Specs Kane EF Roof.docx
DOCX document 59 KB Posted
- Attached to
- Kane Experimental Forest Roof Replacements
- Solicitation number
- 12445525Q0105
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a comprehensive set of technical specifications for the Kane Experimental Forest Roof Replacements project issued by the USDA Forest Service's Northern Research Station. The project involves removing and replacing approximately 7,100 square feet of asphalt shingle roofing across six buildings located in Kane, Pennsylvania. The scope of work includes complete roof system replacement, including synthetic underlayment, architectural shingles, drip edge, valley/ridge shingles, step flashings, and penetration flashings, with provisions for potential sheathing and support replacement as needed. An additional line item allows for replacement of damaged roof sheathing and supports, which will be approved by the Contracting Officer's Representative (COR).
The solicitation requires a single prime contractor to perform the work, with specific technical requirements detailed across multiple specification sections covering demolition, carpentry, roofing, and site restoration. Key technical specifications include using Owen's Corning Duration architectural shingles in Chateau Green, synthetic underlayment, and adherence to specific installation methods. The project includes provisions for weed and disease prevention, construction waste management, and post-construction seeding. Work is to be performed between 7:00 a.m. and 5:00 p.m., Monday through Thursday, with Davis-Bacon wage rates applicable. The primary contacts are Ray White (Contracting Officer's Representative) and Julie Smithbauer (Site Contact), both from the USDA Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Map Kane EF Roof.docx | DOCX document | |
| SF 1442.pdf | ||
| SOI IGCE Kane EF Roof.xlsx | XLSX spreadsheet | |
| SOW Kane EF Roof.docx | DOCX document | |
| DB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Northern Research Station NRS Kane EF Roof Replacements Specifications
| 011000 – Summary | 2 |
| 013300 – Submittal Procedures | 5 |
| 017100 – Weed and Disease Prevention | 12 |
| 017419 – Construction Waste Management and Disposal | 13 |
| 024119 – Selective Demolition | 14 |
| 06100 – Rough Carpentry | 17 |
| 070150.19 – Preparation for Roofing | 21 |
| 073113 – Asphalt Shingles | 24 |
| 077100 – Roof Specialties | 29 |
| 329000 – Seeding and Mulching | 32 |
SECTION 011000 - SUMMARY
PART 1 - GENERAL
| 1.1 | SUMMARY |
| A. | Section Includes: |
| 1. | Project information. |
| 2. | Work covered by Contract Documents. |
| 3. | Contractor's use of site and premises. |
| 4. | Coordination with occupants. |
| 5. | Work restrictions. |
| 6. | Specification and Drawing conventions. |
| 1.2 | PROJECT INFORMATION |
| A. | Project Identification: Kane EF Roof Replacements |
| 1. | Project Location: 41.598195, -78.765900234, Kane, PA |
| B. | Owner: USDA Forest Service – Northern Research Station |
| 1. | Contracting Officer’s Representative: Ray White – ray.white@usda.gov |
| 2. | Site Contact: Julie Smithbauer - julie.smithbauer@usda.gov |
| 1.3 | WORK COVERED BY CONTRACT DOCUMENTS |
| A. | The Work of Project is defined by the Contract Documents and consists of the following: |
| 1. | Please reference Statement of work and other Contract Documents. |
| B. | Type of Contract: |
| 1. | Project will be constructed under a single prime contract. |
| 1.4 | CONTRACTOR'S USE OF SITE AND PREMISES |
| A. | Limits on Use of Site: |
| 1. | Limit use of Project site to areas immediately in the area of work, unless otherwise approved by COR. Do not disturb portions of Project site beyond areas in which are required to complete the contract work. |
| 2. | Driveways, Walkways, and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials unless approved by the COR. |
| B. | Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. |
| C. | Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations. |
| 1.5 | COORDINATION WITH OCCUPANTS |
| A. | Full Owner Occupancy: Owner will occupy site and existing building(s) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated. |
| B. | A schedule is to be presented to COR and CO within 10 business days of Award. |
| C. | Notify COR a minimum of two week prior to beginning work. |
| 1.6 | WORK RESTRICTIONS |
| A. | Comply with restrictions on construction operations. |
| 1. | Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction. |
| 2. | At the end of each working day, areas around the building must be swept with a magnet. Remove and dispose of any screws, nails, other debris found. |
| B. | On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Thursday (except Federal Holidays), unless otherwise indicated. Permission to work outside these hours can be granted by the COR. |
| C. | Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: |
| 1. | Notify COR not less than seven days in advance of proposed utility interruptions. |
| 2. | Obtain COR written or verbal permission before proceeding with utility interruptions. |
| D. | Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner. |
| 1. | Notify COR not less than seven days in advance of proposed disruptive operations. |
| 2. | Obtain COR written permission before proceeding with disruptive operations. |
| 1.7 | SPECIFICATION AND DRAWING CONVENTIONS |
| A. | Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: |
| 1. | Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. |
| 2. | Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics. |
| 3. | Hypertext: Text used in the Specifications may contain hyperlinks. Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents. |
| 4. | Specification requirements are to be performed by Contractor unless specifically stated otherwise. |
| B. | Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications. |
PART 2 - PRODUCTS
A. Reference Section: 073113 - ASPHALT SHINGLES B. Reference Section: 077100 – ROOF SPECIALTIES C. Reference Section: 329000 – SEEDING AND MULCHING
END OF SECTION 011000
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
| 1.1 | SUMMARY |
| A. | Section Includes: |
| 1. | Submittal schedule requirements. |
| 2. | Administrative and procedural requirements for submittals. |
| 1.2 | DEFINITIONS |
| A. | Approval: Equivalent to “No Exception Taken”. |
| B. | Approved or Approved Equivalent: To possess the same performance qualities and characteristics and fulfill the utilitarian function without any decrease in quality, durability or longevity. For equipment/products defined by the Contractor as "equivalent", substitution requests must be submitted to Contracting Officer’s Representative for consideration and be approved by the COR in writing. Approval shall constitute “No Exception Taken” and shall not be otherwise construed. |
| C. | "No Exception Taken" constitutes that review is for general conformance with the design concept expressed in the Contract Documents for the limited purpose of checking for conformance with information given. Any action is subject to the requirements of the Contract Documents. Contractor is responsible for the dimensions and quantity and will confirm and correlate at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades, and the satisfactory performance of the work. |
| D. | Action Submittals: Written and graphic information and physical samples that require CO or COR’s responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals." |
| E. | Informational Submittals: Written and graphic information and physical samples that do not require CO or COR’s responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals." |
| 1.3 | SUBMITTAL FORMATS |
| A. | Submittal Information: Include the following information in each submittal: |
| 1. | Contract Name and Number. |
| 2. | Date. |
| 3. | Name of Contractor. |
| 4. | Name of firm or entity that prepared the submittal |
| 5. | Names of subcontractor, manufacturer, and supplier. |
| 6. | Category and type of submittal. |
| 7. | Submittal Purpose and description. |
| 8. | Number and title of Specification Section, with paragraph number and generic name for each of multiple items. |
| 9. | Drawing number and detail references, as appropriate. |
| 10. | Indication of full or partial completion. |
| 11. | Consecutive transmittal number. |
| 12. | Submittal and transmittal distribution record. |
| 13. | Other necessary identification. |
| 14. | Remarks. |
| 1.4 | SUBMITTAL PROCEDURES |
| A. | Prepare and submit submittals required by individual Specification Sections as PDF electronic files and as indicated for samples and other physical submittals. Types of submittals are indicated in individual Specification Sections. |
| B. | Submittals shall be transmitted via email to the COR & CO. |
| C. | Identify and incorporate information in each electronic submittal file as follows: |
| 1. | Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form acceptable to Government with links enabling navigation to each item. |
| 2. | Provide means for insertion to permanently record Contractor's review and approval markings and action taken by COR. |
| D. | Coordination: Coordinate preparation and processing of submittals with performance of construction activities |
| 1. | Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. |
| 2. | Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule. |
| 3. | Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals. |
| 4. | Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. |
| a. | Contracting Officer or COR reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. |
| E. | Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Contracting Officer's and COR’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals |
| 1. | Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Contracting Officer or COR will advise Contractor when a submittal being processed must be delayed for coordination. |
| 2. | Intermediate Review: If intermediate submittal is necessary, process intermediate review in same manner as initial submittal. |
| 3. | Resubmittal Review: Allow 15 days for review of each resubmittal. |
| 4. | Sequential Review: Where sequential review of submittals by Contracting Officer's consultants, Government, or other parties is indicated, allow 21 days for initial review of each submittal. |
| F. | Resubmittals: Make resubmittals in same form and number of copies as initial submittal. |
| 1. | Indicate date and content of previous submittal. |
| 2. | Indicate date and content of revision in label or title block and clearly indicate extent of revision. |
| 3. | Resubmit submittals until they are approved in writing by the CO or COR (in a method acceptable to the specifications or as otherwise described by the CO). |
| G. | Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. |
| H. | Use for Construction: Retain complete copies of submittals on Project site. Use only final action or material submittals that are approved in writing by the Contracting Officer or COR. |
| 1.5 | SUBMITTAL REQUIREMENTS |
| A. | Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. |
| 1. | If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data. |
| 2. | Clearly mark each copy of each submittal to show which products and options are applicable. |
| 3. | Include the following information, as applicable: |
| a. | Manufacturer's catalog cuts. |
| b. | Manufacturer's product specifications. |
| c. | Standard color charts. |
| d. | Statement of compliance with specified referenced standards. |
| e. | Testing by recognized testing agency. |
