This specification document outlines the detailed requirements for a landscape construction project at the Advanced Technology Academy Practice Football Field located at 4800 Oakman Boulevard in Dearborn, Michigan. The project encompasses comprehensive site work including fine grading, irrigation system installation, topsoil preparation, seeding, sodding, and landscape maintenance. Key specifications detail work in multiple sections: fine grading to establish proper drainage and finished grades; irrigation system installation with underground piping, sprinkler heads, control valves, and electrical components; topsoil application with specific soil composition and testing requirements (pH range of 6.3 to 7.0, organic matter content of 3% to 10%); and lawn establishment through either seeding or sodding. The athletic field topsoil specifications require sand content of 90-95%, silt content of 2-5%, and clay content of 2-4%, with approved suppliers identified such as Osburn Industries, Inc. in Taylor, Michigan. For seeded areas outside the practice field, a sunny non-irrigated grass mix is specified as the base bid, while the practice field itself requires an irrigated athletic grass mix with specific Kentucky bluegrass and turf-type rye proportions at 7 pounds per 1,000 square feet.
The contractor must provide all labor, materials, equipment, and services to complete the work as shown on drawings and specified herein. Site inspection and subsurface investigations are the contractor's responsibility, with verification that existing grades are within 0.1 feet of proposed grades. The contractor must maintain a competent superintendent and employ skilled personnel to ensure smooth, aesthetically pleasing finish grading ideal for receiving sod and plant materials. A one-year warranty period applies from the date of installation acceptance, during which the landscape contractor guarantees against defects including plant death and unsatisfactory growth, except for defects resulting from owner neglect or damage by others. The contractor is responsible for establishing dense lawns free from lumps, depressions, and bare spots exceeding one foot of area or 3% of total lawn area, with maintenance including fertilizing, weeding, mowing, and application of herbicides and fungicides as required. All materials must be delivered in original unopened containers; sod must be cut, delivered, and installed within a 24-hour period; and the irrigation system must pass a 12-hour pressure test before final payment. Landscape Architect approval and written acceptance of installation are required before the warranty period begins, and the Owner assumes maintenance responsibilities upon final acceptance at the conclusion of the one-year warranty period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATA drawings - practice football field improvements.pdf | ||
| ATA - RFB for Practice Football Field (2019).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02220 - FINE GRADING
PART 1 - GENERAL
1.01 RELATED DOCUMENTS:
A. Attention is directed to Bidding and Contract Requirements, and General and Supplemental Requirements. which are hereby made a part of this section.
1.02 WORK INCLUDED:
A. Provide all labor, materials, necessary equipment and services to complete the Fine Grading work, as indicated on the drawings, as specified herein or both, except as for items specifically indicated as "NIC ITEMS".
B. Related work specified elsewhere:
1. Section 02933: Seeding
2. Section 02934: Sodding
1.03 SITE INSPECTION:
A. The Contractor shall visit the site and acquaint himself with all existing conditions. The Contractor shall be responsible for his own subsurface investigations, as necessary, to satisfy requirements of this Section. All subsurface investigations shall be performed only under time schedules and arrangements approved in advance by the Landscape Architect or Owner's Representative.
1.04 EXISTING CONDITIONS:
A. Obtain drawings showing proposed final grading from Civil Engineer, as indicated on drawings.
B. Verify that contours and grades established under that Contract are within one tenth (.1) of a foot of proposed grades shown on grading plans. Make whatever corrections and/or repairs necessary to make finish grades consistent with the requirements of the grading drawings and specifications.
1.05 UTILITIES:
A. Before starting site operations, verify all utilities that might interfere with the fine grading work.
B. Locate all existing, active utility lines traversing the site and determine the requirements for their protection. Preserve in operating condition all active utilities adjacent to or transversing the site that are designated to remain.
C. Observe rules and regulations governing respective utilities in working under requirements of this section. Adequately protect utilities from damage, remove or relocate as indicated, specified or required. Remove, plug or cap inactive or abandoned utilities encountered in excavation. Record location of active utilities.
