SPECS.pdf
PDF 5 MB Posted
- Attached to
- Moss Park Wastewater Treatment Plant Upgrades
- Solicitation number
- Y25-759-EB
- Issued by
- Orange County, Orlando City, Florida
About this file
The provided document is a comprehensive technical specification package for the Moss Park Wastewater Treatment Plant Improvements Project by Orange County, Florida. The project involves upgrading the existing wastewater treatment facility, with key components including the installation of two positive displacement blowers, replacement of diffusers and air piping in four aeration basins and one sludge holding tank, implementing an automated system to control blower operations based on oxidation-reduction potential (ORP) signals, and miscellaneous concrete repairs and handrailing replacements. The project is scheduled for bid submission by April 22, 2025, with an estimated project cost of $1,825,000, and will be conducted through an electronic procurement platform using OpenGov.
The project requires electronic bid submissions through the OpenGov e-Procurement Platform, with technical support available for bidders. Potential bidders are required to create a free account and submit questions by March 31, 2025, at 5:00 pm EST. The scope of work includes furnishing and installing equipment such as 12-inch coarse bubble diffusers, positive displacement blowers, master control panel, instrumentation, and associated piping and accessories. The project aims to improve the facility's aeration and treatment processes, with specific performance requirements including oxygen transfer rates, airflow capabilities, and automated control systems. Funding appears to be from Orange County, with the project designed to enhance the existing wastewater treatment infrastructure's efficiency and operational capabilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Moss_Park_Wastewater_Treatment_Plant_Upgrades_(Addendum_#5_Revision).pdf | ||
| DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORANGE COUNTY UTILITIES
MOSS PARK WASTEWATER
TREATMENT FACILITY IMPROVEMENTS
100% SUBMITTAL SPECIFICATIONS
JANUARY 2024
This page intentionally left blank
Orange County Facilities Management Moss Park WWTF Improvement Project
Orange County Facilities Management 100% Submittal Moss Park WWTF Improvement Project TOC-1 January 2024
Section Description
DIVISION 1 – SITE WORK SPECIFICATIONS
01001 General Work Requirements 01010 Summary of Work 01014 Construction Sequence 01021 Existing Conditions 01025 Measurement and Payment 01027 Applications for Payment 01050 Surveying and Field Engineering 01065 Permits and Fees 01070 Abbreviations and Symbols 01091 Reference Specifications 01200 Project Meetings 01300 Submittals Procedures 01301 Product Substitutions 01310 Project Schedules 01370 Schedule of Values 01380 Audio-Visual Documentation 01400 Quality Control 01500 Temporary Facilities 01560 Erosion and Sedimentation Control 01580 Project Identification and Signs 01600 General Equipment Stipulations 01610 Delivery, Storage, and Handling 01611 Meteorological and Seismic Design Criteria 01615 Equipment and Valve Identification 01650 Start-Up Requirements 01700 Project Closeout 01720 Project Record Documents and Survey 01730 Operation and Maintenance Manuals 01740 Warranties and Bonds
DIVISION 2 – SITE WORK SPECIFICATIONS
02200 Excavation and Fill for Structures 02200-F1 Temporary Excavation Design Certificate - 1 02202 Trenching and Backfilling 02202-F2 Protective System Design Certificate - 2 02410 Demolition 02578 Solid Sodding
Moss Park WWTF Improvement Project TOC-2 January 2024
DIVISION 3 - CONCRETE SPECIFICATIONS
03302 Miscellaneous Cast-in-Place Concrete 03600 Grouting 03920 Concrete Surface Repair 03930 Concrete Crack Repair
DIVISION 4 – NOT USED
DIVISION 5 – METALS SPECIFICATIONS
05520 Handrailing, Guardrailing, and Ladders 058100 Anchorage in Concrete and Masonry
DIVISION 6 – NOT USED
DIVISION 7 – NOT USED
DIVISION 8 – NOT USED
DIVISION 9 – FINISHES SPECIFICATIONS
09940 Protective Coatings
DIVISION 10 – NOT USED
DIVISION 11 – EQUIPMENT SPECIFICATIONS
11060 Equipment Installation 11572 Coarse Bubble Diffusers 11625 Positive Displacement Blowers
DIVISION 12 – NOT USED
DIVISION 13 – SPECIAL CONSTRUCTION SPECIFICATIONS
13300 PIC General Requirements 13310 PIC Field Instruments 13315 PIC Controls Panel
13325 PIC PLC
13326 PIC PLC Programming 13360 PIC Network Infrastructure
DIVISION 14 – NOT USED
DIVISION 15 – MECHANICAL SPECIFICATIONS
15010 Valve Installation
Moss Park WWTF Improvement Project TOC-3 January 2024
15020 Miscellaneous Piping and Accessories Installation 15064 Stainless Steel Pipe and Alloy Pipe, Tubing, and Accessories 15091 Miscellaneous Ball Valves 15140 Pipe Supports 15180 Valve and Gate Actuators 15250 Mechanical Insulation
DIVISION 16 – ELECTRICAL AND CONTROLS SPECIFICATIONS
16000 Basic Electrical Requirements 16108 Miscellaneous Equipment 16110 Raceways, Boxes, Fittings and Supports 16120 Wires and Cables 16150 Motors 16160 Panelboards 16195 Electrical Identification 16402 Underground System 16450 Grounding System 16500 Lighting System
16709 SPD
Moss Park WWTF Improvement Project 01001-1 January 2024
SECTION 01001
GENERAL WORK REQUIREMENTS
PART 1 - GENERAL
1.01 NOTICES
A. All notices or other papers required to be delivered by the Contractor to the County shall be delivered to the office of Orange County Facilities, 2010 E Michigan St, Orlando, FL 32806.
1.02 UNITS OF MEASUREMENT
A. Both inch-pound (English) and SI (metric) units of measurement are specified herein; the values expressed in inch-pound units shall govern.
1.03 WORK BY COUNTY
A. County shall perform certain activities in connection with the Project with its own personnel as follows:
1. Open/Close valves
2. Testing as described in Section 01440
B. The Contractor shall submit a Construction Assistance Request form (see Figure1) at least 7 days in advance of requiring the above activities to be performed.
1.04 WORK TO BE DONE
A. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all work required by these specifications and as shown on the Drawings, at a rate of progress which will ensure completion of the Work within the Contract Time stipulated.
B. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean up, replacements, and restoration required as a result of damages caused during this construction.
C. The Contractor shall comply with all City, County, State, Federal, and other codes, which are applicable to the proposed Work.
Moss Park WWTF Improvement Project 01001-2 January 2024
D. All newly constructed Work shall be carefully protected from injury in any way.
No wheeling, walking, or placing of heavy loads on it shall be allowed and all portions damaged shall be reconstructed by the Contractor at his own expense.
E. Scope of Work: See Section 01010 "Summary of Work" and the Bid Schedule for details.
1.05 OFFSITE STORAGE
A. Offsite storage arrangements shall be approved by County for all materials and equipment not incorporated into the Work but included in Applications for Payment. Such offsite storage arrangements shall be presented in writing and shall afford adequate and satisfactory security and protection. Offsite storage facilities shall be accessible to County and Engineer.
1.06 DRAWINGS AND PROJECT MANUAL
A. The Work shall be performed in accordance with the Drawings and Specifications prepared by the County/Professional. All work and materials shall conform to the Orange County Utilities Standards and Construction Specifications Manual, latest edition or as indicated in these Specifications or Drawings. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, or laws or regulations in effect at the time of opening of Bids (or on the effective date of the Contract or Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. However, no provision of any referenced standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of County, Contractor, or Engineer, or any of their Subcontractors, consultants, agents, or employees from those set forth in the Contract Documents, nor shall any such provision or instruction be effective to assign to County, Engineer, or any of Engineer's Consultants, agents, or employees, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents.
B. The Contractor shall verify all dimensions, quantities and details shown on the Drawings, Supplementary Drawings, Schedules, Specifications or other data received from the County/Professional, and shall notify same, in writing, of all errors, omissions, conflicts and discrepancies found therein. Failure to discover or correct errors, conflicts or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory Work, faulty construction or improper operation resulting there from, nor from rectifying such conditions at his own expense.
Moss Park WWTF Improvement Project 01001-3 January 2024
C. All schedules are given for the convenience of the County and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for the making of estimates of the size, kind, and quantity of materials and equipment included in the Work to be done under this Contract.
D. Intent:
1. All Work called for in the Specifications applicable to this Contract, but not shown on the Drawings in their present form, or vice versa, shall be of like effect as if shown or mentioned in both. Work not specified either in the Drawings or in the Specifications but involved in carrying out their intent or in the complete and proper execution of the Work, is required and shall be performed by the Contractor as though it were specifically delineated or described.
2. Items of material, equipment, machinery, and the like may be specified on the Drawings and not in the Specifications. Such items shall be provided by the Contractor in accordance with the specification on the Drawings.
3. The apparent silence of the Specifications as to any detail, or the apparent omission from them of a detailed description concerning any Work to be done and materials to be furnished, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used, and interpretation of these Specifications shall be made upon that basis.
E. Refer to the Contract for the order of precedence of items and documents.
1.07 SUBSTITUTES AND “OR-EQUAL” ITEMS
A. Whenever a material or article is specified or described by using the name of a proprietary product or the name of a particular manufacturer or vendor, the specified item shall be understood as establishing the type, function, and quality desired. Requests for review of equivalency will not be accepted from anyone except Contractor, and such requests will not be considered until after the Contract has been awarded. Other manufacturers' products may be accepted, provided sufficient information is submitted to allow Engineer to determine that the products proposed are equivalent to those named. Such items shall be submitted for review by the procedure set forth in the Submittals Procedures section.
1.08 PROTECTION AND RESTORATION
A. The Contractor shall be responsible for the preservation of all public and private property and shall use every means of protection necessary to prevent damage thereto. If any direct or indirect damage is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the Work on the part of the Contractor, such property shall be restored by the
Moss Park WWTF Improvement Project 01001-4 January 2024
Contractor, at his expense, to a condition similar or equal to that existing before the damage was done, or the Contractor shall make good the damage in other manner acceptable to the County/Professional.
B. Protection of Trees and Shrubs
1. Protect with boxes or other barricades.
2. Do not place excavated material so as to injure trees or shrubs.
3. Install pipelines in short tunnels between and under root systems.
4. Support trees to prevent root disturbance during nearby excavation.
C. Tree and Limb Removal
1. Tree limbs, which interfere with equipment operation and are approved for pruning, shall be neatly trimmed and the tree cut coated with tree paint.
2. The County may order the Contractor, for the convenience of the County, to remove trees along the line or trench excavation. The Contractor shall obtain any permits required for removal of trees. Ordered tree removal shall be paid for under the appropriate Contract Items.
D. Trees or shrubs destroyed by negligence of the Contractor or his employees shall be replaced by the Contractor with new stock of similar size and age, at the proper season and at the sole expense of the Contractor.
E. Lawn Areas: All lawn areas disturbed by construction shall be replaced with like kind to a condition similar or equal to that existing before construction. Where sod is to be removed, it shall be carefully removed, and the same re-sodded, or the area where sod has been removed shall be restored with new sod in the manner described in the applicable section.
F. Where fencing, walls, shrubbery, grass strips or area must be removed or damaged incident to the construction operation, the Contractor shall, after completion of the work, replace or restore to the original condition.
G. The cost of all labor, materials, equipment, and work for restoration shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made therefore.
1.09 CUTTING AND PATCHING
A. Contractor shall perform all cutting and patching required for the Work and as may be necessary in connection with uncovering Work for inspection or for the correction of defective Work.
B. Contractor shall perform all cutting and patching required for and in connection with the Work, including but not limited to the following:
1. Removal of improperly timed Work.
Moss Park WWTF Improvement Project 01001-5 January 2024
2. Removal of samples of installed materials for testing.
3. Alteration of existing facilities.
4. Installation of new Work in existing facilities.
C. Contractor shall provide all shoring, bracing, supports, and protective devices necessary to safeguard all Work and existing facilities during cutting and patching operations. Contractor shall not undertake any cutting or demolition which may affect the structural stability of the Work or existing facilities without Engineer's concurrence.
D. Materials shall be cut and removed to the extent indicated on the Drawings or as required to complete the Work. Materials shall be removed in a careful manner, with no damage to adjacent facilities or materials. Materials which are not salvable shall be removed from the site by Contractor.
E. All Work and existing facilities affected by cutting operations shall be restored with new materials, or with salvaged materials acceptable to Engineer, to obtain a finished installation with the strength, appearance, and functional capacity required. If necessary, entire surfaces shall be patched and refinished.
F. The Contractor shall maintain the existing generator building structure (including structural floor and roof decking), envelope (exterior skin and framing, excluding window assemblies and nonstructural roofing material), and interior non-structural elements not indicated to be removed; and shall not cut such existing construction beyond indicated limits.
1.10 PUBLIC NUISANCE
A. The Contractor shall not create a public nuisance including, but not limited to, encroachment on adjacent lands, flooding of adjacent lands, or excessive noise.
B. Sound levels measured by the County/Professional shall not exceed 45 dBA from 8 p.m. to 8 a.m. or 55 dBA 8 a.m. to 8 p.m. This sound level shall be measured at the exterior of the nearest exterior wall of the nearest residence. Levels at the equipment shall not exceed 85 dBA at any time. Sound levels in excess of these values are sufficient cause to have the Work halted until equipment can be quieted to these levels. Work stoppage by the County/Professional for excessive noise shall not relieve the Contractor of the other portions of this specification including, but not limited to, completion dates and bid amounts.
C. No extra charge may be made for time lost due to work stoppage resulting from the creation of a public nuisance.
Moss Park WWTF Improvement Project 01001-6 January 2024
1.11 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK
A. County Inspector Work Hours: Normal work hours for the County’s inspector(s) are defined as any 8-hour period between the hours of 7:00 a.m. and 7:00 p.m.
on the weekdays of Monday through Friday. Any County Inspector(s) work beyond the aforementioned normal work hours and all time on Saturdays, Sundays, and on holidays observed by the County shall be requested in writing 48-hours in advance. All overtime, any County holidays or weekend work compensation for the County’s Inspector(s) to work beyond the normal working hours are considered overtime compensation and shall be paid for by the Contractor. The overtime pay rate will be $51.00 per hour or the most current rate as listed in the County Fee Directory prepared by the Office of Management and Budget, in section “Orange County Utilities Engineering & Construction”, under the heading of “Inspection Fee other than Normal Working Hours”. The Contractor agrees that the County shall deduct charges for work outside normal work hours and for overtime pay from payments due the Contractor. Under emergency situations a verbal request may be made with a follow-up written request.
B. County observes the following holidays: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
1.12 MAINTENANCE OF SERVICE
A. The existing facility must be kept in continuous operation throughout the construction period. The Contractor shall submit a Contractor’s Assistance Request for Access to County Facilities (see Figure 1) at least 72-hours in advance for entering buildings or other restricted areas or equipment.
B. The Contractor shall, prior to interrupting any utility service (water, sewer, etc.) for the purpose of making cut-ins to the existing lines or for any other purposes, contact the County and make arrangements for the interruption which will be satisfactory to the County.
C. Utility lines that are damaged during construction shall be repaired by the Contractor and service restored within 4-hours of the breakage. The County retains the option of repairing any damage to utility pipes in order to expedite service to the customers. The Contractor will remain responsible for all costs associated with the repair.
1.13 CONSTRUCTION ASSISTANT REQUEST (CAR) FORM
A. The Contractor shall submit a CAR to the Owner’s Representative for any interaction requiring the involvement of the Owner’s Operational Staff, Moss Park WWTF Improvement Project 01001-7 January 2024 including but not limited to the following examples; existing valve actuation, process interruptions, equipment operation interruption, power interruption, flow diversions, spare parts transfers, and training. The Contractor shall not have contact with the Operations Staff without the knowledge of the Owner’s Representative. The Owner’s Representative reserves the right to direct the Contractor to provide a CAR at his discretion. Unless otherwise noted by the Owner’s Representative, a CAR shall be submitted a minimum of seven (7) calendar days in advance of the intended operation noted within the CAR.
Reference a blank copy of the form within this section.
1.14 TRANSFER OF SERVICE
A. When the County has accepted a proposed facility and placed it into operation, the transfer of service is complete. The Contractor may begin the work of removing the existing or temporary facilities.
1.15 LABOR
A. Supervision: The Contractor shall supervise and direct the Work efficiently and with his best skills and attention. The Contractor shall have a competent, English speaking superintendent or representative, who shall be on the site of the Project at all working hours, and who shall have full authority by the Contractor to direct the performance of the Work and make arrangements for all necessary materials, equipment, and labor without delay.
B. Jurisdictional Disputes: It shall be the responsibility of the Contractor to pay all costs that may be required to perform any of the Work shown on the Drawings or specified herein to avoid any work stoppages due to jurisdictional disputes. The basis for subletting work in question, if any, shall conform to precedent agreements and decisions on record with the Building and Construction Trades Department, AFL-CIO, dated June 1973, including any amendments thereto.
C. Apprenticeship: The Contractor shall comply with all of the requirements of Section 446, Florida Statutes, for all contracts in excess of $25,000 excluding roadway, highway or bridge contracts and the Contractor agrees to insert in any subcontract under this Contract the requirements of this Article.
1.16 MATERIALS AND EQUIPMENT
A. MANUFACTURER
1. All transactions with the manufacturers or Subcontractors shall be through the
Contractor, unless the Contractor and the County/Professional request that the manufacturer or Subcontractor communicate directly with the
Moss Park WWTF Improvement Project 01001-8 January 2024
County/Professional. Any such transactions shall not in any way release the Contractor from his full responsibility under this Contract.
2. All workmanship and materials shall be of the highest quality. The equipment shall be the product of manufacturers who are experienced and skilled in the field with an established record of research and development. No equipment will be considered unless the manufacturer has designed and manufactured equipment of comparable type and size and have demonstrated sufficient experience in such design and manufacture.
3. No material shall be delivered to the Site without prior approval of the County/Professional.
4. All apparatus, mechanisms, equipment, machinery, and manufactured articles for incorporation into the Project shall be the new (most current production at time of bid) and unused standard products of recognized reputable manufacturers.
5. Manufactured and fabricated products:
a. Design, fabricate and assemble in accord with the best engineering and shop practices.
b. Manufacture like parts of duplicate units to standard sizes and gauges, to be interchangeable.
c. Any two or more pieces of material or equipment of the same kind, type or classification, and being used for identical types of service, shall be made by the same manufacturer.
d. Products shall be suitable for service conditions as specified and as stated by manufacturer.
e. Equipment capacities, sizes and dimensions shown or specified shall be adhered to unless variations are specifically approved in writing.
f. Do not use material or equipment for any purpose other than that for which it is designed or is specified.
1.17 MANUFACTURER'S SERVICE
A. Where service by the manufacturer is specified to be furnished as part of the cost of the item of equipment, the Work shall be at the Contractor's expense.
B. The services provided shall be by a qualified manufacturer's service representative to check and verify the completed installation, place the equipment in operation, and instruct the County's operators in the operation and maintenance procedures. Such services are to be for period of time and for the number of trips specified. A working day is defined as a normal 8-hour working day on the job and does not include travel time.
C. The services shall further demonstrate to the County/Professional’s complete satisfaction that the equipment will satisfactorily perform the functions for which it has been installed.
Moss Park WWTF Improvement Project 01001-9 January 2024
1.18 TRAINING
A. Unless otherwise specified, a minimum of two (2) days of training shall be provided for each piece of equipment supplied, including all electrical installation, instruments, and testing equipment. Contractor shall video and audio record as specified in Section 01380. The Contractor shall submit a CAR (Construction Assistance Request) form seven days prior to beginning of training. Contractor shall submit training agenda, instructor names and resumes, and training handouts to be used. Training shall be based on O&M manuals supplied by the Contractor. Manuals shall be supplied prior to training.
1.19 PERMITS
A. The Contractor shall comply with all laws, rules, regulations, and ordinances of any authority having jurisdiction over the work as required by the General Conditions. Permits obtained by the County are appended to this section. The term “Engineer” in the building department permit holds refers to the Contractor’s engineer.
1.20 INSPECTION AND TESTING
A. General
1. All materials and equipment furnished by the Contractor shall be subject to the inspection, review and acceptance of the County and meet the requirements as outlined in the Orange County Utilities Standards and Construction Specifications Manual. If in the testing of any material or equipment it is ascertained by the County/Professional that the material or equipment does not comply with the Contract, the Contractor shall be notified thereof, and the Contractor will be directed to refrain from delivering said material or equipment, or to remove it promptly from the Site or from the Work and not accepted by the County shall be replaced with acceptable material, without cost to the County.
2. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized test codes of the ANSI, ASME, or the IEE, except as may otherwise be stated herein.
3. The Contractor shall give notice in writing to the County sufficiently in advance of his intention to commence the manufacture or preparation of materials especially manufactured or prepared for use in or as part of the permanent construction. Such notice shall contain a request for inspection, the date of commencement and the expected date of completion of the manufacture or preparation of materials. Upon receipt of such notice, the County shall arrange to have a representative present at such times during the manufacture as may be necessary to inspect the materials; or the County will notify the Contractor that the inspection will be made at a point other than
Moss Park WWTF Improvement Project 01001-10 January 2024 the point of manufacture; or the County will notify the Contractor that inspection will be waived.
4. When inspection is waived or when the County/Professional so requires, the Contractor shall furnish to the County authoritative evidence in the form of Certificates of Manufacture that the materials to be used in the Work have been manufactured and tested in conformity with the Contract Documents.
These certificates shall be notarized and shall include five (5) copies of the results of physical tests and chemical analysis, where necessary, that have been made directly on the product or on similar products of the manufacturer.
5. All materials shall be suitably packaged to facilitate handling and protect against damage during transit and storage. Painted surfaces shall be protected against impact, abrasion, discoloration, and other damage. All painted surfaces which are damaged prior to acceptance of equipment shall be repainted to the satisfaction of Engineer.
6. Each item, package, or bundle of material shall be tagged or marked as identified in the delivery schedule or on the Shop Drawings. Complete packing lists and bills of material shall be included with each shipment.
7. The Contractor must comply with these provisions before shipping any material. Such inspections by the County shall not release the Contractor from the responsibility for furnishing materials meeting the requirements of the Contract Documents.
B. Cost
1. County shall employ and pay for the services of an independent testing laboratory to perform testing indicated on the Contract Documents, or at the County’s discretion to ensure conformity with the Contract Documents.
2. The cost of field leakage and pressure tests and shop tests of materials and equipment specifically called for in the Contract Documents shall be borne by the Contractor. Such costs shall be deemed to be included in the Contract price.
3. The Contractor shall notify the County laboratory a minimum of 48-hours in advance of operations for scheduling of tests. When tests or inspections cannot be performed after such utilities, the Contractor shall reimburse County for expenses incurred.
4. The Contractor shall pay for all work required to uncover, remove, replace, retest, etc., any work not tested due to the Contractor's failure to provide the 48-hours advance notice or due to failed tests. The Contractor shall also provide compensation for the County/Professional’s personnel for required re-testing due to failed or rescheduled testing.
C. Shop Testing
1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance, function or special requirements are specified shall be tested in the shop of the manufacturer in a manner which shall conclusively prove that its characteristics comply fully with the requirements of the Contract
Moss Park WWTF Improvement Project 01001-11 January 2024
Documents. No such equipment shall be shipped to the worksite until the County/Professional notifies the Contractor, in writing, that the results of such tests are acceptable.
2. The manufacturing company shall provide five (5) copies of the manufacturer's actual shop test data and interpreted results signed by a responsible official of the manufacturing company and notarized, showing conformity with the Contract Documents as a prerequisite for the acceptance of any equipment. The cost of shop tests (excluding cost of County's representative) and of furnishing manufacturer's preliminary and shop test data of operating equipment shall be borne by the Contractor and shall be included in the Contract price.
D. Field Testing:
1. The County shall employ and pay for services of an independent testing laboratory to perform testing specifically indicated in the Contract Documents.
Employment of the laboratory shall in no way relieve Contractor's obligations to perform the Work of the Contract. The Contractor shall provide compensation for retesting of all failed tests.
2. The County may at any time during the progress of the Work, request additional testing beyond that which is specified in the Contract. This testing will be at the County's expense. Contractor shall:
a. Cooperate with laboratory personnel, provide access to the Project.
b. Secure and deliver to the laboratory adequate quantities of representative samples of materials proposed to be used and which require testing.
c. Provide to the laboratory the preliminary design mix proposed to be used for concrete, and other material mixes, which require control by the testing laboratory.
E. Demonstration Tests: Upon completion of the Work and prior to final payment, all equipment and piping installed under this Contract shall be subjected to acceptance or demonstration tests as specified or required to provide compliance with the Contract Documents. The Contractor shall furnish all labor, fuel, energy, water and all other equipment necessary for the demonstration tests at no additional cost to the County.
F. Final Inspection: Prior to preparation of the final payment application, a final inspection will be performed by the County to determine if the Work is properly and satisfactorily constructed in accordance with the requirements of the Contract Documents. See also Section 01700 "Project Closeout."
G. Inspection by existing utility owners: The Contractor shall pay for all inspections during the progress of the work required and provided by the owner of all existing public utilities paralleling or crossing the Work, as shown on the Drawings. All such inspection fees shall be deemed included in the appropriate Contract Item or items, or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made, therefore.
Moss Park WWTF Improvement Project 01001-12 January 2024
H. Inspection by Other Agencies: The Florida Department of Transportation, the Florida Department of Environmental Protection, and other authorized governmental agencies shall have free access to the site for inspecting materials and work, and the Contractor shall afford them all necessary facilities and assistance for doing so. Any instructions to the Contractor resulting from these inspections shall be given through the County. These rights of inspections shall not be construed to create any contractual relationship between the Contractor and these agencies.
1.21 PROJECT SITE AND ACCESS
A. SITE ADMINISTRATION
1. Contractor shall be responsible for all areas of the Site used by it and by all
Subcontractors in the performance of the Work. Contractor shall exert full control over the actions of all employees and other persons with respect to the use and preservation of property and existing facilities, except such controls as may be specifically reserved to County or others. Contractor shall have the right to exclude from the Site all persons who have no purpose related to the Work or its inspection, and may require all persons on the Site (except County's employees) to observe the same regulations as Contractor requires of its employees.
2. County reserves the right to direct Contractor to permanently remove any Subcontractor or subcontracted employee from the site for breach of security, policy, unsafe working practice, unprofessional behavior, or failure to comply with access restrictions.
B. SECURITY
1. Contractor shall be responsible for protection of the Site, and all Work, materials, equipment, and existing facilities thereon, against vandals and other unauthorized persons. Contractor shall comply with Orange County’s security requirements to protect the Moss Park WWTF.
2. No Claim shall be made against County by reason of any act of an employee or trespasser, and CONTRACTOR shall make good all damage to County's property resulting from CONTRACTOR's failure to provide security measures as specified.
C. RIGHT-OF-WAY AND EASEMENTS
1. The use of public streets and alleys shall be such as to provide a minimum of inconvenience to the public and to other traffic. Any earth or other excavated material shall be removed by the Contractor and the streets cleaned to the satisfaction of the County.
2. The Contractor shall not enter or occupy private land outside of easements, except by written permission of the property owner.
3. At the time of the Pre-Construction meetings, the Contractor shall become fully acquainted with the status of all easements. Should easements not be
Moss Park WWTF Improvement Project 01001-13 January 2024 acquired by the County in specific areas of the Work, the Contractor shall sequence and schedule his work therein so as not to interfere with the progress of work in other areas of the Project. Any rescheduling of work due to easement acquisitions shall be performed by the Contractor at no additional cost to the County. The County agrees that it will make every effort to acquire all remaining easements with all speed and diligence possible so as to allow the completion of the Work within the Contract time.
4. Contractor will be permitted to use available land belonging to County, on or near the Site, for construction purposes and for storage of materials and equipment.
5. The locations and extent of the areas so used shall be as indicated on the Drawings
6. Contractor shall immediately move stored materials or equipment if any occasion arises, as determined by County, requiring access to the storage area. Materials or equipment shall not be placed on the property of County until County has agreed to the location to be used for storage.
D. ACCESS
1. Neither the material excavated nor the materials or equipment used in the construction of the Work shall be so placed as to prevent free access to all fire hydrants, valves, or manholes.
2. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business access with the business Owner. Such prearranged access closing shall not exceed two
(2) hours. Property drainage and grading shall be restored and all construction debris removed within 48-hours of backfilling trench.
3. Contractor agrees that representatives of the County and any governmental agents will have access to the Work wherever it is in preparation or progress and that the Contractor shall provide facilities for such access and inspection.
E. UNFAVORABLE CONSTRUCTION CONDITIONS
During unfavorable weather, wet ground, or other unsuitable construction conditions, Contractor shall confine its operations to work which will not be affected adversely by such conditions. No portion of the Work shall be constructed under conditions which would affect adversely the quality or efficiency thereof, unless special means or precautions are taken by Contractor to perform the Work in a proper and satisfactory manner.
F. HAZARDOUS ENVIRONMENTAL CONDITIONS AT SITE
No Hazardous Environmental Conditions at the Site in areas that will be affected by the Work are known to the County.
G. TOBACCO FREE POLICY – TOBACCO FREE CAMPUS
In order to protect the public health, safety, and welfare of citizens and employees, smoking tobacco or any other substance is prohibited in County owned or operated facilities and vehicles. Contractor’s personnel will not be
Moss Park WWTF Improvement Project 01001-14 January 2024 permitted to use tobacco products on County property, including County parking lots, break areas, and worksites. Smoking means the lighting of any cigarette, cigar or pipe, or the possession of any lighted cigarette, cigar or pipe, regardless of its composition. This requirement shall be enforced from the beginning of construction and violators will be removed from the property.
1.22 UTILITIES
A. UTILITY CONSTRUCTION
1. Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, house service connections, vaults, manholes and all other appurtenances and facilities pertaining thereto, whether owned or controlled by governmental bodies or privately owned by individuals, firms or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage or water. Other public or private property, which may be affected by the Work, shall be deemed included hereunder.
2. All open excavations shall be adequately safeguarded by providing temporary barricades, caution signs, lights and other means. The Contractor shall, at his own expense, provide suitable and safe bridges and other crossings for accommodating travel by pedestrians and workmen. Bridges provided for access to private property during construction shall be removed when no longer required.
3. The length of open trench will be controlled by the particular surrounding conditions but shall always be confined to the limits described by the County.
If any excavation becomes a hazard, or if it excessively restricts traffic at any point, the County may require special construction procedures. As a minimum, the Contractor shall conform to the following restoration procedures:
a. Interim Restoration: All excavations shall be backfilled and compacted as specified by the end of each working day. For excavations within existing paved areas; limerock base or soil cement base (match existing) shall be spread and compacted to provide a relatively smooth surface free of loose aggregate material. At the end of each workweek, the S-I asphaltic surface course shall be completed and opened to traffic. Contractor shall coordinate his construction activity including density tests and inspections to allow sufficient time to achieve this requirement. All driveway cuts shall be backfilled, compacted, and limerock base spread and compacted immediately after installation. Contractor shall coordinate with the individual property owners prior to removing the driveway section. Any utility crossing an existing roadway, parking lot or other paved area shall be patched by the end of the working day.
b. All pipe and fittings shall be neatly stored in a location, which will cause the least disturbance to the public. All debris shall be removed and properly disposed of by the end of each working day.
Moss Park WWTF Improvement Project 01001-15 January 2024
c. Final Restoration Overlay: After completing all installations, and after testing of the pipe (but no sooner than 30-days after applying the S-I asphaltic surface), final restoration shall be performed. In no event shall final restoration begin after substantial completion. Final restoration shall provide an S-III asphaltic overlay as specified in an uninterrupted continuous operation until completion. Any additional restoration required after testing shall be repaired in a timely manner at no additional cost to the County.
d. Maintenance of all restored facilities shall be the Contractor’s responsibility. This maintenance shall be performed on an on-going basis during the course of construction. The Contractor’s Progress Schedule shall reflect the above restoration requirements.
e. Additional Restoration for Work in Business or Commercial Districts: The Contractor shall restore all private property, damaged by construction, to its original condition. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business accesses with the business owner. Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored within 24-hours of backfilling trench.
B. EXISTING UTILITIES
1. The locations of all existing underground piping, structures and other facilities are shown based on information received from the respective owner. The locations are shown without express or implied representation, assurance, or guarantee that they are complete or correct or that they represent a true picture of underground piping, conduit and cables to be encountered. It is the Contractor’s responsibility to verify all existing underground piping, structures and other facilities.
2. The Contractor shall, at all times, employ acceptable methods and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage or destruction of existing utility installations and structures; and shall, at all times in the performance of the Work, avoid unnecessary interference with, or interruption of, utility services; and shall cooperate fully with the owners thereof to that end.
3. When existing facilities are found to be in conflict with the Work, the County reserves the right to modify alignments to avoid interference with existing facilities.
4. All utilities, which do not interfere with the work, shall be carefully protected against damage. Any existing utilities damaged in any way by the Contractor shall be restored or replaced by the Contractor at his expense as directed by the County. Any existing facilities, which require operation to facilitate repairs, shall be operated only by the owner of the respective utility.
5. It is the responsibility of the Contractor to ensure that all utility and/or poles, the stability of which may be endangered by the proximity of excavation, be temporarily stayed and/or shored in position while work proceeds in the
Moss Park WWTF Improvement Project 01001-16 January 2024 vicinity of the pole and that the utility or other companies concerned be given reasonable advance notice of any such excavation.
C. CONNECTION TO EXISTING FACILITIES
1. Unless otherwise specified or indicated, Contractor shall make all necessary connections to existing facilities, including structures, drain lines, and utilities such as water, sewer, gas, telephone, and electric. In each case, Contractor shall receive permission from County or the owning utility prior to undertaking connections. Contractor shall protect facilities against deleterious substances and damage.
2. Connections to existing facilities which are in service shall be thoroughly planned in advance, and all required equipment, materials, and labor shall be on hand at the time of undertaking the connections. Work shall proceed continuously (around the clock) if necessary, to complete connections in the minimum time. Operation of valves or other appurtenances on existing utilities, when required, shall be by or under the direct supervision of the County or the owning Utility.
D. NOTICES
1. All governmental utility departments and other owners of public utilities, which may be affected by the Work, will be informed in writing by the Contractor two
(2) weeks after the execution of the Contract or Contracts covering the Work.
Such notice will be sent out in general and directed to the attention of the governmental utility departments and other owners of public utilities for such installations and structures as may be affected by the Work.
2. The Contractor shall comply with Florida Statute 553.851 regarding protection of underground gas pipelines. Evidence of notification to the gas pipeline owner shall be furnished to the County within two (2) weeks after the execution of the Contract.
3. It shall be the Contractor's responsibility to contact utility companies at least 72-hours in advance of breaking ground in any area or on any unit of the work so maintenance personnel can locate and protect facilities, if required by the utility company.
4. Utilities and other concerned agencies shall be notified at least 24-hours prior to cutting or closing streets or other traffic areas or excavating near underground utilities or pole lines.
5. The Contractor shall give a minimum five (5) working-day notice to utility personnel prior to interrupting a utility service (water, sewer, etc.).
6. When it is necessary to temporarily deny access to property, or when any utility service connection must be interrupted, Contractor shall give notices sufficiently in advance to enable the affected persons to provide for their needs. Notices shall conform to any applicable local ordinance and, whether delivered orally or in writing, shall include appropriate information concerning the interruption and instructions on how to limit inconvenience caused thereby.
Moss Park WWTF Improvement Project 01001-17 January 2024
E. EXPLORATORY EXCAVATIONS
1. Exploratory excavations shall be conducted by the Contractor for the purpose of locating underground pipelines or structures in advance of the construction.
Test pits shall be excavated in areas of potential conflicts between existing and proposed facilities and at piping connections to existing facilities a minimum of 48-hours or 1,000-feet in advance of work. If there is a potential conflict, the Contractor shall notify the County/Professional immediately.
Information on the obstruction to be furnished by the Contractor shall include:
Location, Elevation, Utility Type, Material and Size. Test pits shall be backfilled immediately after their purpose has been satisfied and the surface restored and maintained in a manner satisfactory to the County.
F. UTILITY CROSSINGS
1. It is intended that wherever existing utilities must be crossed, deflection of the pipe within specified limits and cover shall be used to satisfactorily clear the obstruction unless otherwise indicated on the Drawings. However, when in the opinion of the County this procedure is not feasible, the County may direct the use of fittings for a utility crossing or conflict transition as detailed on the Drawings.
G. RELOCATIONS
1. Relocations shown on the Drawings: Public utility installations or structures, including but not limited to poles, signs, fences, piping, conduits and drains that interfere with the positioning of the work which are shown on the Drawings to be removed, relocated, replaced or rebuilt by the Contractor shall be considered as part of the general cost of doing the Work and shall be included in the prices bid for the various contract items. No separate payment shall be made, therefore.
2. Relocations not shown on the Drawings
a. Where public utility installations or structures are encountered during the course of the work, and are not indicated on the Drawings or in the Specifications, and when, in the opinion of the County, removal, relocation, replacement or rebuilding is necessary to complete the Work, such work shall be accomplished by the utility having jurisdiction, or such work may be ordered, in writing by the County, for the Contractor to accomplish.
b. If such work is accomplished by the utility having jurisdiction, it will be carried out expeditiously and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement or rebuilding as required.
c. If such work is accomplished by the Contractor, it will be paid for as a Change Order.
3. All existing castings, including valve boxes, junction boxes, manholes, hand holes, pull boxes, inlets and similar structures in the areas of construction that are to remain in service and in areas of trench restoration and pavement
Moss Park WWTF Improvement Project 01001-18 January 2024 replacement, shall be adjusted by the Contractor to bring them flush with the surface of the finished work.
4. All existing utility systems which conflict with the construction of the work herein, which can be temporarily removed and replaced, shall be accomplished at the expense of the Contractor. Work shall be done by the utility unless the utility approves in writing that the Work may be done by the Contractor.
1.23 RELATED CONSTRUCTION REQUIREMENTS
A. PUBLIC INFORMATION OFFICER
1. The Contractor shall provide community interaction and coordination through a designated Public Information Officer (PIO). The PIO will provide resolution to complaints and problems from community members affected by the construction for the entire project duration. The PIO will manage a 24-hour hotline phone number for citizens to call. The PIO will field these calls, provide answers to questions, research issues with the project team or appropriate agencies and follow up each complaint in a timely manner. The PIO will maintain a daily diary of call and/or interactions with the community, as well as a complaint log chronicling all issues and proposed resolutions.
2. The PIO shall attend the project progress meetings and provide the project team with a report of public issues since the last progress meeting. The PIO will also disseminate roadway closures, sewer hookups, temporary and permanent restoration and other relevant construction information to the community, as well as, when appropriate, to the media, emergency services personnel and other interested agencies.
3. The designated PIO shall have previous experience in providing similar services on Orange County Utilities, Orange County Public Works or FDOT construction projects.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .