Amend 0001 Beret 13.5.pdf
PDF 499 KB Posted
- Attached to
- Berets, Man's Wool Army and Air Force Federal contract opportunity
- Solicitation number
- SPM1C108X0017
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPM1C1-08-X-0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPM1C1-08-X-0017 Page #2 Berets, Man’s Amendment 0001
1. Subject Request for quotations is modified to extend the closing date from 18 July 2008 until 25 July 2008, 3:00 P.M. Local Time.
2. Reference page # 7 of subject Request for Quotations, specifically Item 1 for Beret, Wool, Man’s Army Black with Flash / 8405-01-088-7805(s) the MIN / MAX quantity is amended to increase the maximum quantity.
The revised Black Beret Quantity: MIN / MAX is: 125,136 / 400,408
Note: The MIN/MAX on the 4 other Berets is unchanged.
3. Reference Clause 52.246-9P05 on page 79 of subject Request for quotations. This clause is deleted and replaced with the following:
52.246-9P04 SHADE EVALUATION OF CONTRACTOR FURNISHED COMPONENTS
(JAN 1992) DSCP
(Applicable when indicated in the individually numbered solicitation)
Contracts awarded under this solicitation shall require shade evaluation of contractor furnished components in accordance with the following provisions:
(a) Swatches shall be cut by the contractor from those pieces or rolls selected by the government representative. For yard goods, the dimensions of each swatch shall be 4" x 12" while for narrow loom material each swatch shall be a full width and 12" in length. The number of pieces or rolls to be sampled shall be in accordance with the following table:
Sampling Plan for Berets shells:
Lot Size Sample Size 10,000 to 20,000* 36 each 5,000 to 9999 18 each 2,500 to 4999 9 each Less than 2,500 5 each
*After 20,000, 36 each will be sampled on every additional 20,000 units
(b) The swatches shall be submitted to the government laboratory for shade evaluation. If any swatches are rejected, the end items made from the rejected component lot shall also be rejected.
In these instances, the contractor, shall, without cost to the Government, cut additional shade swatches from each remaining piece or roll in the component lot which was not previously sampled and submit these swatches to the Government for shade evaluation.
(c) Swatches submitted in accordance with (a) and (b) above, shall also be evaluated for uniformity of shade when so specified in Section 3 of the fabric specification and when the standard sample is referenced for uniformity of shade.
AlAEHDMENT OF SOLIClTAltOllMODACATlOW DF COHTRACf PAGE OF PAW . . 1 , -
01 18 July 2008 Various I &ls!xDw CODE S'MlC:I 7 . M I A I H m B Y # f ~ f k k / M @ Em I Defense Supply center Phihlelphia 700RobbinsAverme Philadelphia, PA 19111-rn
I
6 . N A H A N D A Q D W O F C D ~ C T O R & ~ ~ , s t r l r d Z I P W Po BlL AMMIRWI OF SOUCITATW NO.
SPMlCl-U8-X~17 m . w m m m r s 9 July 2008
1 FAClllTY CODE I I
, nd M~ M- Berets ens - 5 differem ma
13. THIS ITEM APWES ONLY TO MODlFlCATlOhJS OF CONTAACTSIOROERS, IT MODIFIES THE CONTRACTKIROER NO. AS DESCRIBED IN tTEM 14.
I. ~ S H I I ~ O R L l W 1 8 l S S u m P H R S U I # T T O : ~ I 1 ) I E C H ~ S n F W r m I I I I T E M I 4 M W l L U l M # C O l l f R ~ T W I l l l N O . I H l T E M 1 0 R .
E IMPORTANT: c#r~lcwr n b w =mudpn%-~drniwn
See a i d p a g e # 2 for lpplicabIe clmges to this R q m r for gu~atiolls.
~SA.~~AMEANOT~TLEDFS~GWERI;~~~~W&I~~' 16A. HAME AHD TlTLE O f iXMWTM6 WICW tTperl#Srl, EVAN ElSENBERG
IW. m-OR ~fic. DATE s#il#0 im u r m STATES OF A M ~ ~ C A 16c. MTE NNEO
BY
u d ~ - 1 0 w *IW*D/--
. HSn MMll.I62*Wrm P*WRYml S T ~ F P R Y 9 1 ( I I E Y . 1 4 8 3 1
File details come from the government source that posted it. Updated .