| f. | Application of testing agency labels and seals. |
| g. | Notation of coordination requirements. |
| h. | Availability and delivery time information. |
| 4. | Submit Product Data before Shop Drawings, and before or concurrent with Samples. |
| 5. | Submit Product Data in PDF electronic file. |
| B. | Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on standard printed data. |
| 1. | Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable: |
| a. | Identification of products. |
| b. | Schedules. |
| c. | Compliance with specified standards. |
| d. | Notation of coordination requirements. |
| e. | Notation of dimensions established by field measurement. |
| f. | Relationship and attachment to adjoining construction clearly indicated |
| 2. | Submit Shop Drawings in PDF Electronic Format. |
| C. | Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified. |
| D. | Design Data/Product Data/Materials Submittals: Prepare and submit written and graphic information indicating compliance with indicated performance and design criteria in individual Specification Sections. Include list of assumptions and summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Number each page of submittal. |
| E. | Certificates: |
| 1. | Certificates and Certifications Submittals: Submit a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. Provide original paper copy where a notarized signature is required. |
| 2. | Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project. |
| 3. | Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required. |
| 4. | Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents. |
| 5. | Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents |
| F. | Test and Research Reports: |
| 1. | Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion. |
| 2. | Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents. |
| 3. | Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents. |
| 4. | Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents. |
| 5. | Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency. |
| 6. | Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information: |
| 7. | Name of evaluation organization. |
| 8. | Date of evaluation. |
| 9. | Time period when report is in effect. |
| 10. | Product and manufacturers' names. |
| 11. | Description of product. |
| 12. | Test procedures and results. |
| 13. | Limitations of use. |
| 1.6 | CONTRACTOR'S REVIEW |
| A. | Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with contractor approval before submitting to Contracting Officer and COR. |
| B. | Contractor's Approval: Indicate Contractor's approval for each submittal with a uniform written approval method. Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents |
| 1.7 | GOVERNMENT REVIEW |
| A. | Contracting Officer’s Representative (COR) may approve technical submittals, unless otherwise indicated by the contract documents or determined in writing by the Contracting Officer (CO). COR may review each submittal instead of the CO. |
| B. | Action Submittals: Will be reviewed and their approval status will be documented in a project submittal review XLS spreadsheet returned to the contractor. The specific material items will be included in this review document and notes for approval, disapproval, and resubmittal and any questions on items. |
| C. | All submittals reviewed will be approved in the material review spreadsheet only. This will be returned to contactor with each submittal group reviewed. |
| D. | No marked up copies of material cut sheets will be returned to the contractor. |
| E. | Informational Submittals: Contracting Officer or COR will review each submittal and will not return it, or may return it if it does not comply with requirements. Contracting Officer or COR may forward each submittal to appropriate party. Contractor is responsible for compliance with contract requirements and all applicable laws and regulations regardless of whether mistakes were discovered by CO or COR review of informational submittals. |
| F. | Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from COR or Contracting Officer. |
| G. | Incomplete submittals are unacceptable, will be considered nonresponsive, and may be returned for resubmittal without review. |
| H. | Submittals not required by the Contract Documents may be returned by Contracting Officer or COR without action. |
PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)
END OF SECTION 013300
SECTION 017100 WEED AND DISEASE PREVENTION
PART 1 - GENERAL
1.1 SUMMARY
A. This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands.
PART 2 - PRODUCTS
2.1 WATER
A. Free of debris, organic matter, and other objectionable substances.
PART 3 - EXECUTION
3.1 GENERAL
| A. | Notify the COR in writing at least 10 calendar days before moving any construction equipment onto National Forest lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest lands. |
| B. | Perform all work at a location designated on the plans or other locations approved in writing. Provide the COR with an opportunity for inspection. |
3.2 EQUIPMENT
| A. | Use a high-pressure washing system. |
| B. | For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water. |
| C. | For work at a commercial washing facility, use an approved facility. |
3.3 WASHING
A. Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
3.4 INSPECTION
A. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
END OF SECTION 017100
SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 - GENERAL
| 1.1 | SUMMARY |
| A. | Section includes administrative and procedural requirements for the following: |
| 1. | Disposing of nonhazardous construction waste. |
| 1.2 | DEFINITIONS |
| A. | Construction Waste: Building, structure, and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging. |
| B. | Demolition Waste: Building, structure, and site improvement materials resulting from demolition operations. |
| C. | Disposal: Removal of demolition or construction waste and subsequent salvage, sale, recycling, or deposit in landfill, incinerator acceptable to authorities having jurisdiction, or designated spoil areas on Owner’s property. |
PART 2 - EXECUTION
| 2.1 | DISPOSAL OF WASTE |
| A. | General: Remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction. |
| 1. | Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site. |
| 2. | Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. |
| B. | Burning: Do not burn waste materials. |
END OF SECTION 017419
SECTION 024119 - SELECTIVE DEMOLITION
| 1.1 | SUMMARY | |||||||
| A. | The Work of this Section Includes: | |||||||
| 1. | Demolition and removal of selected portions of exterior or interior of building or | structure and site elements. | ||||||
| 1.2 | MATERIALS OWNERSHIP | |||||||
| A. | Unless otherwise indicated, demolition waste becomes property of Contractor. | |||||||
| B. | Historic items, relics, antiques, and similar objects including, but not limited to, | cornerstones and their contents, commemorative plaques and tablets, and other items | of interest or value to Owner that may be uncovered during demolition remain the | property of Owner. | ||||
| 1. | Carefully salvage in a manner to prevent damage and promptly return to | Owner. | ||||||
| 1.3 | FIELD CONDITIONS | |||||||
| A. | Owner will occupy portions of building immediately adjacent to selective demolition | area. Conduct selective demolition so Owner's operations will not be disrupted. | ||||||
| B. | Conditions existing at time of inspection for bidding purpose will be maintained by | Owner as far as practical. | ||||||
| C. | Notify COR of discrepancies between existing conditions and Drawings before | proceeding with selective demolition. | ||||||
| D. | Hazardous Materials: | |||||||
| 1. | It is not expected that hazardous materials will be encountered in the Work. | |||||||
| 2. | If materials suspected of containing hazardous materials are encountered, do | not disturb; immediately notify CO and COR. Hazardous materials will | be removed by Owner under a separate contract. |
PART 2 - PRODUCTS
| 2.1 | PERFORMANCE REQUIREMENTS | |||
| A. | Regulatory Requirements: Comply with governing EPA notification regulations before | beginning selective demolition. Comply with hauling and disposal regulations of | authorities having jurisdiction. | |
| B. | Standards: Comply with ANSI/ASSP A10.6 and NFPA 241. |
PART 3 - EXECUTION
| 3.1 | EXAMINATION | |||||||||
| A. | Verify that utilities have been disconnected and capped before starting selective | demolition operations. | ||||||||
| B. | Photograph any existing building damage prior to beginning selective demolition | operations. Notify the CO and COR of any discovered damage. | ||||||||
| 3.2 | PREPARATION | |||||||||
| A. | Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural | supports as required to preserve stability and prevent movement, settlement, or | collapse of construction and finishes to remain, and to prevent unexpected or | uncontrolled movement or collapse of construction being demolished. | ||||||
| B. | Temporary Protection: Provide temporary barricades and other protection required to | prevent injury to people and damage to adjacent buildings and facilities to remain. | ||||||||
| C. | Existing Items to Remain: Protect construction indicated to remain against damage and | soiling during selective demolition. When permitted by COR, items may be removed to a | suitable, protected storage location and reinstalled in their original locations after | selective demolition operations are complete. | ||||||
| 3.3 | UTILITY SERVICES AND BUILDING SYSTEMS | |||||||||
| A. | Existing Services/Systems to Remain: Maintain utilities and building systems and | equipment to remain and protect against damage during selective demolition | operations. | |||||||
| 3.4 | SELECTIVE DEMOLITION, GENERAL | |||||||||
| A. | General: Demolish and remove existing construction only to extent required by new | construction and as indicated. Use methods required to complete the Work within | limitations of governing regulations and as follows: | |||||||
| B. | Neatly cut openings and holes plumb, square, and true to dimensions required. Use | cutting methods least likely to damage construction to remain or adjoining construction. | Use hand tools or small power tools designed for sawing or grinding, not hammering | and chopping. Temporarily cover openings to remain. | ||||||
| C. | Cut or drill from the exposed or finished side into concealed surfaces to avoid marring | existing finished surfaces. | ||||||||
| D. | Do not use cutting torches until work area is cleared of flammable materials. At | concealed spaces, such as duct and pipe interiors, verify condition and contents of | hidden space before starting flame-cutting operations. Maintain portable fire- | suppression devices during flame-cutting operations. | ||||||
| E. | Locate selective demolition equipment and remove debris and materials so as not to | impose excessive loads on supporting walls, floors, or framing. | ||||||||
| F. | Any damage caused during the selective damage must be repaired by the contractor. | |||||||||
| G. | Site Access and Temporary Controls: Conduct selective demolition and debris-removal | operations to ensure minimum interference with roads, streets, walks, walkways, and | other adjacent occupied and used facilities. | |||||||
| 3.5 | DISPOSAL OF DEMOLISHED MATERIALS | |||||||||
| A. | Remove demolition waste materials from Project site and recycle or dispose of them in | accordance with Section 017419 "Construction Waste Management and Disposal." | ||||||||
