Specs-Sections Combined+113023.docx

DOCX document 103 KB Posted

Attached to
2024 OU P29/P32 PARKING STRUCTURES REPAIRS
Solicitation number
00064
Issued by
Berrien County, Riverview City, Michigan

About this file

This document is a Project Manual for the 2024 OU P29/P32 Parking Structures Repairs project by Oakland University in Rochester, Michigan, prepared by SME engineering firm. The project involves comprehensive repair and maintenance of two parking structures (P29 and P32), including concrete deck repairs, traffic coating replacement, staircase repairs, joint sealant replacement, and structural steel painting. The base bid proposal includes multiple line items such as mobilization, traffic control, concrete deck repair up to six inches deep, double tee flange repairs, bollard replacements, staircase repairs, and drain replacements. The project manual includes detailed specifications for surface preparation, materials application, quality assurance, and warranty requirements, with six potential alternates that can be added or subtracted from the base bid.

The bid form indicates unit pricing for various repair elements, with quantities specified for each component and the expectation that bidders provide comprehensive pricing that includes materials, equipment, labor, insurance, and overhead. The project allows for potential modifications, with the owner reserving the right to delete or add work items during the contract term. Contractors are required to have significant experience in concrete restoration, with a minimum of ten years of successful project history. The coating and repair work comes with extensive warranties, including a two-year warranty from the applicator and a ten-year warranty from the coating manufacturer, ensuring long-term performance and quality of the parking structure repairs.

View the file

Other files

File Type Posted
093986.00 COMBINED Drawings 11-30-23.pdf PDF
Structures drawings link.docx DOCX document
093986.00_DEC202023_ADD A.pdf PDF
Project Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

2024 OU p29/p32 PARKing Structures repair PROJECT

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

ROCHESTER, MICHIGAN

SME Project Number: 093986.00 November 30, 2023

SECTION 00 01 01 – PROJECT TITLE PAGE

PROJECT MANUAL VOLUME 1 FOR OWNER REVIEW

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

Owner Representative:

Oakland University Rochester, Michigan Engineer Project No. 093986.00 Engineer:

SME

43980 Plymouth Oaks Blvd

Plymouth, Michigan 48170
Phone: (734)-454-9900

Issued: November 30, 2023 Copyright 2023 SME. All rights reserved.

END OF SECTION 00 01 01

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – PROJECT TITLE PAGE 000101-1

SECTION 00 01 10 – TABLE OF CONTENTS

Section 000101, Title Page000101-1 to 000101-1
Section 000110, Table of Contents000110-1 to 000110-1
Section 000115, List of Drawing Sheets000115-1 to 000115-1
Section 004113, Bid Form004113-1 to 004113-2
Section 012300, Alternates012300-1 to 012300-1
Section 030100, Maintenance of Concrete030100-1 to 030100-8
Section 071816, Vehicular Traffic Coatings071816-1 to 071816-7
Section 079200, Joint Sealants079200-1 to 079200-7
Section 099113, Exterior Painting099113-1 to 099113-10

END OF SECTION 00 01 10

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – TABLE OF CONTENTS 000110-1

SECTION 00 01 15 - LIST OF DRAWING SHEETS

LIST OF DRAWINGS

Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled For Owner Review dated November 30, 2023, as modified by subsequent Addenda and Contract modifications.

List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

Oakland University Parking Structures P29 / P32 2024 Repairs G0.1 – Cover Sheet S1.1 – Structure P29 First Floor Plan S1.2 – Structure P29 Roof Plan S1.3 – Structure P32 Third Floor Plan S1.4 – Structure P32 Roof Plan S5.1 – Sections and Details

END OF SECTION 00 01 15

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – LIST OF DRAWING SHEETS 000115-1

SECTION 00 41 13 – BID FORM

1.1 UNIT PRICES AND PROPOSAL BREAKDOWN

A. The Owner or Owner’s Representative reserves the right to delete or to add work items during the term of this contract. The undersigned proposes the following unit prices for the base bid and for authorized changes in or additions to the base bid work. Said unit prices shall include all charges for incidental expenses or items necessary to complete the work shown on the project drawings and described in the project construction notes and sequencing, as well as for insurance, overhead and profit. The Owner or Owner’s Representative retains the right to accept or reject said unit prices. Breakdown unit prices into materials, equipment and all labor costs as shown in unit cost schedule.

1.2 UNIT COST SCHEDULE

A. The Unit Prices shown below are inclusive of materials, equipment, installation labor, insurance, and overhead and profit required to perform work items per drawings and specifications.

B. Unit price is an amount incorporated into the Bid Form, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

C. Unit Cost Schedule Notes:

1. The total of the bid items must equal the Base Bid amount.

2. The total Base Bid amount must not be exceeded without prior written authorization by the Owner or Owner’s Representative.

3. Construction Materials Services (Testing and Sampling) as required on this project will be conducted by SME. Do not include any costs for quality assurance services in the Base Bid amount.

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – BID FORM 004113-1

PARKING STRUCTURE P29 – BASE BID PROPOSAL

BIDDING ITEM
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.
Mobilization/General Conditions/Insurance/Permits
1
LS
2.
Traffic Control
1
LS
3.
Dust Control
1
LS
4.
Quantity Verification
1
LS
5.
Concrete Deck Repair (Roof Level) (up to six inches deep), Includes Traffic Coating Replacement

Refer to Detail 1/Sheet S5.1

1,000
SF
6.
Double Tee Flange Full-Depth Repair,

Refer to Detail 2/Sheet S5.1

500
SF
7.
Bollard Replacement (First Level – entrance),

Refer to Detail 4/Sheet S5.1

2
EA
8.
Southwest Staircase Repairs, Including:
8a.
Clean and Coat All Steel Stair Elements, All Levels
1
EA
8b.
Stair Landing Replacement,

Refer to Detail 7/Sheet S5.1

3
EA
8c.
Tread Replacement,

Refer to Detail 6/Sheet S5.1

8
EA
8d.
Bottom Tread Support Angle Repair,

Refer to Detail 5/Sheet S5.1

12
EA
9.
Southeast Staircase Repairs, Including:
9a.
Clean and Coat All Steel Stair Elements, All Levels
1
EA
9b.
Stair Landing Replacement,

Refer to Detail 7/Sheet S5.1

1
EA
9c.
Tread Replacement,

Refer to Detail 6/Sheet S5.1

4
EA
9d.
Bottom Tread Support Angle Repair,

Refer to Detail 5/Sheet S5.1

6
EA
10.
Drain and Piping Replacement,

Refer to Detail 8/Sheet S5.1

12
EA

TOTAL BASE BID:

Lump Sum (LS), Linear Foot (LF), Square Foot (SF), Each (EA)

PARKING STRUCTURE P32 – BASE BID PROPOSAL

BIDDING ITEM
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.
Mobilization/General Conditions/Insurance/Permits
1
LS
2.
Traffic Control
1
LS
3.
Dust Control
1
LS
4.
Quantity Verification
1
LS
5.
Double Tee Stem and Inverted Tee Edge Repairs,

Refer to Detail 16/Sheet S5.1

5
EA
6.
Horizontal Joint Sealant Replacement at Double Tee Longitudinal Joints,

Refer to Detail 14/Sheet S5.1

12,000
LF

TOTAL BASE BID:

Lump Sum (LS), Linear Foot (LF), Square Foot (SF), Each (EA)

END OF SECTION 00 41 13

SECTION 01 23 00 – ALTERNATES

PART 1 – GENERAL

1.2 SUMMARY

Notification: Immediately following award of Contract, prepare and distribute to each party involved notification of the status of each alternate. Indicate whether alternates have been accepted, rejected or deferred for consideration at a later date. Include a complete description of negotiated modifications to alternates, if any.

PART 2 – PRODUCTS (NOT APPLICABLE)

PART 3 – EXECUTION

1.3 SCHEDULE OF ALTERNATES

Alternate No. 1: Provide the add price to replace 425 shear connectors at double tee longitudinal joints at roof level of Parking Structure P29, Details 9, 10, & 11/Sheet S5.1.

Alternate No. 2: Provide the add price to seal replaced 5,000 lineal feet of horizontal joint sealant at double tee longitudinal joints with 12-inch wide traffic coating at roof level of Parking Structure P29, Detail 13/Sheet S5.1.

Alternate No. 3: Provide the add price to replace 160 lineal feet of expansion joint assemblies at roof level of Parking Structure P29, Detail 15/Sheet S5.1.

Alternate No. 4: Provide the add price to replace traffic coating for entire roof level of Parking Structure P29.

Alternate No. 5: Provide the add price to seal replaced 12,000 lineal feet of horizontal joint sealant at double tee longitudinal joints with 12-inch wide traffic coating at roof level of Parking Structure P32, Detail 13/Sheet S5.1.

Alternate No. 6: Provide the deduct price to only complete repairs for Parking Structure P29.

GRAND TOTAL ALTERNATES FOR THE PROJECT:

ALTERNATE NO. 1

ALTERNATE NO. 2

ALTERNATE NO. 3

ALTERNATE NO. 4

ALTERNATE NO. 5

ALTERNATE NO. 6

END OF SECTION 01 23 00

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – ALTERNATES 012300-1

SECTION 03 01 00 – MAINTENANCE OF CONCRETE

PART 1 – GENERAL

1.1 SUMMARY

A. Work includes conducting repairs to parking structure concrete elements with general extent of repairs indicated on drawings. This includes:

1. Concrete Spall/Delamination Repair: Locate and remove deteriorated concrete exhibiting spalling, delamination, crumbling, cracks, and voids to sound material. Properly prepare concrete and apply specified repair materials to restore concrete elements to original condition and appearance.

B. Related sections: Other specification sections, which directly relate to the work of this section and include, but are not limited to, the following:

1. Section 07 18 16 Vehicular Traffic Coatings.

2. Section 07 92 00 Joint Sealant.

C. Review site conditions to verify quantities prior to proceeding.

1.2 QUALITY ASSURANCE

A. Restoration Concrete Contractor Qualifications: A qualified restoration concrete Contractor, experienced in repairing and replacing structural concrete in whole and in part with minimum of ten years of prior successful experience on similar restoration projects. Experience only in new concrete work is insufficient experience for restoration work on this project.

B. Industry Standards: Except as otherwise shown or specified, comply with applicable recommendations and details in the latest editions of MDOT, ASTM, ACI and ICRI Publications.

C. Owner may employ and pay for services of an Engineer to conduct construction observation services or testing during restoration work to determine if materials and methods conform to specifications. Retesting of materials failing to pass designated specifications will be paid for by Contractor.

D. Advise Engineer and Owner's Representative sufficiently in advance of operations (at least 24 hours) to allow completion of quality tests and for the assignment of personnel.

1.3 SUBMITTALS

A. Detailed plan and schedule for restoration operations.

B. Concrete mix design with source and type of aggregates and admixtures to be used in mix and historical performance data for each submitted concrete mix design.

C. A complete list of materials proposed for use including names, sources, and product descriptions.

D. Product Data: Concrete repair material manufacturer’s literature (catalogue cuts) Including:

1. Written instructions for handling, mixing, and safety procedures.

2. Technical data including tested physical and performance properties, including:

a. Temperature ranges for storage and application of materials, and special warm/cold-weather application requirements or limitations.

b. Include recommended Site protection measures; and

c. Safety Data sheets.

E. Certificates:

1. Signed by repair material manufacturer, certifying that products furnished comply with requirements and are recommended by manufacturer for uses indicated.

2. Signed by repair material manufacturer, certifying that individual(s) performing work is approved to install its products.

F. Contractor Qualifications:

1. Evidence that Contractor’s existing company has minimum ten years of continuous experience in concrete restoration and application of specified materials. Provide a list of at least three representatives, successfully completed concrete restoration projects of similar scope and size, including:

a. Project name.

b. Owner’s name, Owner’s Representative name, address, and telephone number.

c. Description of work.

d. Project supervisor.

e. Total cost of restoration work and total cost of project.

f. Completion date.

2. Be an Authorized Applicator by the repair materials’ manufacturer.

G. Allow in schedule a minimum of seven working days for review of each submittal. Provide a submittal schedule prior to first submittal.

H. Review of submittals does not relieve Contractor of responsibility for checking prior to Engineer’s review. Submittal errors and omissions and submittals not conforming to Project Documents are grounds for rejection.

I. Submittals are an indication that Contractor understands design intent as required by Contract Documents. Contractor is responsible to ensure that construction is in accordance with latest Contract Documents. Submittal review is only to ascertain general compliance with Contract Documents. Review does not guarantee that submittals are correct, nor does it infer that their content can supersede information on Contract Documents.

J. Field verify dimensions and show on submittals to Engineer.

1.4 QUALITY ASSURANCE REQUIREMENTS

A. Personnel identified during prequalification process shall be the personnel conducting the Work.

B. Pre-installation Meeting:

1. Conduct meeting at Site: Contractor’s Site superintendent, repair-material manufacturer’s technical representative, Contractor’s foreman, Owner representative and Engineer to attend the site meeting.

2. Review requirements for restoration Work, including:

a. Safety protocol and tradesmen training.

b. Construction schedule.

c. Availability of materials, personnel, equipment, and facilities needed to make progress and avoid delays.

d. Site use, access, staging and set-up location/limitations.

e. Condition of other construction activity that will affect concrete restoration Work.

f. Testing and inspection requirements.

g. Site protection measures.

h. Governing regulations.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle materials according to manufacturer’s recommendations and in such manner as to prevent damage to materials and existing structure.

B. Deliver materials to Site in original containers with seals unbroken, labeled with manufacturer’s name; product brand name and type; date of manufacture; lot number; SPI hazardous rating and appropriate warnings for handling; and directions for storing and mixing.

C. Keep materials dry and do not allow materials to be exposed to moisture during transportation, storage, handling and installation. Reject and remove from Site new materials which exhibit evidence of moisture reaction during application or have been exposed to abuse or other deleterious materials.

D. Store materials in original, undamaged containers in clean, dry, protected location on raised platforms with weather-protective coverings, within temperature range required by injection-material manufacturer.

E. Limit stored materials on structures to safe loading capacity of structure at time materials are stored, and to avoid permanent deck deflection.

F. Conspicuously mark damaged or opened containers with contaminated materials and remove from Site as soon as possible. Dispose containers to legal dump site.

G. Remove and replace materials that cannot be installed within stated shelf life.

1.6 PROJECT CONDITIONS

A. Verify existing dimensions and any known utilities (buried drainpipes, electrical or telecom service) prior to start of concrete restoration Work. Notify Owner representative and Engineer, if conditions found to be different than those indicated in Contract Documents. Be aware of buried utilities, (drainpipes, electrical or telecom service) unknown at time of drilling/chipping.

B. If unusual or concealed conditions are discovered, stop work, and immediately notify owner representative and engineer in writing.

C. Provide adequate protection of structure and adjacent buildings during concrete restoration work.

1.7 FIELD SAMPLES (MOCKUPS)

A. Install at pre-selected areas as directed by engineer.

B. Provide mockups to include:

1. Concrete surface preparation for concrete repair and coating.

2. Concrete repair application.

3. Traffic coating system application.

4. Joint sealants.

C. Conduct adhesion tests on cured field samples to assess the adequacy of surface preparation method to be used during repair Work. Adjust application until required performance per manufacturers written recommendations is achieved.

1. Concrete Repair: Conduct three pull-off tests at cast mock-up in accordance with ASTM C1583/1583M and ICRI guide 210.3r-2022 – “guide for using in-situ tensile Pulloff tests to evaluate concrete surface repairs and bonded overlays”. Use average of test values to assess conformance with standards and guide’s requirements. Repair test core holes with approved repair concrete.

2. Coating: Conduct three pull-off tests at cast mock-up in accordance with ASTM D7234. Repair coating test locations using approved coating.

A. Owner representative or engineer will review technical aspects; surface preparation, application, and workmanship.

B. Field samples will be standard for judging workmanship on remainder of project.

C. Maintain field samples during construction for workmanship comparison.

D. Do not alter, move, or destroy field sample until work is completed and approved by owner’s representative or engineer.

E. Obtain engineer’s written approval of field sample before start of material application, including approval of aesthetics, performance, and appearance.

