SALIENT CHARACTERISTICS.pdf
PDF 70 KB Posted
- Attached to
- ROLLUP DOORS Federal contract opportunity
- Solicitation number
- SPMYM222Q2796
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sole Source Justification - Redacted.pdf | ||
| 22Q2796 ROLL UP DOORS - AMENDMENT.pdf | ||
| 22Q2796 ROLL UP DOORS.pdf | ||
| SALIENT CHARACTERISTICS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Metal Roll-Up Door
Roll-up door description:
• Door curtain will be manufactured with a minimum thickness of 22 gauge or greater with galvanized steel slats.
• Steel slats should be galvanized per ASTM standards.
• Slats should be large flat 2-5/8” with a ¾” recess.
• Each slat should be continuous one piece.
• Door hood should be manufactured with 24 gauge galvanized steel with reinforced top and bottom edges / lips.
• Door hood; should be designed to fully encapsulate roll up door.
• Coil mechanism; heavy duty / industrial grade, 20K cycle operation, with heat treaded coil springs.
• Door should be operational by manual chain with maximum 25lb pull force to operate door.
• Door must have steel channel guides, should be 3/16” steel or greater.
• Door should be designed to withstand to 80 MPH winds or greater.
• Door brackets (fixture) should be 3/16” or greater.
• Door enclosure system should have a grey powder coated finish.
• Door must have chain locking mechanism.
• Door shall be an exterior mount / with aluminum bottom bar and neoprene astragal to help prevent water intrusion.
• Remove and dispose of existing canvas closure on existing single sided storage racks, modifications to galvanized steel structure, roofing, trim and install chain operated roll up coil doors.
• Coil door to be 11’9” wide, 13’6” tall with 2 5/8” tall galvanized 22ga slats grey and U guide angles. 1 right hand 1 left hand chain operator.
• Work to be done in contractor laydown area off the pier.
File details come from the government source that posted it. Updated .