About this file
This document is a Project Addendum #01 for Spring Lake Public Schools, specifically for the High School Media Center AV & Video Security project. The addendum, issued by Commtech Design on July 17, 2025, provides clarifications and updates to the original bid documents. Key project details include a completion date of March 2026, with AV work likely starting in January 2026. The project scope involves audio-visual and video security systems, including Milestone VMS, Axis and Hanwha cameras, Sapling clocks (red, model sbp-31s-254-0r), and a Lightspeed T25 wireless microphone system with speakers.
The addendum addresses several bidder questions, including equipment specifications, connectivity requirements, and licensing details. The owner will provide CAT-6 patch cables and prefers co-terminated Milestone licensing (with a provided license code M01-C05-211-01-6C4E3C). For the huddle spaces, only an Owner Furnished Equipment (OFE) Apple TV will be used, with no additional connectivity cables required. The project allows for alternative manufacturers for some equipment, such as the Lightspeed microphone system, while specifically excluding some alternatives like Valcom clocks.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPLS Media Center AV and Video Secuirty - Addendum 1 1
PROJECT ADDENDUM #01
To All Bidders Date: July 17,2025
From: Bret Emerson Company Commtech Design
Project Name:
HS Media Center AV & Video Security
Client: Spring Lake Public Schools 345 Hammond St Spring Lake, MI 49456
The Following Changes, revisions, modifications, etc. shall be incorporated into the contract documents, specifications and plans
Attachments;
1. TC401
Drawings reissued
1. TC401
a. See Clock locations on re-issued drawings. See “CL” symbol
Specifications re-issued;
1. None
Questions;
1. When is this projects completion date. The documents say July 31, 2025 just want to confirm.
Answer. Completion of work is March 2026. The work for AV will most likely start in January 2026
2. Could you please clarify if a clock system is included in this RFP bid?
I have been reviewing the RFP documents, and I see section 281705 Clock System in the specifications, but I do not see any clocks shown on the drawings. Maybe I'm missing something.
Answer. Clocks are shown to be installed as part of the scope. See revised TC401 noted above. The clock symbols did not plot on the original drawing.
3. You have Milestone VMS listed as the basis of design on the Spring Lake bid spec. You have Axis as the only approved manufacturer for cameras. Hanwha is listed as a platinum partner for Milestone systems, which is its highest level of integration. This is the same level as Axis. Let me know if we can have Hanwha cameras approved along with Axis for this project.
Answer. Hanwha cameras are allowed.
SPLS Media Center AV and Video Secuirty - Addendum 1 2
4. I see the details for the Sapling clocks but I don't see them on the prints anywhere. Are we just supplying labor to remount?
Answer. See Re-Issued TC401 with the clock locations. Clocks to be used are the Sapling sbp-31s-254-0r to be RED in color.
5. If we're supplying the clocks are the Valcom (VIP-D425A) a suitable replacement option?
Answer. Valcom is NOT an approved equal.
6. For the Huddle spaces what kind of connectivity are they looking for? Just the OFE Apple TV or are we supplying an HDMI cable and brush plate? It mentions the potential of an active cable as well. Assuming thats for C205?
Answer. The owner is going to use the OFE Apple TV only. No other connectivity cables are required at the LCD’s in the Huddle Spaces
7. Sheet TC302, Note 1 mentions requirements for the patch cables. Can you specify the color that the District would like for the video surveillance equipment? Is there a preferred manufacturer and style (snagless, booted, etc.)?
Answer. Owner will provide all CAT-6 patch cables. Contractor to install as required to connect their systems.
8. The spec notes that Milestone licensing should be included through June 2026. Is it the intent of the district to have 1 year of Milestone Care Plus for each camera or would they like the CarePlus co-terminated with their existing licensing? If they would like it co-terminated, will you please provide their Milestone Licensing information?
Answer. Co-Terminated will be preferred. License Code is M01-C05-211-01- 6C4E3C
9. I am checking in on what Lightspeed system you want for the Media Center at Spring Lake. In the RFP you have listed the Cascadia C25 but nowhere in the documents do I see that this Network connectable system is connected to the network. Is this just the primary installation for a larger building wide project where the Cascadia system will be tied into the school's network to generate alerts from the teacher's microphone?
Or......could it be that the Lightspeed T25, non-networked system may be the more appropriate solution?
Answer. Provide the T25 wireless microphone system and speakers. Alternates manufacturers are allowed.
Sincerely, Bret Emerson
FE
S
QUIET
STUDY
C202
MEDIA
CENTER
C203
COLLABORATION
CENTER
C132
CAFETERIA
C125
HUDDLE
C205
CONFERENCE
CENTER
C206
HUDDLE
C207
HUDDLE
C208
WELCOME
CENTER
A108
ISS
A109
SECURITY
A111
ATHLETIC
DIRECTOR
A123STORAGE
A136
TOILET
C138
TOILET
C112
MENS
RESTROOM
C127
WOMENS
RESTROOM
C126
ELECTRICAL
C124FACULTY
WORKROOM
C109A
WORKROOM
C106
HUDDLE
C104
HUDDLE
C109B
FACULTY
LOUNGE
C113
ELECTRICAL
A137
CUSTODIAL
CLOSET
A138
MEDIA
PRODUCTION
C107
STAIR
C110
TECHNOLOGY
C108
CORRIDOR
C119
HUDDLE
A158
HALL
A101
VESTIBULE
C101
CIRCULATION
C209
CORRIDOR
C210
SP
RI
N G
LA
KE
, M
IC
H
IG
AN
SP
R
IN
G
L
AK
E
SC
H O
O
LS
H
IG
H S
CH
OO
L M
ED
IA
C
EN
TE
R
AV
S
YS
TE
M
V
ID
EO
S
EC
UR
IT
Y
C om m te ch
9/6 /20
9:
:0
0 A M
Au to de sk
D oc s:
//2
B_
SL
PS
H
S Me di a C en te r & C om m on s R en ov at io n/ Ar ch -2
B-
.rv t
TC401
SPRING LAKE MEDIA CENTER
AUDIO/VIDEO & SECURITY PLAN
N
GENERAL AV NOTES
MEDIA CENTER
AUDIO/VIDEO & SECURITY
FLOORPLAN
TC401
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z1
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z1
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z1
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z1
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z1
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z1
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text A1
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text A1
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text C
AutoCAD SHX Text
SLHS-100
AutoCAD SHX Text C
AutoCAD SHX Text
SLHS-101
AutoCAD SHX Text C
AutoCAD SHX Text
SLHS-102
AutoCAD SHX Text C
AutoCAD SHX Text
SLHS-103
AutoCAD SHX Text C
AutoCAD SHX Text
SLHS-104
AutoCAD SHX Text C
AutoCAD SHX Text
SLHS-105
AutoCAD SHX Text
LCD.75
AutoCAD SHX Text
LCD.75
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z2
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z2
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z2
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text
LCD.75
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z2
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text Z2
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text 12:08
AutoCAD SHX Text 96"
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text
SEE TC301/2
AutoCAD SHX Text
SEE TC303/1
AutoCAD SHX Text
SEE TC301/2
AutoCAD SHX Text
SEE TC302/2
AutoCAD SHX Text
INSTALL IN THE DRYWALL BULKHEAD
AutoCAD SHX Text
LCD.55
AutoCAD SHX Text
INSTALL IN THE DRYWALL BULKHEAD
AutoCAD SHX Text
INSTALL IN THE DRYWALL BULKHEAD
AutoCAD SHX Text
INSTALL IN THE DROP CEILING
AutoCAD SHX Text
INSTALL IN THE DROP CEILING
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
CL
AutoCAD SHX Text
SEE TC301/1
AutoCAD SHX Text
PAGING SYSTEM
AutoCAD SHX Text
SEE TC301/2
AutoCAD SHX Text
SEE TC301/2
AutoCAD SHX Text
CL
AutoCAD SHX Text
INSTALL AUDIO AMP HERE
AutoCAD SHX Text T1
AutoCAD SHX Text C1
AutoCAD SHX Text
TEACHER LOCATION
AutoCAD SHX Text
SEE TC302/2
AutoCAD SHX Text
SEE TC302/2
AutoCAD SHX Text
SEE TC302/2
AutoCAD SHX Text
SEE TC302/5 FOR SECURITY CAMERAS -TYPICAL
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Sheet
AutoCAD SHX Text Date
AutoCAD SHX Text These drawings are the Property of the Designer and are not to be reused or reproduced without the designer's permission.
AutoCAD SHX Text Project
AutoCAD SHX Text 1433_01
AutoCAD SHX Text 07/16/2025
AutoCAD SHX Text CommTech Design
AutoCAD SHX Text Mark
AutoCAD SHX Text Revision Description
AutoCAD SHX Text
FOR BID
AutoCAD SHX Text 06/26/2025
AutoCAD SHX Text
6581 BELDING RD NE STE 101
AutoCAD SHX Text
ROCKFORD, MICHIGAN 49341
AutoCAD SHX Text
WWW.COMMTECHDESIGN.COM
AutoCAD SHX Text Design
AutoCAD SHX Text
ADDENDUM 01
AutoCAD SHX Text 07/16/2025
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
1. AV CONTRACTOR SHALL INSTALL ANY PASS-THRU'S AV CONTRACTOR SHALL INSTALL ANY PASS-THRU'S REQUIRED FOR ROUTING CABLES AROUND THE BUILDING. 2. CONTRACTOR SHALL COMPLETE A WALK-THRU OF THE CONTRACTOR SHALL COMPLETE A WALK-THRU OF THE SITE DURING CONSTRUCTION AND SHALL VERIFY ALL CONDUITS AND PASS THRU'S ARE INSTALLED FOR CABLES. 3. ALL CABLES SHALL BE SUPPORTED ABOVE THE DROP ALL CABLES SHALL BE SUPPORTED ABOVE THE DROP CEILING BY J-HOOKS. HOOKS SHALL BE LOCATED NO LESS THAN EVERY 5 FEET. 4. AV SYSTEMS SHALL BE COORDINATED WITH THE AV SYSTEMS SHALL BE COORDINATED WITH THE FURNITURE AND THE ELECTRICAL WORK. BOTH ARE PART OF EXISTING CONTRACTS.
File details come from the government source that posted it. Updated .