VENDOR QUESTIONS ANSWERED AND SUBMISSION DEADLINE EXTENSION.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Aug-2015 11:59 PM to 19-Aug-2015 11:59 PM.

The following have been added by full text:

VENDOR QUESTIONS ANSWERED

1) Accutex Rotary Table (Section 3.6.1) ------ Need to know rotary table specifications and size requirements for proper quoting

Answer: Refer to new attachment “The specification of new generation W axis”

2) System 3R Chuck and system 3R table clamp kit (Section 3.6.1) --------Need System 3R part number for both items to quote properly, System 3R has several different clamping products and we need to narrow down which one is preferred.

Answer: System 3R Chuck will be Macro Manual RS / Part # 3R-600.24-RS and System 3R table clamp kit /Part # 3R ICS Double clamping M8 C860 000

3) Power Disconnect Box (Section 3.5.6.1) ----------- Customer requesting to quote and provide a lockable power disconnect box with fuse device to protect the machine from a power surge------------Can customer provide additional details on this request, and current models used in their facility?------------

Answer: The Power Disconnect Box needs to meet state code.

4) Request Space Requirements: 102” x 90” x 90” (Section 3.4.3)-------------Is the space requirement a minimum or maximum requirement

Answer: The space requirements are a maximum requirement.

5) Specs state contractor shall demonstrate equipment to perform as required in this specification----------------What tests and specs do they intend to perform (is there anything not identified in this document)?

Answer: The contractor just needs to demonstrate that the equipment performs correctly, for example: cuts to the programmed sizes, angles, etc.

The following have been modified:

ATTACHMENT

ATTACHMENT: CLIN 0001: CONTRACT DATA REQUIREMENT LIST (CDRL) 2-PAGES

CLIN 0001: MANDATORY TECHNICAL SPECIFICATIONS 12-PAGES

CLIN 0001: SPECIFICATION OF NEW GENERATION W AXIS – 3PAGES

(End of Summary of Changes)

File details come from the government source that posted it. Updated .