- Solicitation number
- 246-24-Q-0204
About this file
This document is a combined synopsis/solicitation for a federal contract opportunity to furnish and install a water service line extension to serve four homes in Yukon, OK. The solicitation, issued as Request for Quotes (RFQ) 246-24-Q-0204, is a 100% Indian-owned set-aside under NAICS code 237110 with a $45 million size standard.
The period of performance is 90 calendar days from Notice to Proceed. Key requirements include providing a firm, fixed-price quote; technically acceptable specifications meeting the statement of work; relevant past performance; and bid bond. The estimated award amount is between $100,000 and $250,000. Quotes will be evaluated on an acceptable/non-acceptable basis, ranked by price, and the lowest technically acceptable quote will be selected. A site visit is scheduled for September 3rd, and questions are due by September 9th, with quotes due by September 16th.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised - bid sheet.pdf | ||
| Revised-Specsv2_Signed.pdf | ||
| Revised DWG-21F49_CCWLXv2_Signed.pdf | ||
| SF18-95a Request for Quote.pdf | ||
| SF25A-16d (1).docx | DOCX document | |
| SF24-16d (1).docx | DOCX document | |
| ok29 (1).txt | TXT text file | |
| SF25-16d1 (1).docx | DOCX document | |
| DWG-21F49_CCWLX_Signed.pdf | ||
| 21F49 WLX Bid Sheet.pdf | ||
| IHS IEE Representation Form_Jan 2022_508 Compliant.pdf | ||
| RFQ Construction Clauses-updated May 2024.pdf | ||
| SF18-95a Request for Quote.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oklahoma City Area Indian Health Service August 2024
Table of Contents 1
TABLE OF CONTENTS
CANADAIN COUNTY WATER LINE EXTENSION
FOR
CANADIAN COUNTY WATER AUTHORITY
CANADIAN COUNTY, OKLAHOMA
IHS PROJECT OK-21-F49
EXCHANGE LETTER AMENDMENT PART III
Technical Specifications
Division 1 – General Requirements Section 01100 – Summary of Work Section 01270 – Price and Payment Section 01310 – Project Management and Coordination Section 01330 – Submittal Procedures Section 01420 – References Section 01430 – Quality Requirements Section 01500 – Temporary Facilities and Controls Section 01720 – Staking and Construction Surveying Section 01770 – Closeout Procedures Section 01781 – Project Record Documents
Division 2 – Site Construction Section 02230 – Site Clearing Section 02310 – Grading Section 02315 – Excavation, Trenching, and Backfilling Section 02370 – Erosion and Sediment Control Section Section 02400 – Boring, Jacking, and Directional Drilling Section 02510 – Water Distribution Section 02920 – Topsoiling, Seeding, Fertilizing, and Mulching
Division 3 – Concrete Section 03100 – Concrete
Table of Contents 2
This Page Intentionally Left Blank
Table of Contents 01100-1
SECTION 01100 – SUMMARY OF WORK
PART 1 - GENERAL
SUMMARY
The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
tools equipment materials labor supplies manufactured articles all transportation to complete the work temporary facilities
Location of Work: Project is located within private easements along S Richland Rd in Section 1 Township 11N and Range 6W and SW 5th St and Lainey Ln in Section 2 Township 11N and Range 6W in Canadian County, OK.
Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and performed by the contractor.
SUMMARY OF WORK TO BE DONE BY CONTRACTOR
Water Line Extension generally consists of the following:
installation of approximately 2,732 LF of 4-inch SDR 21 water main and approximately 216 LF of 8-inch HDPE, DR 11 with tracer wire, four road crossing via directional boring. Installation of 1 4-inch gate valve, 1 air release valve, and 1 flush hydrant and other appurtenance specified in the contract drawings to serve four homes.
ADDITIONAL INFORMATION
For information regarding the project, contact the following:
Drew Kay, Environmental Engineer Indian Health Service Clinton Field Office 10321 N 2274 Rd Clinton, Oklahoma 73601 Office: 580-331-3492
Table of Contents 01100-2
Email: drew.kay@ihs.gov
END OF SECTION
Price and Payment 01270 -1
SECTION 01270 – PRICE AND PAYMENT
GENERAL
SUMMARY
Work covered by this section includes method of measurement and basis of payment for all divisions included.
Payment for the various items of the Bid Schedules shall include all compensation to be received by the Contractor for furnishing all tools, equipment, materials, labor, supplies, manufactured articles, transportation, and temporary facilities required to complete the work in accordance with contract documents including incidentals.
Respective prices and payment shall constitute full compensation for all work completed including incidentals.
All items not expressly listed as being provided by others that are necessary for the completion of work shall be furnished and installed by the Contractor.
ESTIMATED QUANTITIES
All quantities stipulated in the bid schedule or other contract documents are approximate and are to be used: (1) as a basis for estimating the probable cost of the work and (2) for the purpose of comparing the bids submitted.
The Contractor shall be paid for actual quantities installed based on the quantities measured in the field. The actual amounts of work completed and materials furnished may differ from estimated quantities. The Contractor shall make no claim for damages, anticipated profits, or otherwise, on account of differences between the estimated amounts and the actual amount of work performed and materials furnished.
SURVEY AND MEASUREMENTS
All quantity measurements shall be the responsibility of the Contractor and will be verified by the Contracting Officers Representative.
All measurements and subsequent payments will be based on completed and accepted work performed in strict accordance with the plans, specifications, and other contract documents.
BID SCHEDULE ITEMS
GENERAL
Payment shall be full compensation to complete the work items in good faith, including incidental work.
Price and Payment 01270 -2
In addition to the basis of payment described under each item, the unit price bid shall be full compensation for all of the following:
General requirements in Division 01, but not limited to the following:
a. Submittals
b. Record drawings
c. Warranties
Specific requirements in Division 02 through 16, including but not limited to the following (unless otherwise expressly defined as a line item in the bid schedule):
a. Erosion control
b. Clearing and grubbing
c. Removal and replacement of obstructions
d. Associated trenching, excavation and backfill including the removal of any nuisance water, bedding, haunching, and compaction
e. Disposal of any excess material
f. Traffic control
g. Rough grading
h. Finish work, where called for, including finish grading, topsoiling, and landscaping
BID ITEMS
A. Schedule A: Canadian County Water Line Extension
1. Mobilization, Demobilization, and Submittals
a. Measurement: By lump sum
b. Basis of Payment: Includes labor, tools, equipment, materials and all other incidentals necessary to transport and set up all equipment, materials, provide all submittals, permits, construction schedule, and other necessary paperwork required for construction start-up. Pay item also includes the provisions necessary to remove all equipment, materials brought to the site by the Contractor(s).
2. 4” PVC SDR 21 Water Main
a. Measurement: By the lineal foot based on the horizontal length installed and measured over the centerline of the pipe
b. Basis of Payment: Includes all pipe, elbows, fittings, labor, tools, equipment and materials required to construct the 4” PVC SDR 21 water main, including excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, disinfection, pressure testing, tracer wire, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, thrust restraints, preparation of seed bed and seeding, and all other incidentals required to complete the work as specified.
Price and Payment 01270 -3
3. Connect to Existing Water Main
a. Measurement: By lump sum
b. Basis of Payment: Includes labor, tools, equipment, excavation, backfill and compaction, 12” x 4” stainless steel tapping sleeve, 4” tapping gate valve, valve box, thrust block and all other incidentals required to complete the work as specified.
4. 4” Air Release Valve
c. Measurement: By each installed
d. Basis of Payment: Includes labor, tools, equipment, excavation, backfill and compaction, concrete, manhole, plumbing, connection to water main, saddle, air valve, and all other incidentals required to complete the work as specified.
5. 8” HDPE, DR 11 Road Bore
a. Measurement: By linear foot based on the horizontal length installed and measured over the centerline of the pipe
b. Basis of Payment: Includes all materials, labor, tools, equipment and materials required to construct the bored casing and inserting of the carrier pipe.
Payment includes but is not limited to clearing and grubbing, excavation, casing, boring, laying, jointing and inserting of water main pipe, thrust restraints, backfill and compaction, flushing, disinfection, pressure testing, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, preparation of seed bed and seeding, and all other incidentals required to complete the work as specified. The carrier pipe shall be included in this price per lineal foot of bored casing.
6. 4” Flush Hydrant
a. Measurement: By each installed.
b. Basis of Payment: Includes labor, tools, equipment, excavation, backfill and compaction, hydrant, gate valve and box, tee, thrust blocks, piping, gravel, polyethylene encasement, utility markers, and all other incidentals required to complete the work as specified.
PART 3 – EXECUTION (N/A)
Project Management And Coordination 01310 - 1
SECTION 01310 – PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
SUMMARY
Section includes the preconstruction conference, construction schedule, working hours/days, coordination requirements and progress meetings.
PRE-CONSTRUCTION CONFERENCE
Required after award of contract and prior to start of construction.
Representatives from the following shall attend.
Prime Contractor Project Engineer and/or Technical Representative Owner’s Representative Appropriate State/Federal Agencies or other Funding Agencies TERO Representative, if applicable THPO Representative, if applicable
The IHS and the Tribe will arrange a date that is mutually acceptable to all parties planning to attend.
Contractor shall notify subcontractors of time and date of meeting.
CONSTRUCTION SCHEDULE
Present the Owner with a written preliminary construction schedule containing start and completion dates of the major items at the preconstruction meeting.
Notify the Owner three full working days in advance of any construction.
Communicate major changes to the schedule to the Owner in writing.
WORKING HOURS/DAYS
Perform all work during regularly scheduled working hours, unless approved by Owner.
Working hours shall be defined as 7 AM to 6 PM Monday through Friday.
No work will be allowed on Saturday, Sunday, Federal holidays, and Tribal holidays without the Owner’s consent.
Holidays include, but are not limited to, New Year’s Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day, or on any other holidays declared by the Owner.
Project Management And Coordination 01310 - 2
Holidays that fall on Saturday will be observed on the preceding Friday; holidays that fall on Sunday will be observed on the following Monday. No construction will be permitted on those days.
IHS has the option to approve overtime or holiday work upon the Contractor’s request not less than 48 hours in advance of the work to be performed. Overtime and holiday requests that exceed a ten (10) hour work shift for a time period exceeding two days will not be approved by the Owner.
COORDINATION WITH OTHER REQUIREMENTS
Coordinate work with other contractors (i.e. roads, building, etc.) in the area as necessary to complete the work specified.
Coordinate work with local utilities (i.e. water and sewer, power, telephone). All buried utilities may not be shown on the plans.
Contractor is responsible for having utilities marked prior to construction and field verify utility location.
PROGRESS MEETINGS
The Owner will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.
Progress meetings will be scheduled throughout progress of the Work at maximum monthly intervals. Frequency of meetings will be determined from Work meeting construction schedule or when Project Engineer deems it necessary.
Representatives from the following shall attend:
Prime Contractor Project Engineer and/or Technical Representative Owner’s Representative
Submittal Procedures 01330 - 1
SECTION 01330 – SUBMITTAL PROCEDURES
PART 1 - GENERAL
SUMMARY
This section includes information on submittal procedures. Materials requiring a submittal are listed in the appropriate specification section.
SUBMITTAL PROCEDURES
Submit one electronic pdf copy or three paper hard copies of submittals to the Owner, unless requested otherwise.
Attach an acceptable submittal cover sheet for all submittal packages.
List all submittals included in the package in the appropriate location.
Signed cover sheet indicating all submittals have been reviewed prior to submission.
Identify each cut sheet or shop drawing with the following information:
Contract number Supplier Pertinent specification section number Pertinent drawing and detail number Clearly identify the product being submitted by circling, highlighting, or underlining.
Submit the following information, as applicable:
Manufacturer’s cut sheets indicating compliance with references (e.g. applicable ASTM, AWWA standards).
Laboratory results, as applicable.
Dimensional drawings or shop drawings, as applicable.
Other information necessary for the Owner to determine compliance with the specifications.
Identify variations from the contract documents and product or system limitations that may be detrimental to successful performance of the completed work.
Revise and resubmit submittals as required and identify all changes made since previous submittal.
Distribute copies of reviewed submittals to concerned parties (i.e. suppliers, sub-contractors). Instruct parties to promptly report inability to comply with requirements.
Submit written communication of any inability to comply with the Owner’s comments.
Submittal Procedures 01330 - 2
Submit information to the Owner at least three weeks in advance of the work to be performed.
Approval of submittals must be provided by the Owner prior to installation of materials and process of any payments for the materials.
Approval of any submittal does not relieve responsibility for completion of the work in accordance to the plans and specifications.
01420 References 1 of 2
SECTION 01420
REFERENCES
1.01 SUMMARY
A. This section includes a list of organizations, associations or appropriate agencies with jurisdiction that have references, standards, laws or regulations cited in these specifications.
B. Use latest revision of all references, standards, laws or regulations.
1.02 LIST OF ORGANIZATIONS, ASSOCIATIONS & AGENCIES
A. National Standards Organizations & Associations
American Association of State Highway and Transportation Officials (AASHTO) 444 North Capital Street NW, Suite 249 Washington DC, 20001
(202) 624-5800 www.aashto.org
American Concrete Institute (ACI) ACI International PO Box 9094 Farmington Hills, Michigan 48333-9094
(810) 848-3700 www.aci-int.org
American Society for Testing and Materials
(ASTM)
100 bar Harbor Drive West Conshohocken, Pa 19428-2959
(610) 832-9585 www.astm.org
American Water Works Association AWWA 6666 West Quincy Avenue Denver, CO 80235
(303) 794-7711 www.awwa.org
National Electric Code (NEC) National Fire and Protection Association 1 Batterymarch Park Quincy, MA 02269-9959 1 888 632-2633 www.nec.com
National Electrical Manufacturer’s Association
NEMA
1300 North 17th Street Rosslyn, VA 22209
(703) 841-3200 www.nema.org
Underwriters’ Laboratories, Inc. UL 333 Pfingston Road Northbrook, IL 60062
(847) 272-8800 www.ul.com
B. Federal Agencies
Environmental Protection Agency (EPA) Region 7 11201 Renner Blvd Lenexa, KS 66219 https://www.epa.gov/aboutepa/epa-region-7-midwest
Occupational Health and Safety Administration Region 7 (OSHA) 2300 Main Street, Suite 10030 Kansas City, MO 64108 https://www.osha.gov/contactus/bystate/KS/are aoffice http://www.aashto.org/ http://www.aci-int.org/ http://www.astm.org/ http://www.awwa.org/ http://www.nec.com/ http://www.nema.org/ http://www.ul.com/
01420 References 2 of 2
C. State Agencies
Oklahoma Department of Environmental Quality 707 N. Robinson P.O. Box 1677
OKC, OK 73102-6010
www.deq.state.ok.us
Oklahoma Water Resources Board 3800 North Classen Blvd.
Oklahoma City, OK 73118 405-530-8800 www.owrb.ok.gov
PART 2 – PRODUCTS (N/A)
PART 3 – EXECUTION (N/A)
http://www.deq.state.ok.us/
Quality Requirements 01430 - 1
SECTION 01430 – QUALITY REQUIREMENTS
PART 1 - GENERAL
SUMMARY
This section includes prerequisites and procedures, installer qualifications, control of installation, and manufacturers’ field services to ensure the quality of the Work.
SUBMITTALS
Contractor Name and License Number
Subcontractor(s) Name and License Number
Name or names of the “Competent Person” in charge of safety on the jobsite, as defined by the OSHA Industry Standard 29 CFR 1926.
INSTALLER QUALIFICATIONS
Perform Work under the direction of personnel licensed by the state and/or reservation having jurisdiction.
If Work being completed is not regulated by the state and/or reservation, submit literature from the manufacturer, independent representative of the manufacturer, and/or supplier indicating the Contractor or Subcontractor’s ability to complete installation based on past experience or formal training.
CONTROL OF INSTALLATION
Review materials for acceptability, in accordance with the approved submittals, when delivered to the site.
Store and handle materials to prevent damage.
Review materials, services, and workmanship to ensure that Work is performed in accordance with the specifications.
Comply fully with manufacturers’ instructions.
Should manufacturers’ instructions conflict with contract documents, request clarification from Project Engineer before proceeding.
Should the finished product or method of completion differ in any way from the manufacturer’s written instructions or the specifications, request approval in writing from the Project Engineer before proceeding.
Correct defective Work to the satisfaction of the Owner.
Quality Requirements 01430 - 2
MANUFACTURER’S FIELD SERVICES
Provide reports on observations and documentation of workmanship to the Owner within 30 days of visit for review where manufacturers’ field services are provided.
WARRANTY
Provide a minimum one (1) year warranty for all materials and labor, covering defects in the materials or deficiencies resulting from contractor installation.
Provide additional warranties as required under other sections.
Warranty takes affect starting the date of substantial completion.
Temporary Facilities and Controls 01500 - 1
SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
SUMMARY
The work covered by this section includes all temporary facilities and controls needed to complete work under the Contract in a manner that protects public safety and worker safety, that preserves both public and private property and that appropriately involved local governments, emergency and law enforcement.
RELATED WORK
Section 02400 – Boring, Jacking, and Directional Drilling
Section 02705 – Road Restoration
REFERENCES
Manual of Uniform Traffic Control Devices
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
GENERAL
Provide temporary facilities and controls that are necessary to carry out the requirements of the Contract in a manner that
1. Protect public safety and worker safety.
2. Preserves both private and public property.
3. Communicates and cooperates with local authorities and governments.
TEMPORARY WATER
Make arrangements with local water utility to draw from a nearby community system.
Back flow protection will be required at all times. Utility reserves the right to charge for water taken from community system by the Contractor for this project.
Temporary Facilities and Controls 01500 - 2
TEMPORARY SANITARY FACILITIES
Provide and maintain a chemical toilet meeting State and Tribal requirements for the use of all workers of all trades.
Place temporary facilities in an inconspicuous place and keep clean.
Remove temporary sanitary facilities after completion of the project.
BARRICADES & WARNING DEVICES
Notify local police, fire departments and other emergency programs of any proposed barricading or detouring.
Erect and maintain barricades, guardrails, lights and signs as necessary for public convenience and safety.
Ensure that barricades remain in place during critical hours.
Comply with “Occupational Safety and Health Act” and local safety requirements, as they apply.
TRAFFIC CONTROL
Conduct all traffic control operations in accordance with the latest issues of the “Manual on Uniform Traffic Control Devices” (MUTCD).
Coordinate and obtain approval for all traffic control from local law enforcement.
Signs, Signals, and Devices
1. Place warning signs in the region of the work.
2. Warn of types of conditions that may be encountered including the following:
a. Muddy roads
b. Slippery roads
c. Flagman
d. Detour
e. Slow moving truck
f. Trucks entering roadway
3. Traffic control signs
a. Meet the needs of the local government authority
4. Traffic cones and drums, flares and lights
a. Meet the needs of the local jurisdictions
b. Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic
c. Ensure that flares, lights, etc. remain in position throughout the night
Temporary Facilities and Controls 01500 - 3
5. Flagman
a. Meet the needs of the local jurisdictions
b. Provide trained and equipped flagmen to regulate traffic when construction operations or traffic encroach on public traffic lanes
Haul Routes
1. Consult with authority having jurisdiction in establishing public thoroughfares to be used for haul routes and site access.
2. Confine construction traffic to designated haul routes.
3. Provide traffic control at critical areas of haul routes to regulate traffic, to minimize interference with public traffic.
Removal of Traffic Control
1. Remove equipment and devices when no longer required.
2. Repair damage caused by installation.
ACCESS ROADS
A. Construct and maintain temporary roads accessing public thoroughfares to serve the construction area as necessary.
B. Provide detours necessary for unimpeded traffic flow.
C. Provide and maintain access to fire hydrants, free of obstructions.
D. Permanent access roads and parking areas, if applicable, will be covered in
Division 2, Site Work.
PARKING
A. The Contractor may park their own and employees' vehicles on the site without charge with permission from the Owner.
B. If the site is not large enough, the Contractor shall make parking arrangements.
C. Prevent interference with the flow of local traffic.
D. Prevent interference with emergency vehicle functions.
ROAD SURFACE MAINTENANCE
A. Remove mud and excavated spoils from the affected roadway at the end of each workday in order to preserve the roadways and maintain safe driving conditions.
B. No tracked machinery will be allowed on paved roadways.
Temporary Facilities and Controls 01500 - 4
C. Contractor is responsible for any costs associated with repairing the roadways that are damaged due to construction equipment.
WATER CONTROL
A. Grade site to drain.
B. Protect site from puddling or running water.
C. Provide water barriers as required to protect site from soil erosion.
DUST CONTROL
A. Use measures to minimize dust caused by the project.
B. Avoid dust-creating activities during dry, windy conditions.
SECURITY
A. The Owner will not be responsible for security on the site of work.
B. Each Contractor will be held responsible for loss or injury to persons or property where their work is involved.
C. Provide (if deemed necessary) such watchmen and take such other precautionary measures as deemed necessary to protect facilities during the contract period.
PROGRESS CLEANING
A. Maintain areas free of waste materials, debris and rubbish. Maintain site in a clean and orderly condition.
B. Remove waste materials, debris, and rubbish from site weekly and dispose off-site.
REMOVAL OF UTILITIES, FACILITIES, & CONTROLS
A. Remove temporary above grade or buried utilities, equipment, facilities, materials, prior to inspection.
B. Clean and repair damage caused by installation or use of temporary work.
C. Restore existing facilities used during construction to original condition.
TEMPORARY FIRST AID FACILITIES
A. Provide temporary first aid facilities for employees in sufficient quantity for the number of workers.
Temporary Facilities and Controls 01500 - 5
TEMPORARY FIRE PROTECTION
A. Post fire department telephone numbers at the jobsite.
B. Keep fire extinguishers on the job that are appropriate for the type of work being performed, if applicable.
Staking and Construction Surveying 01720 - 1
SECTION 01720 – STAKING AND CONSTRUCTION SURVEYING
PART 1 - GENERAL
SUMMARY
This section outlines the staking and surveying work related to provide reference points in the field. Section clarifies the Contractor’s responsibilities.
Construction Surveys establish “control stakes” for basic line and grade used for project construction.
Control stakes are used to check work for contract compliance.
From control stakes set, when needed, supplemental “working stakes”.
CONTRACTOR’S RESPONSIBILITY
Water Main, and Appurtenance Staking
Working stakes are used to perform the work and are provided by the contractor.
Offset of Horizontal or Centerline staking (approximately every 100 feet).
Appurtenance (gate valve, fittings, fire hydrant, etc.) staking on center.
Project Benchmarks
Hubs for vertical control will be placed at various points throughout project.
Hubs for horizontal control (at least one per project).
Set supplementary staking, grade staking, offsets, cut stakes, temporary bench marks, and control points necessary for contractor to complete the work in accordance with the plans and specifications.
Provide all staking materials for contractor supplementary staking to include hubs, lath, flagging, paint and other material needed to provide construction staking.
Request clarification from the Owner regarding conflicts before proceeding with installation of facilities.
Preserve all offset and reference staking, until such time as the pipeline or other facilities are installed.
Reference stakes needing replacement due to Contractor error or negligence must be replaced by Contractor, at no cost to the contract.
All permanent survey points/markers (i.e. property corners) and bench marks not directly in the line of work shall be preserved.
Staking and Construction Surveying 01720 - 2
Replace all permanent survey markers disturbed or destroyed using a Professional Land Surveyor, at no cost to the contract.
Provide evidence of reestablishment of permanent survey markers to the Owner and copy of stamped and approved monument re-establishment documentation from the appropriate jurisdiction (state, BIA, etc.).
Closeout Procedures 01770 - 1
SECTION 01770 – CLOSEOUT PROCEDURES
PART 1 - GENERAL
SUMMARY
Section includes information on substantial completion, closeout procedures, final inspection and final payment.
SUBSTANTIAL COMPLETION
Water Main: Water main construction is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, successfully pressure tested, and passed bacteriological testing, at which point the completed system is connected to the existing system and ready to be consumed.
CLOSEOUT PROCEDURES
Provide warranties, approved Operation & Maintenance Manuals, and approved record documents (e.g. as-built drawings) to the Project Engineer within ten (10) days after date of substantial completion or 5 working days prior to the pre-final inspection (whichever is sooner).
Submit written certification that work is fully completed in accordance with contract documents and ready for final inspection at least five (5) working days prior to final inspection.
PRE-FINAL CLEANING
Complete pre-final clean-up prior to inspection.
Remove waste and surplus materials, rubbish, and construction facilities from the site.
PRE-FINAL INSPECTION
A pre-final inspection of the facilities shall be conducted, at a minimum, by the Owner and the Contractor.
Inspect all facilities installed under the contract.
Complete the requirements listed in Closeout Procedures Section 1.2 prior to the pre-final inspection.
Closeout Procedures 01770 - 2
PRE-FINAL PUNCH LIST
Any deficiencies noted at the pre-final inspection will be communicated to the Contractor through a letter from the Contract Manager.
After Substantial Completion promptly begin work on the punch list of items to be completed or corrected prior to final inspection.
Correct all deficiencies identified prior to scheduling a Final Inspection.
Full payment will not be made until all requirements of this section are met.
Contractor shall submit written certification that all pre-final punch list items have been completed in accordance to the contract documents and ready for final inspection at least five (5) working days prior to final inspection.
FINAL INSPECTION
Final inspection of all the facilities provided will be conducted, at a minimum, with the Owner, IHS, and the Contractor.
Scheduling of the final inspection will not be allowed until all deficiencies listed in the pre-final punch list are corrected to the Owner’s satisfaction.
FINAL PAYMENT
Deficiencies noted during the pre-final inspection will be communicated to the Contractor through a letter from the Contract Manager.
Correction of all deficiencies will be required prior to the final payment being processed.
Final Payment will follow the procedures outlined in Section 01270 Price and Payment and require the Contractor to sign a release of claims for the contract.
Project Record Documents 01781 - 1
SECTION 01781 – PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
SUMMARY
This section describes the requirements for closeout submittals including, record drawings, warranty information and general operation and maintenance information.
DELIVERY
Provide all closeout submittals meeting these requirements and any specific requirements of each section.
Closeout submittals must be received prior to final payment.
All closeout submittals must be received in a correct and complete manner before final payment can be made. If material is deficient, the deficiencies will be indicated in punch lists.
DEFINITIONS
Record Drawing: A drawing showing the actual installation of facilities, showing changes from the plans, and showing detail enough that future persons can readily locate all objects.
Ties: Measurements from permanent easily located objects to an installed object.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
RECORD DRAWINGS
Provide record data in one of the following manners:
On a set of project drawings, neatly draw tie measurements and changes from the original design.
On separate 8½ X 11 sheets, neatly draw site sketches, structure sketches, etc., indicating the necessary information.
Provide offset measurements for buried utilities (e.g. water main) installed parallel to roads or other known utilities.
Provide revised elevation data for all items that have elevations shown on the plan drawings, including, but not limited to, the following:
Project Record Documents 01781 - 2
Elevations of pipe entering and leaving structures Variations from the minimum depth of bury Other elevations indicated on profiles
Provide installed bid schedule items quantities for individual facilities on 8½ X 11 sheets.
Depending on the type of contract, standard forms may be supplied for use by the Contractor.
WARRANTIES
Submit all warranty information regarding the materials installed in accordance with that products particular section.
OPERATION AND MAINTENANCE INFORMATION
Submit all operation and maintenance information as included in the packaging from the manufacturer regarding the materials installed.
Additional project specific operation and maintenance requirements are listed in applicable sections.
Site Clearing 02230 - 1
SECTION 02230 – SITE CLEARING
PART 1 - GENERAL
1.1 SUMMARY
A. This section covers clearing, stripping and grubbing within the proposed areas of the Work.
1.2 RELATED WORK
A. Section 02315 – Excavation, Trenching and Backfill
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 CLEARING AND GRUBBING
A. Obtain necessary permit from Owner prior to cutting any trees or brush (if applicable).
B. Consult with the Project Engineer and Owner to designate a temporary area for stockpiling all cleared brush and trees.
C. Ensure all stockpiled material does not adversely affect drainage nor cause damage to abutting property.
D. Remove all ground vegetation and other extraneous material from the construction area to a depth of 6 inches and stockpile in the designated area.
E. Remove and dispose of all trees, stumps, brush, debris, and all other obstructions as needed in an approved manner off site.
1. Do not burn, bury, and/or leave debris within the Work areas.
F. If possible within right-of-way and property lines, extend clearing and grubbing a minimum of 10 feet beyond all proposed structures unless otherwise directed by the Engineer.
02310 Grading 1 of 2
SECTION 02310
GRADING
1.01 SUMMARY
A. This section includes rough and finished site grading of all areas disturbed during construction.
1.02 RELATED WORK
A. Section 02315 – Excavation, Trenching and Backfill B. Section 02370 – Erosion Control C. Section 02920 – Topsoiling Seeding
PART 2 – PRODUCTS (Not applicable)
3.01 ROUGH GRADING
A. Grade the area in the vicinity of the excavation to prevent surface water from flowing into the excavation.
B. Maintain existing drainage.
3.02 FINISH GRADING
A. Grade site to true grades as specified on the plans after all structures and piping have been installed.
B. Grade sites for effective drainage away from structures.
C. Dress and trim all slopes.
Excavation, Trenching, and Backfill 02315 - 1
SECTION 02315 – EXCAVATION, TRENCHING AND BACKFILL
PART 1 - GENERAL
SUMMARY
This section includes excavation, trenching and backfill necessary for the construction of the facilities as indicated on the plans including, but not limited to: water mains and service lines, sewer mains and service lines, concrete manholes, septic tanks, and other structures.
RELATED WORK
Section 2400 – Boring, Jacking & Directional Drilling
Section 02510 – Water Distribution
Section 02705 – Road Restoration
Section 02920 – Topsoiling, Seeding, and Mulching
REFERENCES
Manual on Uniform Traffic Control Devices
ASTM D698 – Test Methods for Moisture Density Relations of Soils and Soil- Aggregate Mixtures Using 5.5 lb. Rammer and 12-in. Drop [Standard Proctor Test]
ASTM D2321 – Underground Installation of Flexible Thermoplastic Sewer Pipe
ASTM D2487 – Classification of Soils for Engineering Purposes [Unified Soil Classification System]
SUBMITTALS
Imported Bedding Sieve Analysis
Compaction Method
Warning Tape
DEFINITIONS
Bedding, Haunching, and Initial Backfill zones as defined herein and on the standard pipe trench detailed drawing.
Soil Materials as summarized and defined in ASTM D2321 and ASTM D2487.
Excavation, Trenching, and Backfill 02315 - 2
PART 2 - PRODUCTS
BEDDING, HAUNCHING AND INITIAL BACKFILL MATERIAL
Native material if acceptable to Owner.
Imported Bedding: Consists of sand, sandy gravel, or fine gravel having a maximum size of ¾-inch and a maximum Plasticity Index of 6.
WARNING TAPE
Detectable 3 inches wide.
Printed with “Caution Buried Water Line Below” for water mains.
PART 3 - EXECUTION
GENERAL
Trenching and excavation work shall be done in accordance with proper emphasis on safety as determined by the Contractor to conform to recommended safety standards such as OSHA 1910 and 1926.
A Competent Person, as defined by OSHA 1926, shall be on site at all times when excavation work is being completed.
Provide suitable sheeting, shoring, and bracing as required in conformance with OSHA regulations.
In accordance with the contract, obtain all permits from appropriate road agency for construction within road right of way.
Repair damage resulting from settlement, slides, cave-ins, water pressure, and other causes.
Provide adequate signs, barricades, fences and amber lights and take all necessary precautions to protect the work and the safety of the public in all construction areas.
Placement of construction signs and barricades shall conform to the most current version of the “Manual on Uniform Traffic Control Devices.”
Protect barricades and obstructions at night by amber signal lights that burn from sunset to sunrise. Barricades shall also be of substantial construction, painted white or with reflective paint to increase their visibility at night.
Perform work without obstruction to traffic or inconvenience to the general public and the residents in the vicinity of the work.
The maximum open trench allowed during the day at each location shall not exceed 200 feet, with no open trench allowed overnight unless specifically approved.
Excavation, Trenching, and Backfill 02315 - 4
HAUNCHING AND INITIAL BACKFILL
General.
Provide complete and uniform bearing and support for the pipe, including allowance for bell holes, or structure.
Work material under and around the pipe to ensure full pipe support.
Prevent movement of the pipe during placement of material.
Avoid contact between the pipe and mechanical compaction equipment.
Where a trencher is approved, backfill the trench from surface with selected material, free from large clods and all stones larger than 3 inches.
No saturated, foreign, or organic materials will be allowed.
Hand compact in 6-inch lifts from the bottom of the trench to 12 inches above the pipe crown.
BACKFILL & COMPACTION
All buried material shall be inspected by technical representative prior to backfilling.
Backfill remainder of excavation with native material, free from large clods, stones 8 inches or larger, organic material or frost chunks.
All backfill shall be compacted in the specified lifts utilizing mechanical equipment designed for compaction. Compaction methods utilizing mechanical equipment not designed for compaction will not be approved.
All methods of compaction shall be approved prior to construction.
Compact in 6-inch lifts to a density not less than the density of the surrounding undisturbed soil or not less than 90% of the maximum dry density, determined by
ASTM D698.
In cases where the Contractor performs unacceptable methods of compaction, the work on the project will cease until an acceptable method of compaction has been approved. The Owner has the right to delay work until soil samples along the project alignment are taken for the purpose of developing a proctor for testing the compaction of the soil backfilled in the trench.
Conform to Section 02705 for backfill requirements within roadways.
Compact with mechanical tamper, after initial backfill, to a density not less than
95% of the maximum dry density, determined by ASTM D698 for the entire depth of the trench through a roadway or driveway.
Repair any trenches improperly backfilled or where settlement occurs, then refill and compact.
Restore surface to the required grade and compaction. Conform to Section 02300 for rough grading, finish grading and site surface drainage.
Excavation, Trenching, and Backfill 02315 - 5
Remove and dispose of all surplus backfill materials to a location approved by the Owner.
WARNING TAPE INSTALLATION
Install warning tape over water, sewer or force mains and service lines in trench 2 feet below finished grade.
REMOVAL OF NUISANCE WATER
Remove nuisance water entering the trenches.
Nuisance water that can be removed through the use of sump or trash pumps is not considered dewatering.
Keep trenches free from water until waterlines, fittings, valves, sewer lines, manholes and other appurtenances are in place and sealed against the entrance of water.
Prevent all water, earth or any foreign material from entering any facility.
Keep trenches free from water until the facilities are in place, sealed against the entrance of water, and backfill has been placed and compacted above the water level.
LOCATE EXISTING UTILITIES
Field locate all existing underground utilities.
Utilize state “811” or “one-call” hotlines.
Contact all other utility owners not covered by the state “one-call” hotlines.
UTILITY CONFLICTS
Protect existing utilities from damage during excavation and backfilling operations.
Provide temporary support for existing water, gas, telephone, power, or other utility services that cross the trench until backfilling of trench is complete
Compact backfill to 95% of Standard Proctor Density under disturbed utilities.
Repair or replace any damaged existing utilities, at no additional cost to the project.
If it is impossible to meet any of the above separation distances and deviations, one of the following methods shall be adhered to:
For parallel placements, sanitary sewer must be constructed with equivalent protection such as concrete encasement, vacuum sewers, or jointless pipe such as fused HDPE or cured-in-placed pipe liner
For crossing placements, sanitary sewer must be constructed of one of the following materials and pressure tested to assure water tightness:
a. Ductile iron pipe conforming to ASTM A536 or ANSI/AWWA C151/A21.51 with minimum thickness class 50 and gasketed, push-on or mechanical joints
Excavation, Trenching, and Backfill 02315 - 6 in conformance with ANSI/AWWA C110/A21.10 or ANSI/AWWA C111/A21.11.
b. PVC pipe conforming to ASTM D3034 with minimum all thickness of SDR41, ASTM F679, or ASTM F794 with gasketed push-on joints in conformance with ASTM D3212
c. Reinforced concrete pipe conforming to ASTM C76 with gasketed joints in conformance with ASTM C361 or ASTM C443.
Water and sewer main and service crossing and parallel installation:
Maintain a minimum 10 feet horizontal separation from water and sewer services as measured from edge to edge of the pipes.
a. Water main is above the sewer main.
b. Separate trenches are maintained.
Maintain a minimum 2 feet vertical separation for crossing water and sewer services.
a. If the sewer pipe is to be installed less than 2 feet below the water pipe, the sewer shall be encased in concrete with a minimum thickness of 6 inches for a 10-foot distance on each side of the crossing or the crossed section.
This requirement must also be followed where a water main must cross under an existing sewer main.
MOVING FENCES AND MINOR STRUCTURES
Remove and reset culverts, drainage pipes or other minor structures that fall within the alignment of the new construction, to their original location and grade.
Visit the project site and determine actual conditions with regard to the existence of old car bodies, abandoned houses, fences, driveways, trees, stumps, brush, sidewalks, approaches, and other miscellaneous obstacles to construction.
Unless specifically referenced in a bid item, no separate payment will be made for the removal or replacement of these items.
RECORDS
Conform to as-built requirements in Section 01781.
Erosion and Sediment Control 02370 - 1
SECTION 02370 – EROSION AND SEDIMENT CONTROL
1.1 SUMMARY
A. This section includes temporary erosion and sediment control measures by use of silt fences, hay bales, and erosion blankets. This is not intended to incorporate all available methodologies of temporary erosion and sediment control or supersede any state or Tribal laws.
1.2 RELATED WORK
A. Section 00361 – Permit Application – SWPPP
B. Section 02920 – Topsoiling, Seeding, Fertilizing, and Mulching
1.3 REFERENCES
A. ASTM D4355 – Standard Test Method for Grab Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Arc Type Apparatus
B. ASTM D4632 – Standard Test Method for Grab Breaking Load and Elongation of Geotextiles
C. ASTM D4751 – Standard Test Method for Determining Apparent Opening Size of a
Geotextile
D. EPA – Clean Water Act
E. ND DOT – Erosion and Sediment Control Handbook
F. MN PCA – Minnesota Pollution Control Agency Best Management Practices
G. SD DOT – Construction Field Manual – Construction Site Management and Erosion and Sediment Control
1.4 SUBMITTALS
A. Method of erosion control
B. Silt fence and appurtenances
C. Hay bales and appurtenances
D. Erosion blankets and appurtenances
E. Erosion control plan
Erosion and Sediment Control 02370 - 2
1.5 DEFINITIONS
A. Erosion Control: Any practice that protects the soil surface and minimizes the amount of soil particles detached and transported by rainfall or wind. Erosion control is implemented as a source control.
B. Sediment Control: Any practice that traps the soil particles after they have been detached and transported. Sediment control begins with erosion control by minimizing the potential sources of sediment. The emphasis should be placed on providing a protective cover on the soil surface, diverting runoff so that it does not flow across disturbed areas, and preserving existing vegetation to maximize soil infiltration and capture sediment.
1.6 QUALITY ASSURANCE
A. Erosion control materials, methods, and practices shall conform to the strictest of applicable state or Tribal agency handbooks of Best Management Practices, laws established for the purpose of erosion control, or the specifications herein.
