SOW Kane EF Roof.docx
DOCX document 13 MB Posted
- Attached to
- Kane Experimental Forest Roof Replacements
- Solicitation number
- 12445525Q0105
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for roof replacement at the Kane Experimental Forest in Kane, Pennsylvania, issued by the U.S. Department of Agriculture (USDA) Forest Service. The project involves removing and replacing approximately 7,100 square feet of roofing across six buildings (bunkhouse, staff dwelling, office, garage, forge, and classroom), including complete removal of existing asphalt shingles, underlayment, and flashings, and installing new synthetic underlayment, architectural shingles, drip edge, valley/ridge shingles, and associated flashings.
The contract requires a contractor with a minimum of 5 years of roofing experience, licensed in Pennsylvania, and fully insured. The project includes an additional line item for replacing damaged sheathing and roof supports, estimated at 384 square feet of sheathing and 10 linear feet of structural lumber. The period of performance is 30 days from Notice to Proceed, with work to be completed between 7:00 AM - 5:00 PM Monday through Thursday, excluding federal holidays. The Davis-Bacon and Related Acts (DBRA) apply to this solicitation, and the project is located at GPS coordinates 41.598195, -78.765900 in Elk County, Pennsylvania.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Map Kane EF Roof.docx | DOCX document | |
| SF 1442.pdf | ||
| Specs Kane EF Roof.docx | DOCX document | |
| SOI IGCE Kane EF Roof.xlsx | XLSX spreadsheet | |
| DB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work NRS Kane Experimental Forest Roof Replacements 41.598195, -78.765900 Kane, PA
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Deliverables / Schedule | 4 |
| Site Photos | 4 |
Project NRS Kane EF Roof Replacements
General Information
1.0 Scope of Work
The NRS Kane Roof Replacements project shall consist of the removal and legal disposal of the approximately 7,100 square feet of existing asphalt shingles, underlayment, flashings, drip edge, and fasteners on six buildings at the Kane Experimental Forest Headquarters. After removal, the work shall also include the installation of full replacement of synthetic underlayment, architectural shingle roof, drip edge, valley/ridge shingles, as well as the installation of step flashings, pipe/vent/chimney penetration flashings, and other items associated with a watertight roofing installation. Remove and reinstall lightening protections components as necessary.
Architectural Shingle Replacement
| Building |
| Approximate Roof Area* |
| Bunkhouse |
| 1400 sq. ft. |
| Staff Dwelling |
| 1100 sq. ft. |
| Office |
| 1400 sq. ft. |
| Garage |
| 900 sq. ft. |
| Forge |
| 500 sq. ft. |
| Classroom |
| 1800 sq. ft. |
*Contractor to verify dimensions prior to ordering material.
There is additional line item (Item 4) for replacement of damaged sheathing and roof supports as discovered after roof removal. Additionally, demo the metal chimney on the bunkhouse roof and patch the sheathing in preparation for reroofing. Replace sheathing and supports only with COR approval. The following sheathing and support quantities are estimated to be needed. All sheathing is expected to be ½”, ¾”, or 5/8” plywood or 7/16” OSB. Damage supports are located around the bunkhouse chimney and quantities are expected to be 10ft length or less of 2x6 structural lumber.
Sheathing Replacement
| Building |
| Approximate Roof Area* |
| Bunkhouse |
| 64 sq. ft. |
| Staff Dwelling |
| 160 sq. ft. |
| Forge |
| 160 sq. ft. |
*Contractor to verify existing sheathing condition and type prior to ordering material.
Locations for replacement to be approved by COR.
2.0 Background
The Kane EF is a federally owned facility. The site is located in Jones Township, Elk County Pennsylvania, near the intersection of Township Road 359 and Forest Road 123, about 5 miles south of the borough of Kane and 5 miles west of the village of Wilcox. The approximate GPS location of the site is 41.598195, -78.765900.
The government shall furnish access to the site between the hours of 7:00AM – 5:00PM Monday through Thursday excluding Federal Holidays. Access to the site may be obtained outside of these hours with permission from the COR.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contactor shall be:
· Experienced in roofing, with a minimum of 5 years of roofing construction experience.
· Licensed in the state of Pennsylvania.
· Fully Insured.
4.0 Deliverables / Schedule
Period of Performance for all Key Deliverables: 30 days from Notice to Proceed Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| 1 |
| Mobilization |
| Contractor to mobilize/demobilize any and all equipment required for work. |
| 2 |
| Removal/Disposal of Existing Roofs |
| Remove and legally dispose of the asphalt shingle roofing system, underlayment, flashings, fasteners, and other components of existing Kane EF bunkhouse, staff dwelling, office, garage, classroom, and forge. Roofing total is approximately 7,100 square feet. |
| 3 |
| Installation of New Roofing Systems |
| Install new ice/water barrier, synthetic underlayment, architectural shingles, step flashings, pipe/penetration flashings, drip edge, ridge/valley shingles, other appurtenances related to watertight architectural shingle installation on the Kane EF bunkhouse, staff dwelling, office, garage, classroom, and forge. Roof total area is approximately 7,100 square feet. Contractor shall verify roof dimensions prior to purchasing and installing roofing materials. |
| 4 |
| Replacement of Damaged Sheathing and Supports |
| Remove and legally dispose of approximately 384 sq. ft. damaged sheathing and 10 linear ft. structural supports. Remove and legally dispose of the round metal chimney on the Bunkhouse and damaged surrounding sheathing to suitable supports for new sheathing. Existing sheathing is expected to be ½”, 5/8”, ¾” plywood or 7/16” OSB. Sheathing shall be replaced in-kind. Replace water damage supports around the Bunkhouse Chimney. Expected replacement is less than or equal to 10ft of 2x6 structural lumber. |
See Photos Below
Photo 1: Front Right Bunkhouse
Photo 2: Rear Left Bunkhouse, Showing Metal Chimney for Removal
Photo 3: Interior Bunkhouse Chimney to be Removed
Photo 4: Damaged Sheathing and Supports near Bunkhouse Chimney
Photo 5: Front Staff Dwelling
Photo 6: Rear Staff Dwelling
Photo 7: Typical Damage Sheathing Staff Dwelling
Photo 8: Front Right Office
Photo 9: Rear Office
Photo 10: Front Garage
Photo 11: Rear Garage, Metal Roof on Addition to Remain, Only Replace Shingles
Photo 12: Front Forge
Photo 13: Rear Forge
Photo 14: Front Classroom, Only Replace Shingles not Metal Porch Roofs
Photo 15: Rear Classroom image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg