Spefication_ Certified_Final_RTA_sealed.pdf
PDF 2 MB Posted
- Attached to
- FY25 Muskegon Harbor North Revetment Repairs
- Solicitation number
- W911XK25B0004
About this file
This document is a specification for the Certified Final - Ready to Advertise Muskegon Harbor North Revetment Repair Project. The project involves excavation, removal, and replacement of the existing concrete walkway, grout stone base, armor and filter stone, and soil. It also includes the supply and installation of geotextile, graded stone, concrete cut-off wall, and concrete walkway, as well as repair and refurbishment of the existing pipe railing, site restoration, and temporary structures. The project is located in Muskegon, Michigan and is being solicited by the U.S. Army Corps of Engineers, Detroit District under Solicitation Number W911XK25B0004. The specification provides detailed requirements for the products, materials, and construction methods to be used in completing this revetment repair project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Muskegon Har bor Nor t h Revet ment Repai r Cer t i f i ed Fi nal - Ready t o Adver t i se
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 10 10 03/ 01 REAL ESTATE
01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK
01 20 00 11/ 20, CHG 2: 08/ 21 PRI CE AND PAYMENT PROCEDURES
01 32 01. 00 10 02/ 15 PROJECT SCHEDULE
01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES
01 35 13 11/ 20, CHG 1: 02/ 22 SPECI AL PROJECT PROCEDURES
01 35 26 05/ 24 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 11/ 16, CHG 2: 11/ 21 QUALI TY CONTROL
01 45 00. 15 10 11/ 16, CHG 2: 08/ 19 RESI DENT MANAGEMENT SYSTEM CONTRACTOR
MODE ( RMS CM)
01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND
CONTROLS
01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON
01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND
DI SPOSAL
01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/ 22 DEMOLI TI ON
DI VI SI ON 03 - CONCRETE
03 30 00 02/ 19, CHG 4: 08/ 22 CAST- I N- PLACE CONCRETE
DI VI SI ON 05 - METALS
05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS
DI VI SI ON 09 - FI NI SHES
09 90 00 02/ 21 PAI NTS AND COATI NGS
DI VI SI ON 31 - EARTHWORK
31 23 00. 00 20 02/ 11, CHG 2: 08/ 15 EXCAVATI ON AND FI LL
31 32 19. 16 02/ 21 GEOTEXTI LE SOI L STABI LI ZATI ON
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 30 00 06/ 23 SI TE RESTORATI ON AND PLANTI NG
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 31 19 01/ 08, CHG 1: 11/ 14 STONE, CHANNEL, SHORELI NE/ COASTAL
PROTECTI ON FOR STRUCTURES
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
SECTI ON 01 10 10
REAL ESTATE
03/ 01
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Addi t i onal Pr oper t y Agr eement s; G, DO
Copi es of any agr eement s f or Cont r act or - acqui r ed r eal est at e r i ght s f or t hi s pr oj ect shal l be f ur ni shed bef or e ent er i ng t her eon.
Cer t i f i ed Sur vey Resul t s
Fur ni sh a copy of cer t i f i ed r esul t s of sur veys whi ch ver i f y ar eas and l i mi t s of Cont r act or - acqui r ed r eal est at e r i ght s.
1. 2 REGULATORY REQUI REMENTS
1. 2. 1 Real Est at e Ri ght s
Ri ght s f or t he use of t he wor k and st or age ar eas and/ or ot her addi t i onal r eal est at e t hat have been obt ai ned ar e shown on t he t ask or der speci f i c dr awi ngs. Copi es of r eal est at e agr eement s, i f any, obt ai ned pr i or t o adver t i sement ar e i ncl uded i n t he sol i c i t at i on package. Cont r act or s ar e r equi r ed t o compl y wi t h r equi r ement s and condi t i ons f or al l agr eement s i n t he sol i c i t at i on package, and any ot her s obt ai ned af t er , as a condi t i on f or use of t he r eal est at e. No ot her r eal est at e agr eement s have been obt ai ned by t he Gover nment f or t hi s pr oj ect and cont r act or s ar e caut i oned of t he need t o compl et e t he pr oj ect wi t hout dependence on addi t i onal r eal est at e bei ng obt ai ned. Pr oper t y agr eement s and/ or r eal est at e r i ght s pr ovi ded under t hi s cont r act ( i f any) wi l l be at t ached t o Sect i on 01 99 90
" LI STI NG OF ENCLOSED DOCUMENTS, EXHI BI TS AND OTHER ATTACHMENTS"
1. 2. 2 Addi t i onal Real Est at e Ri ght s
I f addi t i onal pr oper t y agr eement s and/ or r eal est at e r i ght s ar e desi r ed by t he Cont r act or , t hey may obt ai n and ut i l i ze t hem at t hei r own expense. Al l addi t i onal r eal est at e agr eement s shal l c l ear l y r el i eve t he Gover nment of any pot ent i al r esponsi bi l i t y f or damages or l i abi l i t y r esul t i ng f r om t he Cont r act or ' s use of such gr ounds.
Fur ni sh a copy of Cer t i f i ed Sur vey Resul t s whi ch ver i f y ar eas and l i mi t s of Cont r act or - acqui r ed r eal est at e r i ght s.
Addi t i onal agr eement s obt ai ned by t he Cont r act or must be coor di nat ed and
August 21, 2024 01 10 10 - 1 acknowl edged suf f i c i ent by Real Est at e Of f i ce, US Ar my Cor ps of Engi neer s, Det r oi t Di st r i ct , 477 Mi chi gan Avenue, Det r oi t , Mi chi gan pr i or t o appl i cat i on and execut i on. Thi s acknowl edgment of suf f i c i ency wi l l be dependent upon conf or mance wi t h Feder al Real Est at e and Envi r onment al r equi r ement s and any ot her l aws and r egul at i ons as may be det er mi ned appl i cabl e by t he Gover nment .
1. 2. 3 Addi t i onal Real Est at e Ri ght s Obt ai ned by t he Gover nment
Addi t i onal r eal est at e agr eement s may al so be obt ai ned by t he Gover nment af t er t he sol i c i t at i on. I f ut i l i zed, t he Cont r act or i s r equi r ed t o abi de by al l t er ms and condi t i ons as set f or t h i n t he agr eement s.
1. 3 PROJECT/ SI TE CONDI TI ONS
1. 3. 1 Locat i on and Ver i f i cat i on
I t shal l be t he Cont r act or ' s r esponsi bi l i t y t o accur at el y l ocat e t he l i mi t s of al l l ands ut i l i zed under t he cont r act . The cor ner and angl e poi nt s of each ar ea f or whi ch r i ght s have been obt ai ned shal l be mar ked wi t h semi per manent mar ker s except wher e t her e i s an appr oved exi st i ng pr oper t y mar ker . Tempor ar y mar ker s shal l be pl aced at poi nt s on al i gnment . The poi nt s on al i gnment shal l be mar ked at st at i ons so t hat i nt er val s bet ween poi nt s do not exceed 200 f eet .
1. 3. 2 Sur vey Mar ker s
Al l mar ker s shal l be i nst al l ed i n an ar ea pr i or t o i t s use and t hey shal l be avai l abl e f or r ef er ence dur i ng and upon compl et i on of use of t he ar ea.
Wher e appr oved exi st i ng pr oper t y mar ker s ar e f ound, a wi t ness st ake, as speci f i ed i n Subpar agr aph, " Semi per manent Mar ker s" bel ow, shal l be pr ovi ded. I f t he t ypes of mar ker s speci f i ed her ei naf t er cannot be used, ot her t ypes, as appr oved by t he Cont r act i ng Of f i cer , shal l be pr ovi ded.
1. 3. 2. 1 Semi per manent Mar ker s
The mar ker s shal l be a st eel r od one- hal f i nch i n di amet er and f our ( 4) f eet l ong. The st eel r od shal l be dr i ven ver t i cal l y i nt o t he gr ound so t hat t he t op i s f l ush wi t h t he f i ni shed gr ound sur f ace. Each mar ker shal l be wi t nessed by a 2" x 2" yel l ow st ake ext endi ng t wo ( 2) f eet above t he gr ound sur f ace and dr i ven i nt o t he gr ound unt i l s t abl e, wi t h not l ess t han one ( 1) f oot penet r at i on.
1. 3. 2. 2 Tempor ar y Mar ker s
Mar ker s shal l be 2" x 2" , r ed- col or ed, wood hub st akes dr i ven i nt o t he gr ound unt i l s t abl e ( not l ess t han one ( 1) f oot penet r at i on) wi t h t wo ( 2) f eet pr oj ect i ng above t he gr ound sur f ace. I f t he per i od i n whi ch t empor ar y mar ker s ar e t o be i n pl ace exceeds one ( 1) const r uct i on season, a mor e per manent t ype of mar ker , as appr oved, shal l be pr ovi ded.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on - -
August 21, 2024 01 10 10 - 2
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes t he excavat i on, haul i ng, and pl acement of dune sand, demol i t i on, excavat i on, haul i ng, and di sposal of t he exi st i ng concr et e wal kway, gr out ed st one base, ar mor and f i l t er st one, and soi l , t he suppl y and i nst al l at i on of geot ext i l e, A, B, and C st one, concr et e cut - of f wal l , and concr et e wal kway, r epai r and r ef ur bi shment of t he exi st i ng pi pe r ai l , s i t e r est or at i on, t empor ar y st r uct ur es, and i nci dent al r el at ed wor k.
