SPMYM2-20-Q-2805 (CDRLS) Ozone Injection Scrubber System.pdf
PDF 363 KB Posted
- Attached to
- PORTABLE OZONE INJECTION SCRUBBER SYSTEM Federal contract opportunity
- Solicitation number
- SPMYM2-20-Q-2805
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM2-20-Q-2805 (SOLICITATION) PORTABLE OZONE INJECTION SCRUBBER SYSTEM.pdf | ||
| SPMYM2-20-Q-2805 (SALIENT CHARACTERISTICS) OZONE INJECTION SYSTEM.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ____________ OTHER SESS
D. SYSTEM/ITEM
Portable Ozone Injection Scrubber System (Project #819-834)
E. CONTRACT/PR NO.
F. CONTRACTOR
Contractor’s Name
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Technical Data Package
3. SUBTITLE
Equipment Drawings/Design
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776A NOTICE 1
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
Purchasing Activity
. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
D*
10. FREQUENCY
ONE/R
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
A. ADDRESSEE Final
N/A Draft Reg Repr
16. REMARKS
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 8/18/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 – Documentation shall be delivered after contract award, but before manufacturer of the equipment.
NOTE: One (1) “hard” copy of the design shall be provided. The data shall be in the English language. The data shall be clearly legible and on 8-1/2 x 11 inch plain bond paper (unless larger sized design drawings are necessary to show design clarity).
The designated equipment shall be designed by a qualified/professional engineer. It shall be designed to withstand salt and a dust laden outdoor marine industrial environment, subject to high winds, driven rain, sleet and snow; OR designed for use in a non-air conditioned manufacturing building in an industrial environment (whatever application is applicable). The design drawings shall have sufficient details for proper evaluation by the government. Allow for 14 calendar days for review by the government of the submittal.
No fabrication or manufacturing shall commence until the design is approved by the government and comments addressed.
N68438 (TRF, Bangor) 0 1 0
TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Carl S Jaeckel
X Carl S Jaeckel
8/18/2020
7/27/2020
DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
0004AA A
A001
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
TDP ______________ TM ____________ OTHER TMSS
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Commercial Off-The-Shelf (COTS) Manuals And Associated Supplemental Data
3. SUBTITLE
Operation, Maintenance, and Repair Manuals
4. AUTHORITY (Data Acquisition Document No.)
DI-TMSS-80257C NOTICE 1
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A only. Administration and operations only, effective 7/27/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 – Documentation shall be delivered with equipment, or at the time of the installation/training of the equipment (if applicable).
NOTE: The equipment shall be furnished with three (3) “hard” copies of the manufacturer’s standard Operation, Maintenance, and Repair Manual(s), bound in durable three ring binder(s). The manuals shall include all mechanical and electrical schematics showing discrete components/block diagrams/wiring diagrams with inputs and outputs identified/system electrical interface documents and drawings for the specific model of all machine equipment/drives/controls supplied. The information contained in the manual(s) shall reflect the unit and its components in the “as built” configuration. The information contained in the manual(s) shall be adequate to permit trouble shooting and repair of the equipment by journeymen level personnel. The information contained in the manual(s) shall be in the English language. The information contained in the manual(s) shall be in imperial units of measure. The vendor shall provide a “no asbestos used” statement, certifying that all products/materials (i.e. gaskets, etc.) used in the components of the equipment does not contain asbestos. The contractor shall provide a list of recommended consumable spare parts and possible sources for procurement.
N68438 (TRF, Bangor) 0 3 0
TOTAL 0 3 0
Carl S Jaeckel
7/27/2020
X Carl S Jaeckel
7/27/2020
Carl Jaeckel
TOTAL PRICE
A0004AB
AB01
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Warranty Performance Report
3. SUBTITLE
Warranty Terms and Conditions
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81639A
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A only. Administration and operations only, effective 8/18/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
NOTE: One (1) “hard” copy of the warranty certificate shall be provided. The warranty period shall be for at least one (1) year. The warranty certificate shall be used by operators/maintenance staff of the equipment, to determine warranty work items. The information contained in the warranty certificate shall be in the English language. The warranty certificate shall be clearly legible and on 8-1/2 x 11 inch plain bond paper.
Carl S Jaeckel
Carl S. Jaeckel
TOTAL PRICE
A0004AE
AE01
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Technical Data Package
3. SUBTITLE
Air Emissions Permitting
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776 NOTICE 1
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A only. Administration and operations only, effective 6/17/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 12 – Documentation shall be delivered after contract award, but before manufacturer of the equipment.
NOTE: One (1) “hard” copy of the environmental permitting data shall be provided. The data shall be used by the government to determine (and if needed), apply for a Washington State Air Emission permit. The data shall be in the English language. The data shall be clearly legible and on 8-1/2 x 11 inch plain bond paper.
The new air emissions source equipment being procured, shall be operated in accordance with applicable federal, Washington State and Puget Sound Clean Air Agency (PSCAA) air quality regulations, including but not limited to 40 CFR 1039 and PSCAA Regulation I, Article 6 – New Source Review. The contractor shall provide to the government all necessary documentation to determine whether the equipment will require an air permit from PSCAA or a formal notification of intent to operate to PSCAA.
Upon contract award, the contractor shall provide to the government all pertinent equipment technical data to include brochures of the make and model of equipment being supplied, assembly sketches of the overall project design with critical dimensions, sketches (with dimensions) of equipment to be provided, vendor data regarding intake and exhaust filtration systems and ventilation filter and pre-filter capture efficiencies, design system intake and exhaust airflow (in cfm), design system intake and exhaust airflow ducting, and other technical information related to the design as necessary, for submittal (if deemed necessary) of the PSCAA Notice of Construction (NOC) permit application in accordance with PSCAA Regulation I, Section 6.03.
If required, the government will prepare and forward the permit application package to the PSCAA for approval based on the contractor’s design submittal. The government shall be responsible for associated permit application fees. Final design approval and construction work in accordance with this contract may not commence until final permit approval is received. Final project and equipment design shall include features as necessary to comply with federal, state, and local environmental regulations and the conditions of the approved permit.
Carl S Jaeckel
7/27/2020
Carl S. Jaeckel
7/27/2020
TOTAL PRICE
A0004AD
AD01
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
Technical Data Package
3. SUBTITLE
NRTL Certification
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80776 NOTICE 1
5. CONTRACT REFERENCE
Per Contract
6. REQUIRING OFFICE
SUBMISSION
SEE BLOCK 16*
14. DISTRIBUTION
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A only. Administration and operations only, effective 7/6/2020. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
NOTE: The equipment and its component parts shall be in compliance with applicable Code of Electrical Regulations (CFR) Title 29, Part 1910. By definition, any equipment will be deemed acceptable and approved by PSNS&IMF, if it meets specific Occupational Safety and Health Administration (OSHA) conditions outlined in CFR Title 29, Part 1910;
Subparts "O" and "S". Specifically, equipment will be "Accepted" by PSNS&IMF if it has been inspected and found by a Nationally Recognized Testing Laboratory (NRTL) to conform to specified plans or procedures of applicable codes. The equipment (as a whole system) shall be Nationally Recognized Testing Laboratory (NRTL) inspected and certified (by an OSHA authorized third party). One (1) “hard” copy of the NRTL certification report shall be provided. If the equipment type/model has already been NRTL inspected and certified, a certification report (one (1) ”hard” copy) or documentation mounted on the equipment, (which acknowledges it is NRTL certified), shall be provided.
Carl S Jaeckel
7/27/2020
7/6/2020
7/27/2020
7/6/2020
TOTAL PRICE
A0004AC
AC01
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
File details come from the government source that posted it. Updated .