| B. | Do not allow demolished materials to accumulate on-site. | |||||||||
| C. | Remove and transport debris in a manner that will prevent spillage on adjacent surfaces | and areas. | ||||||||
| D. | Remove debris from elevated portions of building by chute, hoist, or other device that | will convey debris to grade level in a controlled descent. | ||||||||
| E. | Comply with requirements specified in Section 017419 "Construction Waste | Management and Disposal." | ||||||||
| F. | Burning: Do not burn demolished materials. | |||||||||
| 3.6 | CLEANING | |||||||||
| A. | Clean adjacent structures and improvements of dust, dirt, and debris caused by | selective demolition operations. Return adjacent areas to condition existing before | selective demolition operations began. |
END OF SECTION 024119
SECTION 061000 - ROUGH CARPENTRY
| 1.1 | SUMMARY | |||||||
| A. | Section Includes: | |||||||
| 1. | Wood products. | |||||||
| 2. | Wood-preservative-treated lumber. | |||||||
| 3. | Fire-retardant-treated lumber. | |||||||
| 4. | Dimension lumber framing. | |||||||
| 5. | Miscellaneous lumber. | |||||||
| 6. | Plywood backing panels. | |||||||
| 1.2 | DEFINITIONS | |||||||
| A. | Boards or Strips: Lumber of less than 2 inches nominal (38 mm actual) size in least | dimension. | ||||||
| B. | Dimension Lumber: Lumber of 2 inches nominal (38 mm actual) size or greater but less | than 5 inches nominal (114 mm actual) size in least dimension. | ||||||
| C. | Exposed Framing: Framing not concealed by other construction. | |||||||
| 1.3 | ACTION SUBMITTALS | |||||||
| A. | Product Data: For each type of process and factory-fabricated product. Indicate | component materials and dimensions and include construction and application details. | ||||||
| 1. | Include data for wood-preservative treatment from chemical treatment | manufacturer and certification by treating plant that treated materials comply | with requirements. Indicate type of preservative used and net amount of | preservative retained. | ||||
| 1.4 | DELIVERY, STORAGE, AND HANDLING | |||||||
| A. | Stack wood products flat with spacers beneath and between each bundle to provide air | circulation. Protect wood products from weather by covering with waterproof sheeting, | securely anchored. Provide for air circulation around stacks and under coverings. |
PART 2 - PRODUCTS
| 2.1 | WOOD PRODUCTS | ||||||||
| A. | Lumber: Comply with DOC PS 20 and applicable rules of grading agencies indicated. If no | grading agency is indicated, comply with the applicable rules of any rules-writing agency | certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC | Board of Review to inspect and grade lumber under the rules indicated. | |||||
| B. | Maximum Moisture Content: 19 Percent | ||||||||
| 2.2 | WOOD-PRESERVATIVE-TREATED LUMBER | ||||||||
| A. | Preservative Treatment by Pressure Process: AWPA U1, Use categories as follows: | ||||||||
| 1. | UC1: Interior construction not in contact with ground or subject to moisture. | Include all rough carpentry. | |||||||
| a. | Wood sills, sleepers, blocking, and similar concealed members in | contact with masonry or concrete. | |||||||
| b. | Wood framing and furring attached directly to the interior of below- | grade exterior | |||||||
| 2. | Preservative Chemicals: Acceptable to authorities having jurisdiction and | containing no arsenic or chromium. | |||||||
| 3. | After treatment, redry boards and Dimension lumber to 19 percent maximum | moisture content. | |||||||
| B. | Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not | use material that is warped or that does not comply with requirements for untreated | material. | ||||||
| C. | Mark lumber with treatment quality mark of an inspection agency approved by the ALSC | Board of Review. | |||||||
| D. | Application: Treat all rough carpentry unless otherwise indicated. | ||||||||
| 2.3 | DIMENSION LUMBER FRAMING | ||||||||
| A. | Non-Load-Bearing Interior Partitions by Grade: Construction or No. 2 grade. | ||||||||
| B. | Load-Bearing Partitions by Grade: No. 2 grade. | ||||||||
| C. | Joists, Rafters, and Other Framing by Grade: Structural grade. | ||||||||
| 2.4 | PLYWOOD BACKING PANELS | ||||||||
| A. | See Sheathing requirements in Section 070150.19 – Preparation for Reroofing | ||||||||
| 2.5 | FASTENERS | ||||||||
| A. | General: Fasteners are to be of size and type indicated and comply with requirements | specified in this article for material and manufacture. Provide nails or screws, in | sufficient length, to penetrate not less than 1-1/2 inches (38 mm) into wood substrate. | ||||||
| B. | Nails, Brads, and Staples: ASTM F1667. | ||||||||
| C. | Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to | authorities having jurisdiction, based on ICC-ES AC70. |
PART 3 - EXECUTION
| 3.1 | INSTALLATION | ||||||||
| A. | Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame | Construction," unless otherwise indicated. | |||||||
| B. | Set work to required levels and lines, with members plumb, true to line, cut, and fitted. | Fit rough carpentry accurately to other construction. | |||||||
| C. | Do not splice structural members between supports unless otherwise indicated. | ||||||||
| D. | Sort and select lumber so that natural characteristics do not interfere with installation | or with fastening other materials to lumber. Do not use materials with defects that | interfere with function of member or pieces that are too small to use with minimum | number of joints or optimum joint arrangement. | |||||
| E. | Comply with AWPA M4 for applying field treatment to cut surfaces of preservative- | treated lumber. | |||||||
| 1. | Use inorganic boron for items that are continuously protected from liquid | water. | |||||||
| 2. | Use copper naphthenate for items not continuously protected from liquid | water. | |||||||
| F. | Securely attach rough carpentry work to substrate by anchoring and fastening as | indicated, complying with the following: | |||||||
| 1. | Table 2304.10.1, "Fastening Schedule," in ICC's International Building Code | (IBC). | |||||||
| G. | Securely attach roofing nailers to substrates by anchoring and fastening to withstand | bending, shear, or other stresses imparted by Project wind loads and fastener-resistance | loads as designed in accordance with ASCE/SEI 7. | ||||||
| H. | Use steel common nails unless otherwise indicated. Select fasteners of size that will not | fully penetrate members where opposite side will be exposed to view or will receive | finish materials. Make tight connections between members. Install fasteners without | splitting wood. Drive nails snug but do not countersink nail heads unless otherwise | indicated. | ||||
| 3.2 | INSTALLATION OF WOOD BLOCKING AND NAILERS | ||||||||
| A. | Install where indicated and where required for attaching other work. Form to shapes | indicated and cut as required for true line and level of attached work. Coordinate | locations with other work involved. | ||||||
| B. | Attach wood blocking to substrates to support applied loading. Recess bolts and nuts | flush with surfaces unless otherwise indicated. | |||||||
| C. | Attach wood roofing nailers securely to substrate to resist the designed outward and | upward wind loads indicated on Drawings and in accordance with ANSI/SPRI ED-1, | Tables A6 and A7. | ||||||
| 3.3 | PROTECTION | ||||||||
| A. | Protect wood that has been treated with inorganic boron (SBX) from weather. If, despite | protection, inorganic boron-treated wood becomes wet, apply EPA-registered borate | treatment. Apply borate solution by spraying to comply with EPA-registered label. |
END OF SECTION 061000
SECTION 070150.19 - PREPARATION FOR REROOFING
PART 1 - GENERAL
| 1.1 | SUMMARY |
| A. | Section Includes: |
| 1. | Full tear-off of entire roof system. |
| 2. | Re-cover preparation of entire roof area. |
| 3. | Removal of flashings and counterflashings. |
| 1.2 | ALLOWANCES |
| A. | Allowance for removal of existing deteriorated wood sheathing, and replacement with new wood deck, is listed under Item 0004 in the bid items. |
| 1.3 | UNIT PRICES |
| A. | Work in this section of specifications is paid under a lump sum pay item. |
| 1.4 | FIELD CONDITIONS |
| A. | Existing Roofing System: Asphalt Shingles |
| B. | Owner will occupy portions of building immediately below reroofing area. |
| 1. | Conduct reroofing so Owner's operations are not disrupted. |
| 2. | Provide Owner with not less than seven days written notice of activities that may affect Owner's operations. |
| 3. | Contractor shall place protective covers over sensitive equipment, furnishings, HVAC, or fire detection equipment as necessary to protect Forest Service property and the health of those working in the office and evacuate occupants from below work area if necessary. |
| C. | Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations. |
| D. | Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. |
| E. | Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building. |
| 1. | Remove only as much roofing in one day as can be made watertight in the same day. |
| F. | Existing lightening protection system to be removed and reinstalled. |
PART 2 - EXECUTION
| 2.1 | PREPARATION |
| A. | Seal or isolate windows that may be exposed to airborne substances created in removal of existing materials. |
| B. | Shut off rooftop utilities and service piping before beginning the Work. |
| C. | Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. |
| 1. | Cover air-intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork. |
| D. | During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain. |
| 2.2 | ROOF TEAR-OFF |
| A. | Notify COR each day of extent of roof tear-off proposed for that day. |
| B. | Full Roof Tear-off: Remove existing roofing and other roofing system components down to the existing sheathing. |
| 1. | Remove perimeter edge flashing (drip edge, as applicable). |
| 2. | Remove flashings at pipes, curbs, mechanical equipment, and other penetrations. |
| 3. | Remove fasteners from deck. |
| 2.3 | DECK PREPARATION |
| A. | Inspect deck after tear-off of roofing system. |
| B. | If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify COR. |
| 1. | COR approval is required prior to replacement. In no event shall this be reason for not temporarily covering the roof deck in the event of a rainstorm. The contractor is still required to maintain the building in a watertight condition. |
| 2. | All sheathing replacements shall be documented with photos and measurements. |
| C. | Replace plywood and/or OSB roof sheathing as directed by COR. |
| 2.4 | ROOF RE-COVER PREPARATION |
| A. | Remove any nails, clips, screws, other objects that protrude from the sheathing that prevent the new roof from laying flat. |
| 1. | Verify sheathing is dry. |
END OF SECTION 070150.19
SECTION 073113 - ASPHALT SHINGLES
PART 1 - GENERAL
| 1.1 | SUMMARY |
| A. | Section Includes: |
| 1. | Architectural asphalt shingles. |
| 2. | Underlayment materials. |
| 3. | Metal flashing and trim. |
| 1.2 | ACTION SUBMITTALS |
| A. | Product Data: For the following: |
| 1. | Asphalt shingles. |
| 2. | Underlayment materials. |
| 3. | Sample Warranty |
| 1.3 | CLOSEOUT SUBMITTALS |
| A. | Maintenance data: to be included in maintenance manuals. |
| B. | Warranty Information |
| 1.4 | QUALITY ASSURANCE |
| A. | Installer Qualifications: An authorized installer who is capable of providing services qualified for warranty by manufacturer. |
| 1.5 | WARRANTY |
| A. | Materials Warranty: Manufacturer agrees to repair or replace asphalt shingles that fail within specified warranty period. |
| 1. | Materials Warranty Period: 40 years from date of Substantial Completion, prorated, with first five years nonprorated. |
| 2. | Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds of up to 110 mph (49 m/s) for five years from date of Substantial Completion. |
| 3. | Algae-Resistance Warranty Period: Asphalt shingles will not discolor for five years from date of Substantial Completion. |
PART 2 - PRODUCTS
| 2.1 | ARCHITECTURAL ASPHALT SHINGLES |
| A. | Laminated-Strip Asphalt Shingles: ASTM D3462/D3462M, laminated, multi-ply overlay construction; glass-fiber reinforced, mineral-granule surfaced, and self-sealing. |
| 1. | Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following: |
| a. | OWEN'S CORNING - DURATION. |
| 2. | Algae Resistance: Granules resist algae discoloration. |
| 3. | Color and Blends: Chateau Green, or other COR approved color. |
| B. | Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles. |
| 2.2 | UNDERLAYMENT MATERIALS |
| A. | Synthetic Underlayment: UV-resistant polypropylene, polyolefin, or polyethylene polymer fabric with surface coatings or treatments to improve traction underfoot and abrasion resistance; evaluated and documented to be suitable for use as a roof underlayment under applicable codes by a testing and inspecting agency acceptable to authorities having jurisdiction. |
| 1. | Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following: |
| a. | OWEN'S CORNING. |
| B. | Ice and Water Shield/Barrier |
| 1. | Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following: |
| a. | OWEN'S CORNING. |
| 2.3 | RIDGE VENTS |
| A. | Ridge Vents are part of roofing structure. No roofing vents to be installed, however ridge shingles are necessary on ridges of roof and existing raised constructed vents. |
| 2.4 | ACCESSORIES |
| A. | Roofing Nails: ASTM F1667 |
| 1. | Where nails are in contact with metal flashing, use nails made from same metal as flashing. |
| B. | Underlayment Nails: Aluminum, stainless steel, or hot-dip galvanized-steel wire nails with low-profile metal or plastic caps, 1-inch- (25-mm-) minimum diameter. |
| 1. | Provide with minimum 0.0134-inch- (0.34-mm-) thick metal cap, 0.010-inch- (0.25-mm-) thick power-driven metal cap, or 0.035-inch- (0.89-mm-) thick plastic cap; and with minimum 0.083-inch- (2.11-mm-) thick ring shank or 0.091-inch- (2.31-mm-) thick smooth shank of length to penetrate at least 3/4 inch (19 mm) into roof sheathing or to penetrate through roof sheathing less than 3/4 inch (19 mm) thick. |
| 2.5 | METAL FLASHING AND TRIM |
| A. | Comply with requirements in Section 077100 “Roofing Specialties” |
| 1. | Sheet Metal: Coated metal to match proposed roofing color |
| B. | Fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of the item unless otherwise indicated on Drawings. |
| 1. | Vent-Pipe Flashings: Vent Pipes shall be flashed with appropriate metal or rubber boot and collar and extend at least 4 inches (102 mm) from pipe onto roof to prevent water intrusion. |
| 2. | Step Flashings: Step flashings shall be installed along rakes at the interface of roof deck and adjacent sidewall/fascia. Step flashings shall be coated aluminum or coated steel. |
PART 3 - EXECUTION
| 3.1 | INSTALLATION OF UNDERLAYMENT MATERIALS | |
| A. | Comply with asphalt shingle and underlayment manufacturers' written installation instructions and with recommendations in NRCA's "The NRCA Roofing Manual: Steep-Slope Roof Systems" applicable to products and applications indicated unless more stringent requirements are specified in this Section or indicated on Drawings. | |
| B. | Synthetic Underlayment: | |
| 1. | Install on roof deck parallel with and starting at the eaves. | |
| a. | Lap sides and ends as recommended in writing by manufacturer. | |
| b. | Stagger end laps between succeeding courses at interval recommended in writing by manufacturer. | |
| c. | Fasten with underlayment nails in accordance with manufacturer's written instructions. | |
| d. | Cover underlayment within period recommended in writing by manufacturer. | |
| C. | Ice and Water Shield/Barrier | |
| 1. | Install on roof deck parallel with and starting at the eaves. | |
| a. | Install starting at the eave and working towards the ridge. Extend to extents as specified in the manufacturer’s recommendations, but not less than 24” past the inside of the interior wall line or a minimum of 2 courses, whichever is larger. | |
| b. | Install at valleys, starting at the lowest point and working towards the ridge. | |
| 2. | Install fasteners based on manufacturers recommendations. | |
| 3. | Terminate flush against sidewalls. | |
| 4. | Install ice and water shield of minimum footprint of vent flashing over vent pipe, with the bottom edge lapped over the top edge of the nearest course of shingles. | |
| 3.2 | INSTALLATION OF METAL FLASHING AND TRIM | |
| A. | Install metal flashings and trim to comply with requirements in Section 077100 "Roofing Specialties." | |
| 1. | Install metal flashings in accordance with manufacturers recommendations and in NRCA's "NRCA Guidelines for Asphalt Shingle Roof Systems." | |
| 2. | Bed flanges of metal flashings using asphalt roofing cement or elastomeric f | lashing sealant. |
| B. | Step Flashings: Install right angle step flashing at each course of shingle at the interface of rake wall. Flashing shall be tucked behind the existing siding or fascia. If existing flashing exists in watertight condition, it may remain and be utilized with COR approval. | |
| 3.3 | INSTALLATION OF ASPHALT SHINGLES | |
| A. | Install asphalt shingles in accordance with manufacturer's written instructions and recommendations in NRCA's "NRCA Guidelines for Asphalt Shingle Roof Systems." | |
| B. | Install starter strip along lowest roof edge, consisting of an asphalt shingle strip with self-sealing strip face up at roof edge. | |
| 1. | Extend asphalt shingles 1/2 inch (13 mm) maximum over fascia at eaves and rakes. | |
| 2. | Install starter strip along rake edge. | |
| C. | Install first and remaining courses of laminated asphalt shingles stair-stepping diagonally across roof deck with manufacturer's recommended offset pattern at succeeding courses, maintaining uniform exposure. | |
| D. | Fasten asphalt shingle strips with a minimum of four roofing nails, but not less than the number indicated in manufacturer's written instructions for roof slope and design wind speed indicated on Drawings and for warranty requirements specified in this Section. | |
| 1. | Locate fasteners in accordance with manufacturer's written instructions. | |
| 2. | Where roof slope is less than 4:12, hand seal self-sealing asphalt shingles to improve the shingles' positive bond by applying asphalt roofing cement spots between course overlaps after nailing the upper course. | |
| 3. | When ambient temperature during installation is below 50 deg F (10 deg C), hand seal self-sealing asphalt shingles by applying asphalt roofing cement spots between course overlaps after nailing the upper course. | |
| E. | Valleys: Extend succeeding asphalt shingle courses from both sides of valley 12 inches (305 mm) beyond center of valley, weaving intersecting shingle-strip courses over each other (as applicable). Use one-piece shingle strips without joints in valley. | |
| 1. | Do not nail asphalt shingles within 6 inches (152 mm) of valley center. | |
| F. | Hip and Ridge Shingles: Maintain same exposure of cap shingles as roofing-shingle exposure. Lap cap shingles at ridges to shed water away from direction of prevailing winds. | |
| 1. | Fasten with roofing nails of sufficient length to penetrate sheathing. | |
| 2. | Fasten ridge cap asphalt shingles to cover ridge vent without obstructing airflow. |
END OF SECTION 073113
SECTION 077100 - ROOF SPECIALTIES
| 1.1 | SUMMARY |
| A. | Section Includes: |
| 1. | Copings. |
| 2. | Roof-edge specialties. |
| 3. | Reglets and counterflashings. |
| 1.2 | ACTION SUBMITTALS |
| A. | Product Data: For each type of product. |
| B. | Sample Warranty |
| 1.3 | CLOSEOUT SUBMITTALS |
| A. | Maintenance Data: For roofing specialties to include in maintenance manuals. |
| B. | Warranty Information |
PART 2 - PRODUCTS
| 2.1 | PERFORMANCE REQUIREMENTS | |
| A. | Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, hole elongation, over-stressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Provide clips that resist rotation and avoid shear stress as a result of thermal movements. Base calculations on surface temperatures of mate-rials due to both solar heat gain and nighttime-sky heat loss. | |
| 1. | Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. | |
| B. | Aluminum Finish: Two-coat fluoropolymer. | |
| 1. | Color: As selected by COR from manufacturer's full range to match existing. | |
| 2.3 | MATERIALS | |
| A. | Zinc-Coated (Galvanized) Steel Sheet: ASTM A653/A653M, G90 (Z275) coating designation. | |
| B. | Aluminum Sheet: ASTM B209 (ASTM B209M), alloy as standard with manufacturer for finish required, with temper to suit forming operations and performance required. | |
| C. | Stainless Steel Sheet: ASTM A240/A240M or ASTM A666, Type 304. | |
| D. | Copper Sheet: ASTM B370, cold-rolled copper sheet, H00 or H01 temper. | |
| 2.4 | MISCELLANEOUS MATERIALS | |
| A. | Fasteners: Manufacturer's recommended fasteners, suitable for application and designed to meet performance requirements. Furnish the following unless otherwise indicated: | |
| 1. | Exposed Penetrating Fasteners: Gasketed screws with hex washer heads matching color of sheet metal. | |
| 2. | Fasteners for Copper Sheet: Copper, hardware bronze, or passivated Series 300 stainless steel. | |
| 3. | Fasteners for Aluminum: Aluminum or Series 300 stainless steel. | |
| 4. | Fasteners for Stainless Steel Sheet: Series 300 stainless steel. | |
| 5. | Fasteners for Zinc-Coated (Galvanized) Steel Sheet: Series 300 stainless steel or hot-dip zinc-coated steel according to ASTM A153/A153M or ASTM F2329. |
PART 3 - EXECUTION
| 3.1 | INSTALLATION, GENERAL |
| A. | Install roof specialties according to manufacturer's written instructions. Anchor roof specialties securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, underlayments, sealants, and other miscellaneous items as required to complete roof-specialty systems. |
| 1. | Install roof specialties level, plumb, true to line and elevation; with limited oil-canning and without warping, jogs in alignment, buckling, or tool marks. |
| 2. | Provide uniform, neat seams with minimum exposure of solder and sealant. |
| 3. | Install roof specialties to fit substrates and to result in weathertight performance. Verify shapes and dimensions of surfaces to be covered before manufacture. |
| 4. | Torch cutting of roof specialties is not permitted. |
| 5. | Do not use graphite pencils to mark metal surfaces. |
| B. | Expansion Provisions: Allow for thermal expansion of exposed roof specialties. |
| 1. | Space movement joints at a maximum of 12 feet (3.6 m) with no joints within 18 inches (450 mm) of corners or intersections unless otherwise indicated on Drawings. |
| 2. | When ambient temperature at time of installation is between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement each way. Adjust setting proportionately for installation at higher ambient temperatures. |
| C. | Fastener Sizes: Use fasteners of sizes that penetrate substrate not less than recommended by fastener manufacturer to achieve maximum pull-out resistance. |
| D. | Seal concealed joints with butyl sealant as required by roofing-specialty manufacturer. |
This is the start of the file's text. The full file is on GovTribe.