This specification covers the minimum government requirements for the procurement of four composite Submarine Deep Draft Separators. Key requirements include design, manufacture, testing, delivery, assembly, training, and documentation for salt water use separators that are 12 feet deep, 20 feet long, 22 feet tall and can support a 16,800 long ton load. The procurement is a 100% total small business set aside to be conducted using FAR Parts 12 and 13.5 procedures by DLA Maritime Puget Sound. Quotes are due by March 31, 2021 for a firm fixed price supply contract requiring FOB Destination delivery by September 30, 2021 to Building 7000 Door 12 at Naval Base Kitsap in Silverdale, Washington. The solicitation number is SPMYM2-21-R-0005 and will be available for download on or around March 17, 2021 at beta.sam.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM2-21-R-0005 (CDRLS)Composite Submarine Deep Draft Separators -.pdf | ||
| SPMYM2-21-R-0005 (SOLICITATION) SUBMARINE DEEP DRAFT SEPERATORS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification for a Composite Submarine Deep Draft Separators
Project # P011-21 18 Feb 21
1 SCOPE
This specification reflects those characteristics that are essential to the minimum needs of the government for four (4) Composite Submarine Deep Draft Separators. The scope of work shall include the “Turn-Key” set-up, operational testing and training of the equipment as specified herein. It is the government’s intent that a single (primary) contractor be awarded this contract and be responsible for the accomplishment of all work detailed by this specification.
2 APPLICABLE DOCUMENTS
The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of an invitation for bids or a request for proposals shall apply.
2.1 SAFETY REQUIREMENTS
• Safety Requirements For TRIDENT Refit Facility (TRF), Bangor
A copy of this document is attached to this specification (See Enclosure 1).
2.2 PADEYES REQUIREMENTS
• Process Instruction (PI) for “Padeyes: Temporary and Permanent; Installation, Use and Removal of” (PI No. 611-401-026), for Trident Refit Facility, Bangor (TRFB)
A copy of this document can be provided upon request.
2.3 CRANE/WEIGHT HANDLING EQUIPMENT REQUIREMENTS
• Management of Weight Handling Equipment (June 2016) – NAVFAC P-307.
A copy of this document can be provided upon request.
2.4 ENVIRONMENTAL COMPLIANCE REQUIREMENTS
• Environmental Compliance Requirements for TRF, Bangor
A copy of this document can be provided upon request.
2.5 GENERAL ENVIRONMENTAL REQUIREMENTS
2.5.1 Hazardous Material Control shall include the following:
2.5.1.1 Estimated Contractors Hazardous Material Inventory (CHMI) Table provides quantities of each hazardous material to be used on this project. Copies of all Safety Data Sheets (SDS), will be submitted to the Base Environmental Office (BEO) and be kept on site where the work is being performed.
2.5.1.2 Contractor shall not use Hazardous Material (HM) composed of any of the following chemicals or substances: Leads, chromium, mercury, phenols, trichloroethylene, chlorofluorocarbons, halon, PCBs, asbestos, silica sand (for use as blasting agent), Class I Ozone Depleting Substances (ODS), radioactive materials or instruments capable of producing ionizing radiation, and chemicals listed in 40 CFR 355.50 Appendix B.
2.5.1.3 If additional Hazardous Materials (HM) is required for this project, an SDS shall be submitted to the BEO for approval before the HM is brought on board Naval Base Kitsap (NBK), Bangor. The contractor shall not bring on board NBK, Bangor any HM until approved by the BEO. All containers of hazardous material shall be resealed, placed in a secure area while on base, and transported off base for reuse of material at other contractor projects. The Contractor shall not generate any contractor generated hazardous or dangerous waste on this project.
2.5.2 Hazardous Waste Control shall include the following:
2.5.2.1 A trained individual from the government shop with a current Waste Originator certification must be present for each shift that hazardous waste is produced.
2.5.2.2 Disposal Of Hazardous Waste – TRF, Bangor Site is the owner of all hazardous waste generated within its facilities. This includes hazardous waste generated by contractor personnel while working at TRIDENT Refit Facility. All hazardous waste generated by this contract shall be turned over to the activity for disposal prior to the end of the work shift. The shop shall submit completed NBK Bangor Waste Information Specification (WIS) forms for all hazardous waste expected to be encountered during the course of this project. The BEO will provide final waste designation along with WIS instructions. If additional wastes are produced after this plan is approved, waste is encountered not identified, or changes occur to waste streams that have already been assigned a WIS number, a new or updated WIS for each waste stream must be submitted to the BEO for designation.
2.5.2.3 A hazardous waste label must be affixed to the appropriate container upon the first addition of waste. If more than 55 gallons of Dangerous Waste (DW) or 1 quart of Extremely Hazardous Waste (EHW) is produced, the date must be filled in on the label. All containers must be under the control of the shop and located in the same area the waste is generated.
3 REQUIREMENTS:
3.1 GENERAL DESCRIPTION OF SYSTEM - This specification covers the minimum government requirements for a “Turn-Key” composite Submarine Deep Draft Separators (Quantity: 4).
3.2 WORK INCLUDED - The Contractor shall be responsible for the following:
• Design, manufacture, test and groom all equipment required to provide a complete system and in accordance with the requirements specified herein.
• All shipping, crating, and rigging costs associated with the transport and delivery of the equipment specified herein.
• Complete documentation and organization of all technical data which applies to the operation, maintenance, and repair of the specific equipment.
• Provide training to personnel on the proper operation and maintenance of the assembled equipment and its component parts.
3.3 CONDITIONS OF SERVICE AND PERFORMANCE - The following service and operational conditions shall apply to the equipment delivered under this specification.
3.3.1 Environmental Conditions - The specified equipment will be operated in salt water, subject to high winds, driven rain, sleet and snow, and shall be capable of continuous operation over an extended period of time with minimal maintenance and upkeep.
3.3.2 Lifting and Handling - The specified equipment shall be equipped with four gross weight lifting padeyes, mounted on the top of the unit, correctly spaced for even and level lifting by a single crane hook. See paragraph 2.2 reference (Appendix 1) for design, fabrication and testing requirements as well as paragraph 2.3 reference.
3.4 GENERAL EQUIPMENT REQUIREMENTS:
3.4.1 Standard, Off The Shelf Components - All materials and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service except as required for factory testing.
Standard, off the shelf components with proven reliability shall be used wherever possible to increase performance reliability and reduce costs. The system components shall be one of the manufacturer’s current production models which, on the day this solicitation is issued, has been designed, engineered and sold, or is being offered for sale through advertisements or manufacturer’s published catalogs or brochures. System components such as a prototype unit, pre-production model, or experimental unit DO NOT qualify as meeting this requirement. The system shall be complete, so that when connected to the utilities identified herein, it can be used for the function for which it is designed and constructed.
3.4.2 Painting - All surfaces shall be painted in conformance with the manufacturer’s standard practices and good workmanship. Painting shall result in a highly wear-resistant finish, which guarantees continued protection to the surfaces covered against the specified environment under all service conditions. The manufacturer’s standard color shall be provided. Lead base or chromium base paints are prohibited.
3.4.3 Caution - Warning Plates - Corrosion resistant “Caution” or “Warning” plates shall be securely attached to system components in visible locations, with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the plates.
3.4.4 Identification Plate - An identification plate shall be furnished with the system. A nameplate shall be affixed to each major component of the system showing the manufacturer’s name, equipment model, year of manufacture, and any other pertinent information for identifying the part as a unique component of the system.
3.4.5 Asbestos – No asbestos products/materials shall be used in any components (i.e. gaskets, etc.) of the equipment. The equipment shall be asbestos free.
3.4.6 New Developments - The contractor shall identify any new developments that would improve the efficiency, accuracy or productivity of the equipment or would decrease its operating costs. The contractor shall notify the Contracting Officer and technical POC in order that the new developments may, at the Government's option, be included in the equipment. Reports of such developments shall be addressed to the Contracting Officer.
3.5 EQUIPMENT TO BE PROVIDED - Four (4) Composite Submarine Deep Draft Separators shall include the following minimum (or equal) features incorporated into the design (for each separator):
3.5.1 Twelve (12) ft. deep (outside of fender to outside of fender) x 20 ft. long x 22 ft. tall.
3.5.2 Load of 16,800 long tons.
3.5.3 Three (3) ft. of desired freeboard.
3.5.4 Six (6) - 24 inch (10 ton) mooring cleats shall be securely mounted on the surface of the separator.
3.5.5 Estimated weight of each separator shall be 70,000 lbs.
3.5.6 Four (4) padeyes (lifting points) shall be located in the top of each separator (See para. 2.2 reference, Appendix 1).
3.5.7 Rubber arch fenders on each surface (to meet Trident Submarine load/hull pressure requirements).
3.5.8 Inherently buoyant structure. The materials of construction shall have a lower density than that of water so there are no “air” tanks or cavities that rely on being air tight. The interior cavities of the separator shall be designed to completely flood with water.
3.5.9 Construction materials shall be all structural fiberglass materials and 316 stainless steel, making the structure maintenance free for the entire life of the structure (25+ years).
3.5.10 Assembly shall include the following items:
3.5.10.1 The unit shall be shipped in at least two modules to an assembly site on-base (at a location designed by the government).
3.5.10.2 Two (or more) modules at 12’ deep x 20’ long x 11’ tall shall be shipped to the site. These sections shall be structurally bonded and bolted together at the assembly site. The arch fenders would be bolted in place.
3.5.10.3 The separators shall then be placed in the water by the contractor (i.e. via a mobile crane, floating crane, etc.). The freeboard and trim shall be adjusted as required.
3.6 CONTRACTOR ASSEMBLY AND SET-UP SERVICES TO BE PROVIDED - The specified equipment and all associated equipment shall be assembled, set-up and tested by the contractor in the area(s) designated as its functional work area by the Receiving Activity Point of Contact. The contractor shall provide all personnel, and supplies necessary for the complete assembly and set-up of the proposed system (except as noted elsewhere in this specifications).
3.6.1 Coordination - The Contractor shall contact the Receiving Activity Point of Contact with a proposed delivery/assembly schedule (at least one week before the delivery/assembly starts). The assembly schedule shall be reviewed and approved of the Receiving Activity Point of Contact. The Contractor shall coordinate the site preparation and the delivery of the equipment/materials in a manner which causes minimum disruption/interference with the activity’s normal business routine.
3.6.2 Work Process - The Contractor shall provide a field supervisor to direct set up and testing. The field supervisor shall have full authority to implement his field decisions in an expeditious manner. No work shall be accomplished when the field supervisor is not in the immediate work area.
3.6.3 Lifting And Rigger Services - The contractor shall provide all material handling equipment necessary to unload the specified equipment, transport it to the assembly site and any other equipment (such as forklifts, man-lifts, mobile crane, etc.) necessary for continuous support of the transportation and assembly of the specified equipment, and shall provide qualified personnel to operate it by the contractor.
3.6.4 Crane/Weight Handling Equipment (When Used as a Crane) Services - All weight handling evolutions where a load is suspended from any type of weight handling equipment shall conform to the requirements of NAVFAC P-307 (June 2016) Management of Weight Handling Equipment. Applicable sections of P-307 include “Contractor Operated Cranes”, “Operator Licensing”, “Rigging Gear and Miscellaneous Equipment”, and “Appendix P – Contractor Crane (or Alternate Machine Used To Lift Suspended Load) and Rigging Gear Requirements”. The contractor shall prepare the “Certificate of Compliance” and the “Contractor Crane or Rigging Operation Checklist” in P-307 Appendix P. Each lift shall require the submission of a Lift Plan, and approved by the receiving activity’s weight handling engineering department. The Lift Plan shall meet the requirements listed in the P-307 definition of “critical lift plan”, with the exception that this applies to all lifts. Additional site specific requirements may be found in the attachments to this document.
3.6.5 Contractor Site Visit - The contractor shall make a site visit to the facility prior to submitting a bid. This shall include viewing the existing facility, utilities, etc. The contractor shall have a complete understanding of the requirements for the assembly of the specified equipment (prior to bidding on this project).
3.6.6 Assembly Waste Disposal - See Section 2.5.2.2.
3.6.7 Assembly Non-Hazardous Waste Disposal - The contractor shall properly be responsible for and dispose of all non-hazardous waste products produced during the set-up/assembly of contractor provided services for this project.
3.6.8 Start-Up Supplies – The contractor shall be required to furnish start-up supplies necessary for the proper operation of the specified equipment.
3.7 ASSEMBLY SUPPORT SERVICES PROVIDED BY THE GOVERNMENT - The activity will provide the following in support of the assembly:
3.7.1 Receiving Activity Point Of Contact - Upon contract award, the receiving activity (TRIDENT Refit Facility, Bangor Site) shall designate a Receiving Activity Point of Contact who shall be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Receiving Activity Point of Contact shall serve as the contractor’s primary contact for all interaction with government activities.
3.7.2 Utilities - Reasonable amounts of water, shop air (80-90 psi) and electricity shall be made available adjacent (within 50 feet) to the assembly site at no cost to the contractor (for temporary use during the assembly of the specified equipment). The Contractor shall be responsible for any costs incurred in connecting, converting and transferring the utilities to the work site.
3.7.3 Storage - Lay-down area will be provided within the vicinity of assembly site for storage of Contractor materials and tools. The government does not accept responsibility for security of Contractor’s materials or tools.
The area must be kept clean and orderly, free of rags, paper and other debris. Failure to maintain area in a clean condition may result in the loss of the area. The Contractor shall be responsible to restore the storage area to original condition after use.
3.7.4 Start-Up Supplies – The Receiving Activity (TRF Bangor) will provide necessary for the proper operation of the specified equipment.
3.8 CONTRACTOR PROVIDED DESIGN - The designated equipment shall be designed by a qualified professional engineer. It shall be designed to withstand salt water, subject to high winds, driven rain, sleet and snow. The design drawings shall have sufficient details for proper evaluation by the government. Allow for 14 calendar days for review by the government of the submittal. No fabrication or manufacturing shall commence until the design is approved and comments addressed.
3.9 LOAD TEST OF LIFTING PADSEYES AND NON-DESTRUCTIVE TEST (NDT) OF LOAD
BEARING WELDS - The contractor shall perform these tests prior to shipping the equipment to the government.
Each lifting padeye, while attached to the top of the specified equipment shall undergo a load test for a minimum of 10 minutes without damage or deformation. The magnitude of the load test shall be based on a 125% to 130% increase above the “design load” or the Working Load Limit (WLL) per Appendix 1 of para. 2.2 reference..
Acceptance shall be based on no visible damage or permanent distortion following the proof test. Damage and permanent distortion is defined as cracks, tears, mushrooming of load-bearing areas, bent or twisted pads or structure, etc. On each lifting padeye (or immediately adjacent to it) the lifting pad design load, 125% (+5%, -0%) test load and test date shall be stencil or labeled in 1-inch high letters. A Non-Destructive Test shall be made on each of the lifting padeyes (after the load test of each lifting padeye is performed). This shall include magnetic particle or liquid penetrant examination of the load bearing welds and lifting padeyes. Welds and materials shall meet the acceptance criteria in Mil-Std-2035A Class 1. All “design load” calculations shall be based on the maximum weight including the specified equipment per Appendix 1 of paragraph 2.2 reference.
3.10 TECHNICAL DATA TO BE PROVIDED
3.10.1 Operator / Maintenance / Repair Manuals - The equipment shall be furnished with three (3) hard copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all schematics showing discrete components. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel.
The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure. The vendor shall provide a “no asbestos used” statement, certifying that all products/materials (i.e. gaskets, etc.) used in the components of the equipment does not contain asbestos, as outlined in paragraph 3.4.5. The contractor shall provide a list of recommended consumable spare parts and possible sources for procurement.
3.10.2 Lifting Padeye Certification and Non-Destructive Testing (NDT) Report - Concurrent with delivery of the equipment, the contractor shall provide a signed, written certification of compliance to the lifting padeyes and NDT testing requirements as outlined in this specification. The Lifting Padeye Certification statement shall include that all lifting padeyes have been designed in accordance with design criteria of paragraph 2.2 reference and that each lifting padeye has successfully passed a 125% to 130% load test. The NDT report shall show the results of the magnetic particle or liquid penetrant examination of each load bearing weld and lifting padeye (following the load test). Failure to provide this certification and NDT report could result in rejection of this equipment, because of failure to comply with the terms of the contract.
3.10.3 Contractor Provided Design - The designated equipment shall be designed by a qualified engineer. It shall be designed to withstand salt water, subject to high winds, driven rain, sleet and snow. The design drawings and calculations shall have sufficient details for proper evaluation by the government. Allow for 14 calendar days for review by the government of the submittal. No fabrication or manufacturing shall commence until the design is approved and comments addressed.
3.11 WARRANTY - Supplies and services furnished shall be covered by warranty from defects in design, materials and workmanship. The warranty shall be the manufacturer’s standard commercial warranty, which shall conform to all the requirements of the contract. Acceptance of the manufacturer’s standard commercial warranty shall not minimize the rights of the government under clauses in the contract, and in any conflict that arises between the terms and conditions of the contract and manufacturer’s warranty, the terms and conditions of the contract shall take precedence. The warranty period shall be for one year. The warranty period shall commence from the date of acceptance. All warranty work shall be provided by a factory authorized distributer.
4 QUALITY ASSURANCE PROVISIONS
4.1 RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for the performance of all inspection requirements (examinations and tests) as specified herein. The government reserves the right to perform any of the inspections set forth in this specification, where such inspections are deemed necessary to assure supplies and services conform to the prescribed requirements.
4.2 RESPONSIBILITY FOR COMPLIANCE - All items shall meet all requirements of this specification.
The inspection(s) set forth in this specification shall become part of the contractor’s overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitted to the government for acceptance comply with all requirements of the contract. Sampling inspections, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known defective material, either indicated or actual, nor does it commit the government to accept defective material.
4.3 INSPECTION/TESTING AT ORIGIN - Basic performance tests (prior to shipment) shall be conducted by the manufacturer on the primary equipment and all associated equipment to the extent practicable, to demonstrate functionality, to ensure contract requirements are being met. The tests may be performed by the contractor, either by personnel of their service organization directly, or by an independent testing agency. The contractor shall contact the government a minimum of two (2) weeks before the completion of the manufacturing of the specified equipment. This shall allow the government the option of sending their technical representative(s) to witness the tests, and to ensure contract requirements are being met, prior to shipment of the unit to the government.
4.4 INSPECTION/TESTING AT DESTINATION
4.4.1 Initial Test And Grooming - The equipment delivered with the system shall be inspected by the government for mechanical and electrical integrity as follows: All welds shall be inspected for integrity and appearance. Surfaces shall be examined for sharp edges and burrs. Fasteners shall be checked for tightness and if fixed to prevent loosening due to vibration. Paint will be checked for flaking and blistering. Electrical requirements shall be examined for compliance to the National Electrical Code, (NFPA 70/79). The fit of parts shall be observed, with particular reference to the interchangeability of those that are likely to require replacement. Faults will be duly recorded and presented to the contractor for rectification.
4.4.2 Operational Tests - Upon satisfactory completion of the tests above, the equipment shall be set up for an operational test and evaluation. The contractor shall demonstrate the ability of the equipment to perform as required in this specification. All equipment functions shall be exercised to the extent necessary to prove proper operation in accordance with specification requirements. The system shall function, without failure, for the duration of this test period. If a failure occurs during the test period, repairs shall be immediately affected by the Contractor, and the tests shall be restarted from the first test. Three failures without completion of the test period shall be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction, which requires remedial action to restore the system to full operation in accordance with contract specifications.
4.4.3 Load Test of Lifting Padeyes and Non-Destructive Tests of Load Bearing Welds - Each lifting padeye while attached to the equipment shall undergo a load test for a minimum of 10 minutes without damage or deformation. The magnitude of the load test shall be based on a 125% to 130% increase above the “design load” or the WLL. Acceptance shall be based on no visible damage or permanent distortion following the proof test.
Damage and permanent distortion is defined as cracks, tears, mushrooming of load-bearing areas, bent or twisted padeyes or structure etc. On each lifting padeye (or immediately adjacent to it) the lifting padeye design load, 125% test load and test date shall be stencil or labeled in 1-inch high letters. A Non-Destructive Test shall be made on each of the lifting padeyes (after the load test if each lifting padeye is performed). This shall include magnetic particle or liquid penetrant examination of the load bearing welds and lifting padeyes. Welds and materials shall meet the acceptance criteria in Mil-Std-2035A Class 1.
4.5 PROVISIONS FOR REPAIR AND RETEST - In the event of a test failure, the contractor, at their discretion, may elect to correct the failed condition and request a retest of the system (vs. shipping the equipment back to the manufacturer for repairs).
4.6 FINAL ACCEPTANCE - Final acceptance shall be upon satisfactory completion of assembly, inspection and testing of the system (as outlined in this specification).
5 DELIVERY
5.1 It is required that all equipment, goods and services (including final acceptance outlined in paragraph 4.6) identified in this specification, shall be completed prior to 180 days post contract award.
5.2 The Receiving Activity Officer shall be notified no less than one week prior to the arrival at the site of the specified equipment and/or contractor personnel.
5.3 Material transportation from the manufacturer’s facility to the work site shall be the responsibility of the contractor. Limited secured storage areas at the facility will not permit the government to store material for extended periods of time. Early shipment of materials, without the permission of the receiving activity shall be refused.
5.4 Packing Material - The use of shredded paper, whether newspaper, office scrap, computer sheets, or wax paper, in packing material for shipment to Navy activities, is prohibited.
5.5 It is the government’s intent that the Contractor delivers a fully operational and functional system meeting the requirements stated herein prior to acceptance by the receiving activity and final payment by the government.
Delivery of this system shall occur when all deliverable items of this contract have been received, assembled and made operational and the contractor has demonstrated and the receiving activity has confirmed that the system meets or exceeds the requirements set forth in this specification and is ready for government use.
6 GENERAL NOTES
6.1 RESPONSE TO REQUEST - As a part of the response to this request, descriptive literature shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling provided, statements of compliance with specification, and performance statements with special attention to the key performance criteria stated herein.
6.2 ADMITTANCE TO THE WORK SITE:
6.2.1 Upon contract award, employees or representatives of the Contractor who require access to the Receiving Activity's facility at Naval Base Kitsap, Bangor (NBK, Bangor) shall be admitted to the work site only after they have been issued an appropriate Naval Region NW visitor security badge which is obtained at NBK, Bangor Pass & ID Office (located outside the NBK, Bangor Trident/ Main Gate).
6.2.2 Navy Region NW badge is required to gain access through the Operational Area Gate, or Waterfront Restricted Area, and is obtained through the on-line Base Authorization and Visit Request (BAVR) computer system. The prime contractor will need to submit all badge requests for their personal and for sub-contractor personnel. To request a Navy Region NW badge, Go on line to "https://www.bavr.cnic.navy.mil, and submit a request for a badge, a minimum of five (5) business days prior to arrival. All requested information highlighted in red is mandatory. Type N/A for “Driver’s License Information”. The "Command you are visiting" is: “Trident Refit Facility (TRF)” (or "NBK Bangor"). The “Company Name or Command” and “Work Phone” is your company/command information. The “Originating Command Security Officer Information” is Bruce Girkin, bruce.girkin@navy.mil. The "Sponsor E-Mail" for an on-line badge should be: aaron.k.peal@navy.mil (Aaron Peal, 360-315-1047, 360-471-8624 (cell)). In the "Purpose of Visit" box, please explain in detail the purpose of your visit, and include the Contract Number, the Receiving Activity Point of Contact (name and telephone number) and ALL the buildings/areas/piers you are visiting. The “Start Date” is the day you expect to pick up your badge (you cannot pick it up early, even if approvals are completed). The “End Date” is the last date of your visit. Also send a copy of the contract (or contract modification if the delivery date has been changed) to Aaron Peal at the e-mail address listed above. You will be notified at the e-mail address you provided, when all approvals have been completed. If the BAVR computer system doesn't work, try different search engines (“Firefox” search engine seems to work the best). If BAVR still doesn’t work contact the Receiving Activity Point of Contact or our security manager, Aaron Peal, 360-315-1047, 360-471-8624 (cell) to schedule a visit(s), and shall provide the following information:
* Full Legal Name
* US Citizen Status
* All Company Contact Information
* Contract Number
6.2.3 Visitors must show proof of US Citizenship (at the NBK Bangor Pass & ID Office, located outside Bangor’s Main Gate (Trident Boulevard), by having an original active US Passport, an "Enhanced Driver's License", or an unlamented official birth certificate.
6.2.4 Truck delivery personnel only need to show their Bill of Lading and show proof of US Citizenship (at the NBK Bangor Pass & ID Office) by having an original active US Passport, Enhanced Driver's License, or an unlamented official birth certificate. All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection. Drivers should expect delays due to heightened security.
6.2.5 Contractor's vehicles requiring NBK Bangor Delta Pier/Waterfront Restricted Area access shall provide the following data to the Receiving Activity Point of Contact, who shall request a Strategic Weapons Facility, Pacific (SWFPAC) Delta Pier vehicle permit. These permits are issued by SWFPAC and are picked up (by the contractor) at the SWFPAC Pass & ID building (located next to the NBK Bangor Pass & ID Office, located outside Bangor’s Main Gate (Trident Boulevard)
* Company Name (must match the vehicle's registration):
* Vehicle Make:
* Vehicle Model:
* Vehicle Year:
* License Plate #:
* License Plate Issue State:
* Access Start/End Dates:
6.2.6 Notice: Persons who are currently on probation or parole from a felony conviction cannot qualify for security clearances, and will be denied access to the activity.
6.2.7 It shall be the Contractor's responsibility to collect, account for all identification passes issued to their personnel at the expiration of the contract or when access is no longer required. All NBK Bangor Pass & ID Office issued badges and identification passes must be returned back to the NBK Bangor Pass & ID Office no later than the expiration date.
6.2.8 Foreign Nationals or Affiliations - Foreign Nationals (non-U.S. Citizens) or persons affiliated with, or employed by, a foreign, or foreign owned company will not be granted access without proper NBK Bangor Commanding Officer's written approval. Please note that All NBK Bangor Command Foreign Nationals or Affiliations visit request must be submitted sixty (60) days prior to a requested visit date.
6.2.9 Identification. All Contractors shall clearly identify themselves as contactor personnel.
6.3 RESTRICTIONS:
6.3.1 Parking - Vehicles and equipment required by the Contractor to complete this contract must be registered with Security. Forms for obtaining vehicle passes and permits may be obtained from the Receiving Activity Point of Contact. Parking is available at or near the work site or at other authorized areas on the station. Contractor vehicles must be marked on the outside with the company name or logo or both. Failure to comply will result in ticketing and/or loss of vehicle privileges.
6.3.2 Regular Working Hours - All work is to be performed during TRF, Bangor's regular work hours from 6:30 a.m. to 3:00 p.m., Monday through Friday except for Federal Holidays. If the Contractor desires to work on Saturdays, Sundays, holidays, or outside the regular or specified hours/days, the Contractor shall submit a request to the Receiving Activity Point of Contact, for approval a minimum of two (2) working days prior to the anticipated work date. In no event shall a Contractor carry on work outside the hours and days specified in the contract without prior approval.
6.3.3 Restricted Colors - TRF, Bangor uses the colors magenta and yellow to identify specially controlled materials. The Contractor is specifically prohibited from using magenta and yellow colored plastic wrapping materials or bags, tape, or other covering materials.
6.3.4 Radio Restrictions - Operation of privately owned citizens band or amateur radio equipment (receive and transmit) within the geographic limits of the activity is prohibited. All radio equipment installed in privately owned motor vehicles must be turned off upon entering the premises.
6.3.5 Contractor Electronic Devices – Use of such devices, including cell phones, and computers shall not be capable of photography or digital recording by contractor personnel at TRF, Bangor is restricted. This includes personally owned Portable Electronic Devices (PEDs) that are used for storing data, including but not limited to removable storage devices (e.g. memory sticks rewriteable CDs and DVDs, Zip and floppy disks). Contractors requiring such devices in the performance of this contract shall have the equipment inspected and approved by the PSNS & IMF Information Assurance office, located in Bremerton, WA. If this equipment is needed, it must comply with the photography regulations. Please contact Receiving Activity Point of Contact to make a request. Please allow at least 5 business days for required electronic devices to be approved.
6.3.6 Photography/Recording - Contractor personnel are prohibited from having personal reproduction equipment of any kind, including but not limited to photocopying, copying, and/or recording devices. This includes photographic equipment, tape recorders, or other recording devices in their possession while inside the Operations Area (OA). Contractors requiring the use of photographic equipment in TRF, Bangor spaces must request authorization through the TRF, Bangor security office. Please contact the Receiving Activity Point of Contact to make a request.
6.3.7 Prohibited Items - The items listed below are prohibited (and includes any other item, which the possession of is prohibited by Federal, State or municipal law, Department of Defense or Department of Navy instruction directive or policy).
6.3.7.1 Weapons or other dangerous materials of any kind, including by not limited to firearms, ammunition, knives (blades longer than 3-inches), explosives, incendiaries, personal defense aerosols/sprays.
6.3.7.2 Alcoholic Beverages of any kind and illegal to include marijuana.
7 PERSONAL HEALTH AND SAFETY
7.1 The Contractor shall provide their employees with all necessary safety equipment during the performance of work on this contract, and ensure their employees follow safe work practices. All contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective safety equipment (PPE) (i.e. hard-hats, safety shoes, safety glasses with permanently attached side shields, face protection and hearing protection; In addition, any special PPE required for the task or process, including the required training for the particular PPE).
The Contractor shall provide all appropriate safety barricades, signs, and signal lights required to properly isolate the area of work.
7.2 All Contractors shall clearly identify themselves as contactor personnel.
7.3 Medical Treatment. Government emergency vehicles and medical personnel shall only be used in emergency situations affecting contractor personnel whose life may be in danger or who are seriously injured.
Government facilities may be used in these instances as the first point of treatment. Transfer to a non-government medical treatment facility shall be made as soon as possible and as determined by attending medical authorities.
8 WORK SITE INFORMATION
8.1 Regular Working Hours/Shifts. Regular working hours is normally 8 hours (6:30 am to 3:00 pm), with a 30-minute lunch break, Monday through Friday. Working hour variations may be requested by contractor personnel, and approved by the Receiving Activity Point of Contact.
8.2 Holidays and Shutdown Periods. All shutdown periods, when directed by the Commanding Officer, are normally associated with holidays or inclement weather. Naval Base Kitsap policy is to continue operations during adverse weather. Severe weather may cause an electrical power outage, or snow, ice, or wind conditions may cause the base to remain closed. Other shutdown periods may be declared by Executive Order. Contact the Surveillance Officer regarding severe weather or Executive Order shutdown information. The contractor shall not be required to work during designated shutdown periods. Holidays observed by the contractor shall include all legal holidays observed by the government. These holidays are:
New Year's Day Labor Day Martin Luther King Day Columbus Day President's Day Veterans' Day Memorial Day Thanksgiving Day Independence Day Christmas Day
8.3 Overtime is not authorized (unless approved in advance). Overtime is defined as hours worked in excess of the employee's normal workweek. The normal workweek is defined as forty (40) hours.
8.4 Nothing contained in the specifications shall relieve the Contractor from complying with applicable Federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits that may be required for the Contractor or Subcontractor(s) to perform a particular function, such as hazardous waste handling or disposal, for example.
ENCLOSURE 1
SAFETY REQUIREMENTS FOR THE TRIDENT REFIT FACILITY (TRF), BANGOR SITE
SCOPE
These specifications provide safety information and procedures required for any work performed at TRIDENT Refit Facility (TRF), Bangor Site. This does not include additional safety requirements from Naval Base Kitsap at Bangor which is the host activity at Bangor.
APPLICABLE DOCUMENTS
The following documents form a part of this specification. Unless otherwise indicated, the issue in effect on the date of a request for proposals or request for quotes shall apply.
National Fire Protection Association (NFPA)
NFPA 54 National Fuel Gas Code NFPA 70 National Electric Code NFPA 79 Electrical Standards for Industrial Equipment
Code Of Federal Regulations
29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment 29 CFR 1926 Safety and Health Regulations for Construction
(Application for copies should be addressed to Superintendent of Documents, Government Printing Office, Washington, DC 20402)
Washington State Administration Code (WAC)
WAC 173-60 Maximum Environmental Noise Levels
I. GENERAL REQUIREMENTS
a. All documentation/correspondence and/or communication specified in these specifications shall be submitted to the Contracting Officer or their designated Government Representative.
b. Mutual Understanding Meeting. Prior to commencing work: The Contractor shall meet in conference with the Contracting Officer, and other necessary government personnel to discuss and develop mutual understandings regarding administration of the Safety Program, methods and schedules, security, and any other subject necessary for a smooth and successful operation.
c. Environmental & Safety Compliance, General Awareness Training, and Regulatory Interface
1. Contractors working at the TRF, Bangor are required to perform their work in compliance with all Federal, State, and local regulations pertaining to the environment at all times.
2. The contractor is responsible for complying with the safety regulatory notices or orders, including payment of any fines attributable to the contractor’s conduct, regardless of whether or not the contractor is the name recipient of the notice, order, or fine.
3. The contractor is responsible to perform all duties and responsibilities for environmental and safety compliance set forth in this contract. The Contracting Officer can use failure to comply with the responsibilities for environmental and safety requirements as a basis for termination for default.
4. Failure to comply with or repeated violations of local, state, or Federal regulations can result in the violator(s) losing their access to TRF, Bangor or the operation being suspended until the Contractor can provide properly trained personnel. Certification of training shall be presented upon request by the Contracting Officer.
The contractors (including its employees) loss of access to TRF, Bangor will not be considered by the Contracting Officer as a basis for an adjustment to the contract for additional costs incurred by the contractor.
5. The contractor shall be responsible for conducting routine inspections of the work and storage areas to maintain compliance with the cleanliness and safety requirements associated with this contract.
d. Definitions – Technical:
1. Contractor. The term Contractor refers to both the prime Contractor and subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of this contract
II. HEALTH AND SAFETY
a. Personal Health And Safety
Contractor work performed at TRF, Bangor is typically in an industrialized area and is subject to OSHA Standards.
The contractor shall conduct all work in a safe manner and shall provide all necessary safety equipment.
The contractor shall make the maximum use of low-noise emission equipment as certified by the Environmental Protection Agency. Applicable regulatory requirements for maximum environmental noise levels are published in the Washington Administrative Code, WAC 173-60. The contractor shall provide hazardous noise signs and label equipment wherever work procedures and equipment produce sound-pressure levels greater than 84 dB(A) steady state and/or 140 dB peak sound pressure level for impact or impulse noise, regardless of the duration of the exposure.
b. Compliance With OSHA
Contractor’s personnel shall perform all work in accordance with the most current OSHA rules and regulations issued by the Department of Labor, as applicable.
For all electrical equipment installation, the equipment and its component parts shall be in compliance with the applicable OSHA regulations in accordance with CFR Title 29, Chapter XVII, Part 1910 and installed in accordance with NEC/NFPA requirements. Approval shall be as specified under the “Approval” and “Acceptance” criteria in the OSHA regulations Subpart “O”, Machinery and Machine Guarding paragraph 1910.212 and Subpart “S” Electrical, paragraph 1910.303 and paragraph 1910.399.
The contractor shall ensure all hazardous material (e.g. hydraulic oil, lubricants, grease, ink, paint, etc.) that is delivered with the equipment, is properly labeled and a Material Safety Data Sheet (MSDS) for each hazardous material is provided, as outlined in OSHA paragraph 1910.1200. MSDS(s) shall be delivered to the Receiving Activity Point of Contract/Surveillance Officer (who will deliver the MSDS(s) to the appropriate Hazardous Material Coordinator for addition of the material to the shop Authorized Use List, and possibly have the material labeled (by the government) with a Hazardous Material barcode).
c. PCB Certification
Provide written certification from the manufacturer that any new equipment provided by this contract contains no detectable PCBs (less than two (2) parts per million (ppm)). The certification shall be on the manufacturer’s letterhead and signed by a company official who is empowered to provide same. PCB Label Plate – A label plate containing the PCB Certification information shall be permanently affixed to the equipment in the vicinity of the manufacturer’s identification plate. The certification label shall be engraved or etched on wear and corrosion resistant material.
d. Safety Equipment
During the performance of work under this contract, all contractor personnel shall have in their possession and shall properly wear OSHA approved personnel protective equipment (i.e. hard-hats, safety shoes, safety glasses and hearing protection, fall protection gear/equipment and other PPE as necessary).
The Contractor shall provide all appropriate safety barricades, signs, and signal lights.
e. Safety Inspections
The contractor’s workspace may be inspected periodically for compliance with OSHA Standards.
Abatement of violations will be the responsibility of the contractor and/or the government as determined by the Contracting Officer.
The Contractor shall provide assistance to the Safety Office escort and the federal OSHA inspector if a complaint is filed. Fines levied on the Contractor by federal OSHA offices due to safety/health violations shall be paid promptly by the Contractor.
f. Energy Control
Prior to commencement of ashore work, the contractor shall provide their 29 CFR 1915.89 compliant program/procedures to the Government's Representative. The contractor is required to meet with the Government's Representative and all affected Lockout-Tags-Plus Coordinators to discuss and coordinate lockout/tags-plus interfacing and work requirements.
The contractor shall notify all employees working in the area that Hazardous Energy Control work will be performed.
Contractor personnel shall ensure Hazardous Energy Control training is current and complies with 29 CFR 1915.89.
Equipment provided by the contractor shall provide energy isolating devices (e.g. safety switches valves, etc.) to protect personnel from Hazardous energy. These energy isolating devices shall be designed and manufactured such that they can be locked to prevent inadvertent operation or unauthorized change. The contractor shall ensure all energy isolating devices installed or modified are capable of being locked. To include, but is not limited to, manual, mechanical and electrical devices.
Contractor personnel are required to know and understand all energy sources associated with their work, the means to control these sources of energy and to render the system inoperative before work can begin.
Government organizations representatives shall ensure adherence to the "Organizations that issues contracts" section located in OSHE Control Manual Chapter 250 Hazardous Energy Control.
Government representatives shall also make certain all contractors understand "Contractors and other Non-Shipyard Government Organizations Shall" section of the OSHE Control Manual Chapter 250 Hazardous Energy Control.
Contractor personnel are also required to know the Hazardous Energy Control policy that TRF, Bangor employees are working to.
g. Audible Noise Levels
The peak audible noise emitted by the equipment being installed by the contractor shall not exceed 84 decibels at the operator’s work position, nor at any other point at a distance of three feet from the equipment, as measured on the “A” weighed scale of a standard sound level meter under all operating and service conditions.
h. Accident Reporting
The contractor shall submit to the Contracting Officer, using the cognizant regulatory agencies prescribed forms, exposure data and all accidents resulting in death, trauma, or occupational disease. Accident reports shall be submitted within 24 hours of their occurrence.
The contractor shall submit to the Contracting Officer a full report of damage to government property or equipment by Contractor employees. Damage reports shall be submitted within 24 hours of the occurrence.
i. Emergency Medical Care
Only emergency medical care is available in government facilities to contractor employees who suffer on-the-job injury or disease. Care will be rendered at the rates in effect at the time of treatment. Reimbursement shall be made by the contractor to the Naval Regional Medical Center Collection Agent upon receipt of statement.
j. Fire Protection
The contractor and his employees shall know where the fire alarms are located and how to turn them on. The contractor shall handle and store all combustible supplies, materials, waste, and trash in a manner that prevents fire or hazards to persons, facilities, and materials. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire.
| 3.4.6 New Developments - The contractor shall identify any new developments that would improve the efficiency, accuracy or productivity of the equipment or would decrease its operating costs. The contractor shall notify the Contracting Officer and te... |
| 3.10.3 Contractor Provided Design - The designated equipment shall be designed by a qualified engineer. It shall be designed to withstand salt water, subject to high winds, driven rain, sleet and snow. The design drawings and calculations shall have... |
| II. HEALTH AND SAFETY |
| f. Energy Control |
| g. Audible Noise Levels |
| h. Accident Reporting |
| i. Emergency Medical Care |
| j. Fire Protection |