This is a Scope of Work specification document for the Department of Human Services' thermal insulation project at Chester Mental Health Center, located at 1315 Lehmen Drive, Chester, Illinois. The project involves furnishing all labor, materials, equipment, and services required to install, repair, and replace thermal insulation within the hospital mechanical room. Work encompasses eight primary areas: feedwater lines (approximately 6 feet of new insulation); steam converter systems with two units requiring waterside flange and heat exchanger head insulation plus approximately 45 feet of 8-inch piping; chilled water lines requiring replacement of approximately 40 feet of 10-inch pipe insulation, two sections totaling 32 feet of 8-inch pipe, and 11 feet of 10-inch pipe insulation; CHW pumps and supply/discharge lines requiring replacement on two sections of approximately 6 feet each of 8-inch piping plus 20 feet of 10-inch pipe insulation; air handler unit lines requiring replacement of 100 feet of 4-inch pipe insulation for AHU19 and 10 feet for AHU20; condensate return lines requiring approximately 10 feet of damaged insulation replacement; laundry mechanical room requiring 40 feet of 1½-inch and 20 feet of ¾-inch insulation installation; and corridor fan coil line requiring 36 feet of ¾-inch insulation installation. Contractors must attend a mandatory onsite prebid meeting to verify existing conditions prior to bid submission. All materials must comply with applicable ASTM thermal insulation standards and recognized industry best practices. Work is restricted to Monday through Friday during 7:00 AM to 4:00 PM hours, prohibited on state and federal holidays, and requires one week advance notice for project initiation with scheduling coordinated through the Chief Engineer or designee.
The specification document does not contain information regarding pricing terms, set-asides, incumbent vendors, funding sources, contract award dates, or contract term and renewal options. Contractors are required to field-verify all quantities, dimensions, and existing conditions prior to bidding and must clearly state any deviations or additional work identified during the prebid inspection in their bid proposals. Compliance with Chester Mental Health Center work rules and safety protocols is mandatory for all contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Self-Performance Requirements~18.docx | DOCX document | |
| Standard Terms and Conditions v.23.2~62.pdf | ||
| RMU150~89.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chester Mental Health Center
27-444DHS-MENTH-B-54743
Thermal Insulation Project Scope of Work Project Overview The contractor shall furnish all labor, materials, equipment, and services required to install, repair, and replace thermal insulation within the hospital mechanical room. All work shall comply with applicable ASTM thermal insulation standards and recognized industry best practices. Contractors must attend the mandatory onsite pre‑bid meeting and verify all existing conditions prior to submitting bids.
1. Feedwater Lines
• Install new insulation on approximately 6 feet of exposed make‑up feedwater piping from pump discharge valves.
• Insulate one 90‑degree elbow located near the boiler.
2. Steam Converter Systems (Two Units)
• Insulate water‑side flanges and heat‑exchanger heads.
• Insulate supply and return valves.
• Insulate approximately 45 feet of 8‑inch heat‑exchanger water inlet and outlet piping.
3. Chilled Water (CHW) Lines
• Replace approximately 40 feet of 10‑inch pipe insulation on CHW lines near the steam converter hot‑water takeoff (near pipe hanger).
• Replace missing or damaged insulation and lagging on chiller connection piping for two chiller units:
– One 20‑foot section of 8‑inch pipe
– One 12‑foot section of 8‑inch pipe
• Replace 11 feet of 10‑inch pipe insulation on CHW line in boiler room lab.
• Replace insulation on CHW separator near pump inlets.
4. CHW Pumps & Pump Supply/Discharge Lines
• Replace insulation on pumps, inlets, and outlet lines (two sections, approx. 6 feet of 8‑inch piping each).
• Replace 20 feet of 10‑inch pipe insulation on discharge side of pumps, from chain‑operated valve to T‑connection.
5. Air Handler Unit (AHU) Lines
• Replace 100 feet of 4‑inch pipe insulation on supply and return lines for AHU‑19.
• Replace 10 feet of insulation on supply and return lines to AHU‑20.
6. Condensate Return Lines
• Replace approximately 10 feet of damaged insulation on condensate return lines, including one elbow.
7. Laundry Mechanical Room
• Install 40 feet of 1‑1/2‑inch insulation on hot water system lines.
• Install 20 feet of 3/4‑inch insulation on tankless water heater supply and return lines.
8. Corridor Fan Coil Line
• Install 36 feet of 3/4‑inch insulation on hot water system lines.
General Requirements
• All materials shall meet applicable ASTM standards for thermal insulation.
• All workmanship shall be neat, uniform, and consistent with professional mechanical insulation practices.
• Contractors shall field‑verify all quantities, dimensions, and existing conditions prior to bidding.
• Any deviations or required additional work identified during the pre‑bid inspection shall be clearly stated in the bid proposal.
• Compliance with CMHC work rules and safety protocols is mandatory.
Work Hours & Scheduling
• Work permitted Monday through Friday only.
• Allowable working hours are 7:00 AM to 4:00 PM
• Work is prohibited on state and federal holidays.
• All scheduling shall be coordinated with the Chief Engineer or designee.
• Initial project start requires one‑week advance notice.