Revised-Specsv2_Signed.pdf

PDF 3 MB Posted

Attached to
Water Service Line Extension, Four Homes Yukon, OK
Solicitation number
246-24-Q-0204
Issued by

About this file

This document is a combined synopsis/solicitation for a Request for Quotes (RFQ) to furnish and install a water service line extension to serve four homes in Yukon, OK. The Indian Health Service is issuing this 100% Indian Owned set-aside procurement under NAICS code 237110, with an estimated award amount between $100,000 and $250,000.

The key requirements include: installing approximately 2,732 LF of 4-inch water main and 216 LF of 8-inch HDPE, with four road crossings via directional boring, as well as installing valves, an air release valve, and a flush hydrant. Quotes are due by September 16, 2024, and the period of performance is 90 calendar days from the notice to proceed. The solicitation includes technical specifications, a required bid bond, and past performance criteria. Award will be made to the lowest priced, technically acceptable offeror.

View the file

Other files

File Type Posted
Revised - bid sheet.pdf PDF
Revised DWG-21F49_CCWLXv2_Signed.pdf PDF
SF18-95a Request for Quote.pdf PDF
SF25A-16d (1).docx DOCX document
SF24-16d (1).docx DOCX document
ok29 (1).txt TXT text file
SF25-16d1 (1).docx DOCX document
DWG-21F49_CCWLX_Signed.pdf PDF
Specs_Signed.pdf PDF
21F49 WLX Bid Sheet.pdf PDF
IHS IEE Representation Form_Jan 2022_508 Compliant.pdf PDF
RFQ Construction Clauses-updated May 2024.pdf PDF
SF18-95a Request for Quote.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oklahoma City Area Indian Health Service August 2024

Table of Contents 1

TABLE OF CONTENTS

CANADAIN COUNTY WATER LINE EXTENSION

FOR

CANADIAN COUNTY WATER AUTHORITY

CANADIAN COUNTY, OKLAHOMA

IHS PROJECT OK-21-F49

EXCHANGE LETTER AMENDMENT PART III

Technical Specifications

Division 1 – General Requirements Section 01100 – Summary of Work Section 01270 – Price and Payment Section 01310 – Project Management and Coordination Section 01330 – Submittal Procedures Section 01420 – References Section 01430 – Quality Requirements Section 01500 – Temporary Facilities and Controls Section 01720 – Staking and Construction Surveying Section 01770 – Closeout Procedures Section 01781 – Project Record Documents

Division 2 – Site Construction Section 02230 – Site Clearing Section 02310 – Grading Section 02315 – Excavation, Trenching, and Backfilling Section 02370 – Erosion and Sediment Control Section Section 02400 – Boring, Jacking, and Directional Drilling Section 02510 – Water Distribution Section 02920 – Topsoiling, Seeding, Fertilizing, and Mulching

Division 3 – Concrete Section 03100 – Concrete

Table of Contents 2

This Page Intentionally Left Blank

Table of Contents 01100-1

SECTION 01100 – SUMMARY OF WORK

PART 1 - GENERAL

SUMMARY

The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:

tools equipment materials labor supplies manufactured articles all transportation to complete the work temporary facilities

Location of Work: Project is located within private easements along S Richland Rd in Section 1 Township 11N and Range 6W and SW 5th St and Lainey Ln in Section 2 Township 11N and Range 6W in Canadian County, OK.

Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and performed by the contractor.

SUMMARY OF WORK TO BE DONE BY CONTRACTOR

Water Line Extension generally consists of the following:

installation of approximately 2,732 LF of 4-inch SDR 21 water main and approximately 216 LF of 8-inch HDPE, DR 11 with tracer wire, four road crossing via directional boring. Installation of 1 4-inch gate valve, 1 air release valve, and 1 flush hydrant and other appurtenance specified in the contract drawings to serve four homes.

ADDITIONAL INFORMATION

For information regarding the project, contact the following:

Drew Kay, Environmental Engineer Indian Health Service Clinton Field Office 10321 N 2274 Rd Clinton, Oklahoma 73601 Office: 580-331-3492

Table of Contents 01100-2

Email: drew.kay@ihs.gov

END OF SECTION

Price and Payment 01270 -1

SECTION 01270 – PRICE AND PAYMENT

GENERAL

SUMMARY

Work covered by this section includes method of measurement and basis of payment for all divisions included.

Payment for the various items of the Bid Schedules shall include all compensation to be received by the Contractor for furnishing all tools, equipment, materials, labor, supplies, manufactured articles, transportation, and temporary facilities required to complete the work in accordance with contract documents including incidentals.

Respective prices and payment shall constitute full compensation for all work completed including incidentals.

All items not expressly listed as being provided by others that are necessary for the completion of work shall be furnished and installed by the Contractor.

ESTIMATED QUANTITIES

All quantities stipulated in the bid schedule or other contract documents are approximate and are to be used: (1) as a basis for estimating the probable cost of the work and (2) for the purpose of comparing the bids submitted.

The Contractor shall be paid for actual quantities installed based on the quantities measured in the field. The actual amounts of work completed and materials furnished may differ from estimated quantities. The Contractor shall make no claim for damages, anticipated profits, or otherwise, on account of differences between the estimated amounts and the actual amount of work performed and materials furnished.

SURVEY AND MEASUREMENTS

All quantity measurements shall be the responsibility of the Contractor and will be verified by the Contracting Officers Representative.

All measurements and subsequent payments will be based on completed and accepted work performed in strict accordance with the plans, specifications, and other contract documents.

BID SCHEDULE ITEMS

GENERAL

Payment shall be full compensation to complete the work items in good faith, including incidental work.