1.8 WARRANTY

A. Provide a two-year warranty for defects in workmanship and materials for restoration work after final acceptance by Owner. Replace defects in restoration work during this time period at no cost to Owner. This includes:

1. Repair concrete elements, including re-application of repair concrete and traffic coating, if present, that:

i. Do not comply with project requirements.

ii. Fail due to manufacturing or application defect.

2. Provide a Warranty including costs associated with:

i. Providing access to Warranty work.

ii. Providing protection to adjacent structure’s elements to remain.

iii. Removal and re-installation or replacement of topical application such as traffic coating and sealant as necessary to provide complete repair work.

PART 2 – MATERIALS

2.1 PRODUCTS

A. Source Limitations: Obtain concrete repair materials through single manufacturer as much as possible, and/or from sources approved by manufacturer of repair material.

B. Approved Products and Manufacturers/Suppliers:

1. Concrete Repair Materials:

APPLICATION TYPE
APPROVED PRODUCT

(MAPEI)

APPROVED ALTERNATE

(SIKA)

Form and Pour (Horizontal Surfaces – Parking Structure Deck)

PLANITOP 18 TG
SIKATOP-111 PLUS

Hand Patching Small Repair Areas Less Than 2 sq. ft. (Vertical and Overhead)

PLANITOP XS
SIKAQUICK VOH
Beam and Stem Form and Pour
PLANITOP 11SCC
SIKACRETE-211SCC PLUS
Reinforcement Coating
MAPEFER 1K
ARMATEC-110 EPOCEM

C. The pre-mixed patching concrete could be substituted for a conventional ready-mixed repair concrete for structural repair meeting MDOT “Type C” patching concrete in accordance with MDOT 2020 Standard Specifications for Constructions Sections 706 and 1006, meeting mixture proportions listed in Table 1006-1. Additionally, provide concrete repair mixture containing an integral corrosion inhibitor, such as CORTEC MCI MINI GRENADES or approved equivalent.

D. ABRASIVE NOSINGS

1. Cast-Metal Units: Cast iron, with an integral abrasive, as-cast finish.

2. Extruded Units: Aluminum units with abrasive filler in an epoxy-resin binder.

i. Provide ribbed units, with abrasive filler strips projecting 1/16 inch above aluminum extrusion.

3. Provide anchors for embedding units in concrete, either integral or applied to units, as standard with manufacturer.

4. Apply bituminous paint to concealed surfaces of cast-metal units set into concrete.

5. Apply clear lacquer to concealed surfaces of extruded units set into concrete.

PART 3 – EXECUTION

3.1 Deteriorated concrete removal and surface preparation.

A. Remove deteriorated concrete exhibiting spalling, delamination, crumbling, cracks, voids, and aggregate separation to sound material as indicated on drawings. Provide final prepared surfaces meeting ICRI concrete surface profile (CSP) CSP-8, utilizing wet abrasive blasting methods. Clean exposed reinforcing steel and other embedded steel items in accordance with SSPC SP-7, brush-off blast cleaning, and preparation standards.

B. Use of hand tools and hand-held power tools for demolition activities is permitted. Mechanical removal methods may be used to remove material to within 1/4-inch of specified final surfaces. After completing mechanical removal, conduct wet abrasive blasting method to remove bruised and micro-fractured final 1/4-inch, leaving a clean and abraded surface with open pores and reinforcing conforming to required surface treatment, i.e. ICRI CSP-8. Acceptable processes include:

1. Pointed gads and chisel heads less than 1-1/2-inches in width driven by hand-held hammers with maximum head weight of 10 lbs.

2. Pneumatic chipping tools that are a maximum of 15 lbs. with pointed gads or chisel heads no-larger than 1-1/2-inches in width.

3. Electric powered reciprocating or impact hammer drills with or without rotation of pointed gads or chisels where maximum width of chisel heads shall be 2-inches.

4. Use of scrabbler, scarifying, milling, plaining and mobile or equipment mounted breaking apparatus are prohibited.

5. Use of processes which require application of heat, acids, or other chemicals are prohibited.

C. Saw-cut horizontal and vertical edges of repairs to a depth of 1/2-inch, perpendicular to surface or slightly undercut using diamond blades and pneumatic or electric powered equipment to expose clean reinforcement. Where edges cannot be cut due to restricted access or presence of reinforcing steel, chip or hydro-blast a minimum of 1/2-inch deep and as nearly perpendicular to exterior face as possible. Under no circumstances is saw-cutting permitted to make contact with reinforcing steel. Damage to reinforcing can undermine structural integrity and result in unsafe conditions and damage to elements to remain. Contractor is responsible to maintain safe conditions and repair any damaged caused during work.

D. Where removal exposes reinforcing steel, carry depth of removal behind reinforcing steel for a minimum 3/4 to 1 inch to provide adequate coverage for mechanical bonding of repair materials to existing reinforcing.

E. Install epoxy coated steel reinforcement, conforming to ASTM A615-96A, Grade 60, to supplement or replace existing exposed reinforcing steel which has deteriorated more than 20% in cross-sectional area or has failed. Replace with same size as original reinforcing steel or as noted in restoration details. Place reinforcement following MDOT 2020 Standard Specifications for Construction Section 706.03.E.

F. Provide reinforcing bar lap splice and development lengths in accordance with ACI 318-14.

Reinforcing Bar Size
#3
#4
#5
#6
Min. Straight Development Length, inch
14
18
22
26
Min. Straight Lap Length, inch
16
22
28
32

G. Concrete cover for reinforcement shall be as follows, u.n.o.:

1. Concrete cast against and exposed to earth (footing bottoms): 3 inches.

2. Concrete surfaces exposed to earth or weather: 1-1/2 inches.

H. Prior to termination of demolition activities and installation of repair materials, provide timely notice and access to Engineer for verification that removal of distressed concrete materials is complete and sufficient. Provide Engineer with unrestricted access and, if necessary, labor assistance at no additional expense.

3.2 REPAIR MATERIAL APPLICATION AND CURING

A. Deposit concrete repair mix into the formwork in a manner to require as little rehandling as possible. Place in a continuous manner throughout repaired area without use of intermediate bulkheads.

B. Thoroughly consolidate repair concrete mix against and along faces of forms and along full length of exposed repair region in addition to other embedded items.

C. Maintain concrete at minimum 50 degrees Fahrenheit for minimum 5 days after placement. Maintain concrete temperature less than 90 degrees Fahrenheit.

D. Remove forms after concrete has reached a minimum 3000 psi compressive strength and not less than 5 days of curing. Remove sharp projections, dress offsets to form a smooth transitional surface, and sack rub or grout clean surfaces to obtain uniform color and texture. Vertical and horizontal deviation from established plane shall not exceed + 3/16-inch at any point.

E. Carefully remove forms to avoid damage to placement. Repair damage and honeycombed areas with patching concrete specified.

F. Wet-cure repair concrete using polyethylene films and burlap sheeting as follows: entirely cover top surface and sides of placement concrete with polyethylene and burlap sheets. At polyethylene sheet splices, lap at least 18-inches. Place and weight polyethylene and burlap sheeting to remain in contact with surface covered. Unless otherwise specified, maintain sheeting in place for a minimum 5 days after concrete has been placed and thoroughly and continuously soaked with water.

G. Remove sharp projection, dress offsets to form a smooth transitional surface, and sack rub or grout clean surfaces to obtain uniform color and texture. Vertical and horizontal deviation from established plan shall not exceed acceptable placement tolerances in accordance with 2020 MDOT Standard Specifications for Construction. Carefully remove forms to avoid damage to the placement. Repair damage and honeycombed areas with the patching concrete specified.

H. Apply new concrete coating where present to match existing coating system color and texture.

3.3 PROTECTION

A. Protect existing surfaces from concrete and coating restoration Work in progress and from mechanical damage due to chipping operations, scaffolding, and/or methods of work and other equipment.

B. Limit access to Work areas. Always wear PPE equipment when using fluids and air under pressure. Wear gloves to avoid skin contact with unreacted grouts. Follow all OSHA and Site Safety protocols.

3.4 CLEANING

A. Protect existing adjacent building surface finish(s) during restoration work.

B. Clean concrete surfaces adjoining, and wash free of stains, discoloration, dirt and other foreign material just prior to final inspection.

1. Allow repair material enough time to cure before performing cleanup.

2. Clean surfaces by grinding or other means.

C. Clean up all areas and remove all debris, rubbish and excess from the site which may have been caused by the work of this Section.

END OF SECTION 03 01 00

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – MAINTENANCE OF CONCRETE 030100-1

SECTION 07 18 16 – VEHICULAR TRAFFIC COATINGS

PART 1 – GENERAL

1.1 SUMMARY

A. Work includes removal of existing traffic coating and installation of new waterproofing, traffic bearing membrane system per limits indicated on drawings.

B. Related sections: other specification sections, which directly relate to the work of this section and include, but are not limited to, the following:

3. Section 03 01 00 Maintenance of Concrete.

4. Section 07 92 00 Joint Sealant.

C. Review site conditions to verify quantities prior to proceeding.

1.2 QUALITY ASSURANCE

A. Restoration traffic coating contractor qualifications: a qualified restoration traffic coating contractor, experienced in repairing and replacing concrete traffic coating in whole and in part with minimum of ten years of prior successful experience on similar restoration projects.

B. Industry standards: except as otherwise shown or specified, comply with applicable recommendations and details in the latest editions of MDOT, ASTM, ACI and ICRI publications.

C. Owner may employ and pay for services of an engineer to conduct construction observation services or testing during restoration work to determine if materials and methods conform to specifications. Retesting of materials failing to pass designated specifications will be paid for by contractor.

D. Advise engineer and owner's representative sufficiently in advance of operations (at least 24 hours) to allow completion of quality tests and for the assignment of personnel.

1.3 SUBMITTALS

A. Detailed plan and schedule for restoration operations.

B. Product Data: Coating system material manufacturer’s literature (catalogue cuts) Including:

1. Written instructions for handling, mixing, and safety procedures.

2. Technical data including tested physical and performance properties, including:

a. Temperature ranges for storage and application of materials, and special warm/cold-weather application requirements or limitations.

b. Include recommended Site protection measures, and

c. Safety Data sheets.

C. Samples: Submit samples of specified vehicular traffic coating system. Samples shall be construed as examples of finished color and texture of the system only.

D. Applicator Approval: Submit letter from manufacturer stating applicator is approved to install the specified vehicular traffic coating system.

E. Warranty: Submit copy of manufacturer's standard warranty.

F. Certificates:

1. Signed by repair material manufacturer, certifying that products furnished comply with requirements and are recommended by manufacturer for uses indicated.

2. Signed by repair material manufacturer, certifying that individual(s) performing work is approved to install its products.

G. Allow in schedule a minimum of seven working days for review of each submittal. Provide a submittal schedule prior to first submittal.

H. Review of submittals does not relieve Contractor of responsibility for submittal review and approval prior to Engineer’s review. Submittal errors and omissions and submittals not conforming to Project Documents are grounds for rejection.

I. Submittals are an indication that Contractor understands design intent as required by Contract Documents. Contractor is responsible to ensure that construction is in accordance with latest Contract Documents. Submittal review is only to ascertain general compliance with Contract Documents. Review does not guarantee that submittals are correct, nor does it infer that their content can supersede information on Contract Documents.

J. Field verify dimensions and show on submittals to Engineer.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle materials according to manufacturer’s recommendations and in such manner as to prevent damage to materials and existing structure.

B. Deliver materials to Site in original containers with seals unbroken, labeled with manufacturer’s name; product brand name and type; date of manufacture; lot number; SPI hazardous rating and appropriate warnings for handling; and directions for storing and mixing.

C. Keep materials dry and do not allow materials to be exposed to moisture during transportation, storage, handling and installation. Reject and remove from Site new materials which exhibit evidence of moisture reaction during application or have been exposed to abuse or other deleterious materials.

D. Store materials in original, undamaged containers in clean, dry, protected location on raised platforms with weather-protective coverings, within temperature range required by injection-material manufacturer.

E. Limit stored materials on structures to safe loading capacity of structure at time materials are stored, and to avoid permanent deck deflection.

F. Conspicuously mark damaged or opened containers with contaminated materials and remove from Site as soon as possible. Dispose containers to legal dump site.

G. Remove and replace materials that cannot be installed within stated shelf life.

1.5 PROJECT CONDITIONS

A. Verify existing dimensions and any known utilities (buried drainpipes, electrical or telecom service) prior to start of concrete restoration Work. Notify Owner representative and Engineer, if conditions found to be different than those indicated in Contract Documents. Be aware of buried utilities, (drainpipes, electrical or telecom service) unknown at time of drilling/chipping.

B. If unusual or concealed conditions are discovered, stop work, and immediately notify owner representative and engineer in writing.

C. Provide adequate protection of structure and adjacent buildings during concrete restoration work.

D. Only proceed with application of materials when substrate temperature is 40°F/4°C or greater. Do not proceed if precipitation is imminent. Only apply to dry, clean surfaces; do not apply to damp, dirty, or frosty surfaces. Ambient temperature should be a minimum 40°F/4°C and rising, and more than 5°F/3°C above dew point. Take special precautions when ambient and/or substrate temperatures are approaching, at, or above 100°F/38°C; it may be necessary to limit material application to evening hours for exterior exposed decks.

E. Coordinate waterproofing work with other trades. Applicator shall have sole right of access to the specified area for the time needed to complete the application and allow the vehicular traffic coatings to cure adequately.

F. Keep products away from spark or flame. Do use equipment which may produce sparks during application and until all vapors have dissipated. Post "no smoking" signs.

1.6 FIELD SAMPLES (MOCKUPS)

A. Install a field sample of at least 100 square feet at the project site or pre-selected area as agreed to by owner's representative, applicator and manufacturer.

B. Provide mockups to include:

1. Concrete surface preparation for coating.

2. Traffic coating system application.

3. Joint sealants.

C. Conduct adhesion tests on cured field samples. Adjust application until required performance per manufacturers written recommendations is achieved.

D. Owner representative or engineer will review technical aspects; surface preparation, application, and workmanship.

E. Field samples will be standard for judging workmanship on remainder of project.

F. Maintain field samples during construction for workmanship comparison.

G. Do not alter, move, or destroy field sample until work is completed and approved by owner’s representative or engineer.

H. Obtain engineer’s written approval of field sample before start of material application, including approval of aesthetics, performance, and appearance.

1.7 WARRANTY

1. Manufacturer's Warranty for traffic coating system: written Warranty in which manufacturer agrees to provide cost of labor and materials for traffic coating repair installations that fail due to defects in materials or workmanship within specified Warranty period.

C. Installer’s Warranty: submit traffic coating installer’s Warranty, on Warranty form acceptable to Owner, signed by installer, covering the work of this section, for the following Warranty period:

1. Warranty period: five years from date of substantial completion.

2. Repair applied traffic coating that:

i. Do not comply with project requirements.

ii. Fail due to manufacturing or application defect.

iii. General durability, including cracks, blistering and peeling, pinholing, checks, fades, chalks, or adhesion or cohesion failures.

iv. Deteriorate due to improper surface preparation or in manner not clearly specified by submitted traffic coating manufacturer’s data as inherent quality of material for application indicated.

3. Provide a Warranty including costs associated with:

i. Providing access to Warranty work.

ii. Providing protection to adjacent structure’s elements to remain.

iii. Removal and re-installation or replacement of sealant to provide complete repair work.

iv. Surface preparation work.

4. Provide new, repair traffic coating materials closely matching color and texture of the applied traffic coating system. Extend new, repair application to reveals, surface edges, or other natural termination points to minimize differences in appearance between new and existing traffic coating system.

PART 2 – MATERIALS

2.1 PRODUCTS

A. Source Limitations: Obtain traffic coating system materials through single manufacturer as much as possible, and/or from sources approved by manufacturer of coating material.

B. Approved Products and Manufacturers/Suppliers:

1. Auto-Gard E Urethane/Epoxy Hybrid System by Neogard, a part of Hempel, 2728 Empire Central, Dallas, TX 75235, (800) 321-6588, www.neogard.com.

2. Materials:

i. Auto-Gard E Materials (Hempel product numbers in parentheses):

· Primer: Concrete and metal primers as required by Neogard.

· Flashing Tape: 86218 (62ZJB) flashing tape.

· Reinforcing Fabric: 86220 (63BJB) reinforcing fabric (Tietex T-272).

· Sealant: 70991 (47XJB) urethane sealant.

· Aggregate: Aggregate (choose one):

a. 7992-U (66EJB) silica quartz sand.

b. #16 aluminum oxide.

· Base Coat: FC7500/FC7960 (45063) urethane.

· Wear Coat: 70714/70715-09 (45062) pigmented 100% solids epoxy.

· Topcoat: FC7540/FC7964 (47QJB) aliphatic urethane.

PART 3 – EXECUTION

3.1 SURFACE PREPARATION AND APPLICATION

A. Examine existing parking deck substrates, with installer present, for compliance with requirements and for other conditions affecting application and performance of traffic coating system.

1. For the record, prepare written report, endorsed by installer, listing conditions detrimental to performance.

2. Verify compatibility with and suitability of substrates.

B. Clean surfaces using a stiff bristle broom and a strong non-sudsing detergent such as Neogard 8500 biodegradable cleaner (089jb). Thoroughly wash, clean, and dry. Areas where oil or other contaminants penetrate deep into the concrete may require removal by mechanical methods.

C. Remove deteriorated traffic coating system and mechanically prepare surface by shot-blasting to industry standard surface texture meeting ICRI CSP 3 to 4 without causing additional surface defects.

D. Verify that concrete substrate is dry and free of moisture, steel shot media, dust and other contaminants that could impair bonding of traffic coating. Test for surface contaminants and moisture as follows:

1. Wipe testing using a dark color cloth to check for surface cleanliness and visible surface contaminants in accordance with testing procedure for evaluating the degree of chalking paint per ASTM D4214.

2. Water – break testing to check for oil contaminants in accordance with ASTM F22.

3. Moisture testing using the plastic sheet method in accordance with ASTM D4263.

4. Apply an 18-inch square, 4-mil plastic sheet to cleaned concrete substrate in order to qualitatively assess moisture condition. Applied plastic sheets to be assessed for moisture presence after 16 hours, per ASTM D4263.

E. Engage the traffic coating manufacturer’s representative to examine substrate to ensure that it is properly prepared and ready to receive traffic coating system.

1. Traffic coating manufacturer’s representative shall report in writing to applicator and Engineer, conditions that may adversely affect roofing system application or performance and recommend corrections.

2. Do not proceed with traffic coating system application until unsatisfactory conditions have been corrected and reviewed by Engineer.

F. Repair holes and treat cracks and allow to cure before installation of traffic coating system.

G. Do not apply materials to damp, wet, or contaminated substrates. Perform concrete moisture test in accordance with ASTM D4263, standard test method for indicating moisture in concrete by the plastic sheet method, prior to installation.

H. Do not apply when substrates are over 110 degrees Fahrenheit or under 40 degrees Fahrenheit. Do not apply in rain or when rain is expected within 24 hours.

I. Make test application to evaluate the bond of the traffic coating system in accordance with the manufacturer’s recommendations, or as described by ASTM D4541, standard test method for pull-off strength of coatings using portable adhesion testers.

J. Provide the following surface prestriping and detailing when applicable:

1. Prestripe with primer 1-inch beyond surfaces that require detail work.

2. For non-moving joints and cracks less than 1/16-inch wide, apply 25 wet mils prestriping of base coat over cured primer. Apply base coat to fill and overlap joint or crack 3-inches on each side. Feather the edges.

3. Rout dynamic cracks and joints over 1/16-inch wide to a minimum of 1/4-inch by 1/4-inch. Install bond breaker tape to prevent adhesion to bottom of joint. Prime joint faces only with sealant primer and fill with sealant. Fill joints deeper than 1/4-inch with backer rod and deep joint sealant. For cracks, tool sealant flush with adjacent surface. For expansion joints, tool sealant slightly concave.

4. Coat over sealed joints 1-inch or less with deck coating system.

5. Where coating system will be terminated and no wall, joint, or other break exists, cut 1/4-inch by 1/4-inch keyway into concrete. Fill and coat keyway as application of base coat progresses.

3.2 PROTECTION

A. Protect traffic coating system from damage and wear during remainder of construction period.

B. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

C. Do not dump any excess or waste materials into drains or on the ground.

D. Limit access to Work areas. Always wear PPE equipment when using fluids and air under pressure. Wear gloves to avoid skin contact with unreacted grouts. Follow all OSHA and Site Safety protocols.

3.3 CLOSEOUT AND CLEANING

A. Correction of Work: Work that does not conform to specified requirements including tolerances, colors, and finishes shall be corrected and/or replaced. Any deficiencies of traffic coating application noted during the final punchlist inspections shall be corrected and/or replaced at contractor’s expense.

B. Clean concrete surfaces adjoining, and wash free of stains, discoloration, dirt and other foreign material just prior to final inspection.

1. Allow repair material enough time to cure before performing cleanup.

2. Clean surfaces by grinding or other means.

C. Clean up all areas and remove all debris, rubbish and excess from the site which may have been caused by the work of this Section.

3.4 ONE-YEAR INSPECTION

A. Owner will set date for one-year inspection of traffic coating system.

B. Owner, Contractor, Engineer, and Manufacturer’s representative shall attend inspection.

C. Repair deficiencies in completed traffic coating systems as determined by Engineer in accordance with Manufacturer’s instructions.

END OF SECTION 07 18 16

2024 OU P29/P32 PARKING STRUCTURES REPAIRS

SME PROJECT NUMBER 093986.00 – VEHICULAR TRAFFIC COATINGS 071816-6

SECTION 07 92 00 - JOINT SEALANTS

1. GENERAL

SUMMARY

Section Includes:

Silicone joint sealants.

PREINSTALLATION MEETINGS

Preinstallation Conference: Conduct conference at the Project Site.

ACTION SUBMITTALS

Product Data: For each joint-sealant product.

Samples: For each kind and color of joint sealant required.

INFORMATIONAL SUBMITTALS

Product test reports.

Preconstruction testing reports.

Sample warranties.

QUALITY ASSURANCE

Installer Qualifications: An authorized representative who is trained and approved by manufacturer.

PRECONSTRUCTION TESTING

Preconstruction Field-Adhesion Testing: Before installing sealants, field test their adhesion to Project joint substrates. Test joint sealants according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1.1 in ASTM C 1193 or Method A, Tail Procedure, in ASTM C 1521.

FIELD CONDITIONS

Do not proceed with installation of joint sealants under the following conditions:

When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer.

When joint substrates are wet.

Where joint widths are less than allowed by joint-sealant manufacturer for applications indicated.

Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.

WARRANTY

Special Installer's Warranty: Installer agrees to repair or replace joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.

Warranty Period: Two years from date of Substantial Completion.

Special Manufacturer's Warranty: Manufacturer agrees to furnish joint sealants to repair or replace those joint sealants that do not comply with performance and other requirements specified in this Section within specified warranty period.

Warranty Period: Five years from date of Substantial Completion.

Special warranties specified in this article exclude deterioration or failure of joint sealants from the following:

Movement of the structure caused by stresses on the sealant exceeding sealant manufacturer’s written specifications for sealant elongation and compression.

Disintegration of joint substrates from causes exceeding design specifications.

Mechanical damage caused by individuals, tools, or other outside agents.

Change in sealant appearance caused by accumulation of dirt or other atmospheric contaminants.

PRODUCTS

JOINT SEALANTS, GENERAL

Colors of Exposed Joint Sealants: As selected by Owner from manufacturer's full range.

Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint sealant manufacturer, based on testing and field experience.

NONSTAINING SILICONE JOINT SEALANTS

Nonstaining Joint Sealants: No staining of substrates when tested according to ASTM C 1248.

Silicone, Nonstaining, S, NS, 100/50, NT: Single-component, nonsag, plus 100 percent and minus 50 percent movement capability, nontraffic-use, neutral-curing silicone joint sealant; ASTM C 920, Type S, Grade NS, Class 100/50, Use NT.

Products: Subject to compliance with requirements, provide one of the following:

DOWSIL 790 and 795 - manufactured by Dow Corning Corporation Control joints and sealant between sheet metal and masonry: DOWSIL 790 Window Needle Glazing: DOWSIL 795

JOINT-SEALANT BACKING

Cylindrical Sealant Backings: ASTM C1330, Type B, bi-cellular material with a surface skin as approved in writing by joint-sealant manufacturer for joint application indicated, and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.

Install joint backing to maintain the following joint ratios:

Joints up to 1/2-inch-wide: 1:1 width to depth ratio.

Joints greater than 1/2-inch-wide: 2:1 width to depth ratio; maximum 1/2-inch joint depth.

Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer.

MISCELLANEOUS MATERIALS

Primer: Material recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.

Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials.

Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.

EXECUTION

EXAMINATION

Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting performance of the Work.

Proceed with installation only after unsatisfactory conditions have been corrected.

PREPARATION

Removal of Failed Joint Sealant Materials: Cut out and remove joint materials and associated backing materials as indicated on the drawings or identified by the Consultant.

Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:

Remove foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.

Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion.

Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods in addition to solvent cleaning to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air.

Remove laitance and form-release agents from concrete.

Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience.

Masking: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces to prevent staining or damage.

INSTALLATION OF JOINT SEALANTS

General: Comply with ASTM C 1193 and joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.

Install sealant backings of kind indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.

Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.

Install sealants using proven techniques that comply with the following and at the same time backings are installed:

Place sealants so they directly contact and fully wet joint substrates.

Completely fill recesses in each joint configuration.

Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.

Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants to form smooth, uniform beads of configuration indicated. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.

Remove excess sealant from surfaces adjacent to joints.

Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.

Provide concave joint profile per Figure 8A in ASTM C 1193 unless otherwise indicated.

FIELD QUALITY CONTROL

Tests and Inspections:

Field-Adhesion Testing: Field test joint-sealant adhesion to joint substrates as follows:

Extent of Testing: Test completed and cured sealant joints as follows:

Perform one test for each 1000 ft. of joint length thereafter.

Test Method: Test joint sealants in accordance with Method A, Tail Procedure, in ASTM C1521.

For joints with dissimilar substrates, verify adhesion to each substrate separately; extend cut along one side, verifying adhesion to opposite side. Repeat procedure for opposite side.

Inspect tested joints and report on the following:

Whether sealants filled joint cavities and are free of voids.

Whether sealant dimensions and configurations comply with specified requirements.

Whether sealants in joints connected to pulled-out portion failed to adhere to joint substrates or tore cohesively. Include data on pull distance used to test each kind of product and joint substrate. Compare these results to determine if adhesion complies with sealant manufacturer's field-adhesion hand-pull test criteria.

Record test results in a field-adhesion-test log.

This is the start of the file's text. The full file is on GovTribe.