BRAND NAME.pdf

PDF 405 KB Posted

Attached to
VACUUM PUMP ASSY Federal contract opportunity
Solicitation number
SPMYM4-25-Q-0567
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document is a Memorandum to the File justifying the use of a sole source procurement from Kelvin International for specialized cryogenics equipment for the Pearl Harbor Naval Shipyard (PHNSY) Nitrogen Shop. The procurement covers five specific items including an Agilent Turbomolecular Pump, vacuum hose, connections, pump operator, and a CPV union thread connection, with a total of five line items. The justification for sole source procurement is based on "Other Reasons", specifically that Kelvin International previously provided the shop equipment and is considered the world's foremost expert on cryogenics. The document states that other brands or equivalents have proven less effective and could potentially damage the current nitrogen supply and equipment. The technical certification was completed by Colby Kagawa, a Planner at PHNSY, on 5/8/2025.

View the file

Other files for this federal contract opportunity

Other files attached to VACUUM PUMP ASSY, newest first.
File Type Posted
SPMYM4-25-Q-0567.pdf PDF
SPMYM4-25-Q-0567.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING: (select all that apply):

A. 0 ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. □ RESTRICTIVE RIGHTS

The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government's need.

2. □ EXCLUSIVE LICENSING AGREEMENTS

The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

Explain the circumstances surrounding why the item or service is only available from the manufacturer or service provider.

OR

Provide evidence of the exclusive licensing agreement as an attachment to this document.

NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank.

3. 0 OTHER REASONS

Other reason not identified above. Provide details on mission impact if requirement is not solicited.from only one source.

Direct updated replacement for existing Shop equipment previously provided by Kelvin International. Kelvin is the world's foremost expert on Cryogenics.

Nitrogen Shop needs exact equipment to keep PHNSY & IMF Nitrogen to the correct purity. Other Brands or Equivalents have proven in the past to be less effective and could damage current Nitrogen supply and equipment.

B. □ BRAND NAME

Item required must be a brand name product, or feature of a product, particular to one manufacturer.

Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government's requirements and why a "brand name or equal" purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies' similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the a�ency 's needs.

C. □ UNUSUAL AND COMPELLING URGENCY

The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: _____________ _

2. Explanation of why delivery/commencement of services by the date mentioned above is required:

Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as "urgent, " estimated production lead time.for the item, etc.

3. If appropriate, include any additional pertinent information.