This is a Purchase Description for a sole source acquisition of one DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center with associated tooling and equipment. The machine will be delivered to Puget Sound Naval Shipyard (PSNS) in Bremerton, Washington, specifically to Building 431, Shop 31, Work Center 35.

The equipment specifications include mandatory components: FANUC 0i-Plus Control, 40-tool automatic tool changer, BIG-PLUS CAT40 tool shank, 15,000 rpm high-speed spindle, through-spindle coolant system, chip conveyor, LNS FOX HM2-700 mist collector, Samchully 4-axis NC rotary table, Renishaw measurement probes, and various peripheral equipment. The electrical system must operate on the existing 220 Volt, 3-phase, 120-amp power source available at the installation site, with tolerance for ±10 percent voltage fluctuation. All equipment must comply with OSHA standards (29 CFR 1910 and 1915), NFPA 70 and 79 electrical standards, and produce noise not exceeding 84 decibels. The contractor is responsible for leveling, aligning, and providing all necessary tools, gages, and testing instrumentation for acceptance testing, while the government will provide labor for off-loading, anchor bolts, rough leveling, and utilities connection within 25 feet. The contractor must provide three hard copies and one searchable electronic copy of comprehensive operating and maintenance manuals including schematics, troubleshooting guides, spare parts lists, and energy control procedures. Training for up to six operators/programmers is required for a minimum of two consecutive eight-hour workdays at the customer facility, conducted by a qualified United States citizen proficient in English. Final acceptance testing will be performed at the installation site following OEM standards and requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VIBB

August 2026

PURCHASE DESCRIPTION FOR THE SOLE SOURCE ACQUISITION OF ONE (1)

DN SOLUTIONS VERTICAL MACHINING CENTER (VMC), 3-AXIS

1. SCOPE. The purchase description set forth below describes the minimum requirements of the government for a DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center and tooling.

contract.

1.1. Facility Location. One (1) shall be provided for Puget Sound Naval Shipyard (PSNS), Bremerton site, Building 431, Shop 31, Work Center 35.

2. APPLICABLE DOCUMENTS. The documents listed in this section are cited in sections 3 and 4 of this specification. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.

2.1. Government Documents.

2.1.1. Specifications, Standards, and Handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents shall be the current edition at time of solicitation.

FEDERAL STANDARDS

FED-STD-313 ------------------------------ Material Safety Data, Transportation Data, and Disposal Data for Hazardous Materials Furnished to Government Activities

(Copies available online at http://quicksearch.dla.mil/)

MILITARY STANDARDS

MIL-STD-130N w/ Change 1 ------------ Identification Marking of U.S. Military Property

(Copies available online at http://quicksearch.dla.mil/)

NAVSEA

OSHECM Chapter 250 Rev 1 ------------ NAVSEA Occupational Safety, Health and Environment Control Manual for Naval Shipyards Chapter 250

(Copies available online at http://www.navsea.navy.mil/Home/Shipyards/Norfolk.aspx)

2.1.2. Other Government Publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents shall be the current edition at time of solicitation.

COMBINED FEDERAL REGULATIONS

29 CFR 1910 -------------------------------- General Industry, OSHA Safety and Health Standards

29 CFR 1915 -------------------------------- Occupational Safety and Health Standards for Shipyard Employment

40 CFR 82 ----------------------------------- Protection of Stratospheric Ozone

(Copies available online at http://www.gpo.gov/fdsys)

LOCAL ATTACHMENTS

Attachment A ------------------------------- Puget Sound Naval Shipyard, Bremerton Site Specific Regulations

(Copies attached to the solicitation)

2.2. Non-Government Publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents shall be the current edition at time of solicitation.

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEMA 250 ---------------------------------- Enclosures for Electrical Equipment (1000 Volts Maximum)

(Copies available at http://www.nema.org or National Electrical Manufacturers Association, 1300 North 17th Street, Suite 1752, Rosslyn, VA 22209)

NATIONAL FIRE PROTECTION ASSOCIATION

NFPA 70 ------------------------------------- National Electrical Code

NFPA 79 ------------------------------------- Electrical Standard for Industrial Machinery

(Copies available at http://www.nfpa.org or NFPA, 1 Batterymarch Park, Quincy, MA 02169)

UNIFIED FACILITIES CRITERIA (UFC)

UFC 3-301-01 ------------------------------ Structural Engineering

UFC 3-501-01 ------------------------------ Electrical Engineering

2.3. Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1. Design. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.

3.1.1. Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. These materials shall not be brought on site without prior approval of the Government. Radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, prohibited. Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of FED-STD-313. Nickel Metal Hydride and lithium batteries are permissible for memory backup. Class I Ozone Depleting Substances as defined in 40 CFR 82 shall not be used in the performance of this contract or be provided as part of the equipment. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration, not later than 60 calendar days after effective date of contract and prior to any work being performed.

3.1.2. Measuring and Indicating Device Graduations. All measuring and indicating devices on the DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center shall be graduated in the inch/pound or both inch/pound and metric.

3.1.3. OSHA Compliance. The equipment installation and its component parts shall be in compliance with 29 CFR 1910, NFPA 70 and NFPA 79. Approval shall be as specified under and paragraph 1910.399.

3.1.4. Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment. Noise generated by the work piece shall be excluded in determining compliance of the equipment with the dB requirements.

3.2. Standard Equipment. All standard equipment required for proper operation of the DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center (such as special tools needed for maintenance) shall be provided. A list of these items shall be furnished at time of proposal.

3.2.1. Basic Operation. The Contractor shall provide all fluids, piping, interconnecting hoses, wiring, cables, disconnects, connectors, and any other materials to make ready to operate all equipment components required by this contract.

3.3. Components. The DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center shall consist of not less than the following components:

a. FANUC 0i-Plus Control

b. Automatic Tool Changer, 40-tool storage capacity

c. BIG-PLUS CAT40 Tool Shank

d. 15,000 rpm High Speed Spindle

e. 2MPa (1.5kW) Through Spindle Coolant (TSC)

f. Chip Conveyor, hinged belt, right hand

g. LNS FOX HM2-700 (700 CFM) Mist Collector

h. Samchully S-250F4 4-axis NC Rotary Table

i. -jaw manual chuck and tailstock

j. Renishaw OTS-AA automatic tool measurement probe

k. Renishaw OMP60 automatic workpiece measurement spindle probe

l. Renishaw CAT40 tool setter calibration master m.

n. 4th Axis Preparation Cabling for Servo/1-Pneumatic Piping

o. External air blow nozzle, Through Spindle Air (TSA)

p. Air gun

q. Coolant gun

3.4. Electrical System.

system shall be tolerant of voltage fluctuation of ± 10 percent. The electrical system shall include transformers required to modify the existing source voltage to the proper operating voltage of the equipment.

3.4.1. Electrical System Specifics, Building 431, Shop 31. Existing electrical power source available at the installation site is 220 Volt, 3 Phase, 120 Amps.

3.5. Marking on Instruments, Control Panels, and Plates. All words on instruments, control panels, and plates shall be in the English language. Characters shall be engraved, etched, embossed, or stamped in boldface on a contrasting background. All plates shall be corrosion resistant.

3.5.1. Nameplate. A nameplate shall be permanently and securely attached to each machine.

The nameplate shall contain the information listed below. If the machine is a special model, the model designation shall include the model number of the basic standard machine and a suffix identified in the manufacturer's permanent records.

a. Nomenclature

b. Manufacturer's name

c. Manufacturer's model designation

d. Manufacturer's serial number

e. Power input (volts, total amps, phase, frequency)

f. Contract Number or Order Number

g. Date of manufacture

3.5.2. Identification Marking of Military Property. An Item Unique Identification Marking (IUID) shall be provided in accordance with MIL-STD-130N and all applicable documents within the standard with Machine Readable Information (MRI) for item identification marking and automatic data capture. The application of Human Readable Information (HRI) shall be used in combination with MRI and free text.

3.6. Technical Data. Three (3) hard copies and one (1) searchable electronic copy of the following technical data shall be provided with the machine.

3.6.1. Operating and Maintenance (O&M) Manuals. O&M Manuals shall contain technical information, specifications, instructions for the operation, maintenance of the machine and recommended spare parts list. All copies of technical data shall be legible and written in the English language. Technical Data shall contain at a minimum:

a. Data shall enable an average journeyman mechanic to operate, program, maintain, and repair the equipment.

b. Complete instructions and information for all equipment, components, assemblies, subassemblies, attachments, and accessories.

c. Operating instructions including programming requirements, pre-operational checks, start up, shut down and emergency shutdown procedures.

d. Maintenance and service instructions, including all preventive maintenance schedules, and lubrication charts.

e. Trouble-shooting guides.

f. Parts list containing: illustrations, part numbers, part nomenclature, original manufacturer, cross reference numbers, and recommended spare parts, including quantities.

g. Energy control procedure, in accordance with 29 CFR 1910.147, to bring equipment to a zero energy state for maintenance.

h. All mechanical and electrical schematics with a table of contents showing discrete components, block diagrams, wiring diagrams with inputs and outputs identified, system electrical interface documents, and drawings for the specific model of all machine equipment/drives/controls supplied.

i. All final contract drawings shall be provided electronically. The format of the drawing files shall be in AutoCAD. Files shall have DWG or DXF extensions.

3.6.2. OSHA Approved Certification. The equipment specified herein shall be inspected, approved as defined in 29 CFR 1910.399, and labeled by a Nationally Recognized Testing Laboratory (NRTL) as defined in 29 CFR 1910.7.

3.7. Hazardous Energy Control (HEC) Program, Lockout/Tags-Plus (LOTP). HEC/LOTP shall be accomplished in accordance with OSHECM Chapter 250 and 29 CFR 1915.89.

3.8. Training. After completion of final acceptance testing at destination, the services of a qualified representative(s), who is a United States citizen proficient in the English language, shall be provided for training receiving activity personnel. The training shall be at the customer facility and utilize drawings and manuals provided under this contract. All printed training aids shall be in the English language.

3.8.1. Operator /Programmer Training. Training shall include preparation of part programs, and preparation of equipment for safe operation. The trainees shall be provided instruction for all aspects of machining operations. Trainees shall be provided instruction for the care, use and operation of all attachments and accessories. Training shall be provided for up to six (6) operators/programmers. The training period shall not be less than two (2) consecutive, eight-hour workdays.

4. QUALITY ASSURANCE

4.1. Final Inspection/Acceptance Test (Destination). Final inspection and acceptance testing shall be performed on the DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center to ensure conformance with this purchase description. The acceptance test shall be performed only after the DN Solutions DNM 6700 (4th Generation) 3-Axis Vertical Machining Center is installed at its final location. The acceptance test shall consist of all examinations, calibrations, checks, and tests performed as standard or required by the Original Equipment Manufacturer (OEM). The machine shall pass the examination and all tests in order to be accepted by the Government.

INSTALLATION RESPONSIBILITIES

Government Contractor

(XX) ( ) a. Furnish labor and material handling equipment for off-loading and placing item on install site.

(XX) ( ) b. Provide and install anchor bolts and nuts.

(XX) ( ) c. Set and rough level the machine on its foundation.

( ) (XX) d. Level and align machine.

(XX) ( ) e. Connect machine to the provided utilities hook-up within 25 feet.

( ) (XX) f. Provide all necessary tools, gages, and instrumentation necessary to perform the required tests.

(XX) ( ) g. Provide and charge all systems with fluids in accordance with manufacturer's instructions.