1.7 CLEANUP
A. Remove sediment deposits in a timely manner when deposits reach 1/3 the height of the silt fence or bale line.
1. Place in the topsoil stockpile area or area approved by the Owner.
B. Remove temporary erosion and sediment control measures only after the area has stabilized and vegetation has developed to the extent that further erosion is unlikely.
PART 2 - PRODUCTS
2.1 SILT FENCING
A. Applicability.
1. Heavy duty: General use during site grading to protect critical areas and navigable waters.
2. Standard: Light duty applications to protect temporary construction or to supplement the other types of silt fence.
3. Machine-slice: For most applications.
B. Geotextile uniform in texture and appearance and have no defects, flaws, or tears that would affect its physical properties as follows.
Erosion and Sediment Control 02370 - 3
Description Heavy Duty Standard Machine
Slice
Type woven woven monofilament
Width 48 inches 36 inches 36 inches
Minimum grab tensile Strength per ASTM D4632
100 pounds 100 pounds 130 pounds
Equivalent opening size per ASTM D4751
20-70 sieve 20-70 sieve 30-40 sieve
Minimum UV stability per ASTM D4355 500 hour
70% 70% 70%
Top fastening component Overlap around woven wire backing sewn-in cord
C. Post properties.
Slice
Material metal wood metal
Minimum size
1.25 pounds per foot
1.5 inch x
1.5 inch
1.25 pounds per foot
Minimum length 5 feet 4 feet 5 feet
Post fastener No. 16 gauge wire hog rings
Gun staples
0.5 inches long
Plastic zip ties 50 pound tensile strength
D. Net Backing
1. Woven wire
2. Minimum 14-1/2 gauge
3. 2-6 inch mesh opening
4. Minimum 30 inch width
5. 100 pound per foot tensile strength per ASTM D4595
6. Minimum 70% UV stability per ASTM D4355 500 hour
E. All seams heat sealed or sewn
2.2 EROSION BALES
A. Erosion bales may be used in lieu of silt fencing.
B. Rectangular clean hay bales or straw bales free of noxious weeds.
C. Twine bound.
D. Wood or steel anchor stakes.
1. Minimum 2 inch nominal x 2 inch nominal x 6 feet long (wood) or 5 foot (steel)
Erosion and Sediment Control 02370 - 4
2.3 EROSION CONTROL BLANKETS
A. Blankets consist of softly barbed, interlocking, 100% bio or photodegradable, and weed seed free Aspen excelsior fibers
1. Curlex I or Curlex Double Net as manufactured by American Excelsior Company or approved equal rated for particular application slopes and velocities.
2. Minimum 4 foot blanket width.
3. Minimum No. 11 gauge “u” staples with 1-2 inch heads.
a. 6, 8, or 12 inch depending on soil.
2.4 OTHER
A. It may be necessary to implement other materials and methods to prevent erosion and sediment transport than those specified herein (e.g. areas of high flow, navigable water boundaries, etc.). Other materials and methods proposed by the Contractor shall conform to standards published by the applicable state or Tribal agency’s Best Management Practices (BMPs).
3.1 INSTALLATION
A. Coordinate temporary and permanent erosion control measures to assure economical, effective, and continuous erosion control.
B. Divert drainage away from construction areas.
C. Perform construction in and adjacent to navigable waters in such a manner as to avoid washing, sloughing, or deposition of material into waters which will result in undue or avoidable contamination, pollution, or siltation.
D. Install silt fence as shown in the plans and/or to the contour of the slope such that flow approaches the fence at right angles.
1. Place in an arc or horseshoe shape with the ends pointing towards the slope.
2. Install the silt fence fabric and net backing on the upstream side of the post according to the embedment, spacing, and fastening requirements for each respective application type.
Slice
Minimum embedment 2 feet 1.5 feet 2 feet
Maximum spacing 8 feet 8 feet 6 feet
Minimum fasteners per post
3 5 3
3. Maximum drainage area of 1/4 acre per 100 feet of fence.
4. Installation limitations are as follows with a maximum permissible slope of 2:1 with no interpolation between grade tiers (e.g. a 4:1 slope would have a maximum slope length of 15 feet).
Erosion and Sediment Control 02370 - 5
Slope Steepness Maximum Slope Length (feet)
2:1 (50%) 15
5:1 (20%) 25
10:1 (10%) 50
20:1 (5%) 75
100:1 (1%) 100
5. Compact the soil on the upslope side of the fence.
6. Maintain silt fences and ensure that they provide effective erosion and sediment control.
Problem Corrective Maintenance
Undercutting of fence Replace, rearrange, and/or re-grade
Collapsing of fence Replace or rearrange Add bales, stakes, wire, or rock
Torn fabric Replace Add bales, stakes, wire, or rock
Excessive sagging Decrease spacing between posts Reinforce
Runoff escaping around fence Lengthen fence
E. Place bales as shown in the plans and/or to the contour of the slope such that flow approaches the bale wall at right angles.
1. Installation limitations are the same as silt fence requirements for slope steepness and the corresponding maximum slope length.
2. Place bales in a 4 inch deep trench on their side.
3. Securely anchor each bale with stakes.
4. Compact soil on the upslope side of bales.
5. Fill gaps between bales with straw.
6. Bales may be used as mulching material if they meet the specifications of
Section 02920.
7. Maintain bales and ensure that they provide effective erosion and sediment control.
Problem Corrective Maintenance
Undercutting of bales Replace or rearrange Add bales, stakes, wire, or rock
Displacing of bales Replace or rearrange Reinforce with rock, bales, or basins
Gaps between bales Replace or rearrange Stuff loose bale material in voids
Decomposing Bales Replace as necessary
Runoff escaping around bales Lengthen the bale check
F. Install erosion control blankets where indicated in the plans and on slopes greater than 6:1 (16.67%).
1. Install in accordance with the manufacturer’s…