VENDOR QUESTIONS ANSWERED AND SUBMISSION DEADLINE EXTENSION.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-Q-0782-P0002.doc | DOC document | |
| SPMYM2-15-Q-0782-The_specification_of_new_generation_W_axis.pdf | ||
| Mandatory_Technical_Specifications_for_WIRE_EDM_-_SPMYM2-15-Q-0782.pdf | ||
| CDRL_for_CLIN_0001_SPMYM2-15-Q0782.pdf | ||
| SPMYM2-15-Q-0782.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Aug-2015 11:59 PM to 19-Aug-2015 11:59 PM.
The following have been added by full text:
VENDOR QUESTIONS ANSWERED
1) Accutex Rotary Table (Section 3.6.1) ------ Need to know rotary table specifications and size requirements for proper quoting
Answer: Refer to new attachment “The specification of new generation W axis”
2) System 3R Chuck and system 3R table clamp kit (Section 3.6.1) --------Need System 3R part number for both items to quote properly, System 3R has several different clamping products and we need to narrow down which one is preferred.
Answer: System 3R Chuck will be Macro Manual RS / Part # 3R-600.24-RS and System 3R table clamp kit /Part # 3R ICS Double clamping M8 C860 000
3) Power Disconnect Box (Section 3.5.6.1) ----------- Customer requesting to quote and provide a lockable power disconnect box with fuse device to protect the machine from a power surge------------Can customer provide additional details on this request, and current models used in their facility?------------
Answer: The Power Disconnect Box needs to meet state code.
4) Request Space Requirements: 102” x 90” x 90” (Section 3.4.3)-------------Is the space requirement a minimum or maximum requirement
Answer: The space requirements are a maximum requirement.
5) Specs state contractor shall demonstrate equipment to perform as required in this specification----------------What tests and specs do they intend to perform (is there anything not identified in this document)?
Answer: The contractor just needs to demonstrate that the equipment performs correctly, for example: cuts to the programmed sizes, angles, etc.
The following have been modified:
ATTACHMENT
ATTACHMENT: CLIN 0001: CONTRACT DATA REQUIREMENT LIST (CDRL) 2-PAGES
CLIN 0001: MANDATORY TECHNICAL SPECIFICATIONS 12-PAGES
CLIN 0001: SPECIFICATION OF NEW GENERATION W AXIS – 3PAGES
(End of Summary of Changes)