1. 1. 2 Locat i on
The wor k i s l ocat ed at t he Muskegon Har bor Nor t h Revet ment l ocat ed i n Muskegon, Muskegon Count y, MI , appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 2 OCCUPANCY OF PREMI SES
The publ i c bat hr oom near t he f i shi ng pi er access par ki ng l ot shal l r emai n open t o t he publ i c dur i ng const r uct i on.
Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.
1. 3 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound, pi er deck or paved sur f ace wher e exi st i ng under gr ound
August 21, 2024 01 11 00 - 1 ut i l i t i es or ut i l i t i es encased i n pi er st r uct ur es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made. No excavat i on may pr oceed pr i or t o l ocat i ng and mar ki ng of al l exi st i ng ut i l i t i es.
1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 5 Vet er ans Empl oyment Emphasi s f or U. S. Ar my Cor ps of Engi neer s Cont r act s
I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS
222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USAGE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USAGE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USAGE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USAGE cont r act or s i n t hei r out r each ef f or t s:
- U. S. Depar t ment of Labor Vet er ans' Empl oyment and Tr ai ni ng Ser vi ce ( VETS) : ht t ps: / / www. dol . gov/ vet s/
- Feder al Vet er an Empl oyment I nf or mat i on: ht t ps: / / www. f edshi r evet s. gov/
- Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am:
ht t ps: / / www. benef i t s. va. gov/ vow/
- U. S. Ar my War r i or Tr ansi t i on Command Empl oyment I ndex:
ht t ps: / / wct . ar my. mi l / modul es/ empl oyer s/ i ndex. ht ml
- Hi r i ng Our Her oes:
ht t ps: / / www. uschamber f oundat i on. or g/ hi r i ng- our - her oes
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
August 21, 2024 01 11 00 - 2
SECTI ON 01 20 00
PRI CE AND PAYMENT PROCEDURES
11/ 20, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s Cont r act f or whi ch Cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 1. 1 0001, 0025; Mobi l i zat i on/ Demobi l i zat i on
1. 1. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on, as def i ned i n Cl ause 252. 236- 7004 PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON at t he cont r act l ump sum pr i ce. Mobi l i zat i on and demobi l i zat i on shal l i ncl ude i nsur ance, const r uct i on pr epar at or y oper at i ons and submi t t al s, al l cost s associ at ed wi t h and i ncur r ed i n per f or mi ng pr e- const r uct i on and post - const r uct i on sur veys and as- bui l t s, i ncl udi ng t he movement of per sonnel and equi pment t o t he Pr oj ect s i t e, al l mat er i al s necessar y t o mobi l i ze and subsequent l y demobi l i ze t he const r uct i on pr epar at or y oper at i ons, and al l ot her f aci l i t i es and i nci dent al i t ems necessar y t o per f or m wor k i n accor dance wi t h t he r equi r ement s of t he Cont r act t hat ar e not speci f i cal l y i dent i f i ed as ot her i t ems of wor k. Payment shal l be made at t he cont r act l ump sum pr i ce f or t he f ur ni shi ng of al l mat er i al s, l abor , t ool s, equi pment and i nci dent al s necessar y t o mobi l i ze and subsequent l y demobi l i ze t he const r uct i on pr epar at or y oper at i ons. Cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on f or Opt i on 1 shoul d be i ncl uded i n bi d i t em 0001.
1. 1. 1. 2 Uni t of Measur e
Uni t of Measur e: Job.
1. 1. 2 0002, 0014, 0026; Tempor ar y Wor ks and Si t e Pr epar at i on
1. 1. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t empor ar y const r uct i on f aci l i t es and cont r ol s, i ncl udi ng si t e er osi on cont r ol s and si t e access, as descr i bed i n t he pl ans and speci f i cai on Sect i ons 01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS and 01 57 19 TEMPORARY ENVI RONMENTAL
CONTROLS.
1. 1. 2. 2 Uni t of Measur e
Uni t of Measur e: Job.
August 21, 2024 01 20 00 - 1
1. 1. 3 0003, 0015, 0027; Demol i t i on
1. 1. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he par t i al demol i t i on of t he exi st i ng st r uct ur e i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i ons Sect i on 02 41 00 DEMOLI TI ON at t he cont r act l ump sum pr i ce.
1. 1. 3. 2 Uni t of Measur e
Uni t of Measur e: Job.