Price and Payment 01270 -2

In addition to the basis of payment described under each item, the unit price bid shall be full compensation for all of the following:

General requirements in Division 01, but not limited to the following:

a. Submittals

b. Record drawings

c. Warranties

Specific requirements in Division 02 through 16, including but not limited to the following (unless otherwise expressly defined as a line item in the bid schedule):

a. Erosion control

b. Clearing and grubbing

c. Removal and replacement of obstructions

d. Associated trenching, excavation and backfill including the removal of any nuisance water, bedding, haunching, and compaction

e. Disposal of any excess material

f. Traffic control

g. Rough grading

h. Finish work, where called for, including finish grading, topsoiling, and landscaping

BID ITEMS

A. Schedule A: Canadian County Water Line Extension

1. Mobilization, Demobilization, and Submittals

a. Measurement: By lump sum

b. Basis of Payment: Includes labor, tools, equipment, materials and all other incidentals necessary to transport and set up all equipment, materials, provide all submittals, permits, construction schedule, and other necessary paperwork required for construction start-up. Pay item also includes the provisions necessary to remove all equipment, materials brought to the site by the Contractor(s).

2. 6” PVC SDR 21 Water Main

a. Measurement: By the lineal foot based on the horizontal length installed and measured over the centerline of the pipe

b. Basis of Payment: Includes all pipe, elbows, fittings, labor, tools, equipment and materials required to construct the 6” PVC SDR 21 water main, including staking, excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, disinfection, pressure testing, tracer wire, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, thrust restraints, preparation of seed bed and seeding, and all other incidentals required to complete the work as specified.

Price and Payment 01270 -3

3. 4” PVC SDR 21 Water Main

a. Measurement: By the lineal foot based on the horizontal length installed and

b. Basis of Payment: Includes all pipe, elbows, fittings, labor, tools, equipment and materials required to construct the 4” PVC SDR 21 water main, including staking, excavation, trenching, laying and jointing pipe, backfill and compaction, flushing, disinfection, pressure testing, tracer wire, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, thrust restraints, preparation of seed bed and seeding, and all other incidentals

4. Connect to Existing Water Main

a. Measurement: By lump sum

b. Basis of Payment: Includes labor, tools, equipment, excavation, backfill and compaction, 12” x 6” stainless steel tapping sleeve, 6” tapping gate valve, valve box, thrust block and all other incidentals required to complete the work as specified.

5. 8” Steel Bore Casing- Road Bore

a. Measurement: By linear foot based on the horizontal length installed and

b. Basis of Payment: Includes all materials, labor, tools, equipment and materials required to construct the bored casing and inserting of the carrier pipe.

Payment includes but is not limited to clearing and grubbing, excavation, casing, boring, laying, jointing and inserting of water main pipe, thrust restraints, backfill and compaction, flushing, disinfection, pressure testing, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated material, preparation of seed bed and seeding, and all other incidentals

6. 12” HDPE, DR 11 Casing- Road Bore

Payment includes but is not limited to clearing and grubbing, excavation, casing, boring, laying, jointing and inserting of water main pipe, thrust restraints, backfill and compaction, flushing, disinfection, pressure testing, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated

Price and Payment 01270 -4

7. 8” HDPE, DR 11 Casing- Road Bore

Payment includes but is not limited to clearing and grubbing, excavation, casing, boring, laying, jointing and inserting of water main pipe, thrust restraints, backfill and compaction, flushing, disinfection, pressure testing, removal and replacement of fences, culverts, protection and/or replacement or repair of utilities which may be impaired by work, disposal of excess excavated

8. 6” Air Release Valve

a. Measurement: By each installed compaction, concrete, manhole, plumbing, connection to water main, saddle, air valve, and all other incidentals required to complete the work as specified.

9. 4” Flush Hydrant

a. Measurement: By each installed.

compaction, hydrant, gate valve and box, tee, thrust blocks, piping, gravel, polyethylene encasement, utility markers, and all other incidentals required to complete the work as specified.

PART 3 – EXECUTION (N/A)

Project Management And Coordination 01310 - 1

SECTION 01310 – PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

SUMMARY

Section includes the preconstruction conference, construction schedule, working hours/days, coordination requirements and progress meetings.

PRE-CONSTRUCTION CONFERENCE

Required after award of contract and prior to start of construction.

Representatives from the following shall attend.

Prime Contractor Project Engineer and/or Technical Representative Owner’s Representative: Canadian County Water Authority Appropriate State/Federal Agencies or other Funding Agencies TERO Representative, if applicable THPO Representative, if applicable

The IHS and Canadian County Water Authority will arrange a date that is mutually acceptable to all parties planning to attend.

Contractor shall notify subcontractors of time and date of meeting.

CONSTRUCTION SCHEDULE

Present the Owner with a written preliminary construction schedule containing start and completion dates of the major items at the preconstruction meeting.

Notify the Owner three full working days in advance of any construction.

Communicate major changes to the schedule to the Owner in writing.

WORKING HOURS/DAYS

Perform all work during regularly scheduled working hours, unless approved by Owner.

Working hours shall be defined as 7 AM to 6 PM Monday through Friday.

No work will be allowed on Saturday, Sunday, Federal holidays, and Tribal holidays without the Owner’s consent.

Holidays include, but are not limited to, New Year’s Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day, or on any other holidays declared by the Owner.

Project Management And Coordination 01310 - 2

Holidays that fall on Saturday will be observed on the preceding Friday; holidays that fall on Sunday will be observed on the following Monday. No construction will be permitted on those days.

IHS has the option to approve overtime or holiday work upon the Contractor’s request not less than 48 hours in advance of the work to be performed. Overtime and holiday requests that exceed a ten (10) hour work shift for a time period exceeding two days will not be approved by the Owner.

COORDINATION WITH OTHER REQUIREMENTS

Coordinate work with other contractors (i.e. roads, building, etc.) in the area as necessary to complete the work specified.

Coordinate work with local utilities (i.e. water and sewer, power, telephone). All buried utilities may not be shown on the plans.

Contractor is responsible for having utilities marked prior to construction and field verify utility location.

PROGRESS MEETINGS

The Owner will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.

Progress meetings will be scheduled throughout progress of the Work at maximum monthly intervals. Frequency of meetings will be determined from Work meeting construction schedule or when Project Engineer deems it necessary.

Representatives from the following shall attend:

Prime Contractor Project Engineer and/or Technical Representative Owner’s Representative

Submittal Procedures 01330 - 1

SECTION 01330 – SUBMITTAL PROCEDURES

PART 1 - GENERAL

SUMMARY

This section includes information on submittal procedures. Materials requiring a submittal are listed in the appropriate specification section.

SUBMITTAL PROCEDURES

Submit one electronic pdf copy or three paper hard copies of submittals to the Owner, unless requested otherwise.

Attach an acceptable submittal cover sheet for all submittal packages.

List all submittals included in the package in the appropriate location.

Signed cover sheet indicating all submittals have been reviewed prior to submission.

Identify each cut sheet or shop drawing with the following information:

Contract number Supplier Pertinent specification section number Pertinent drawing and detail number Clearly identify the product being submitted by circling, highlighting, or underlining.

Submit the following information, as applicable:

Manufacturer’s cut sheets indicating compliance with references (e.g. applicable ASTM, AWWA standards).

Laboratory results, as applicable.

Dimensional drawings or shop drawings, as applicable.

Other information necessary for the Owner to determine compliance with the specifications.

Identify variations from the contract documents and product or system limitations that may be detrimental to successful performance of the completed work.

Revise and resubmit submittals as required and identify all changes made since previous submittal.

Distribute copies of reviewed submittals to concerned parties (i.e. suppliers, sub-contractors). Instruct parties to promptly report inability to comply with requirements.

Submit written communication of any inability to comply with the Owner’s comments.

Submittal Procedures 01330 - 2

Submit information to the Owner at least three weeks in advance of the work to be performed.

Approval of submittals must be provided by the Owner prior to installation of materials and process of any payments for the materials.

Approval of any submittal does not relieve responsibility for completion of the work in accordance to the plans and specifications.

01420 References 1 of 2

SECTION 01420

REFERENCES

1.01 SUMMARY

A. This section includes a list of organizations, associations or appropriate agencies with jurisdiction that have references, standards, laws or regulations cited in these specifications.

B. Use latest revision of all references, standards, laws or regulations.

1.02 LIST OF ORGANIZATIONS, ASSOCIATIONS & AGENCIES

A. National Standards Organizations & Associations

American Association of State Highway and Transportation Officials (AASHTO) 444 North Capital Street NW, Suite 249 Washington DC, 20001

(202) 624-5800 www.aashto.org

American Concrete Institute (ACI) ACI International PO Box 9094 Farmington Hills, Michigan 48333-9094

(810) 848-3700 www.aci-int.org

American Society for Testing and Materials

(ASTM)

100 bar Harbor Drive West Conshohocken, Pa 19428-2959

(610) 832-9585 www.astm.org

American Water Works Association AWWA 6666 West Quincy Avenue Denver, CO 80235

(303) 794-7711 www.awwa.org

National Electric Code (NEC) National Fire and Protection Association 1 Batterymarch Park Quincy, MA 02269-9959 1 888 632-2633 www.nec.com

National Electrical Manufacturer’s Association

NEMA

1300 North 17th Street Rosslyn, VA 22209

(703) 841-3200 www.nema.org

Underwriters’ Laboratories, Inc. UL 333 Pfingston Road Northbrook, IL 60062

(847) 272-8800 www.ul.com

B. Federal Agencies

Environmental Protection Agency (EPA) Region 7 11201 Renner Blvd Lenexa, KS 66219 https://www.epa.gov/aboutepa/epa-region-7-midwest

Occupational Health and Safety Administration Region 7 (OSHA) 2300 Main Street, Suite 10030 Kansas City, MO 64108 https://www.osha.gov/contactus/bystate/KS/are aoffice http://www.aashto.org/ http://www.aci-int.org/ http://www.astm.org/ http://www.awwa.org/ http://www.nec.com/ http://www.nema.org/ http://www.ul.com/

01420 References 2 of 2

C. State Agencies

Oklahoma Department of Environmental Quality 707 N. Robinson P.O. Box 1677

OKC, OK 73102-6010

www.deq.state.ok.us

Oklahoma Water Resources Board 3800 North Classen Blvd.

Oklahoma City, OK 73118 405-530-8800 www.owrb.ok.gov

PART 2 – PRODUCTS (N/A)

PART 3 – EXECUTION (N/A)

http://www.deq.state.ok.us/

Quality Requirements 01430 - 1

SECTION 01430 – QUALITY REQUIREMENTS

PART 1 - GENERAL

SUMMARY

This section includes prerequisites and procedures, installer qualifications, control of installation, and manufacturers’ field services to ensure the quality of the Work.

SUBMITTALS

Contractor Name and License Number

Subcontractor(s) Name and License Number

Name or names of the “Competent Person” in charge of safety on the jobsite, as defined by the OSHA Industry Standard 29 CFR 1926.

INSTALLER QUALIFICATIONS

Perform Work under the direction of personnel licensed by the state and/or reservation having jurisdiction.

If Work being completed is not regulated by the state and/or reservation, submit literature from the manufacturer, independent representative of the manufacturer, and/or supplier indicating the Contractor or Subcontractor’s ability to complete installation based on past experience or formal training.

CONTROL OF INSTALLATION

Review materials for acceptability, in accordance with the approved submittals, when delivered to the site.

Store and handle materials to prevent damage.

Review materials, services, and workmanship to ensure that Work is performed in accordance with the specifications.

Comply fully with manufacturers’ instructions.

Should manufacturers’ instructions conflict with contract documents, request clarification from Project Engineer before proceeding.

Should the finished product or method of completion differ in any way from the manufacturer’s written instructions or the specifications, request approval in writing from the Project Engineer before proceeding.

Correct defective Work to the satisfaction of the Owner.

Quality Requirements 01430 - 2

MANUFACTURER’S FIELD SERVICES

Provide reports on observations and documentation of workmanship to the Owner within 30 days of visit for review where manufacturers’ field services are provided.

WARRANTY

Provide a minimum one (1) year warranty for all materials and labor, covering defects in the materials or deficiencies resulting from contractor installation.

Provide additional warranties as required under other sections.

Warranty takes affect starting the date of substantial completion.

Temporary Facilities and Controls 01500 - 1

SECTION 01500 – TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

SUMMARY

The work covered by this section includes all temporary facilities and controls needed to complete work under the Contract in a manner that protects public safety and worker safety, that preserves both public and private property and that appropriately involved local governments, emergency and law enforcement.

RELATED WORK

Section 02400 – Boring, Jacking, and Directional Drilling

Section 02705 – Road Restoration

REFERENCES

Manual of Uniform Traffic Control Devices

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

GENERAL

Provide temporary facilities and controls that are necessary to carry out the requirements of the Contract in a manner that

1. Protect public safety and worker safety.

2. Preserves both private and public property.

3. Communicates and cooperates with local authorities and governments.

TEMPORARY WATER

Make arrangements with local water utility to draw from a nearby community system.

Back flow protection will be required at all times. Utility reserves the right to charge for water taken from community system by the Contractor for this project.

Temporary Facilities and Controls 01500 - 2

TEMPORARY SANITARY FACILITIES

Provide and maintain a chemical toilet meeting State and Tribal requirements for the use of all workers of all trades.

Place temporary facilities in an inconspicuous place and keep clean.

Remove temporary sanitary facilities after completion of the project.

BARRICADES & WARNING DEVICES

Notify local police, fire departments and other emergency programs of any proposed barricading or detouring.

Erect and maintain barricades, guardrails, lights and signs as necessary for public convenience and safety.

Ensure that barricades remain in place during critical hours.

Comply with “Occupational Safety and Health Act” and local safety requirements, as they apply.

TRAFFIC CONTROL

Conduct all traffic control operations in accordance with the latest issues of the “Manual on Uniform Traffic Control Devices” (MUTCD).

Coordinate and obtain approval for all traffic control from local law enforcement.

Signs, Signals, and Devices

1. Place warning signs in the region of the work.

2. Warn of types of conditions that may be encountered including the following:

a. Muddy roads

b. Slippery roads

c. Flagman

d. Detour

e. Slow moving truck

f. Trucks entering roadway

3. Traffic control signs

a. Meet the needs of the local government authority

4. Traffic cones and drums, flares and lights

a. Meet the needs of the local jurisdictions

b. Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic

c. Ensure that flares, lights, etc. remain in position throughout the night

Temporary Facilities and Controls 01500 - 3

5. Flagman

a. Meet the needs of the local jurisdictions

b. Provide trained and equipped flagmen to regulate traffic when construction operations or traffic encroach on public traffic lanes

Haul Routes

1. Consult with authority having jurisdiction in establishing public thoroughfares to be used for haul routes and site access.

2. Confine construction traffic to designated haul routes.

3. Provide traffic control at critical areas of haul routes to regulate traffic, to minimize interference with public traffic.

Removal of Traffic Control

1. Remove equipment and devices when no longer required.

2. Repair damage caused by installation.

ACCESS ROADS

A. Construct and maintain temporary roads accessing public thoroughfares to serve the construction area as necessary.

B. Provide detours necessary for unimpeded traffic flow.

C. Provide and maintain access to fire hydrants, free of obstructions.

D. Permanent access roads and parking areas, if applicable, will be covered in

Division 2, Site Work.

PARKING

A. The Contractor may park their own and employees' vehicles on the site without charge with permission from the Owner.

B. If the site is not large enough, the Contractor shall make parking arrangements.

C. Prevent interference with the flow of local traffic.

D. Prevent interference with emergency vehicle functions.

ROAD SURFACE MAINTENANCE

A. Remove mud and excavated spoils from the affected roadway at the end of each workday in order to preserve the roadways and maintain safe driving conditions.

B. No tracked machinery will be allowed on paved roadways.

Temporary Facilities and Controls 01500 - 4

C. Contractor is responsible for any costs associated with repairing the roadways that are damaged due to construction equipment.

WATER CONTROL

A. Grade site to drain.

B. Protect site from puddling or running water.

C. Provide water barriers as required to protect site from soil erosion.

DUST CONTROL

A. Use measures to minimize dust caused by the project.

B. Avoid dust-creating activities during dry, windy conditions.

SECURITY

A. The Owner will not be responsible for security on the site of work.

B. Each Contractor will be held responsible for loss or injury to persons or property where their work is involved.

C. Provide (if deemed necessary) such watchmen and take such other precautionary measures as deemed necessary to protect facilities during the contract period.

PROGRESS CLEANING

A. Maintain areas free of waste materials, debris and rubbish. Maintain site in a clean and orderly condition.

B. Remove waste materials, debris, and rubbish from site weekly and dispose off-site.

REMOVAL OF UTILITIES, FACILITIES, & CONTROLS

A. Remove temporary above grade or buried utilities, equipment, facilities, materials, prior to inspection.

B. Clean and repair damage caused by installation or use of temporary work.

C. Restore existing facilities used during construction to original condition.

TEMPORARY FIRST AID FACILITIES

A. Provide temporary first aid facilities for employees in sufficient quantity for the number of workers.

Temporary Facilities and Controls 01500 - 5

TEMPORARY FIRE PROTECTION

A. Post fire department telephone numbers at the jobsite.

B. Keep fire extinguishers on the job that are appropriate for the type of work being performed, if applicable.

Staking and Construction Surveying 01720 - 1

SECTION 01720 – STAKING AND CONSTRUCTION SURVEYING

PART 1 - GENERAL

SUMMARY

This section outlines the staking and surveying work related to provide reference points in the field. Section clarifies the Contractor’s responsibilities.

Construction Surveys establish “control stakes” for basic line and grade used for project construction.

Control stakes are used to check work for contract compliance.

From control stakes set, when needed, supplemental “working stakes”.

CONTRACTOR’S RESPONSIBILITY

Water Main, and Appurtenance Staking

Working stakes are used to perform the work and are provided by the contractor.

Offset of Horizontal or Centerline staking (approximately every 100 feet).

Appurtenance (gate valve, fittings, fire hydrant, etc.) staking on center.

Project Benchmarks

Hubs for vertical control will be placed at various points throughout project.

Hubs for horizontal control (at least one per project).

Set supplementary staking, grade staking, offsets, cut stakes, temporary bench marks, and control points necessary for contractor to complete the work in accordance with the plans and specifications.

Provide all staking materials for contractor supplementary staking to include hubs, lath, flagging, paint and other material needed to provide construction staking.

Request clarification from the Owner regarding conflicts before proceeding with installation of facilities.

Preserve all offset and reference staking, until such time as the pipeline or other facilities are installed.

Reference stakes needing replacement due to Contractor error or negligence must be replaced by Contractor, at no cost to the contract.

All permanent survey points/markers (i.e. property corners) and bench marks not directly in the line of work shall be preserved.

Staking and Construction Surveying 01720 - 2

Replace all permanent survey markers disturbed or destroyed using a Professional Land Surveyor, at no cost to the contract.

Provide evidence of reestablishment of permanent survey markers to the Owner and copy of stamped and approved monument re-establishment documentation from the appropriate jurisdiction (state, BIA, etc.).

Closeout Procedures 01770 - 1

SECTION 01770 – CLOSEOUT PROCEDURES

PART 1 - GENERAL

SUMMARY

Section includes information on substantial completion, closeout procedures, final inspection and final payment.

SUBSTANTIAL COMPLETION

Water Main: Water main construction is considered substantially complete once the work has been installed in accordance with the specifications, backfilled and compacted in place, successfully pressure tested, and passed bacteriological testing, at which point the completed system is connected to the existing system and ready to be consumed.

CLOSEOUT PROCEDURES

Provide warranties, approved Operation & Maintenance Manuals, and approved record documents (e.g. as-built drawings) to the Project Engineer within ten (10) days after date of substantial completion or 5 working days prior to the pre-final inspection (whichever is sooner).

Submit written certification that work is fully completed in accordance with contract documents and ready for final inspection at least five (5) working days prior to final inspection.

PRE-FINAL CLEANING

Complete pre-final clean-up prior to inspection.

Remove waste and surplus materials, rubbish, and construction facilities from the site.

PRE-FINAL INSPECTION

A pre-final inspection of the facilities shall be conducted, at a minimum, by the Owner and the Contractor.

Inspect all facilities installed under the contract.

Complete the requirements listed in Closeout Procedures Section 1.2 prior to the pre-final inspection.

Closeout Procedures 01770 - 2

PRE-FINAL PUNCH LIST

Any deficiencies noted at the pre-final inspection will be communicated to the Contractor through a letter from the Contract Manager.

After Substantial Completion promptly begin work on the punch list of items to be completed or corrected prior to final inspection.

Correct all deficiencies identified prior to scheduling a Final Inspection.

Full payment will not be made until all requirements of this section are met.

Contractor shall submit written certification that all pre-final punch list items have been completed in accordance to the contract documents and ready for final inspection at least five (5) working days prior to final inspection.

FINAL INSPECTION

Final inspection of all the facilities provided will be conducted, at a minimum, with the Owner, IHS, and the Contractor.

Scheduling of the final inspection will not be allowed until all deficiencies listed in the pre-final punch list are corrected to the Owner’s satisfaction.

FINAL PAYMENT

Deficiencies noted during the pre-final inspection will be communicated to the Contractor through a letter from the Contract Manager.

Correction of all deficiencies will be required prior to the final payment being processed.

Final Payment will follow the procedures outlined in Section 01270 Price and Payment and require the Contractor to sign a release of claims for the contract.

Project Record Documents 01781 - 1

SECTION 01781 – PROJECT RECORD DOCUMENTS

PART 1 - GENERAL

SUMMARY

This section describes the requirements for closeout submittals including, record drawings, warranty information and general operation and maintenance information.

DELIVERY

Provide all closeout submittals meeting these requirements and any specific requirements of each section.

Closeout submittals must be received prior to final payment.

All closeout submittals must be received in a correct and complete manner before final payment can be made. If material is deficient, the deficiencies will be indicated in punch lists.

DEFINITIONS

Record Drawing: A drawing showing the actual installation of facilities, showing changes from the plans, and showing detail enough that future persons can readily locate all objects.

Ties: Measurements from permanent easily located objects to an installed object.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

RECORD DRAWINGS

Provide record data in one of the following manners:

On a set of project drawings, neatly draw tie measurements and changes from the original design.

On separate 8½ X 11 sheets, neatly draw site sketches, structure sketches, etc., indicating the necessary information.

Provide offset measurements for buried utilities (e.g. water main) installed parallel to roads or other known utilities.

Provide revised elevation data for all items that have elevations shown on the plan drawings, including, but not limited to, the following:

Project Record Documents 01781 - 2

Elevations of pipe entering and leaving structures Variations from the minimum depth of bury Other elevations indicated on profiles

Provide installed bid schedule items quantities for individual facilities on 8½ X 11 sheets.

Depending on the type of contract, standard forms may be supplied for use by the Contractor.

WARRANTIES

Submit all warranty information regarding the materials installed in accordance with that products particular section.

OPERATION AND MAINTENANCE INFORMATION

Submit all operation and maintenance information as included in the packaging from the manufacturer regarding the materials installed.

Additional project specific operation and maintenance requirements are listed in applicable sections.

Site Clearing 02230 - 1

SECTION 02230 – SITE CLEARING

PART 1 - GENERAL

1.1 SUMMARY

A. This section covers clearing, stripping and grubbing within the proposed areas of the Work.

1.2 RELATED WORK

A. Section 02315 – Excavation, Trenching and Backfill

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

3.1 CLEARING AND GRUBBING

A. Obtain necessary permit from Owner prior to cutting any trees or brush (if applicable).

B. Consult with the Project Engineer and Owner to designate a temporary area for stockpiling all cleared brush and trees.

C. Ensure all stockpiled material does not adversely affect drainage nor cause damage to abutting property.

D. Remove all ground vegetation and other extraneous material from the construction area to a depth of 6 inches and stockpile in the designated area.

E. Remove and dispose of all trees, stumps, brush, debris, and all other obstructions as needed in an approved manner off site.

1. Do not burn, bury, and/or leave debris within the Work areas.

F. If possible within right-of-way and property lines, extend clearing and grubbing a minimum of 10 feet beyond all proposed structures unless otherwise directed by the Engineer.

02310 Grading 1 of 2

SECTION 02310

GRADING

1.01 SUMMARY

A. This section includes rough and finished site grading of all areas disturbed during construction.

1.02 RELATED WORK

A. Section 02315 – Excavation, Trenching and Backfill B. Section 02370 – Erosion Control C. Section 02920 – Topsoiling Seeding

PART 2 – PRODUCTS (Not applicable)

3.01 ROUGH GRADING

A. Grade the area in the vicinity of the excavation to prevent surface water from flowing into the excavation.

B. Maintain existing drainage.

3.02 FINISH GRADING

A. Grade site to true grades as specified on the plans after all structures and piping have been installed.

B. Grade sites for effective drainage away from structures.

C. Dress and trim all slopes.

Excavation, Trenching, and Backfill 02315 - 1

SECTION 02315 – EXCAVATION, TRENCHING AND BACKFILL

PART 1 - GENERAL

SUMMARY

This section includes excavation, trenching and backfill necessary for the construction of the facilities as indicated on the plans including, but not limited to: water mains and service lines, sewer mains and service lines, concrete manholes, septic tanks, and other structures.

RELATED WORK

Section 2400 – Boring, Jacking & Directional Drilling

Section 02510 – Water Distribution

Section 02705 – Road Restoration

Section 02920 – Topsoiling, Seeding, and Mulching

REFERENCES

Manual on Uniform Traffic Control Devices

ASTM D698 – Test Methods for Moisture Density Relations of Soils and Soil- Aggregate Mixtures Using 5.5 lb. Rammer and 12-in. Drop [Standard Proctor Test]

ASTM D2321 – Underground Installation of Flexible Thermoplastic Sewer Pipe

ASTM D2487 – Classification of Soils for Engineering Purposes [Unified Soil Classification System]

SUBMITTALS

Imported Bedding Sieve Analysis

Compaction Method

Warning Tape

DEFINITIONS

Bedding, Haunching, and Initial Backfill zones as defined herein and on the standard pipe trench detailed drawing.

Soil Materials as summarized and defined in ASTM D2321 and ASTM D2487.

Excavation, Trenching, and Backfill 02315 - 2

PART 2 - PRODUCTS

BEDDING, HAUNCHING AND INITIAL BACKFILL MATERIAL

Native material if acceptable to Owner.

Imported Bedding: Consists of sand, sandy gravel, or fine gravel having a maximum size of ¾-inch and a maximum Plasticity Index of 6.

WARNING TAPE

Detectable 3 inches wide.

Printed with “Caution Buried Water Line Below” for water mains.

PART 3 - EXECUTION

GENERAL

Trenching and excavation work shall be done in accordance with proper emphasis on safety as determined by the Contractor to conform to recommended safety standards such as OSHA 1910 and 1926.

A Competent Person, as defined by OSHA 1926, shall be on site at all times when excavation work is being completed.

Provide suitable sheeting, shoring, and bracing as required in conformance with OSHA regulations.

In accordance with the contract, obtain all permits from appropriate road agency for construction within road right of way.

Repair damage resulting from settlement, slides, cave-ins, water pressure, and other causes.

Provide adequate signs, barricades, fences and amber lights and take all necessary precautions to protect the work and the safety of the public in all construction areas.

Placement of construction signs and barricades shall conform to the most current version of the “Manual on Uniform Traffic Control Devices.”

Protect barricades and obstructions at night by amber signal lights that burn from sunset to sunrise. Barricades shall also be of substantial construction, painted white or with reflective paint to increase their visibility at night.

Perform work without obstruction to traffic or inconvenience to the general public and the residents in the vicinity of the work.

The maximum open trench allowed during the day at each location shall not exceed 200 feet, with no open trench allowed overnight unless specifically approved.

Excavation, Trenching, and Backfill 02315 - 4

HAUNCHING AND INITIAL BACKFILL

General.

Provide complete and uniform bearing and support for the pipe, including allowance for bell holes, or structure.

Work material under and around the pipe to ensure full pipe support.

Prevent movement of the pipe during placement of material.

Avoid contact between the pipe and mechanical compaction equipment.

Where a trencher is approved, backfill the trench from surface with selected material, free from large clods and all stones larger than 3 inches.

No saturated, foreign, or organic materials will be allowed.

Hand compact in 6-inch lifts from the bottom of the trench to 12 inches above the pipe crown.

BACKFILL & COMPACTION

All buried material shall be inspected by technical representative prior to backfilling.

Backfill remainder of excavation with native material, free from large clods, stones 8 inches or larger, organic material or frost chunks.

All backfill shall be compacted in the specified lifts utilizing mechanical equipment designed for compaction. Compaction methods utilizing mechanical equipment not designed for compaction will not be approved.

All methods of compaction shall be approved prior to construction.

Compact in 6-inch lifts to a density not less than the density of the surrounding undisturbed soil or not less than 90% of the maximum dry density, determined by

ASTM D698.

In cases where the Contractor performs unacceptable methods of compaction, the work on the project will cease until an acceptable method of compaction has been approved. The Owner has the right to delay work until soil samples along the project alignment are taken for the purpose of developing a proctor for testing the compaction of the soil backfilled in the trench.

Conform to Section 02705 for backfill requirements within roadways.

Compact with mechanical tamper, after initial backfill, to a density not less than

95% of the maximum dry density, determined by ASTM D698 for the entire depth of the trench through a roadway or driveway.

Repair any trenches improperly backfilled or where settlement occurs, then refill and compact.

Restore surface to the required grade and compaction. Conform to Section 02300 for rough grading, finish grading and site surface drainage.

Excavation, Trenching, and Backfill 02315 - 5

Remove and dispose of all surplus backfill materials to a location approved by the Owner.

WARNING TAPE INSTALLATION

Install warning tape over water, sewer or force mains and service lines in trench 2 feet below finished grade.

REMOVAL OF NUISANCE WATER

Remove nuisance water entering the trenches.

Nuisance water that can be removed through the use of sump or trash pumps is not considered dewatering.

Keep trenches free from water until waterlines, fittings, valves, sewer lines, manholes and other appurtenances are in place and sealed against the entrance of water.

Prevent all water, earth or any foreign material from entering any facility.

Keep trenches free from water until the facilities are in place, sealed against the entrance of water, and backfill has been placed and compacted above the water level.

LOCATE EXISTING UTILITIES

Field locate all existing underground utilities.

Utilize state “811” or “one-call” hotlines.

Contact all other utility owners not covered by the state “one-call” hotlines.

UTILITY CONFLICTS

Protect existing utilities from damage during excavation and backfilling operations.

Provide temporary support for existing water, gas, telephone, power, or other utility services that cross the trench until backfilling of trench is complete

Compact backfill to 95% of Standard Proctor Density under disturbed utilities.

Repair or replace any damaged existing utilities, at no additional cost to the project.

If it is impossible to meet any of the above separation distances and deviations, one of the following methods shall be adhered to:

For parallel placements, sanitary sewer must be constructed with equivalent protection such as concrete encasement, vacuum sewers, or jointless pipe such as fused HDPE or cured-in-placed pipe liner

For crossing placements, sanitary sewer must be constructed of one of the following materials and pressure tested to assure water tightness:

a. Ductile iron pipe conforming to ASTM A536 or ANSI/AWWA C151/A21.51 with minimum thickness class 50 and gasketed, push-on or mechanical joints

Excavation, Trenching, and Backfill 02315 - 6 in conformance with ANSI/AWWA C110/A21.10 or ANSI/AWWA C111/A21.11.

b. PVC pipe conforming to ASTM D3034 with minimum all thickness of SDR41, ASTM F679, or ASTM F794 with gasketed push-on joints in conformance with ASTM D3212

c. Reinforced concrete pipe conforming to ASTM C76 with gasketed joints in conformance with ASTM C361 or ASTM C443.

Water and sewer main and service crossing and parallel installation:

Maintain a minimum 10 feet horizontal separation from water and sewer services as measured from edge to edge of the pipes.

a. Water main is above the sewer main.

b. Separate trenches are maintained.

Maintain a minimum 2 feet vertical separation for crossing water and sewer services.

a. If the sewer pipe is to be installed less than 2 feet below the water pipe, the sewer shall be encased in concrete with a minimum thickness of 6 inches for a 10-foot distance on each side of the crossing or the crossed section.

This requirement must also be followed where a water main must cross under an existing sewer main.

MOVING FENCES AND MINOR STRUCTURES

Remove and reset culverts, drainage pipes or other minor structures that fall within the alignment of the new construction, to their original location and grade.

Visit the project site and determine actual conditions with regard to the existence of old car bodies, abandoned houses, fences, driveways, trees, stumps, brush, sidewalks, approaches, and other miscellaneous obstacles to construction.

Unless specifically referenced in a bid item, no separate payment will be made for the removal or replacement of these items.

RECORDS

Conform to as-built requirements in Section 01781.

Erosion and Sediment Control 02370 - 1

SECTION 02370 – EROSION AND SEDIMENT CONTROL

1.1 SUMMARY

A. This section includes temporary erosion and sediment control measures by use of silt fences, hay bales, and erosion blankets. This is not intended to incorporate all available methodologies of temporary erosion and sediment control or supersede any state or Tribal laws.

1.2 RELATED WORK

A. Section 00361 – Permit Application – SWPPP

B. Section 02920 – Topsoiling, Seeding, Fertilizing, and Mulching

1.3 REFERENCES

A. ASTM D4355 – Standard Test Method for Grab Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Arc Type Apparatus

B. ASTM D4632 – Standard Test Method for Grab Breaking Load and Elongation of Geotextiles

C. ASTM D4751 – Standard Test Method for Determining Apparent Opening Size of a

Geotextile

D. EPA – Clean Water Act

E. ND DOT – Erosion and Sediment Control Handbook

F. MN PCA – Minnesota Pollution Control Agency Best Management Practices

G. SD DOT – Construction Field Manual – Construction Site Management and Erosion and Sediment Control

1.4 SUBMITTALS

A. Method of erosion control

B. Silt fence and appurtenances

C. Hay bales and appurtenances

D. Erosion blankets and appurtenances

E. Erosion control plan

Erosion and Sediment Control 02370 - 2

1.5 DEFINITIONS

A. Erosion Control: Any practice that protects the soil surface and minimizes the amount of soil particles detached and transported by rainfall or wind. Erosion control is implemented as a source control.

B. Sediment Control: Any practice that traps the soil particles after they have been detached and transported. Sediment control begins with erosion control by minimizing the potential sources of sediment. The emphasis should be placed on providing a protective cover on the soil surface, diverting runoff so that it does not flow across disturbed areas, and preserving existing vegetation to maximize soil infiltration and capture sediment.

1.6 QUALITY ASSURANCE

A. Erosion control materials, methods, and practices shall conform to the strictest of applicable state or Tribal agency handbooks of Best Management Practices, laws established for the purpose of erosion control, or the specifications herein.

1.7 CLEANUP

A. Remove sediment deposits in a timely manner when deposits reach 1/3 the height of the silt fence or bale line.

1. Place in the topsoil stockpile area or area approved by the Owner.

B. Remove temporary erosion and sediment control measures only after the area has stabilized and vegetation has developed to the extent that further erosion is unlikely.

PART 2 - PRODUCTS

2.1 SILT FENCING

A. Applicability.

1. Heavy duty: General use during site grading to protect critical areas and navigable waters.

2. Standard: Light duty applications to protect temporary construction or to supplement the other types of silt fence.

3. Machine-slice: For most applications.

B. Geotextile uniform in texture and appearance and have no defects, flaws, or tears that would affect its physical properties as follows.

Erosion and Sediment Control 02370 - 3

Description Heavy Duty Standard Machine

Slice

Type woven woven monofilament

Width 48 inches 36 inches 36 inches

Minimum grab tensile Strength per ASTM D4632

100 pounds 100 pounds 130 pounds

Equivalent opening size per ASTM D4751

20-70 sieve 20-70 sieve 30-40 sieve

Minimum UV stability per ASTM D4355 500 hour

70% 70% 70%

Top fastening component Overlap around woven wire backing sewn-in cord

C. Post properties.

Slice

Material metal wood metal

Minimum size

1.25 pounds per foot

1.5 inch x

1.5 inch

1.25 pounds per foot

Minimum length 5 feet 4 feet 5 feet

Post fastener No. 16 gauge wire hog rings

Gun staples

0.5 inches long

Plastic zip ties 50 pound tensile strength

D. Net Backing

1. Woven wire

2. Minimum 14-1/2 gauge

3. 2-6 inch mesh opening

4. Minimum 30 inch width

5. 100 pound per foot tensile strength per ASTM D4595

6. Minimum 70% UV stability per ASTM D4355 500 hour

E. All seams heat sealed or sewn

2.2 EROSION BALES

A. Erosion bales may be used in lieu of silt fencing.

B. Rectangular clean hay bales or straw bales free of noxious weeds.

C. Twine bound.

D. Wood or steel anchor stakes.

1. Minimum 2 inch nominal x 2 inch nominal x 6 feet long (wood) or 5 foot (steel)

Erosion and Sediment Control 02370 - 4

2.3 EROSION CONTROL BLANKETS

A. Blankets consist of softly barbed, interlocking, 100% bio or photodegradable, and weed seed free Aspen excelsior fibers

1. Curlex I or Curlex Double Net as manufactured by American Excelsior Company or approved equal rated for particular application slopes and velocities.

2. Minimum 4 foot blanket width.

3. Minimum No. 11 gauge “u” staples with 1-2 inch heads.

a. 6, 8, or 12 inch depending on soil.

2.4 OTHER

A. It may be necessary to implement other materials and methods to prevent erosion and sediment transport than those specified herein (e.g. areas of high flow, navigable water boundaries, etc.). Other materials and methods proposed by the Contractor shall conform to standards published by the applicable state or Tribal agency’s Best Management Practices (BMPs).

3.1 INSTALLATION

A. Coordinate temporary and permanent erosion control measures to assure economical, effective, and continuous erosion control.

B. Divert drainage away from construction areas.

C. Perform construction in and adjacent to navigable waters in such a manner as to avoid washing, sloughing, or deposition of material into waters which will result in undue or avoidable contamination, pollution, or siltation.

D. Install silt fence as shown in the plans and/or to the contour of the slope such that flow approaches the fence at right angles.

1. Place in an arc or horseshoe shape with the ends pointing towards the slope.

2. Install the silt fence fabric and net backing on the upstream side of the post according to the embedment, spacing, and fastening requirements for each respective application type.

Slice

Minimum embedment 2 feet 1.5 feet 2 feet

Maximum spacing 8 feet 8 feet 6 feet

Minimum fasteners per post

3 5 3

3. Maximum drainage area of 1/4 acre per 100 feet of fence.

4. Installation limitations are as follows with a maximum permissible slope of 2:1 with no interpolation between grade tiers (e.g. a 4:1 slope would have a maximum slope length of 15 feet).

Erosion and Sediment Control 02370 - 5

Slope Steepness Maximum Slope Length (feet)

2:1 (50%) 15

5:1 (20%) 25

10:1 (10%) 50

20:1 (5%) 75

100:1 (1%) 100

5. Compact the soil on the upslope side of the fence.

6. Maintain silt fences and ensure that they provide effective erosion and sediment control.

Problem Corrective Maintenance

Undercutting of fence Replace, rearrange, and/or re-grade

Collapsing of fence Replace or rearrange Add bales, stakes, wire, or rock

Torn fabric…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .