost-plus-fixed-fee basis in support of the CMWS airborne missile warning system. The statement of work specifies requirements for configuration management, item marking, packaging and shipping, quality assurance, security, and diminishing manufacturing sources.

Exhibit A SOW

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement Of Work (SOW) For

Spares of AN/AAR-57A(V) Warning Receiver System, Countermeasure Known as Common Missile Warning System (CMWS)

1.0 Scope

This Statement of Work (SOW) defines the work efforts required for the Acquisition of Spare Parts (or Spares) for Common Missile Warning System (CMWS) items. The contractors shall provide the price quotes for Spares on each National Stock Number (NSN) identified in Table 1-Spares as requested by the government.

2.0 Applicable Documents

The latest approved revisions of the following documents are applicable to the extent specified herein. The Contractor shall report any conflicts within this SOW or documents referenced herein to the Procuring Contracting Officer (PCO) for resolution.

Military and Federal Standards

MIL-STD-129R Military Marking for Shipment and Storage

MIL-STD-130N, W/

Change 1

Identification Marking of U.S. Military Property

MIL-STD-2073-1E

w/chg 1

Standard Practice for Military Packaging

Military and Federal Specifications

Other Documents MIL-HDBK-61A Configuration Management Guidance (Dated 7 Feb

2001) DI-MISC-80711A Scientific and Technical Reports – Configuration

Control DOD 5220.22-M DOD Industrial Security Manual For Safeguarding

Classified Information. Copies of DOD 5220.22-M are available from: Defense Automated Printing Service, 700 Robbins Ave., Bldg. 4d, Philadelphia, Pa. 19111- 5094.

DI-MISC-80508B Technical Report – Study/Services DoDD 5230.24 Distribution Statements on Technical Documents DI-PSSS-81656B Source Data For Forecasting Diminishing

Manufacturing Sources and Material Shortages

(DMSMS)

DI-SESS-81759 Logistic Product Data Summaries/DMS Inventory

Report DI-MISC-80711 Scientific and Technical Reports-Risk Management

Report DI-MGMT-80934B Operations Security (OPSEC) Plan DLAD 52.247-9012 Requirements for Treatment of Wood Packaging

Material (WPM)

DFARS 252.211-

Passive Radio Frequency Identification (PADDS#

FA60001)

DFARS 252.211-

Item identification and valuation

DI-MISC-80711A Scientific and Technical Reports – IUID Marking Diagram/Instructions

Document No. 07-

PDASE-00042

Revision WS71035 (Volume I)

Common Missile Warning System (CMWS) Specification

Document No. ASE- 09-003

Hostile Fire Detection (HFD)Specification for GEN3

ECU CMWS AN/AAR-57A(V)

Commercial Documents

ISPM Number 15 Regulation of Wood Packaging Material in International T (2009)

ASME Y14.100 Engineering Drawing Practices ASTM D3951-15 Standard Practice for Commercial Packaging IPC-2221A Generic Standard on Printed Board Design ISO 10303 Industrial Automation Systems and Integration –

Product data representation and exchange, including:

Part 203, Application Protocol: Configuration Controlled Design Part 209, Application Protocol: Composite and metallic structural analysis and related design Part 210, Application Protocol: Electronic Assembly, interconnect, and packaging design Part 232 (Draft International Standard), Application Protocol: Technical data packaging core information and exchange

Security Documents

Security Classification Guide for U.S. Army Version of Aircraft Survivability Equipment (ASE), March 15,

3.0 Requirements for Spares

The CWS spares that the contractor shall produce consist of the items set forth in Section B of the contract in the quantity listed. In the event of a conflict between the requirements of this SOW and any cited documents for the item on contract, the requirements of this SOW shall govern.

3.1Requirements for Configuration Management

3.1.1 Product Definition Information. The Product Definition Information describes a product’s performance, functional and physical attributes, including the requirements and design information (specifications, drawings, design descriptions and software). Interfaces, including interfaces with other products, are also documented in the Product Definition Information. The Product Definition Information shall be specified by the Contractor’s Item Part Number (CIPN).

3.1.2 Configuration Change Process. The contractor shall establish a system for managing the configuration changes to the CIPN baseline.

3.1.3 CIPN Configuration Baseline. The CIPN, as defined by the Contractor’s specifications, drawings, catalog page, etc., at the time of award of this contract, shall form the Configuration Baseline for this acquisition.

The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:

Table 1 - Spares

Item Description/CI National Stock Number (NSN) Part Number

Receiver Countermeasure (Gen 3 ECU) 5865-01-571-8436 8416099-1 Chassis Assy 5975-01-645-5658 8467436-1 Panel Assy 5998-01-652-9732 8416102-1 Module Assy, Common Video Processor (CPM) 5836-01-645-2508 8417231-4 Controller 5845-01-645-2524 800406-7 Module Assy, AIO Processor (APM) 5998-01-645-5686 8412812-4 Peripheral 5998-01-652-6062 800406-8 Peripheral Processor Module Assy (PPM) 5998-01-645-5681 8412813-4 Power Supply, Front End, Gen 3 ECU (PSFE) 6130-01-645-2514 8422412-3 Power Supply, Back End, Gen 3 ECU (PSBE) 6130-01-652-6056 8422412-2 Fan/Harness 5995-01-645-2539 8439195-1 Module Assy, Jammer Processor (JPM) 5998-01-645-8049 8438870-4 Module Assy, Indicator Processor (IPM) 5998-01-647-8993 8438871-4 Common Video Processor Mezzanine (CVP) 5998-01-645-5646 8412814-1 CCA, Aircraft Input/Output (AIO) 5998-01-645-5643 8419383-2 CCA, Discrete Input/Output (DIO) 6605-01-645-5675 8433413-1 Inertial Measurement Unit (IMU) 6605-01-650-3156 HG19303BA99 Filter/Optical 6650-01-652-6067 3111402G3 Intensifier VIDAR 5996-01-652-5952 3111439G2 Secondary Optics 5860-01-645-7654 3111494G2

CCA, VIPE 5998-01-645-5650 8411093-1

Sensor, Electro-Optic, Countermeasure (EOMS)

5865-01-457-4947 8355115G1

CCA, EOMS J1 Flex Cable 5998-01-651-4127 3111447G1 High Voltage Power Supply 6120-01-651-8987 21100309-101

Container, Countermeasure Chaff, (Payload) 5865-01-605-2375 196405-0002 Tester, Countermeasure Dispensing Set (CDT) 4920-01-524-4734 341001-7002 Gen3 UDM (37.5GB) 7025-01-647-8526 8460840-1 Gen3 UDM (75GB) 7025-01-648-4924 8460840-2 Dispenser Subassembly (DISP) 5865-01-529-7225 196401-0001

3.1.4 Configuration. Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and if applicable, any subsequent CB’s that will be made contractually binding by the PCO.

3.1.5 Application Management.

3.1.5.1 Application Management. In performing Application Management, the Government must assess the impact of design changes to the Configuration Item. The Government is the Configuration Management authority on application management for all external applications and for all Major changes that affect the CIPN specified in paragraph 3.1.1. A Major change is defined as any change that will impact any of the following conditions of the CIPN:

(a) Overall performance and Form, Fit, Function and Interface (F3I) Characteristics.

(b) Reliability, Maintainability and Survivability

(c ) Electromagnetic Interference (EMI), air worthiness certification, or other pertinent requirement.

(d) Safety

(e) Support, operational and training requirements

(f) Impact on Technical Manuals, Repair Parts and Special Tools Lists (RPSTLs), DMWRs, Provisioning Parts List (PPL), etc.

(g) Impact on Cost and/or Schedule.

(h) Impact on test equipment, support equipment and associated software.

(i) Software.

3.1.5.2 Application Activity. The Government is an Application Activity (AA) for changes that affect the CIPN. The Government does not possess document change authority over the changes affecting the CIPN. As part of the Government’s Application Management process, the Government as AA does have a right to review or be notified of changes made by the Contractor that will affect any of the conditions identified in paragraph 3.1.5.1. Any changes that affect these conditions shall be submitted for Government review or notification in accordance with (IAW) the procedures outlined below (para 3.1.5.3). Configuration changes not directly affecting the configuration baseline conditions identified in paragraph 3.1. 5.1 do not require Government review or notification.

3.1.5.3 Departures from CB. Changes that affect the CIPN conditions cited in paragraph 3.1.5.1 shall be submitted within 30 days for Government review or notification in accordance with this SOW and the DD Form 1423 for DI-MISC-80711A. Upon receipt of notification, the Government will review the impact of the change within 30 days.

3.1.5.3.1 Request For Change (RFC). The Request For Change (RFC) includes both the engineering change and the supporting documentation by which the change is described and suggested. An RFC describes changes to the CI/CSCI and associated Contractor documents and data (if applicable) that are affected by the proposed engineering change. The RFC also describes a full impact analysis of the effect of the change on the logistics, interface, design, cost and schedule requirements of the CIPN.

3.1.5.3.1 .1 RFCs could be generated as any of the following categories: Change Directive; Change Request; Engineering Change Package; Engineering Change Proposal; Engineering Change Request;

Engineering Change Memo; Engineering Change Notice.

3.1.5.3.1.2 RFCs may contain some of the following elements:

(a) A unique change identifier; identification of originating organization and responsible individual.

(b) Change classification, (c ) Identification of product(s) (including components and interfacing products) affected by the change.

(d) Change description and scope (including effects on performance, operation, maintenance, servicing, operation and maintenance training, repair parts, support and test equipment, cost, schedule, and any other effect on physical, functional, and logistics characteristics of the CIPN).

(e) Reason and justification for the change and consequences of not incorporating the change.

(f) Estimated cost increase or savings.

(g) Change implementation (and effectivity) and impact on delivery schedule.

(h) Criteria, if any, for retrofitting products.

3.1.6 Contractor-approved changes that adversely impact any of the CIPN conditions listed in paragraph

3.2.5.1 may require re-evaluation by the Government of the CIPN. Re-evaluation may include operational testing re-assessment or re-assessment of the logistics impact of the proposed change. An approved change to the design of the CIPN must be verified to ascertain that the CIPN has achieved the functional attributes and requirements specified in the baseline Product Definition Information (CIPN) and that it is adequate for its intended purposes. The Government is not obligated to accept any CIPNs that no longer meet the Government’s requirements as established by the CIPN at the time of contract award.

3.2 Requirements for Item Marking (Gov't Detailed and/or Performance Design Items)

3.2.1. Part Number Marking

Each item delivered under contract, along with each assembly, sub assembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. The marking shall become permanently part of the item after it is applied, and can be applied using deformation, tag, rubber stamp with permanent characteristics, etc. The marking shall not interfere with proper operation of the item, and shall have no deleterious effect on the item. Any item deemed unsuitable for marking as outlined herein shall be identified to the Contracting Officer for resolution as to marking requirement. This requirement may be entirely met by existing marking requirements contained within the drawings or specifications cited in this contract.

3.2.2. National Stock Number (NSN) Marking

In addition to the marking required by para 3.2.1 above, each item on contract listed in Section B of the contract, shall be identified with its Government assigned NSN. The intent of this requirement is to ensure that using personnel can identify the circuit card or assembly when it is removed from its assembly, and when it is received from stock as a spare part. The marking can be on a paper label, placed in a location that will not harm the item. If guidance is necessary to implement this requirement, contact the Contracting Officer for guidance.

3.2.3. Serial Number Marking

3.2.3.1. Any item or subassembly which contains a serialization requirement shall have serial numbers applied to each item in the place provided (generally on a nameplate/serial number plate). In addition the NSN, CAGE Code, Part Number and if space permits Contract Number shall also be applied. When applicable, the Unique Item Identification (UID) requirements, cited elsewhere in this SOW, shall also apply.

3.2.3.2 The contractor shall maintain an accurate, current list of serial numbers for all manufactured items under this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or government representative at any time during the life of the contract and for a period of 3 years following the completion of the contract.

3.3 Requirements for Item Unique Identification (IUID)

The contractor shall mark all contract deliverables In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.211-7003 in Section F of this contract and the following requirements.

3.3.1 IUID Marking

3.3.1.1. New items

The contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of $5000 or more and Government serial numbered items. For long term contracts, the Contractor shall implement IUID markings IAW MIL-STD-130N w/Ch1, dated 16 Nov 12 for any item that will exceed the $5,000.00 unit price for any range quantity or contract year. This requirement is effective throughout the life of this contract.

3.3.1.2 Commercial Markings

All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Items http://www.acq.osd.mil/dpap/pdi/uid/index.html.

3.3.1.3 Permanency and Legibility

The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-STD-130N w/Ch1, dated 16 Nov 12.

3.3.1.4 Deleterious Effect

Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of http://www.acq.osd.mil/dpap/pdi/uid/index.html the marking shall not create hazardous conditions.

3.3.1.5 Mandatory Information Reporting for all items requiring IUID marking The contractor shall include the NSN, if the item has a NSN, the Serial Number marked on the item, if a Serial Number is marked on the item, the original part number, the current part number (only if not the same as the original part number), the current part number effective date (only if the current part number is used) and the USARMY as the SERVICE /AGENCY/COMMAND data element in the information reported to the IUID Registry, in addition to the information required to be reported to the IUID Registry by DFARS clause 252.211-7003.

