Specs Modular Cone Penetrometer Sounding System 1.docx

DOCX document 550 KB Posted

Attached to
D7 Modular Cone Penetrometer System
Solicitation number
26-494DOT-FINAD-B-49174
Issued by
Edwards County, Illinois

About this file

This document is a state-level procurement specification from the Illinois Department of Transportation (IDOT) Bureau of Business Services for a 20-Ton Modular Cone Penetrometer Testing System, targeting May 2025. The specification outlines detailed requirements for a hydraulically powered CPT (Cone Penetrometer Testing) push/pull system with specific technical specifications, including a 20-ton push capacity, 25-ton pull capacity, 44-inch rod stroke, and comprehensive cone system components. The solicitation requires bidders to submit descriptive literature, specifications, and a completed questionnaire, with bids only accepted from established manufacturers or authorized dealers.

The procurement includes specific equipment requirements such as two 10.0 cm2 Hogentogler equivalent SCPTU cones, 150 feet of push rod, a data acquisition system, a rugged field laptop, and associated accessories. The specification mandates a minimum 12-month full coverage warranty, on-site training by qualified personnel within 15 days of delivery, and the ability to provide parts and service within Illinois. Bidders must demonstrate the equipment's capabilities upon request and provide comprehensive documentation including service repair manuals, operators' manuals, and parts lists. The document emphasizes the importance of equipment compatibility, operational readiness, and the ability to perform precise geological testing and data collection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Illinois Department of Transportation Bureau of Business Services Specifications and Questionnaire for a 20-Ton Modular Cone Penetrometer Testing System May 2025

This specification and questionnaire covers a 20-ton modular CPT system for use by the Department of Transportation. To improve parts and service availability and increase tool life, the Department of Transportation is specifying units and accessories as outlined below.

Each bidder shall submit with their bid descriptive literature and specifications describing all the equipment proposed. This information shall be clearly marked to indicate the make, model, and accessories proposed to be furnished.

· The manufacturer of the equipment proposed has been actively involved in the manufacture of the equipment called for in the questionnaire for a period of not less than 5 years.

· Parts and service for the equipment proposed are readily available within the State of Illinois.

It is the responsibility of each bidder to complete and return this questionnaire with the bid.

Unless otherwise specified, the proposed equipment shall be complete in all parts and ready for immediate use upon delivery.

Bidders are advised to carefully read these specifications as changes have been made since the last solicitation issue.

Proposed with this Bid:

Make: Model:

Manufactured By:

Bidder:

Telephone:

Contact Name:

Email:

Specification No.

Bids will only be accepted from established manufacturers or their authorized dealers. Any dealer submitting a bid hereby guarantees that it is an authorized dealer of the manufacturer and that the manufacturer has agreed to supply the dealer with all quantities of products required by the dealer in fulfillment of its obligations under any resultant contract with the State. Bidder must submit authorized dealer letter upon request.

Warranty:

Unless otherwise specified, Manufacturers’ standard warranty shall be provided. Bidder shall attach copies of warranty with their bid. Warranty shall commence at the Illinois Department of Transportation in-service date. If any equipment fails to conform to the warranties during the applicable warranty period, the Vendor or Manufacturer will adjust, repair or replace the equipment at no charge to the Department as soon as possible upon notice from the Department.

The Vendor may provide or perform warranty service at a dealer location within the Districts geographic region if on-site repair is not possible. Vendor shall facilitate pickup and delivery of equipment at Vendor's cost if warranty repair(s) are made off-site during the warranty period. The contract Vendor is responsible for any failure of their allied or sub-contractors’ fulfillment of said warranties.

Delivery:

It will be the responsibility of the successful vendor to guarantee delivery within the quoted time and to require allied manufacturers or suppliers to complete the installation of auxiliary equipment in accordance with the quoted delivery time.

All equipment provided by the Vendor shall be fully operational when delivery is made. Any noted defects at the time of delivery shall be addressed by Vendor in the first 30 days of in-service.

Bidder/Vendor acknowledges the requirements above. Yes |_| No |_| Bidder/Vendor Initials: Date:

Note: If the equipment proposed exceeds the minimums called for in the specification please do not mark NO. Mark Yes and explain with a short comment on how it exceeds.

Specific Specifications and Questionnaire for a 20-Ton Modular Cone Penetrometer Testing System Specification No.

CPT Push/Pull System:

The CPT modular push system shall be hydraulically powered with quick disconnect supply hoses allowing for interchangeability between a variety of common equipment (i.e. skidsteer, compact loader, telehandler, etc.). The modular system should be outfitted for both 10 and 15 cm2 products. The frame design shall incorporate dual hydraulic leveling legs and helical anchors and meet the following minimum requirements:

· 20 tons of push capacity

· 25 tons of pull capacity

· 44” of rod stroke

· 2 Motorized Anchor heads

· Dual manual leveling legs

· Dual hydraulic double stroke helical anchors (15” min.)

· One set of anchor extensions

· 85,000 lb capacity hydraulic bottom rod clamp with smooth jaws

· Detachable rod rack

· Hydraulic valves with manual controls and pressure gauges

· ASTM dedicated push lever

· Universal quick attach plate

Push capacity:

Pull capacity:

Rod stroke:

Anchor Size:

Complies: Yes |_| No |_| Controls shall be located so that operator has unobstructed view of testing operations. Controls shall consist of a multifunction joystick or multiple levers for functions.

Complies: Yes |_| No |_| A speed control feature shall be included to allow the operator to advance the probe at 2 cm/s as recommended by ASTM.

Complies: Yes |_| No |_| Operators station shall include a shelf or area on control dash to place a field laptop or data acquisition equipment.

Complies:Yes |_| No |_| Not Available |_| Cone System:

The cone system shall be complete with all components necessary to perform and transmit data to a data acquisition system. The cone system shall be pre-calibrated with the data acquisition system described later in the specification. The following components at a minimum shall be supplied with the modular CPT system.

Component List:

· Two (2) – 10.0 cm² Hogentogler equivalent SCPTU cones with 10 ton push capacity. Capable of recording:

· Tip Resistance

· Local Friction (skin friction)

· Pore Water Pressure

· Shear Wave collection for seismic application

· Inclination

· 150 Feet of Push rod with the required diameter that matches the cone

· One (1) - Cone adapter (if required) Cone to Rod

· One (1) - Friction Reduction Ring for Push rod

· One (1) - Spool of CPT cable, 150’+ min. with storage

· One (1) - Depth measuring device to determine real time depth of cone

· Two (2) - Seismic strike plates with two triggers and strike hammer

· One (1) - Rod wiper donut and holder Any component not called for in the minimum list above required to complete the system shall be included.

Complies: Yes |_| No |_| Exception |_|

If NO or exception to any portion, please explain:

The following items shall be provided at a minimum for replacement or repair needs:

· Two (2) – Spare cone tips

· Two (2) – Friction sleeves

· One (1) – Spool of CPT cable 150’+

· 100 count of u2 pore water pressure filter elements, pre-saturated

· 10 count of C-clip if required for CPT probe

· 50 count of each size O-ring, X-ring, gaskets or seals for probe

· One (1) – Field service kit with carrying case, complete with any tools for field service repairs to the system or supporting equipment.

Complies: Yes |_| No |_|

CPT Data Acquisition and Interface System:

The following components shall be compatible with the cone system provided, pre-calibrated and ready for use upon delivery:

· One (1) – Data Acquisition Unit and carrying case

· All cables to interface with CPT probe and Data Acquisition unit

· Capability of interfacing with GPS to record test location

· Switching unit and cables for seismic strike plate and trigger Complies: Yes |_| No |_| Component provided:

Make: Model:

If NO or exception to any portion, please explain:

· One (1) – Rugged Field Laptop computer with carrying case

· Minimum 4 gig of ram

· Latest version of software and license to interface with Data Acquisition unit

· All cables required for connection between laptop and acquisition unit

· GPS interface to record test location

· If system requires Bluetooth/wifi connectivity or external flash drive it shall be included Complies:Yes |_| No |_| Exception |_| Component provided:

Make: Model:

If NO or exception to any portion, please explain:

Finish:

All exterior surfaces normally powder coated or painted shall be manufacturer's standard color.

Complies: Yes |_| No |_|

The above specifications will be the same for all CPT units.

District Body Configuration and Options:

Listed below are the requirements for the requesting District’s unit. Some options may be in “Lieu of” or “in Addition to” the base specification.

District 7

Manuals:

One copy of the service repair manual shall be included at delivery of each unit.

Complies: Yes |_| No |_| Three copies of all operators’ manuals, parts lists, and warranty information shall be provided at time of delivery to each district receiving one or more units.

Complies: Yes |_| No |_| Note: The manuals, parts lists, and service or shop manuals listed above may be furnished on flash drive in lieu of paper.

Requirements Covering Items Detailed Above:

All equipment cataloged as standard or safety related shall be furnished and in place and shall be included in the purchase price of the unit. Any parts, tools, and/or accessories not specifically called for but required for proper operation shall be provided.

Complies: Yes |_| No |_| The component parts of the unit shall be of proper size and design to safely withstand maximum stresses imposed by a capacity load, and the manufacturers rated loads for components shall not be exceeded when the unit is loaded with such loads.

Complies: Yes |_| No |_| Standard tool kits shall be supplied if needed.

Complies: Yes |_| No |_| Not required |_|

If NO to any portion, please explain:

Warranty:

Full coverage warranty for a minimum 12 months shall be provided. Bidder shall attach copy of warranty with bid.

Complies: Yes |_| No |_|

Describe warranty:

Since the continuous operation of this equipment is of the utmost importance and sometimes of an emergency nature, it is necessary that the successful bidder be in a position to render prompt parts and service within the State of Illinois.

List sources for parts and Service

The bidder or manufacturer of the unit which is considered for award shall, at the request of the State of Illinois, demonstrate this equipment within the receiving District in the State of Illinois and in the presence of authorized IDOT personnel to prove out any features which may be in question.

Training:

Instruction shall be performed by qualified factory or dealer personnel covering the operation and routine service and maintenance of the machine shall be performed upon delivery or agreed date within 15 days of delivery.

The training shall be for all personnel in the assigned headquarters location of the machine. More than a single day may be required to satisfy this requirement.

Describe Training:

Note: This is not a sales call. Training not meeting IDOT expectations will be cause to generate a “Complaint- to-Vendor”.

Delivery:

This equipment is to be delivered in first-class operating condition with acceptance subject to Department of Transportation inspection and approval.

Bid Response:

Bidders will need to send copies of each of the following with their bid response.

a) Specification Questionnaire

b) Descriptive Literature

Picture is for visual reference only. Bid per specification.

image1.png

File details come from the government source that posted it. Updated .