SpecsMapBidSched20210623.pdf
PDF 888 KB Posted
- Attached to
- WESTON HILLS GRADING AND DRAINAGE Federal contract opportunity
- Solicitation number
- 140L6221R0041
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WestHills_Priorities_2021_4_13.jpg | JPG image | |
| Engineering_WestonHills_Gravel.pdf | ||
| Water_Bar_abrupt.pdf | ||
| Bid_Schedule_Weston_Hills_SMRA_Grading_and_Drainage.xlsx | XLSX spreadsheet | |
| FS_water_bar.pdf | ||
| Sol_140L6221R0041.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 2 SECTION 02311
SITEWORK ROAD GRADING
WESTON HILLS GRADING 2021 02311 - 1 of 3
SECTION 02311
ROAD GRADING
PART 1 GENERAL
1.1 SUMMARY
A. Description of Work: Furnishing labor, equipment, supplies, and materials to grade and restore gravel and dirt roadways as specified on the plans, maps, exhibits, and as specified herein. Work shall be performed in accordance with the specifications and contract. The road sections include seven (7) areas, one of approximately 300 linear feet and others up to 100 linear feet each and are not contiguous. Installation of water bars. Weston Road is located in Campbell County, Wyoming.
B. Contractor shall ensure there is no additional disturbance to the road, shoulder, or adjacent landscape while moving equipment and motor grader between the road sections. The Contractor shall coordinate the grading of the road sections with the BLM in order to best determine when to perform work with precipitation and moisture conditions.
All road sections are primitive two-track, user created, and have minimal aggregate surfacing. The road sections shall be restored to a useable condition.
1.2 DEFINITIONS
A. Fill Material: Pit run material shall be mineral soil free from peat, frozen material, brush, trees, roots over 50 mm (2 inches) in diameter and rocks over 100 mm (3 inches) in greatest diameter.
1.3 QUALITY ASSURANCE
A. Failure Criteria: Not limited to the following:
1. Formation of pools of moisture where positive drainage is indicated on the drawings or as specified herein.
2. Settlement of fill.
1.4 PROJECT/SITE CONDITIONS
A. Environmental Conditions: Do not attempt to grade frozen or saturated material. The
Contractor shall coordinate the grading of the roads with the BLM in order time the work with precipitation and moisture content. Work will be postponed until conditions are favorable to minimize damage.
PART 2: PRODUCTS
2.1 EQUIPMENT AND MATERIALS
A. General: See definitions.
1. Road Grading Equipment: The Contractor shall provide a motor grader with a minimum 150 horsepower and twelve-foot blade. The cutting edges of the blade shall be in good condition, free from deformation due to excessive wear. All
WESTON HILLS GRADING 2021 02311 - 2 of 3 controls, including brakes, shall be in proper working condition to allow full control of the grading at all times.
PART 3: EXECUTION
3.1 PERFORAMANCE STANDARDS AND INSTALLATION
A. Grading
1. When not otherwise indicated, material shall be level, or uniform slopes between points where elevations are given, or between such points and existing finished grades. Abrupt change in slopes shall be rounded and blended. Finish grading shall match and blend into existing topography and promote positive drainage away from road surface with water bars. Site drainage shall be considered of prime importance.
2. Maximum graded side slope: 3H:1V B. Compaction Methods: Fill material shall be spread over the full area of the cross section of the fill to a maximum layer thickness of 6 inches (150 mm). Wheel tracking the fill may be used to obtain the required degree of compaction.
C. Water Bars: To be installed at various locations per Project inspector. See typical details.
D. Traffic Control:
1. The Contractor shall conform to MUTCD requirements for control of traffic in the work zone.
3.2 FIELD QUALITY CONTROL
A. The Owner reserves the right to conduct testing at any time.
B. Unless otherwise specified on the plans, provide positive drainage. The contractor will grade and compact such that no ponding greater than 4” deep nor larger than 1 sq. ft.
occurs.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Measurement of topsoil stripping and replacement, grading, scarification, compaction, seeding shall be made per section of road grading completed in place as identified on the drawings, exhibits, figures, and as identified herein.
4.2 BASIS OF PAYMENT
A. Payment for each item shall be considered as full compensation for furnishing all labor, materials, tools, equipment, and other incidentals necessary to complete each component of the Work described in this Section.
2021 BFO WESTON HILLS ROAD GRADING 02311 - 3 of 3
B. All components of the Work described in this section not called out as pay items shall be considered subsidiary items of Work. No separate measurement and payment shall be made for subsidiary items.
C. Payment for Work described in this Section shall be based on the Contract unit price for each component of the Work in place, complete, and accepted as shown below:
Item Basis of Payment Grade and Repair Road Water Bars
Linear Feet (LF) Each (EA)
END OF SECTION
WESTON HILLS ROAD GRAVEL 02503-1
SECTION 02503
AGGREGATE SURFACING & IMPORT MATERIAL
PART 1: GENERAL
1.1 SUMMARY:
A. Description of Work: Importing geotechnical backfill material, i.e. gravel, pit run, topsoil, etc.
1.2 RELATED WORK:
General Information and Requirements Section 02311
1.3 REFERENCES:
A. American Association of State Highway and Transportation Officials
AASHTO T 27-84 Sieve Analysis of Fine and Coarse Aggregates AASHTO T 90-86 Determining the Plastic Limit and Plasticity Index of Soils AASHTO T 96-83 Resistance to Abrasion of Small Size Coarse Aggregate by Use of the Los Angeles
Machine
1.4 SUBMITTALS:
A. Gradation: The Contractor shall provide a sieve analysis of the proposed material. The material shall be 4” minus pit run with less than 20% fines. The Contractor shall allow five (5) days for review.
B. Weight Tickets: The Contractor shall provide copies of weight tickets from a certified scale at the time of delivery.
PART 2: PRODUCTS
2.1 MATERIALS:
A. All pit run material shall be free from vegetative matter and lumps or balls of clay. Furnish a homogenous mixture of naturally occurring material that has at least 50 percent by weight retained on the 1 1/2 sieve, with the remaining material composed of sand with a nominal quantity of silt/clay. The maximum size of an individual piece cannot be more that 2/3 of the specified individual layer thickness. Obtain material from a department-approved source substantially free of topsoil, organic materials, and other deleterious materials.
PART 3: EXECUTION
3.1 AGGREGATE INSTALLATION:
B. Pit Run Placement: The pit run shall be placed the rutted and damaged portions of the roadway or “hole” and tapered in to blend and match existing contours. The material shall be graded to blend and match to the existing contours and shall promote positive drainage. The Contractor shall make a minimum of three passes with a loaded end-dump or other heavy equipment to compact the previously graded surface.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
WESTON HILLS GRADING 2021 02503-2
A. Units: Measurement and payment for pit run will be by the ton.
4.2 BASIS OF PAYMENT:
A. Payment: Prices and payment will be full compensation for the work described in this section.
Payment will be made under:
Pay Item Pay Unit
Pit Run Ton (TN)
END OF SECTION
£¤14 £¤16
Gillette
128 129 132 141
¬«51¬«50
¬«59
§̈¦90
Weston Hills Gravel Project
Weston Hills Recreation Area _̂ Weston Turnoff
Weston Hills Gravel Project:
Exit 124 of Interstate-90 Turn East on HWY. 59 at Gillette Airport Approximately: 30.3 miles +/- North of Gillette on HWY.
GPS Coordinates: 105°3'21.94"W 44°12'37.899"N
Airport
Weston Hills Recreation Area
0 4 8 12 Miles
| Section02311 RoadGradingBFO WestonHills20200821 |
| 1.1 SUMMARY |
| A. Description of Work: Furnishing labor, equipment, supplies, and materials to grade and restore gravel and dirt roadways as specified on the plans, maps, exhibits, and as specified herein. Work shall be performed in accordance with the specificatio... |
| The road sections include seven (7) areas, one of approximately 300 linear feet and others up to 100 linear feet each and are not contiguous. Weston Road in located in Campbell County, Wyoming. |
| B. Contractor shall ensure there is no additional disturbance to the road, shoulder, or adjacent landscape while moving equipment and motor grader between the road sections. The Contractor shall coordinate the grading of the road sections with the BL... |
| All road sections are primitive two-track, user created, and have minimal aggregate surfacing. The road sections shall be restored to a useable condition. |
| 1.2 DEFINITIONS |
| A. Fill Material: Pit run material shall be mineral soil free from peat, frozen material, brush, trees, roots over 50 mm (2 inches) in diameter and rocks over 100 mm (4 inches) in greatest diameter. |
| 1.3 QUALITY ASSURANCE |
| A. Failure Criteria: Not limited to the following: |
| 1. Formation of pools of moisture where positive drainage is indicated on the drawings or as specified herein. |
| 2. Settlement of fill. |
| 1.4 PROJECT/SITE CONDITIONS |
| A. Environmental Conditions: Do not attempt to grade frozen or saturated material. The Contractor shall coordinate the grading of the roads with the BLM in order time the work with precipitation and moisture content. Work will be postponed until co... |
| 2.1 EQUIPMENT AND MATERIALS |
| A. General: See definitions. |
| 3.1 PERFORAMANCE STANDARDS AND INSTALLATION |
| A. Grading |
| 1. When not otherwise indicated, material shall be level, or uniform slopes between points where elevations are given, or between such points and existing finished grades. Abrupt change in slopes shall be rounded and blended. Finish grading shall ma... |
| 2. Maximum graded side slope: 3H:1V |
| B. Compaction Methods: Fill material shall be spread over the full area of the cross section of the fill to a maximum layer thickness of 6 inches (150 mm). Wheel tracking the fill may be used to obtain the required degree of compaction. |
| C. Traffic Control: |
| 1. The Contractor shall conform to MUTCD requirements for control of traffic in the work zone. |
| 3.2 FIELD QUALITY CONTROL |
| A. The Owner reserves the right to conduct testing at any time. |
| B. Unless otherwise specified on the plans, provide positive drainage. The contractor will grade and compact such that no ponding greater than 4” deep nor larger than 1 sq. ft. occurs. |
| 4.1 METHOD OF MEASUREMENT |
| A. Measurement of topsoil stripping and replacement, grading, scarification, compaction, seeding shall be made per section of road grading completed in place as identified on the drawings, exhibits, figures, and as identified herein. |
| 4.2 BASIS OF PAYMENT |
| A. Payment for each item shall be considered as full compensation for furnishing all labor, materials, tools, equipment, and other incidentals necessary to complete each component of the Work described in this Section. |
| B. All components of the Work described in this section not called out as pay items shall be considered subsidiary items of Work. No separate measurement and payment shall be made for subsidiary items. |
| C. Payment for Work described in this Section shall be based on the Contract unit price for each component of the Work in place, complete, and accepted as shown below: |
| Item Basis of Payment |
| Section 2503GAggregateSurfacing BFO Westonhills20200821 |
| Engineering_WestonHills_Gravel |
| BidSched BFOWeston20200821 |
| Bid Schedule |
File details come from the government source that posted it. Updated .