3.3.1.6 Wide Area Workflow (WAWF)

Users shall report this mandatory information to the IUID Registry by Direct submission via an X12 Ship Notice/Shipment and Billing Notice (856/857) transaction, an IUID XML transaction, an IUID flat file transaction or a WAWF IUID Material Inspection and Receiving Report/Combo UDF through the Global Exchange (GEX) Service, or manually, via the IUID Web Entry Site at http://www.bpn.gov/iuid.

For WAWF users, these methods do not replace the current WAWF interaction, but are performed in addition to it after the shipment has been accepted to provide IUID data that cannot be provided via

WAWF.

3.3.2 IUID Coding

IUID markings and readability requirements shall comply with MIL-STD-130N w/Ch1, dated 16 Nov 1

3.3.2.1Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD-130N w/Ch1, dated 16 Nov 12. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.

3.3.2.2 If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.

3.3.2.3 The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.

3.3.3 Pricing of IUID Requirements

All efforts required by this SOW and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base contract price.

3.4. Requirements for Quality Assurance System

The contractor shall maintain a Quality Assurance System for higher-level product integrity that meets or exceeds the requirements established below. These requirements are commonly accepted practices http://www.bpn.gov/iuid employed by industry in both national and international manufacturing environments.

3.4.1 Quality Approach

The contractor shall establish/maintain a quality approach to ensure higher-level product integrity and to satisfy contract or order requirements.

3.4.2 Initial Quality Planning

The contractor during the earliest practical phase of the contract shall conduct a complete review of the contract requirements to identify all the resources necessary for assuring product integrity.

3.4.3 Design

The contractor shall establish/maintain controls over the design process to ensure that contract requirements are satisfied.

3.4.4 Document Control

The contractor shall establish/maintain procedures that control the adequacy, completeness, currentness, and changes of all documents (work instructions, drawings, specifications, etc.).

3.4.5 Records

The contractor shall maintain and utilize all records required for effective operation of the quality approach. The quality approach shall ensure that these records are complete (including subcontractor records) and reliable.

3.4.6 Control of Purchases

The contractor shall ensure that all supplies and services purchased from suppliers conform to contract requirements. The contractor shall require that their subcontractors control the product integrity of their services and supplies.

3.4.7 Materials Control

The contractor shall maintain controls over all materials and products throughout the manufacturing process. These controls shall enable the identification of materials that have passed inspection from those which have not. The contractor shall maintain records identifying the status and final destination of all materials/products.

3.4.8 Manufacturing Operations/Process Controls

The contractor’s quality approach is responsible for assuring/monitoring that all manufacturing operations/processes are accomplished under controlled conditions. Controlled conditions include documented work instructions (including workmanship), place of performance, production equipment, special work environments, inspections/tests, work specifications, and approval/rejection criteria.

3.4.9 Inspection and Testing

The quality approach shall assure that all inspections and tests required satisfying contract or order requirements are conducted. Inspection and testing requirements for each item are in accordance with the established drawing and part numbers listed in Table 1.

3.4.10 Measuring, Testing, and Inspection Equipment

The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that products conform to contract requirements. These devices shall be calibrated against certified measurement standards that are traceable back to national/international standards.

3.4.11 Inspection and Test Status

The contractor shall maintain a system for the identification of the inspection and test status of all products throughout all stages of the manufacturing cycle.

3.4.12 Quality Audits

The contractor shall perform internal quality audits to verify the effectiveness of their quality approach.

3.4.13 Statistical Quality Control and Analysis

The contractor shall establish/utilize statistical methods whenever appropriate to satisfy the contract or order requirements.

3.4.14 Continuous Process Improvement

The contractor shall monitor the effectiveness of their quality approach and continually improve quality processes.

3.4.15 Handling, Storage, Preservation, Packaging, and Shipping

The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products.

3.5 Shipping Address

DDSP New Cumberland Facility (DODAAC: W25G1U) 2001 Normandy Drive door 113 TO 134 New Cumberland, PA 17070-5002

3.6 Requirements for Packaging

Preservation, packing and marking for shipment shall be in accordance with Section "D" of the contract.

Marking is in accordance with MIL-STD-129R.

Radio Frequency Identification (RFID) Requirements shall be IAW the Section ‘F’ clause, DFARS 252.211- 7006, of the contract.

Packaging shall be in accordance with MIL-STD 2073-1E. Level of Preservation (LOP): Military, Level of Pack (LPK): B, Quantity Unit Pack (QUP):001.

3.6.1 Wood Packaging Material

Wood Packaging Material (WPM) shall meet the following requirements.

3.6.1.1 Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a anufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB). See DLAD 52.247-9012 Requirements for Treatment of Wood Packaging Material (WPM).

3.6.1.2 All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulation of Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.

3.6.1.3 All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).

3.6.1.4 All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.

3.6.1.5 Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.

3.7 Dimishing Manufacturing Sources and Material Shortages (DMSMS)

3.7.1 The contractor shall monitor Parts Obsolescence/Dimishing Manufacturing Sources and Material Shortages surveys as necessary. Results of the survey shall be submitted to CECOM along with the price proposal plan which will be separately priced and negotiated. The contractor will provide a Parts Obsolescence/Diminishing Source of Spares report as quarterly. The DMSMS data shall be developed in accordance with this SOW and the CDRL (DD Form 1423) for DI-PSSS-81656B.

3.7.2 In an effort to identify a depletion of the GFM inventory, a status of GFM inventory shall be submitted to the CECOM quarterly IAW CDRL (DD Form 1423) for DI-SESS-81759, Logistics Product Data Summaries-DMS Inventory Report, with precise data as to what the GFM was used towards and the quantities depleted.

http://www.alsc.org/

3.7.3 The Contractor shall manage and monitor all items covered under the task order for obsolescence and availability issues. The Contractor shall report the obsolescence/DMS status IAW CDRL(DD Form 1423) for DI-MISC-80711A for CMWS (excluding Gen 2) to include obsolete component part number, manufacturer part number, quantity per system, Shop Replaceable Unit (SRU) usage, quantity of components on hand, quantity of components on order, approximate unit cost per component and recommended solution.

3.8 Security

The contractor will be required to have a Secret facility clearance to perform Acceptance Testing, storage of material and software. The contractor also will be required to have a Secret safeguarding capability for classified documentations that is limited 2 cu. Ft of space. The contractor will require access to FOUO information. The contract will also require access to Security/Program Classification Guide (SCG). To perform this contract, the contractor will receive and generate classified material and fabricate/modify/store the classified software. Administrative duties will not require a clearance and may require investigation for IT duties. All classified material will be forwarded as request and clearance is approved.

3.8.1 Information Security (INFOSEC)

a. For Contracts That Require Handling or Access to Classified Information. Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.

3.8.2 For contracts that require a formal OPSEC program

The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer.

This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1. The Operation Security (OPSEC) Plan shall be developed in accordance with CDRL DI-MGMT-80934B. The OPSEC Plan shall be consistent with Government OPSEC Plan, dated 13 February 2014.

3.8.3 For contracts that require OPSEC Training

Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. Level I OPSEC training is available at the following website:

http://cdse.edu/catalog/elearning/GS130.html (Duration: 45 minutes).

3.8.4 Threat Awareness Reporting Program

Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b

CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1

THE GOVERNMENT ASSIGNED EACH CDRL AN EXHIBIT NUMBER IN SECTION J.

CDRL LIST

CDRL DATA

LINE NO.

DID

IDENTIFICATION TITLE

A001 DI-MISC- 80711A SCIENTIFIC AND TECHNICAL REPORTS -- CONFIGURATION

MANAGEMENT

G001 DI-PSSS- 81656B SOURCE DATA FOR FORECASTING DIMINISHING

MANUFACTURING SOURCES AND MATERIAL SHORTAGES

(DMSMS)

H001 DI-SESS- 81759 LOGISTIC PRODUCT DATA SUMMARIES/DMS INVENTORY

REPORT

K001 DI-MISC- 80711 SCIENTIFIC AND TECHNICAL REPORTS – RISK

MANAGEMENT REPORT

B001 DI-MGMT- 80934B OPERATIONS SECURITY (OPSEC) PLAN

3.3.2.3 The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection...
THE gOVERNMENT ASSIGNED Each CDRL an Exhibit Number in Section J.
CDRL List
DID IDENTIFICATION
CDRL DATA LINE NO.
TITLE
SCIENTIFIC AND TECHNICAL REPORTS -- CONFIGURATION MANAGEMENT
80711A
DI-MISC-
A001
SOURCE DATA FOR FORECASTING DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS)
81656B
DI-PSSS-
G001
LOGISTIC PRODUCT DATA SUMMARIES/DMS INVENTORY REPORT
81759
DI-SESS-
H001
SCIENTIFIC AND TECHNICAL REPORTS – RISK MANAGEMENT REPORT
80711
DI-MISC-
K001
OPERATIONS SECURITY (OPSEC) PLAN
80934B
DI-MGMT-
B001

File details come from the government source that posted it. Updated .