Exhibit_A_Technical_Requirements_SPRBL1-17-R-0022__Rev_1.pdf

PDF 190 KB Posted

Attached to
H250/VCEB HANDSET Federal contract opportunity
Solicitation number
SPRBL1-17-R-0022
Issued by
Defense Logistics Agency Land and Maritime

About this file

Technical Requirements Document

View the file

Other files for this federal contract opportunity

Other files attached to H250/VCEB HANDSET, newest first.
File Type Posted
SPRBL1-17-R-0022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A SPRBL1-17-R-0022 Page 1 of 21 Issue: 09 May 2017 SEE SOURCE SELECTION INFORMATION

FAR 2.101 & 3.104

STATEMENT OF WORK

FOR

NSN 5965-01-549-6390 H-250B/G Handset and H-250VCEB Handset

1.0 Scope. This Statement of Work (SOW) defines the efforts required to produce the products required by this solicitation/contract in accordance with (IAW) the documents listed below. The items being purchased are entitled “NSN 5965-01-549-6390 H-250B/G Handset and H-250VCEB Handset”.

2.0 Applicable Documents. The following documents are applicable to the extent cited.

2.1 Military and Federal Stds

Document No. Document Title Applicability MIL-STD- 129 R Military Marking for Shipment and Storage Required MIL-STD- 810G(1) Environmental Engineering Considerations and

Laboratory Tests Required

2.2 Military and Federal Specs

Document No. Document Title Applicability

MIL-PRF-

MIL-PRF-

22750G

49078A(CR)

Coating, Epoxy, High-Solids Performance Specification H-250/U

Required Required

MIL-HDBK - 61A Configuration Management Guidance (Dated 7 Feb 2001)

Referenced

2.3 Other DOD Documents

CECOM- SM-D-889337 Rev. G Handset H-250/VCEB Assembly Required

2.4 Com’l Documents

ASTM D3951-15 Standard Practice for Commercial Packaging Required ISPM Number 15 Regulation of Wood Packaging Material in

International Trade Required

SAE EIA- 649-1 Configuration Management Requirements for Denfense Contracts

Referenced

3.0 Requirements. The contractor shall produce the items in the quantity set forth in Section B of the schedule and delivery orders issued by the Procurement Contracting Officer (PCO) in accordance with documents listed above and this SOW. In the event of a conflict between the requirements of this SOW and any drawings for the item on contract, the requirements of this SOW shall govern.

3.1. Requirements for Packaging. Preservation, packing and marking for shipment shall be in accordance with Section ‘D’ of the contract. Marking shall be in accordance with MIL-STD-129R. Radio Frequency Identification (RFID) requirements shall be in accordance with the Section “F” clause, DFARS 252.211-7006, of the contract. MIL-STD-129R is applicable.

Exhibit A SPRBL1-17-R-0022 Page 2 of 21

FAR 2.101 & 3.104

3.1.1 Packaging/packing shall be in accordance with ASTM D3951-15, Standard Practice for Commercial Packaging, Level of Protection (LOP): Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001. Some supplies may need Military packaging depending on the destination and intended use.

Packaging requirements for those items will be provided with the delivery order.

3.1.2 Wood Packaging Material (WPM) shall meet the requirements below.

3.1.2.1 Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB).

3.1.2.2 All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulation of Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.

3.1.2.3 All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).

3.1.2.4 All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.

3.1.2.5 Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.

3.2 Requirements for Configuration Control.

3.2.1 Configuration Baseline. The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:

NSN CB DESCRIPTION (CI/CSCI)

5965-01-549-6390 SM-D-889337 H-250B/G Handset and H-250VCEB Handset

3.2.2 Configuration Responsibility. Each CI/CSCI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO). Configuration changes not directly effecting the configuration baseline do not require Government approval prior to incorporation, but must be documented by the contractor and shall be made available to the Government upon request. The contractor may use MIL-HDBK-61A and SAE EIA-649-1, http://www.alsc.org/

Exhibit A SPRBL1-17-R-0022 Page 3 of 21

FAR 2.101 & 3.104

Configuration Management Requirements for Defense Contracts, which was adapted on 04 March 2015 for use by the Department of Defense (DoD), as guidance for establishing a Configuration Management Program.

3.2.3 Departures from CB. No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with DD Form 1423 for DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO. Configuration Control shall be effected by the Configuration Control Documents (CCDs) as follows:

3.2.3.1 Engineering Change Proposal (ECP) includes both the engineering change and the supporting documentation by which the change is described and suggested. An ECP describes changes to the CI/CSCI and associated Government documents and data that are affected by the proposed engineering change. An ECP shall be prepared on the latest revision of DD Form 1692, to include DD Form 1692/1 through 1692/6, addressing all areas impacted by the requested change. A separate ECP/VECP shall be prepared for each distinct engineering change.

3.2.3.1.1 A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the ECP. The NOR shall be prepared on the latest revision of DD Form 1695.

3.2.3.1.2 A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN shall be prepared on the latest revision of DD Form 1696. The SCN is not used for a military or federal document, only a Request for Variance can be used for those documents.

3.2.3.1.3 Value Engineering Change Proposal (VECP) is the same as an ECP except there are proposed cost savings for the program. The contractor shall follow the guidance in Section I of this contract for VECPs.

3.2.3.2 Request for Variance (RFV) is a temporary departure from requirements and do not constitute a permanent change to the Functional Configuration Document, Allocated Configuration Document, or Product configuration Document. Prior to or after manufacture of an item, the supplying activity may request a variance.

The supplying activity shall not build items, or present items for acceptance, that incorporate a known departure from requirements, unless a request for a variance has been approved. Where it is determined that a change should be permanent, an ECP must be processed in accordance with this document. A RFV shall be submitted using the latest revision of DD Form 1694.

3.2.3.3 Contractor shall provide all supporting program or cost data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, VECP, NOR, SCN or RFV. The identification number should use less than 16 characters.

3.2.4 Identification of Authorized Personnel. The contractor shall identify to the PCO, Administrative Contracting Officer (ACO), and the technical office identified on the DD Form 1423 for DI-MISC-80711A, the name(s) of the official(s) of its organization who are authorized to submit CCDs 30 Days after Contract (DAC).

Exhibit A SPRBL1-17-R-0022 Page 4 of 21

Exhibit A SPRBL1-17-R-0022 Page 5 of 21

FAR 2.101 & 3.104

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Original Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0006 A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

H-250B/G and H-250VCEB

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Scientific and Technical Reports Configuration Control

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80711A SOW Para 3.2.3 RDER-PRC-TR INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD ASREQ SEE ITEM 16 b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

SEE ITEM 16

Reg

Repro

16. REMARKS:

Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in SOW 3.2.

The contractor shall prepare and submit Configuration Control Documents in accordance with the SOW section for Configuration Control (Para 3.2) when a change to or departure from a contractual baseline document is deemed necessary.

The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have 30 days to review, accept, and/or comment on the final submission.

All deliveries shall be in digital format. All digital files shall be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM or DVD readable by computers running Microsoft Windows. Alternate delivery media may be allowed subject to Government review and approval.

If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract). Email notification required with any electronic submission.

RDER-PRC-TR

PCO

ACO

QAR

AMSEL-LCL-ECM

AMSEL-LCL-EIE*

*1 COPY VECP ONLY

15. TOTAL 0 6 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Man Bun Lau

RDER-PRC-TR

05/09/2017 Daniel Webster

RDER-PRC-TR

Chief, Tactical Radio Branch

05/09/2017

Exhibit A SPRBL1-17-R-0022 Page 6 of 21

FAR 2.101 & 3.104

Based upon DD Form 1423-1, 1 Jun 90

3.3 Requirements for Item Marking (Gov't Detailed Design Items).

3.3.1 Part Number Marking. Each item delivered under contract, along with each assembly, sub assembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. The marking shall become permanently part of the item after it is applied, and can be applied using deformation, tag, rubber stamp with permanent characteristics, etc.

The marking shall not interfere with proper operation of the item, and shall have no deleterious effect on the item. Any item deemed unsuitable for marking as outlined herein shall be identified to the Contracting Officer for resolution as to marking requirement. This requirement may be entirely met by existing marking requirements contained within the drawings or specifications cited in this contract.

3.3.2 NSN Marking. In addition to the marking required by para 3.3.1 above, each item on contract listed in Section B of the contract, shall be identified with its Government assigned NSN. The intent of this requirement is to ensure that using personnel can identify the circuit card or assembly when it is removed from its assembly, and when it is received from stock as a spare part. The marking can be on a paper label, placed in a location that will not harm the item. If guidance is necessary to implement this requirement, contact the Contracting Officer for guidance.

3.3.3. Serial Number Marking.

3.3.3.1. Any item or subassembly which contains a serialization requirement shall have serial numbers applied to each item in the place provided (generally on a nameplate/serial number plate). In addition the NSN, CAGE Code, Part Number and if space permits Contract Number shall also be applied. When applicable, the Unique Item Identification (UID) requirements, cited elsewhere in this SOW and contract, shall also apply. In addition, the contractor shall obtain a block of serial numbers from the Government within 30 days of request from:

Commander, US Army C-E LCMC ATTN: RDER-PRC-TR (Man Bun Lau, email: man.b.lau.civ@mail.mil)

APG, MD 21005

The contractor shall include the following information in the request:

1) Contract Number

2) Quantity of item on contract

3) Item’s part number as noted in Section B of the contract.

4) Contractor’s name and address.

3.3.3.2 The contractor shall maintain an accurate, current list of serial numbers for all manufactured items under this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or government representative at any time during the life of the contract and for a period of 3 years following the completion of the contract.

3.4. Requirements for Production Evaluation.

Exhibit A SPRBL1-17-R-0022 Page 7 of 21

FAR 2.101 & 3.104

3.4.1 General. The equipment on contract, including all materials, parts, subassemblies and assemblies, shall be produced in strict conformance with the Government-Furnished technical data, including all changes cited in the solicitation/contract, and as supplemented or modified by approved Engineering Change Proposals (ECPs).

This technical data may require compatibility corrections, referred to throughout this SOW as 'Production Evaluation (PE) Compatibility' corrections, to improve production efficiency.

3.4.1.1 Contractor’s Obligation and Responsibility. The contractor shall perform the following tasks.

3.4.1.1.1 Perform a PE review. The contractor shall continually review the technical data to identify and propose corrections for all PE compatibility discrepancies. This review shall commence during the production and quality planning phase and continue through the preproduction, production, inspection and testing phases of this contract. The contractor shall evaluate the Government-Furnished Technical Data Package (including drawings, specifications, gage drawings, test fixture drawings, master pattern drawings or data, engineering change proposals with notices of revisions (NOR) and specification change notices (SCN), models (if any) and any other data defined as technical data by the government) to determine such PE corrections, and submit PE Compatibility ECPs to the Government to reflect these corrections, as described below. PE Compatibility corrections are discussed in Appendix entitled “Sample PE Compatibility Discrepancies, Errors, Omissions and Deficiencies.”

3.4.1.1.2 Submit PE Compatibility Engineering Change Proposals to the Government. Recommendations for compatibility changes shall be prepared and submitted as Engineering Change Proposals (ECP) with appropriate NORs and SCNs in accordance with the Configuration Management Section. PE ECPs shall:

a. Be submitted as soon as the need for a change is recognized.

b. Clearly and explicitly state the proposed change and the need for the change.

c. Include all technical documentation and supporting data required to justify the change.

3.4.1.1.3. Special Instructions for PE ECPs. The first page of the ECP form shall have the following:

a. This statement:

“This ECP is submitted as a PE compatibility change as defined in the contract”.

b. Have 'PE Compatibility' in Size 16 Font included in the Header and Footer of the page.

c. The effect on Delivery Schedule and Estimated Costs shall be indicated as “none”.

3.4.1.1.4 If the incorporation of a PE Compatibility ECP does not correct the deficiency, or creates another deficiency, the contractor shall submit any further ECPs and incorporate such approved changes into all items not yet accepted by the Government, at no cost to the Government.

3.4.1.1.5 Implement PE ECPs. The contractor shall apply all approved PE ECPs to the manufacture of the hardware on contract without increase in contract price or delay in delivery.

Exhibit A SPRBL1-17-R-0022 Page 8 of 21

FAR 2.101 & 3.104

3.4.1.1.6 Revise Technical Data (if required elsewhere in the contract). The contractor will generate all required additional data and revise affected Technical Data to incorporate PE corrections in accordance with the appropriate engineering drawings clauses without increase in contract price or delay in delivery.

3.4.1.1.7 Submit TDP Review Report. The contractor shall prepare and submit a TDP Review Report (including subcontracted PE effort - see paragraph 3.4.4 below) in accordance with DI-MISC-80750 as implemented by the DD Form 1423 for DI-MISC-80750.

Exhibit A SPRBL1-17-R-0022 Page 9 of 21

FAR 2.101 & 3.104

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0006 A TDP TM OTHER MISC

TBD TBD

A002 Technical Data Package Review Report Production Evaluation (PE)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80750 SOW Para 3.4.1.1.7 RDER-PRC-TR INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

DD QRTLY 90 DAC b. COPIES SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

SEE ITEM 16

16.1 DID Modify DI-MISC-80750 as follows:

a. All references to ECP is limited to PE compatibility ECP's.

b. Information required for 10.2.1 shall be as follows:

1. Contract number.

2. PE-ECP Number.

3. Nomenclature of affected configuration item.

4. Date of ECP submittal to Government.

5. Date of Government authorization/disapproval.

6. Baseline documents affected.

7. Date of revision to baseline document.

8. Total number of drawings/specifications/other technical data reviewed during the reporting period. A list of all technical data reviewed shall be attached.

9. Total number of PE compatibility ECPs prepared during the reporting period.

10. Total number of drawings revised due to the PE effort during the reporting period. A list of revised drawings shall be attached.

11. The cumulative number of drawings/specifications/other technical data reviewed during the reporting period.

12. Percentage of total PE effort accomplished since contract award.

c. Information required for 10.2.2 shall be submitted as a letter of PE Certification to the PCO with a copy furnished to the addressee cited in Block 14. This letter shall be submitted concurrently with submission of the First Article Test (FAT) report or at first production lot submittal if FAT is not required and content of this letter shall be IAW SOW paragraph 3.4.1.1.8.

d. If any of the PE effort is subcontracted, the information per b. above for the subcontractor effort shall be separately listed and shall include the name of the subcontractor.

16.2 Submit by LT except for final report, which shall be submitted by DD250.

Data shall be submitted and exchanged electronically in Microsoft Office 2000 or Office XP suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.

If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.

RDER-PRC-TR 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Exhibit A SPRBL1-17-R-0022 Page 10 of 21

FAR 2.101 & 3.104

Man Bun Lau

RDER-PRC-TR

05/09/2017 Daniel Webster

RDER-PRC-TR

Chief, Tactical Radio Branch

05/09/2017

Based upon DD Form 1423-1, 1 Jun 90

3.4.1.1.8 Submit TDP Certification. The contractor shall prepare and submit a letter of PE certification in accordance with DI-MISC-80750 as implemented by the DD Form 1423 for DI-MISC-80750. This letter shall be prepared in accordance with the specific content and format requirements described below.

a. The certification shall be provided on company letterhead, and shall be dated and signed by an authorized official of the company.

b. This letter will state the following:

'(Company Name) has conducted the Production Evaluation effort required to date by Provision Number (Number) of Contract Number (Number) for the (End Item). Although we recognize that PE is a continuing effort and that occasional PE Compatibility ECP's may arise during the full scale production phase of this contract, we have sufficiently identified and corrected any discrepancy, error, omission or deficiency in design or technical data which would otherwise have precluded practical manufacture, assembly or attainment of required performance as set forth in specification (Number of End Item Specification). Accordingly, we hereby certify that the technical data package, as changed or supplemented by the ECP's approved to date, is suitable for our use in fulfilling our obligation of delivering conforming items at the price and delivery schedule established in this contract’.

c. If the contractor does not submit this letter of certification at the specified time, the contractor shall be deemed to have failed to make delivery within the meaning of the 'Default' clause of this contract, and this contract shall be subject to termination for default. However, failure of the Government in such an event to terminate this contract for default shall not relieve the contractor of its responsibility to continue the Production Evaluation effort and to meet the delivery schedule for all items, as well as meeting all other contract requirements.

d. Submission of the Certification shall not relieve the contractor from compliance with the PE requirement, which remains in effect for the duration of the contract.

3.4.2 PE Compatibility Discrepancies, Errors, Omissions and Deficiencies. The types of discrepancies, errors, omissions and deficiencies which require PE compatibility corrections are listed in Appendix entitled “Sample PE Compatibility Discrepancies, Errors, Omissions and Deficiencies.” Examples are provided for illustrative purposes, and are not inclusive.

NOTE: In the event of incompatibility between a 'common' or 'standard' part and a mating part, preference shall be given to correcting the incompatibility by changing the mating part.

3.4.3 Other Discrepancies. The following discrepancies may be uncovered during the PE review. While the contractor is responsible for submitting ECPs to propose corrections to the discrepancies, such ECPs will not be submitted as PE ECPs, but as described below.

Exhibit A SPRBL1-17-R-0022 Page 11 of 21

3.4.3.1 Over specified and nonessential requirements. When over specified or nonessential requirements are identified, the contractor shall submit an ECP proposing the elimination or modification of the nonessential or over specified requirements in accordance with the 'Configuration Management' provision of this contract. If significant savings are anticipated, the contractor shall submit the change as a Value Engineering Change Proposal (VECP) in accordance with the 'Value Engineering' provision of this contract.

3.4.3.2 Design Deficiencies. While it is not the intent of the Government to transfer full design responsibility to the contractor, it is recognized that the PE effort may require some design effort on the part of the contractor. In the event that the contractor discovers a conflict between the specified performance requirements and the construction characteristics specified by the technical data, the contractor shall immediately submit an ECP in accordance with the 'Configuration Management' provision of this contract. Such ECPs shall be identified as 'Basic Design Deficiency' ECPs, and shall describe the alleged design deficiency, the basis for the contractor's conclusion that it is not a PE compatibility discrepancy and the proposed change that will correct the deficiency.

3.4.4 Subcontracting of PE. If any item described by the Government-furnished technical data should be subcontracted, one of the following tasks shall be performed by the contractor:

3.4.4.1 This Production Evaluation requirement shall be made a part of the subcontract. The prime contractor is responsible for assuring that the subcontractor complies with the Production Evaluation requirements.

Submission of ECPs to the Government shall be made only by the prime contractor.

3.4.4.2 Production Evaluation responsibility will be retained by the prime contractor, and all approved PE ECPs shall be provided to the subcontractor for incorporation on hardware. In this situation, the contractor shall prepare and submit a letter to the Procuring Contracting Officer within seven (7) days of award of the subcontract. This letter shall identify the item that has been subcontracted without the PE clause and state the contractor's intention of retaining Production Evaluation responsibility for the subcontracted item.

3.4.5 Alternate Changes. The Government reserves the right to direct an alternate change to a PE ECP.

3.5. Requirements for Contractor Performed First Article Testing.

3.5.1 General. The contractor shall perform First Article Testing (FAT) in accordance with FAR 52.209-3 (see Section I of this contract) and this SOW. As part of FAT, the contractor shall:

a. Select the test unit(s) used for FAT from the first production lot. Test unit(s) shall be selected by the Government representative.

b. Develop the test procedures and plans necessary to demonstrate that these units conform to the requirements established by the applicable specification(s) and other technical data provided in this contract.(Para 3.5.4)

c. Notify the Government and test the First Article units. (Para 3.5.5)

d. Provide a First Article Test Report to the Government which documents the FAT results. (Para 3.5.6)

Exhibit A SPRBL1-17-R-0022 Page 12 of 21

FAR 2.101 & 3.104

e. Insure all equipment used to take performance readings for acceptance tests are kept within the performance parameters delineated by the manufacturer of that equipment. All equipment manufactured by the contractor shall be listed and the parameters established and maintained for this equipment also.

3.5.2 Test Requirements. First article inspection shall be in accordance with MIL-STD-810G to verify compliance with the operating environment requirements set forth in Paragraph 3.5 of MIL-PRF-49078A (CR).

FAT inspection quantities shall be three units. Test unit(s) used for FAT shall be selected from first production lot, which shall contain a minimum of 50 units by the Government representative.

3.5.3 Production of First Article Units. All FAT samples shall be assembled at the same location at which production units will be assembled, using the same parts, materials, and manufacturing processes to be employed for subsequent production.

3.5.4 Test Plan. The contractor shall prepare and submit a First Article Qualification Test Plan in accordance with DI-NDTI-81307A as implemented by the DD Form 1423 for DI-NDTI-81307. In addition to the information required by DI-NDTI-81307, this submission shall contain:

a. The delineation and allocation of tests to be performed on each of the First Article units and the order of such tests (this may be prescribed in applicable technical data).

b. Step-by-step test procedures for each test and the data sheets (see 3.5.6.3) to be employed to document the results of testing.

c. Identification of required test facilities, equipment and personnel.

d. Test milestones schedules and the contractor's test readiness posture.

e. A table which cross references the paragraph number of the specification requirement (including a brief description of the requirement) and the associated paragraph number of the First Article Qualification Test Plan.

Exhibit A SPRBL1-17-R-0022 Page 13 of 21

FAR 2.101 & 3.104

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0006 A TDP TM OTHER NDTI

A003 First Article Qualification Test Plan First Article Test Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-81307A SOW Para. 3.5.4. RDER-PRC-TR INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD ONE/P 30 DAT (DAYS

AFTER

CONTRACT

AWARDS)

b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE ITEM 16

Submit draft via LT. Government requires 45 days for review/comments. Submit final within 30 days of receipt of Government comments, with DD-250 via WAWF. Government requires 30 days for review/approval.

All deliveries shall be delivered in a format, compatible with Microsoft Office 2007 software delivered by e-mail and by CD-R, CD+R Compact Disc, DVD-R or DVD+R 4.7GB Digital Versatile Disc.

Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.

If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable.

RDER-PRC-TR

QAR

15. TOTAL 2 2 0

Man Bun Lau

RDER-PRC-TR

05/09/2017 Daniel Webster

RDER-PRC-TR

Chief, Tactical Radio Branch

05/09/2017

Based upon DD Form 1423-1, 1 Jun 90

Exhibit A SPRBL1-17-R-0022 Page 14 of 21

FAR 2.101 & 3.104

3.5.5 Notice of FAT Performance. As required by FAR 52.209-3, written notices concerning the time and location of FAT shall be furnished to the PCO, the Administrative Contracting Officer and the Government Technical Activity listed in Block 6 of the DD Form 1423 for DI-NDTI-80809B.

3.5.5.1 Selection of First Article Samples. When Initial Production FAT applies to this contract (i.e., when FAR 52.209-3 ALT I and ALT II are specified in Section I), FAT samples shall be selected at random from the initial production lot.

3.5.5.2 Reporting of FAT Failures. Reporting of FAT failures shall be by the FAT Report, in lieu of any other reporting requirements specified in this contract. In addition, FAT failures shall be verbally reported to the Government's Quality Assurance Representative (QAR) and Government Technical Activity listed in Block 6 of the DD Form 1423 for DI-NDTI-80809B within twenty four hours of occurrence.

3.5.6 FAT Report. A FAT Report shall be prepared and submitted in accordance with FAR 52.209-3 and DI- NDTI-80809B as implemented by the DD Form 1423 for DI-NDTI-80809B. The FAT Report shall be complete, accurate, and readable and shall provide sufficient data to determine that the hardware item meets all the requirements delineated in the contract. The report will include the following:

Exhibit A SPRBL1-17-R-0022 Page 15 of 21

FAR 2.101 & 3.104

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0006 A TDP TM OTHER NDTI

A004 Test/Inspection Report First Article Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80809B SOW Para. 3.5.6. RDER-PRC-TR INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN

DD OTIME 20 DAC (DAYS

AFTER

TESTING)

b. COPIES

SECT. B

8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

Submit report of First Article Test results via DD 250.

Government requires 30 days to provide comments/approval.

Submit revised report within 15 days after receipt of government comments. Government requires 30 days to provide comments/approval.

All deliveries shall be delivered in a format, compatible with Microsoft Office 2007 software delivered by e-mail and by CD-R, CD+R Compact Disc, DVD-R or DVD+R 4.7GB Digital Versatile Disc. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.

If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable.

RDER-PRC-TR

QAR

PCO

15. TOTAL 0 3 0

Man Bun Lau

RDER-PRC-TR

05/09/2017 Daniel Webster

RDER-PRC-TR

Chief, Tactical Radio Branch

05/09/2017

Based upon DD Form 1423-1, 1 Jun 90

3.5.6.1. General Data.

a. Contractor's name and address.

Exhibit A SPRBL1-17-R-0022 Page 16 of 21

FAR 2.101 & 3.104

b. Contract number.

c. Nomenclature, type number and (if assigned) stock number of item represented by the First Article.

d. Name and address of plant where First Article was fabricated and assembled.

e. Place and date of performance of tests.

f. Identification (including date) of applicable equipment specifications and associated amendments.

g. Sample size or quantity submitted for test or inspection.

3.5.6.2 Cross Reference. A table which cross-references the paragraph numbers of the specification, the test procedures, and data sheet entry.

3.5.6.3 Test Results. Complete test results showing actual or quantitative observations and all required calculations. ‘GO/NOGO’ data is allowable (under certain circumstances) only with prior Government approval. Allowable tolerances for each parameter shall be presented. Test data should also include the date that the test was performed, name and signature of tester, name and signature of the Government verifier/witness (if applicable) and serial number of the equipment. Test results shall cite detailed qualitative and quantitative data results such as test categories, test conditions, test methods employed, and types of inspection and test equipment used during the test or inspection.

3.5.6.4 FAT Failures. FAT failures shall list all requirements not complied with during FAT. If none, this should be explicitly stated. For each requirement not met, a corrective action to remove the noncompliance will be proposed. This corrective action must include retest or other verification that the corrective action does remedy the problem/failure. The corrective action will address changes in design or manufacturing process which will preclude this deficiency in subsequent production units. Verified corrective action must be implemented prior to contractor entering into production.

3.5.6.5 FAT/Production Discrepancies. Any Government approved (see paragraph 3.5.3), difference between the parts, materials and processes used to manufacture FAT samples and production units shall be documented in the FAT report.

3.5.7 FAT Approval. FAT samples shall meet all contractual requirements or all variances shall be documented by Government approved waivers. First Article approval will be contingent upon the submission of a complete and acceptable FAT report to include verification of corrective action for reported FAT failures to include adequacy of identified changes to the design/manufacturing process.

3. 5.8 FAT Samples and First Production Lot Inspection. If FAR 52.209-3 ALT II is specified in Section I, First Article units shall be utilized to satisfy initial production lot inspection requirements. If the quantity of First Article samples is less than that needed to satisfy first production lot sampling requirements, additional samples shall be selected at random from the production lot and inspected to meet first production lot acceptance requirements.

Exhibit A SPRBL1-17-R-0022 Page 17 of 21

FAR 2.101 & 3.104

3.5.8.1 When Initial Production FAT (FAR 52.209-3 ALT I or ALT II) applies and additional units are tested to satisfy production acceptance requirements, failures for these additional units shall be reported as specified in this contract.

3.5.9. Disposition of First Article Samples. Upon successful completion of FAT, the contractor shall dispose of the FAT samples as follows:

3.5.9.1 One samples shall be retained at the contractor's facility for use as a reference by the QAR, and shall be shipped to the nearest DLA Disposition Services upon completion of contract performance.

3.5.9.2 All remaining FAT samples shall not be delivered as production items on the contract, and shall be shipped to the nearest DLA Disposition Services.

3.5.10 Production Test Procedures. Production test procedures used to test production units shall be identical to those used to test First Article samples.

3.5.10.1 Once FAT is approved, proposed changes to the production test procedures will be submitted to the COR and DCMA Software Specialist (when production test procedures are in the form of test software) for evaluation. Such submissions will provide complete justification for the change. Changes to the approved test procedures shall not be implemented without written Government approval.

3.5.10.2 Any notice of approval of test procedures or changes thereto shall not relieve the contractor from complying with all contractual requirements.

3.5.11 Use of FAT Samples as a Manufacturing Standard. The FAT samples shall NOT serve as a manufacturing standard.

3.6. Requirements for Quality Assurance System. The contractor shall implement and maintain a Quality Assurance System to ensure product integrity that meets or exceeds the requirements established below. These requirements are commonly accepted practices employed by industry both in national and international environments.

3.6.1 Quality Approach. The contractor shall establish/maintain an approach to ensure product integrity and to satisfy contract or order requirements.

3.6.2 Initial Quality Planning. The contractor, during the earliest practical phase of the contract, shall conduct a complete review of the contract requirements to identify all test and inspection resources necessary for assuring product integrity.

3.6.3 Document Control. The contractor shall ensure that the latest revisions of drawings, specifications, work instructions, inspection/test instructions, and other documents required to satisfy the contract are utilized in production, inspection, and test.

3.6.4 Records. The contractor shall maintain records of all inspections and tests to demonstrate that the quality approach satisfies contract requirements.

Exhibit A SPRBL1-17-R-0022 Page 18 of 21

3.6.5 Control of Purchases. The contractor shall ensure that all supplies and services that they purchase from suppliers conform to contract requirements. The contractor shall require that their subcontractors control the quality of their services and supplies.

3.6.6 Government Furnished Property (GFE). Not Applicable.

3.6.7 Materials Control. The contractor shall maintain controls over all materials and products throughout the manufacturing process. These controls shall enable the identification of materials that have passed inspection from those which have not. The contractor shall maintain records identifying the status and final destination of all materials/products.

3.6.8 Nonconforming Material. The contractor shall establish and maintain an approach for controlling material that does not satisfy contract requirements, including procedures for its identification, segregation, and disposition (rework/repair, scrap, etc.).

3.6.9 Corrective Action. The contractor shall promptly act to correct nonconforming materials and processes to preclude the recurrence of the problem and to satisfy contract requirements.

3.6.10 Manufacturing Operations/Process Controls. The contractor’s quality approach shall be responsible for assuring/monitoring that all manufacturing operations/processes are accomplished under controlled conditions.

Controlled conditions include documented work instructions (including workmanship), production equipment, special work environments, inspections/test operations, work specifications, and approval/rejection criteria.

3.6.11 Inspection and Testing. The quality system shall assure that all final inspections and tests required satisfying contract requirements are conducted.

3.6.11.1 The contractor shall perform the following testing to ensure the production units are in compliance with the performance requirements set forth in MIL-PRF-49078A (CR).

3.6.11.1.1 Group A Test. All production units shall undergo 100% Mechanical and Visual Inspection, 100% Talk-out and 100% Electrical Inspections for Microphone Frequency Response and Sensitivity, Microphone Impedance, Earphone Frequency Response and Sensitivity (Output) and Earphone Impedance to verify the compliance of the operating requirements set forth in Paragraph 3.2.1a, 3.2.1c, 3.2.1e and 3.2.1h of the MIL-

PRF-49078A (CR).

3.6.11.1.2 Group B Test. Group B Inspection shall be performed on inspections lots that have passed Group A inspection and on samples selected from units that have been subjected to and met the Group A inspection.

Microphone Frequency Response and Sensitivity, Microphone Distortion, Microphone Impedance, Microphone Signal-to-noise ratio, Earphone Frequency Response and Sensitivity (Output), Earphone Distortion, Earphone Overload and Earphone Impedance shall undergo Group B inspection in accordance with the sampling plan for the AQL of 4% to the Inspection Level S-4 in ANSI/ASQ-Z1.4-2003(R2013) to verify the compliance of the operating requirements set forth in Paragraph 3.2.1a, 3.2.1b, 3.2.1c, 3.2.1d, 3.2.1e, 3.2.1f, 3.2.1g, and 3.2.1h of the MIL-PRF-49078A (CR).

Exhibit A SPRBL1-17-R-0022 Page 19 of 21

FAR 2.101 & 3.104

3.6.11.2 The Government has the right to perform an inspection at any time during normal business hours with a contractor quality representative present. Equipment and facilities required for inspection and testing shall be the contractor’s responsibility. The contractor shall obtain written approval from the Government for utilization of testing facilities other than the primary production testing facility prior to the commencement of any acceptance tests, and shall notify the Government, in writing, of the scheduled test(s), in accordance with FAR 52.246-2, to allow Government representatives to witness and verify inspection and test.

3.6.12 Measuring, Testing, and Inspection Equipment. The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that products conform to contract requirements. These devices shall be calibrated against certified measurement standards that are traceable back to national/international standards.

3.6.13 Inspection and Test Status. The contractor shall maintain a system for the identification of the inspection and test status of all products throughout the manufacturing cycle.

3.6.14 Quality Review. The contractor shall assure effectiveness of quality (e.g. internal quality audits, Statistical Process Control, and related measures).

3.6.15 Training Requirements. The contractor shall identify/provide for the training needs of their personnel performing quality functions.

3.6.16 Statistical Quality Control and Analysis. The contractor’s quality approach shall establish/utilize statistical methods whenever appropriate to satisfy the contract or order requirements.

3.6.17 Continuous Process Improvement. The contractor shall monitor the effectiveness of their quality system and continually improve quality processes.

3.6.18 Handling, Storage, Preservation, Packaging and Shipping. The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, orsubstitution of products.

3.7. Requirements for Value Engineering.

3.7.1 General. The submission of VECPs is encouraged to eliminate unnecessary requirements, reduce costs, and improve functionality of Team Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) managed weapon systems. VECPs can increase the value of delivered products and services and improve contractor profit. FAR clause 52.248-1 is incorporated by reference.

3.7.2. Value Engineering Information. To obtain more information about Value Engineering teaming within C4ISR, contact the Value Concepts Office at:

HEADQUARTERS U.S. ARMY CECOM LCMC

ATTN: AMSEL-LCL-EIE (Value Concepts Office)

6001 COMBAT DRIVE

ABERDEN PROVING GROUND, MARYLAND 21005-1845

Phone: 443-861-5415

Exhibit A SPRBL1-17-R-0022 Page 20 of 21

Appendix I

Sample PE Compatibility

Discrepancies, Errors, Omissions and Deficiencies

1. Compatibility among the drawings and between drawings and other technical data. For example:

- Are the correct specifications cited?

- If a specification has been superseded, is the appropriate replacement cited?

- When parts are specified, is the quantity and part number correct?

- Are code identifications correct?

2. Compatibility between the equipment drawings and related gage/test fixture drawings, test procedures, master pattern drawings and other drawings in the technical data package. For example:

- Are the desired characteristics adequately and correctly specified?

3. Compatibility between Parts Lists, assembly drawings and other technical data. For example:

- Do the Parts Lists cite all required drawings?

4. Compatibility between the physical or functional requirements of the specifications or drawings and the inspection provisions to verify compliance. For example:

- If the requirement specifies operation at a certain temperature, does the inspection requirement provide for its measurement at that temperature?

- Are specified parts and materials compatible with the performance or testing requirements…