51875007-09905-MIL-DTL-1222_OVER_12_INCH _.doc
Detail Specification DOC document 24 KB Posted
- Attached to
- Stud, Continuous Threads (Level 1)
- Solicitation number
- SPMYM4-15-Q-0875
About this file
Packing requirements
View the file
Other versions and copies of MIL-DTL-1222
| File | Revision | Posted | Attached to |
|---|---|---|---|
| MIL-DTL-1222J NSNS.xlsx | Rev. J | MIL-DTL-1222J FULLY COMPETITIVE ITEMS | |
| MIL-DTL-1222J.PDF | Rev. J | Modular Mounts Gas Turbine | |
| 8075B854-01426-Supplemental_ordering_data_to_MIL-DTL-1222J.pdf | Rev. J | Self locking studs and Screw Cap |
Who attaches MIL-DTL-1222
Other files
| File | Type | Posted |
|---|---|---|
| K-Monel_word.doc | DOC document | |
| SPMYM4-15-Q-0875.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PACKAGING REQUIREMENTS FOR MIL-DTL-1222, TY IV STUDS
1. Packing and Packaging shall be per MIL-STD-2073-1E w/CHANGE 1 of 07JAN11
a. Appendix J, Table J.IX, Code E
b. Preservation Method 10
i. Each stud shall have the threads protected by a sleeve extending over the full length of the threads. The sleeve shall be manufactured from paperboard, asphalt impregnated chipboard, or a spiral wrap of kraft paper over chipboard, lined with material conforming to MIL-PRF-121G. Cylindrical shaped flexible plastic netting stock sleeving may be used. The flexible plastic netted sleeves shall be of sufficient thickness and adequate strength to prevent damage by the threads during handling, storage, and transportation. The sleeves shall not be forced fitted over the fasteners. The sleeve size shall permit ease in removal and replacement for inspection purposes. The use of individual wraps, bags and/or cushioning material secured by tape is prohibited.
2. Mark packaged item in accordance with the requirements of MIL-STD-129P.
File details come from the government source that posted it. Updated .