EXHIBIT C- CDRL.pdf
PDF 499 KB Posted
- Attached to
- BLAST CABINETS Federal contract opportunity
- Solicitation number
- SPMYM225Q2250
About this file
This Contract Data Requirements List (DD Form 1423-1) details a contract for three Glove Blast Cabinets (Project #319-340) with specific technical documentation requirements. The contract requires the contractor to provide two hard copies of Nationally Recognized Testing Laboratory (NRTL) certification documentation, demonstrating that the equipment complies with Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Title 29, Part 1910, Subparts "O" and "S". The documentation must be delivered with the equipment or during equipment installation/training, with a distribution statement limiting access to DoD and DoD contractors only, effective 8/26/2024. The contract is associated with TRF, Bangor (Contract No. N68438), and the technical data package must be prepared to ensure the equipment meets specific safety and testing standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SALIENT CHARACTERISTICS_25Q2250 UPDATED.pdf | ||
| SPMYM2-25-Q-2250 Amendment.pdf | ||
| SPMYM2-25-Q-2250.pdf | ||
| SALIENT CHARACTERISTICS_25Q2250.pdf | ||
| EXHIBIT A- CDRL.pdf | ||
| EXHIBIT B- CDRL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ____________ OTHER SESS
D. SYSTEM/ITEM
Glove Blast Cabinets (Qty: 3) (Project #319- 340)
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Technical Data Package
3. SUBTITLE
NRTL Certification
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776 NOTICE 1
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
Purchasing Activity
. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE
Final
N/A Draft Reg Repr o 16. REMARKS
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 8/26/2024. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 – Documentation shall be delivered with equipment, or at the time of the installation/training of the equipment (if applicable).
NOTE: Safety Requirement - The equipment and its component parts shall be in compliance with applicable Code of Federal Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and approved by TRF, Bangor, if it meets specific Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Title 29, Part 1910; Subparts "O" and "S". Specifically, equipment will be "Accepted" by TRF, Bangor, if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party).
Two (2) “hard” copies (total for all three units) of the NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report with two (2) ”hard” copies (total for all three units) or documentation mounted on the equipment, (which acknowledges it is NRTL certified), shall be provided.
N68438 (TRF, Bangor) 0 2 0
TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Carl S Jaeckel 5/27/2025
X Carl S Jaeckel Carl Jaeckel
5/27/2025
Carl S Jaeckel 5/27/2025
X Carl S Jaeckel Carl Jaeckel
5/27/2025
DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
0002AC C
C001
File details come from the government source that posted it. Updated .