SOW Kane EF Roof.docx

DOCX document 13 MB Posted

Attached to
Kane Experimental Forest Roof Replacements
Solicitation number
12445525Q0105
Issued by

About this file

This document is a Statement of Work (SOW) for roof replacement at the Kane Experimental Forest in Kane, Pennsylvania, issued by the U.S. Department of Agriculture (USDA) Forest Service. The project involves removing and replacing approximately 7,100 square feet of roofing across six buildings (bunkhouse, staff dwelling, office, garage, forge, and classroom), including complete removal of existing asphalt shingles, underlayment, and flashings, and installing new synthetic underlayment, architectural shingles, drip edge, valley/ridge shingles, and associated flashings.

The contract requires a contractor with a minimum of 5 years of roofing experience, licensed in Pennsylvania, and fully insured. The project includes an additional line item for replacing damaged sheathing and roof supports, estimated at 384 square feet of sheathing and 10 linear feet of structural lumber. The period of performance is 30 days from Notice to Proceed, with work to be completed between 7:00 AM - 5:00 PM Monday through Thursday, excluding federal holidays. The Davis-Bacon and Related Acts (DBRA) apply to this solicitation, and the project is located at GPS coordinates 41.598195, -78.765900 in Elk County, Pennsylvania.

View the file

Other files

File Type Posted
Site Map Kane EF Roof.docx DOCX document
SF 1442.pdf PDF
Specs Kane EF Roof.docx DOCX document
SOI IGCE Kane EF Roof.xlsx XLSX spreadsheet
DB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work NRS Kane Experimental Forest Roof Replacements 41.598195, -78.765900 Kane, PA

Contents

Project3
General Information3
1.0 Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Deliverables / Schedule4
Site Photos4

Project NRS Kane EF Roof Replacements

General Information

1.0 Scope of Work

The NRS Kane Roof Replacements project shall consist of the removal and legal disposal of the approximately 7,100 square feet of existing asphalt shingles, underlayment, flashings, drip edge, and fasteners on six buildings at the Kane Experimental Forest Headquarters. After removal, the work shall also include the installation of full replacement of synthetic underlayment, architectural shingle roof, drip edge, valley/ridge shingles, as well as the installation of step flashings, pipe/vent/chimney penetration flashings, and other items associated with a watertight roofing installation. Remove and reinstall lightening protections components as necessary.

Architectural Shingle Replacement

Building
Approximate Roof Area*
Bunkhouse
1400 sq. ft.
Staff Dwelling
1100 sq. ft.
Office
1400 sq. ft.
Garage
900 sq. ft.
Forge
500 sq. ft.
Classroom
1800 sq. ft.

*Contractor to verify dimensions prior to ordering material.

There is additional line item (Item 4) for replacement of damaged sheathing and roof supports as discovered after roof removal. Additionally, demo the metal chimney on the bunkhouse roof and patch the sheathing in preparation for reroofing. Replace sheathing and supports only with COR approval. The following sheathing and support quantities are estimated to be needed. All sheathing is expected to be ½”, ¾”, or 5/8” plywood or 7/16” OSB. Damage supports are located around the bunkhouse chimney and quantities are expected to be 10ft length or less of 2x6 structural lumber.

Sheathing Replacement

Building
Approximate Roof Area*
Bunkhouse
64 sq. ft.
Staff Dwelling
160 sq. ft.
Forge
160 sq. ft.

*Contractor to verify existing sheathing condition and type prior to ordering material.

Locations for replacement to be approved by COR.

2.0 Background

The Kane EF is a federally owned facility. The site is located in Jones Township, Elk County Pennsylvania, near the intersection of Township Road 359 and Forest Road 123, about 5 miles south of the borough of Kane and 5 miles west of the village of Wilcox. The approximate GPS location of the site is 41.598195, -78.765900.

The government shall furnish access to the site between the hours of 7:00AM – 5:00PM Monday through Thursday excluding Federal Holidays. Access to the site may be obtained outside of these hours with permission from the COR.

Contractor Requirements

3.0 Technical Requirements / Tasks

Contactor shall be:

· Experienced in roofing, with a minimum of 5 years of roofing construction experience.

· Licensed in the state of Pennsylvania.

· Fully Insured.

4.0 Deliverables / Schedule

Period of Performance for all Key Deliverables: 30 days from Notice to Proceed Key Deliverables

Item No.
Deliverable
Objective
1
Mobilization
Contractor to mobilize/demobilize any and all equipment required for work.
2
Removal/Disposal of Existing Roofs
Remove and legally dispose of the asphalt shingle roofing system, underlayment, flashings, fasteners, and other components of existing Kane EF bunkhouse, staff dwelling, office, garage, classroom, and forge. Roofing total is approximately 7,100 square feet.
3
Installation of New Roofing Systems
Install new ice/water barrier, synthetic underlayment, architectural shingles, step flashings, pipe/penetration flashings, drip edge, ridge/valley shingles, other appurtenances related to watertight architectural shingle installation on the Kane EF bunkhouse, staff dwelling, office, garage, classroom, and forge. Roof total area is approximately 7,100 square feet. Contractor shall verify roof dimensions prior to purchasing and installing roofing materials.
4
Replacement of Damaged Sheathing and Supports
Remove and legally dispose of approximately 384 sq. ft. damaged sheathing and 10 linear ft. structural supports. Remove and legally dispose of the round metal chimney on the Bunkhouse and damaged surrounding sheathing to suitable supports for new sheathing. Existing sheathing is expected to be ½”, 5/8”, ¾” plywood or 7/16” OSB. Sheathing shall be replaced in-kind. Replace water damage supports around the Bunkhouse Chimney. Expected replacement is less than or equal to 10ft of 2x6 structural lumber.

See Photos Below

Photo 1: Front Right Bunkhouse

Photo 2: Rear Left Bunkhouse, Showing Metal Chimney for Removal

Photo 3: Interior Bunkhouse Chimney to be Removed

Photo 4: Damaged Sheathing and Supports near Bunkhouse Chimney

Photo 5: Front Staff Dwelling

Photo 6: Rear Staff Dwelling

Photo 7: Typical Damage Sheathing Staff Dwelling

Photo 8: Front Right Office

Photo 9: Rear Office

Photo 10: Front Garage

Photo 11: Rear Garage, Metal Roof on Addition to Remain, Only Replace Shingles

Photo 12: Front Forge

Photo 13: Rear Forge

Photo 14: Front Classroom, Only Replace Shingles not Metal Porch Roofs

Photo 15: Rear Classroom image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg

File details come from the government source that posted it. Updated .