1. 1. 4 0004, 0016, 0028: Removal , Ref ur bi shment , and Rei nst al l at i on of Pi pe Rai l i ng
1. 1. 4. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he r emoval , handl i ng, t r anspor t at i on, r ef ur bi shment , and r ei nst al l at i on of t he exi st i ng pi pe r ai l i ng i ndi cat ed f or t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i ons Sect i ons 05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS and 09 90 00 PAI NTS AND COATI NGS at t he cont r act l ump sum pr i ce.
1. 1. 4. 2 Uni t of Measur e
Uni t of Measur e: Job.
1. 1. 5 0005, 0017, 0029; Si t e Rest or at i on and Pl ant i ng
1. 1. 5. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h s i t e r est or at i on and pl ant i ng of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i ons Sect i on 32 30 00 SI TE RESTORATI ON AND PLANTI NG at t he cont r act l ump sum pr i ce.
1. 1. 5. 2 Uni t of Measur e
Uni t of Measur e: Job.
1. 1. 6 0006, 0030; Dune Excavat i on, Haul i ng, and Pl acement
1. 1. 6. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he dune excavat i on, haul i ng, and pl acement i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i ons sect i ons 31 23
00. 00 20 EXCAVATI ON AND FI LL at t he cont r act uni t pr i ce.
1. 1. 6. 2 Uni t of Measur e
Uni t of Measur e: Job.
August 21, 2024 01 20 00 - 2
1. 1. 7 0010, 0021, 0034; Suppl y and I nst al l at i on of Geot ext i l e
1. 1. 7. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he suppl y and i nst al l at i on of geot ext i l e i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i on Sect i on 31 32 19. 16 GEOTEXTI LE SOI L STABI LI ZATI ON at t he cont r act l ump sum pr i ce.
1. 1. 7. 2 Uni t of Measur e
Uni t of Measur e: Job.
1. 1. 8 0011, 0022, 0035; I nst al l at i on of Cont r ol l ed Low St r engt h Mat er i al
1. 1. 8. 1 Payment
Payment wi l be made f or cost s associ at ed wi t h t he i nst al l at i on of cont r ol l ed l ow st r engt h mat er i al i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i on Sect i on
35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES.
1. 1. 8. 2 Uni t of Measur e
Uni t of Measur e: Job.
1. 1. 9 0012, 0023, 0036; Concr et e Cut of f Wal l
1. 1. 9. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he concr et e cut of f wal l i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f cat i ons Sect i on 03 30 00 CAST- I N- PLACE CONCRETE at t he cont r act uni t pr i ce.
1. 1. 9. 2 Uni t of Measur e
Uni t of Measur e: Job
1. 1. 10 0013, 0024, 0037; Concr et e Wal kway
1. 1. 10. 1 Payment
Payment wi l be made f or cost s associ at ed wi t h t he concr et e wal kway i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i on Sect i on 03 30 00 CAST- I N- PLACE CONCRETE.
1. 1. 10. 2 Uni t of Measur e
Uni t of Measur e: Job
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , August 21, 2024 01 20 00 - 3 envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 2. 1 0007AA, 0007AB, 0018AA, 0018AB, 0031AA, 0031AB; Suppl y and Pl acement of I mpor t ed A- St one
1. 2. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he suppl y and pl acement of i mpor t ed ar mor A- st one i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment r epai r as shown i n t he pl ans and speci f i cat i on Sect i on 35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES at t he cont r act uni t pr i ce.
1. 2. 1. 2 Measur ement
Measur ement f or t he suppl y and pl acement of i mpor t ed A- St one wi l l be per f or med f or st one pl aced wi t hi n t he l i mi t s of t he pl acement ar ea by t he t on, accept abl y compl et ed, usi ng t r uck t i cket s.
1. 2. 2 0008AA, 0008AB, 0019AA, 0019AB, 0032AA, 0032AB; Suppl y and Pl acement of I mpor t ed B- St one
1. 2. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he suppl y and pl acement of i mpor t ed f i l t er B- st one i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i on Sect i on 35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES at t he cont r act uni t pr i ce.
1. 2. 2. 2 Measur ement
Measur ement f or t he suppl y and pl acement of i mpor t ed B- St one wi l l be per f or med f or st one pl aced wi t hi n t he l i mi t s of t he pl acement ar ea by t he t on, accept abl y compl et ed, usi ng t r uck t i cket s.
1. 2. 3 0009AA, 0009AB, 0020AA, 0020AB, 0033AA, 0033AB; Suppl y and Pl acement of I mpor t ed C- St one
1. 2. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he suppl y and pl acement of i mpor t ed C- st one i n sect i ons of t he Muskegon Har bor Nor t h Pi er Revet ment Repai r as shown i n t he pl ans and speci f i cat i on Sect i on 35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES at t he cont r act uni t pr i ce.
1. 2. 3. 2 Measur ement
Measur ement f or t he suppl y and pl acement of i mpor t ed C- St one wi l l be per f or med f or st one pl aced wi t hi n t he l i mi t s of t he pl acement ar ea by t he t on, accept abl y compl et ed, usi ng t r uck t i cket s.
1. 3 ADDI TI ONAL STONE REQUI RMENTS
1. 3. 1 Measur ement by Tr uckl oad
Each t r uck l oad wi l l be wei ghed t o t he near est 0. 1 t on and t he f i nal
August 21, 2024 01 20 00 - 4 quant i t y r ounded t o t he near est whol e t on. St one wi l l be measur ed f or payment by wei ghi ng on appr oved scal es bef or e bei ng pl aced i n t he wor k.
Scal es shal l be of suf f i c i ent l engt h t o per mi t s i mul t aneous wei ghi ng of al l axl e l oads and shal l have an accur acy wi t hi n 0. 2 per cent t hr oughout t he r ange of t he scal es. The scal e' s accur acy shal l conf or m t o t he appl i cabl e r equi r ement s of NI ST HB 44 and shal l be cer t i f i ed by an accept abl e scal es company r epr esent at i ve pr i or t o wei ghi ng any st one. The scal es shal l be capabl e of pr i nt i ng a wei ght t i cket i ncl udi ng t i me, dat e, t r uck number , and wei ght . I f commer ci al scal es ar e r eadi l y avai l abl e i n c l ose pr oxi mi t y ( wi t hi n 10 mi l es) of s i t e of wor k, document at i on shal l be submi t t ed cer t i f y i ng t hat t he scal es meet t he r equi r ement s of t he speci f i cat i on. Fur ni sh t he scal es and wei gh t he st one i n t he pr esence of t he Cont r act i ng Of f i cer ' s Repr esent at i ve. The Cont r act i ng Of f i cer ' s Repr esent at i ve may el ect t o accept cer t i f i ed r ai l r oad wei ght s or wei ght cer t i f i cat es f ur ni shed by a publ i c wei ghmast er i n l i eu of scal e wei ght s at t he j obsi t e. St ockpi l ed St one I f t he Cont r act or el ect s t o st ockpi l e st one on t he wor ksi t e or of f s i t e, t he st one shal l be wei ghed i mmedi at el y bef or e pl acement by ei t her met hod descr i bed above. St one pl aced i n t empor ar y st or age on t he wor ksi t e as speci f i ed sect i on 35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES par agr aph WORKSI TE STOCKPI LE wi l l not be r equi r ed t o be r e- wei ghed pr i or t o pl acement .
1. 3. 2 Det er mi nat i on of Excess St one
Al l st one out si de t he l i mi t s and t ol er ances of t he cr oss sect i ons of t he st r uct ur e, except var i at i ons so mi nor as not t o be measur abl e, wi l l be deduct ed f r om t he quant i t y of new st one f or whi ch payment i s t o be made.
Wei ght of excess st one wi l l be det er mi ned f r om t he cr oss sect i ons obt ai ned by t he met hod pr ovi ded f or i n par agr aph FI NAL SURVEYS, on t he basi s t hat t he cubi c f eet of vol ume( i ncl udi ng voi ds) f or each t ype of st one, as l i s t ed i n t he Tabl e i n sect i on 35 31 19 STONE MATERI ALS AND PLACEMENT par agr aph FACTORS USED FOR CONVERTI NG I N PLACE VOLUME TO WEI GHT, i s equal t o one t on or 2, 000 pounds f or t he bul k speci f i c gr avi t y and per cent age of voi ds shown. I f t he bul k speci f i c gr avi t y of t he st one f ur ni shed or t he per cent age of voi ds i s ot her t han as l i s t ed bel ow, t he cubi c f eet of vol ume equal i ng 2, 000 pounds shal l be r ecomput ed. Shoul d any excess st one be di scl osed above t he t ol er ance l i ne as def i ned i n par agr aph TOLERANCES, i t s vol ume wi l l be comput ed by t he aver age end ar ea met hod, based upon t he cr oss sect i on i n t he f ol l owi ng manner . The aver age end ar ea of excess st one above t he t ol er ance l i ne f or t wo ( 2) successi ve cr oss sect i ons, mul t i pl i ed by t he di st ance bet ween t he cr oss sect i ons wi l l be accept ed as t he vol ume. I n addi t i on t o t he above, st one, whi ch has been del i ver ed t o t he s i t e and has been l ost or wast ed or ot her wi se not pr oper l y i ncor por at ed i nt o t he f i nal r equi r ed wor k, shal l be deduct ed f r om t he quant i t y f or whi ch payment i s t o be made.
1. 3. 3 Fi nal Sur veys
Sur vey wor k and measur ement s r equi r ed f or det er mi nat i on of excess vol ume comput at i ons f or st one mat er i al s shal l be per f or med i n t he pr esence of t he Cont r act i ng Of f i cer . Not i f y t he Cont r act i ng Of f i cer not l ess t han 3 busi ness days i n advance of each sur vey. I n t he event of unavai l abi l i t y of t he Cont r act i ng Of f i cer , per f or m t he sur vey and cer t i f y t o t he Cont r act i ng Of f i cer t hat i t compl i es wi t h t he speci f i cat i ons. Cr oss sect i on sur veys shal l be t aken per pendi cul ar t o t he axi s of t he st r uct ur es. El evat i ons and soundi ngs shal l be t aken on l i nes 25 f eet apar t measur i ng al ong t he st r uct ur e r ef er ence l i ne, wi t h t he r eadi ngs at 5- f oot i nt er val s and at br eaks i n t he gr ade al ong t he l i ne. Ot her sur vey i nt er val s and r eadi ngs may be used i f deemed appr opr i at e or advi sabl e by t he Gover nment ' s on- si t e
August 21, 2024 01 20 00 - 5 r epr esent at i ve. Addi t i onal cr oss sect i ons, el evat i ons, and soundi ngs may be t aken i f det er mi ned necessar y by t he Gover nment ' s on- si t e r epr esent at i ve. Det er mi nat i on of quant i t i es wi l l be made by t he Gover nment ' s on- si t e r epr esent at i ve and havi ng once been made, wi l l not r eopen, except on evi dence of col l usi on, f r aud or obvi ous er r or . Pr i or t o per f or mi ng any wor k under t hi s Sect i on, coor di nat e al l oper at i ons wi t h t he Gover nment ' s on- si t e r epr esent at i ve so t hat excess vol ume sur veys wi l l be made at t he appr opr i at e t i me. The sur veys made under sect i on 35 31 19 STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES par agr aph CHECK SURVEYS may be used when deemed appr opr i at e by t he Gover nment ' s on- si t e r epr esent at i ve, as par t of t he sur veys r equi r ed her ei n. St one quant i t y comput at i ons shal l be based ent i r el y upon wei ght s of new st one as det er mi ned f r om car r i er di spl acement or cer t i f i ed scal e wei ght t i cket s.
Exi st i ng st one pl aced i n l i eu of new st one f r om of f - s i t e sour ces i s excl uded f r om measur ement and payment .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
August 21, 2024 01 20 00 - 6
SECTI ON 01 32 01. 00 10
PROJECT SCHEDULE
02/ 15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 2017) Admi ni st r at i on - - Pr oj ect Schedul es
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on.
Submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons; G
Pr el i mi nar y Pr oj ect Schedul e; G
I ni t i al Pr oj ect Schedul e; G
Per i odi c Schedul e Updat e; G
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
Desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The aut hor i zed r epr esent at i ve must have a mi ni mum of 2- year s exper i ence schedul i ng const r uct i on pr oj ect s s i mi l ar i n s i ze and nat ur e t o t hi s pr oj ect wi t h schedul i ng sof t war e t hat meet s t he r equi r ement s of t hi s speci f i cat i on. Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.
PART 2 PRODUCTS
2. 1 SOFTWARE
The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s speci f i cat i on.
August 21, 2024 01 32 01. 00 10 - 1
2. 1. 1 Gover nment Def aul t Sof t war e
The Gover nment i nt ends t o use Pr i maver a P6.
2. 1. 2 Cont r act or Sof t war e
Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed sdef f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .
2. 1. 2. 1 Pr i maver a
I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em.
2. 1. 2. 2 Ot her Than Pr i maver a
I f t he cont r act or chooses sof t war e ot her t han Pr i maver a P6, t hat i s compl i ant wi t h t hi s speci f i cat i on, pr ovi de f or t he Gover nment ' s use t wo l i censes, t wo comput er s, and t r ai ni ng f or t wo Gover nment empl oyees i n t he use of t he sof t war e. These comput er s wi l l be st and- al one and not connect ed t o Gover nment net wor k. Comput er s and l i censes wi l l be r et ur ned at pr oj ect compl et i on.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15 Schedul es f or Const r uct i on Cont r act s. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.
Pr epar e each Pr oj ect Schedul e usi ng t he Pr ecedence Di agr am Met hod ( PDM) .
3. 2 BASI S FOR PAYMENT AND COST LOADI NG
The schedul e i s t he basi s f or det er mi ni ng cont r act ear ni ngs dur i ng each updat e per i od and t her ef or e t he amount of each pr ogr ess payment . The aggr egat e val ue of al l act i v i t i es coded t o a cont r act CLI N must equal t he val ue of t he CLI N.
3. 2. 1 Act i v i t y Cost Loadi ng
Act i v i t y cost l oadi ng must be r easonabl e and wi t hout f r ont - end l oadi ng.
Pr ovi de addi t i onal document at i on t o demonst r at e r easonabl eness i f r equest ed by t he Cont r act i ng Of f i cer .
3. 2. 2 Wi t hhol di ngs / Payment Rej ect i on
Fai l ur e t o meet t he r equi r ement s of t hi s speci f i cat i on may r esul t i n t he
August 21, 2024 01 32 01. 00 10 - 2 di sappr oval of t he pr el i mi nar y, i ni t i al or per i odi c schedul e updat es and subsequent r ej ect i on of payment r equest s unt i l compl i ance i s met .
I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i ncl uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made.
3. 3 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 3. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :
3. 3. 2 Act i v i t y Dur at i ons
Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.
Less t han 2 per cent of al l non- pr ocur ement act i v i t i es may have Or i gi nal Dur at i ons ( OD) gr eat er t han 20 wor k days or 30 cal endar days.
3. 3. 3 Pr ocur ement Act i v i t i es
I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
3. 3. 4 Mandat or y Tasks
I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .
b. Submi ssi on, r evi ew and accept ance of f eat ur es r equi r e desi gn compl et i on
c. Long pr ocur ement act i v i t i es
d. Submi ssi on and appr oval of as- bui l t dr awi ngs.
e. Ot her syst ems t est i ng, i f r equi r ed.
f . Cont r act or ' s pr e- f i nal i nspect i on.
g. Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.
h. Gover nment ' s pr e- f i nal i nspect i on.
August 21, 2024 01 32 01. 00 10 - 3 i . Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.
j . Fi nal i nspect i on.
3. 3. 5 Gover nment Act i v i t i es
Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.
These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: appr oval s, envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
3. 3. 6 St andar d Act i v i t y Codi ng Di ct i onar y
Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n. A t empl at e SDEF compat i bl e schedul e backup f i l e i s avai l abl e on t he QCS web si t e: ht t p: / / r ms. usace. ar my. mi l .
The SDEF f or mat i s as f ol l ows:
Fi el d Act i v i t y Code Lengt h Descr i pt i on
1 WRKP 3 Wor ker s per day
2 RESP 4 Responsi bl e par t y
3 AREA 4 Ar ea of wor k
4 MODF 6 Modi f i cat i on Number
5 BI DI 6 Bi d I t em ( CLI N)
6 PHAS 2 Phase of wor k
7 CATW 1 Cat egor y of wor k
8 FOW 20 Feat ur e of wor k*
* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d r equi r ement s.
3. 3. 6. 1 Wor ker s Per Day ( WRKP)
Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y.
3. 3. 6. 2 Responsi bl e Par t y Codi ng ( RESP)
Assi gn r esponsi bi l i t y code f or al l act i v i t i es t o t he Pr i me Cont r act or , Subcont r act or ( s) or Gover nment agency( i es) r esponsi bl e f or per f or mi ng t he act i v i t y.
August 21, 2024 01 32 01. 00 10 - 4
a. Act i v i t i es coded wi t h a Gover nment Responsi bi l i t y code i ncl ude, but ar e not l i mi t ed t o: Gover nment appr oval s, Gover nment desi gn r evi ews, envi r onment al per mi t appr oval s by St at e r egul at or s, Gover nment Fur ni shed Pr oper t y/ Equi pment ( GFP) and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
b. Act i v i t i es cannot have mor e t han one Responsi bi l i t y Code. Exampl es of accept abl e act i v i t y code val ues ar e: DOR ( f or t he desi gner of r ecor d) ;
ELEC ( f or t he el ect r i cal subcont r act or ) ; MECH ( f or t he mechani cal subcont r act or ) ; and GOVT ( f or USACE) .
3. 3. 6. 3 Ar ea of Wor k Codi ng ( AREA)
Assi gn Wor k Ar ea code t o act i v i t i es based upon t he wor k ar ea i n whi ch t he act i v i t y occur s. Def i ne wor k ar eas based on r esour ce const r ai nt s or space const r ai nt s t hat woul d pr ecl ude a r esour ce, such as a par t i cul ar t r ade or cr af t wor k cr ew f r om wor ki ng i n mor e t han one wor k ar ea at a t i me due t o r est r ai nt s on r esour ces or space. Exampl es of Wor k Ar ea Codi ng i ncl ude di f f er ent ar eas wi t hi n a f l oor of a bui l di ng, di f f er ent f l oor s wi t hi n a bui l di ng, and di f f er ent bui l di ngs wi t hi n a compl ex of bui l di ngs.
Act i v i t i es cannot have mor e t han one Wor k Ar ea Code.
Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.
3. 3. 6. 4 Modi f i cat i on Number ( MODF)
Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.
3. 3. 6. 5 Bi d I t em Codi ng ( BI DI )
Assi gn a Bi d I t em Code t o al l act i v i t i es usi ng t he Cont r act Li ne I t em Schedul e ( CLI N) t o whi ch t he act i v i t y bel ongs, even when an act i v i t y i s not cost l oaded. An act i v i t y can have onl y one BI DI Code.
3. 3. 6. 6 Phase of Wor k Codi ng ( PHAS)
Assi gn Phase of Wor k Code t o al l act i v i t i es. Exampl es of phase of wor k ar e pr ocur ement phase and const r uct i on phase. Each act i v i t y can have onl y one Phase of Wor k code.
a. Code pr oposed f ast t r ack desi gn and const r uct i on phases pr oposed t o al l ow f i l t er i ng and or gani z i ng t he schedul e by f ast t r ack desi gn and const r uct i on packages.
b. I f t he cont r act speci f i es phasi ng wi t h separ at el y def i ned per f or mance per i ods, i dent i f y a Phase Code t o al l ow f i l t er i ng and or gani z i ng t he schedul e accor di ngl y.
3. 3. 6. 7 Cat egor y of Wor k Codi ng ( CATW)
Assi gn a Cat egor y of Wor k Code t o al l act i v i t i es. Cat egor y of Wor k Codes i ncl ude, but ar e not l i mi t ed t o const r uct i on submi t t al , pr ocur ement , f abr i cat i on, weat her sensi t i ve i nst al l at i on, non- weat her sensi t i ve
August 21, 2024 01 32 01. 00 10 - 5 i nst al l at i on, st ar t - up, and t est i ng act i v i t i es. Each act i v i t y can have no mor e t han one Cat egor y of Wor k Code.
3. 3. 6. 8 Feat ur e of Wor k Codi ng ( FOW)
Assi gn a Feat ur e of Wor k Code t o appr opr i at e act i v i t i es based on t he Def i nabl e Feat ur e of Wor k t o whi ch t he act i v i t y bel ongs based on t he appr oved QC pl an.
Def i nabl e Feat ur e of Wor k i s def i ned i n Sect i on 01 45 00. 00 10 QUALI TY CONTROL. An act i v i t y can have onl y one Feat ur e of Wor k Code.
3. 3. 7 Cont r act Mi l est ones and Const r ai nt s
Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.
Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.
No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or appr oval on a case by case basi s.
3. 3. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.
3. 3. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Pr oj ect . "
Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h. The Gover nment i s under no obl i gat i on t o accel er at e Gover nment act i v i t i es t o suppor t a Cont r act or ' s ear l y compl et i on.
3. 3. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.
3. 3. 7. 3. 1 St ar t Phase
Use a st ar t mi l est one as t he f i r st act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 3. 7. 3. 2 End Phase
Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.
August 21, 2024 01 32 01. 00 10 - 6
3. 3. 8 Cal endar s
Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y bel ongs. Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, concr et e cur e t i mes, et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op Seasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as appl i cabl e.
I f an act i v i t y i s weat her sensi t i ve i t shoul d be assi gned t o a cal endar showi ng non- wor k days on a mont hl y basi s, wi t h t he non- wor k days sel ect ed at r andom acr oss t he weeks of t he cal endar , usi ng t he ant i c i pat ed adver se weat her del ay wor k days pr ovi ded i n t he Speci al Cont r act Cl auses . Assi gn non- wor k days over a seven- day week as weat her r ecor ds ar e compi l ed on seven- day weeks, whi ch may cause some of t he weat her r el at ed non- wor k days t o f al l on weekends.
3. 3. 9 Open Ended Logi c
Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" may have no pr edecessor l ogi c, and t he l ast act i v i t y - " End Pr oj ect " may have no successor l ogi c.
Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .
3. 3. 10 Def aul t Pr ogr ess Dat a Di sal l owed
Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.
3. 3. 11 Out - of - Sequence Pr ogr ess
Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer .
Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t and i n t he per i odi c schedul e updat e meet i ngs.
3. 3. 12 Added and Del et ed Act i v i t i es
Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .
August 21, 2024 01 32 01. 00 10 - 7
3. 3. 13 Or i gi nal Dur at i ons
Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .
3. 3. 14 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b f l oat , or t o r epl ace pr oper schedul e l ogi c.
a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.
b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.
3. 3. 15 Ret ai ned Logi c
Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be al l owed.
3. 3. 16 Per cent Compl et e
Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue. Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .