This Salient Characteristics document outlines the requirements for procuring three Empire Abrasive Equipment Company Pro-Finish PF-4848 PRC-6 Manual Blast Cabinet Systems with CDC-6 Dust Collection Systems for Building 7000. The procurement includes detailed specifications for the blast cabinets, which feature a 48" x 48" x 36" #14-gauge steel cabinet with dual swing doors, safety-glass viewing window, ergonomic glove rings, LED flood lamps, and a comprehensive pressure blast media delivery system. Additional requirements include full removal and relocation of existing glove blast booths, installation of new equipment, operational testing, and compliance with OSHA safety regulations.
The contract mandates that the selected contractor provide two copies of operation/maintenance manuals, three copies of NRTL certification reports, and two copies of warranty certificates. The warranty will be the manufacturer's standard commercial warranty, covering defects in design, materials, and workmanship for 3 years from the date of shipment. The contractor must handle all equipment removal, transportation, installation, and utility connections, including electrical power and industrial air, with all work to be completed using qualified personnel and necessary material handling equipment. Electrical requirements are 230 Volt, 60 Hz, 1 phase for the blast cabinet systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM2-25-Q-2250 Amendment.pdf | ||
| SPMYM2-25-Q-2250.pdf | ||
| SALIENT CHARACTERISTICS_25Q2250.pdf | ||
| EXHIBIT A- CDRL.pdf | ||
| EXHIBIT B- CDRL.pdf | ||
| EXHIBIT C- CDRL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salient Characteristics for Glove Blast Cabinets (Qty: 3) Project #319-340
18 Sep 2025
1. Scope - This salient characteristics outline reflects those characteristics that are essential to the minimum needs of the Government for the on-site installation of three new Glove Blast Booths (each with a Dust Collection System) in Building 7000. This includes the removal, installation and operational testing of the equipment, as specified herein. It is the Government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this salient characteristics outline. The Glove Blast Booths shall be Empire Abrasive Equipment Company, Pro-Finish PF-4848 PRC-6 Manual Blast Cabinet System, CDC-6 Dust Collection System (Qty: 3) or equal. The Glove Blast Booths (each with a Dust Collection System) shall be include the following minimal capabilities/features/items:
A. PRO-FINISH 4848 PRC-6 MANUAL BLAST CABINET SYSTEM (QTY: 3):
BLAST ENCLOSURE:
48" deep x 48" wide x 36" high #14-gauge Steel Cabinet
(2) 41" deep x 32" high Dual Panel Swing Doors with OSHA Interlocks 14" x 22" Safety-Glass Viewing Window with Rounded Corners Quick-Change Window Replacement, No Tools Required Ergonomic 8" Glove Rings with Arm Rest and Positive Seal Kleensweep™ Air Inlet Design Improves Visibility
(2) Flood Lamps, 16W LED, 1,280 lumens each 1,000 lb. capacity, 3/16” thick Perforated Steel Floor Manual Blow-Off Gun with Trigger, OSHA-Compliant 18" wide Foot Treadle, Pneumatic
(4) Leveling Bolts
PRESSURE BLAST MEDIA DELIVERY:
1 cubic foot Media Storage Hopper 1 cubic foot Pressure Vessel, ASME Front-Mounted 1" Modular Control Piping, including:
o Pressure Regulator with Gauge o Blast Control Valve o General Purpose Filter with Sight Glass and Manual Drain Manual Sure-Flo Grit Valve 3/16" Ceramic Nozzle Automatic Exhaust Valve, MG-78 ½" ID Blast Hose
MEDIA RECOVERY:
8' Media Recovery Hose, 4" dia.
600 cfm Externally Tunable, Cyclonic Reclaimer 11' Dust Hose, 6" dia.
600 cfm Cartridge Dust Collector (CDC-6) with 1 ½ hp Blower on the clean air side, Minihelic Gauge, 16-Gallon Dust Drum and Pushbutton Reverse-Pulse Filter Cleaning
ELECTRICAL REQUIREMENTS:
230 Volt , 60 Hz, 1 phase
AGGRESSIVE MEDIA OPTIONS:
Plastic Window Protector
3/16" Boron Carbide Pressure Nozzle
Heavy Duty 4" Conveying Hose Upgrade
Ultrawear Lining, 600 cfm Reclaimer (essential when using aluminum oxide or silicon carbide blast media)
Reclaimer Inlet Wear Plate, External, 600 cfm
Boron Carbide Exhaust Valve Restrictor (essential when using aluminum oxide or silicon carbide blast media)
CABINET OPTIONS:
Door Sill, 4848 (Quantity 2)
36" Rolling Manual Turntable Assembly for 4848 Cabinet:
o 36" diameter Perforated Steel Top, 3/16" thick o 1,000 lb. capacity (6" off center loading) o Special Sealed Bearings, Heavy Duty construction o Manual Rotation o Rolling 4-Wheel Dolly with Tracks o 39" long Exterior Platform with Fold-Away Track Section
Pro-Finish Powered Vertical Door for 4848 (recommended when Rolling Manual Turntable is purchased)
Static Strap for Wrist
System Security Key Lock (prevents unauthorized use)
Cabinet Air Inlet Silencer
Three Phase Electrical Upgrade (1 1/2 hp) o 460 V/60 hz/3 ph o Single Source with Transformer (115 volt controls)
PRESSURE SYSTEM OPTIONS:
Constant Pressure Switch o Maintains pressure to blast pot for faster restarts
Sight plugs for 350 pressure vessel
Top-Entry Blast Hose Upgrade (1/2” Blast Hose) o Improves ergonomics by reducing operator strain
3 cubic foot pressure vessel upgrade for extended blast duration (400/600 CFM)
B. CDC-9 CARTRIDGE DUST COLLECTOR WITH OPTIONS (FOR PRO-FINISH 4848 PRC-6
MANUAL BLAST CABINET SYSTEM) (QTY: 3):
FEATURES:
85 dBA Blower Exhaust Silencer/Damper
Photohelic Upgrade (automatically pulses cartridges)
HEPA Filter: located after the primary filters on the dust collector
Magnahelic Gauge for HEPA Filter
CDC - Leg Extension Package for 55 Gallon Drum and Includes: Stand, Drum Cover and Hose
ELECTRICAL REQUIRMENTS:
15 Amps at 230 volt, 60 Hz, 1 phase (2 hp Blower Motor)
2. Contractor Removal/Relocation, Installation and Set-Up/Operational Testing of the three (3) New Building 7000 Glove Blast Booths – The contractor shall provide all personnel and supplies necessary for the disconnect/removal/relocation (including power and air) of the existing three Glove Blast Booths and turn them over to the government for disposal. The contractor shall install the three new Glove Blast Booths and mount them to the floor and connect them to utilities (power and air). The contractor shall operationally test the three new Glove Blast Booths, to ensure they operate properly prior to turn over to the customer. The contractor shall provide the following minimal services:
2.1 Disconnect the electrical power from the three old Glove Blast Booths and connect electrical power (currently located on-site) to the three new Glove Blast Booths. This includes all wiring, conduit, etc. modification for the complete installation of electrical power.
2.2 Disconnect the three old Glove Blast Booths and connect industrial air (currently located on-site) to the three new Glove Blast Booths. This includes all industrial air piping, etc. modifications for the complete installation of the industrial air.
2.3 Properly securing the booth (and other necessary components) to the existing concrete. This includes any necessary repairs, etc. to the existing facility (caused by the removal of the three old Glove Blast Booths).
2.4 Relocate/remove the three old Glove Blast Booths (up to 100 ft) and turn them over to the government for disposal
2.5 Lifting and Rigger Services - The contractor shall provide all material handling equipment necessary to unload equipment, transport equipment to the installation site and any other equipment, (such as forklifts, man-lifts, etc.) necessary for continuous support the relocation/removal/installation operations, and shall provide qualified personnel to operate it.
3. Safety Requirement - The equipment and its component parts shall be in compliance with applicable Code of Federal Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and approved by TRF, Bangor, if it meets specific Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Title 29, Part 1910; Subparts "O" and "S". Specifically, equipment will be "Accepted" by TRF, Bangor, if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party). Three (3) “hard” copies (one for each system) of the NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report with three (3) “hard” copies (one for each system) or documentation mounted on the equipment, (which acknowledges it is NRTL certified), shall be provided.
4. Operator / Maintenance / Repair Manuals - The equipment shall be furnished with two (2) copies (for all three (3) systems) of the manufacturer’s standard Product Manual/Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure.
5. Warranty – Two (2) “hard” copies (for all three systems) of the warranty certificate shall be provided.
Supplies and services furnished shall be covered by warranty from defects in design, materials and workmanship. The warranty shall be the manufacturer’s standard commercial warranty, which shall conform to all the requirements of the contract. Acceptance of the manufacturer’s standard commercial warranty shall not minimize the rights of the government under clauses in the contract, and in any conflict that arises between the terms and conditions of the contract and manufacturer’s warranty, the terms and conditions of the contract shall take precedence. The warranty period shall be for 3 years. The warranty period shall commence from the date of shipment. All warranty work shall be provided by a factory authorized distributer.