1.06 QUALITY ASSURANCE:
A. Requirements of all applicable building codes and other public agencies having jurisdiction upon the work.
B. Primary emphasis should be given to the aesthetic appearance and functioning of berming and swales, as directed by the Landscape Architect or Owner's Representative. The Contractor shall employ skilled personnel and any necessary equipment to insure that finish grading is smooth, aesthetically pleasing, drains well and is ideal for receiving sod and plant materials.
PART 2 - MATERIALS
2.01 EXISTING SOIL:
A. Use on-site material, unless otherwise directed by Owner's Representative, free from debris, sod, biodegradable materials and other deleterious materials. The Contractor shall insure that all existing soil has sufficient percolation and surface drainage to support grasses and plant material and that extreme compaction occurs only in areas to receive paving.
B. In areas to receive seeding, verify that soil is scarified to depth of 4" and that soil contains enough organic matter to support and encourage rooting.
PART 3 - EXECUTION
3.01 JOB CONDITIONS:
A. Dust control: Use all means necessary to prevent dust from construction operations from being a nuisance to adjacent property owners and from damaging finish surfaces on adjacent paving, etc. Methods used for dust control are subject to approval by the Landscape Architect of Owner's Representative.
B. Burning: On-site burning will not be permitted.
C. Protection: Use all means necessary to protect curbs, gutters, sprinklers, utilities and vegetation designated to remain, and, in the event of damage, immediately make all repairs, replacements and dressings to damaged plants necessary to the approval of the Landscape Architect. Contractor shall incur all cost for the replacement of damaged objects and vegetation.
3.02 SCHEDULING:
A. Schedule all work in a careful manner with all necessary consideration for adjoining property owners and the public.
B. Coordinate schedule with other Contractors to avoid conflicts with their work.
3.03 EXCAVATION:
A. Excavate where necessary to obtain subgrades, percolation and surface drainage as required.
B. Materials to be excavated are unclassified.
C. Remove entirely any existing obstructions after approval by the Landscape Architect's or Owner's Representative.
D. Remove from site and dispose of debris and excavated material not required.
3.04 GRADING:
A. The Contractor shall establish finished grades as shown on the grading plan and as directed by the Architect, including areas where the existing grade has been disturbed by other work.
B. Finished grading shall be smooth, aesthetically pleasing, drain well and ready to receive sod and other plant material to full satisfaction of the Owner's Representative, Architect and Construction Manager.
3.05 COMPACTION:
A. Compact each layer of fill in designated areas with approved equipment to achieve a maximum density at optimum moisture, AASHTO T 180 - latest edition.
1. Under landscaped area, compaction shall not exceed 85% of maximum density.
B. The Contractor shall coordinate his work with the other trades.
C. The Contractor shall confine his operations to the area to be improved and to the areas allotted him by the Owner's representative for material and equipment storage.
D. The Contractor shall have a minimum of 5 years experience installing irrigation systems of comparable size and complexity.
1.04 SUBMITTALS:
A. Submit specific product information including make and model number to the irrigation consultant or landscape architect on backflow devices, valves, sprinklers, controller, wire connectors and wire, pipe and fittings, clamps. pumps (when specified) to be used on the project prior to purchasing materials. Submittals are subject to the irrigation consultant's approval.
B. Upon irrigation system acceptance, submit written operating and maintenance instructions. Provide format and contents as directed by the Landscape Architect. Include instruction sheets and parts lists for all operating equipment.
C. Provide a reproducible irrigation system record drawing showing sprinkler heads, valves, field splices, drains and pipelines including quick coupler and automatic valves. Drawing is to be given to the owner or the owner's representative at the final irrigation system walkthrough
1. Legibly mark drawings to record actual construction.
2. Indicate horizontal locations, with a minimum of two dimensions to permanent surface improvements.
3. Identify field changes of dimension and detail and changes made by Change Order.
1.05 DELIVERY, STORAGE AND HANDLING:
A. Deliver irrigation system components in manufacturer's original undamaged and unopened containers with labels intact and legible.
B. Deliver plastic piping in bundles, packaged to provide adequate protection of pipe ends, both threaded or plain.
C. Store and handle materials to prevent damage and deterioration.
D. Provide secure, locked storage for valves, sprinkler heads and similar components that cannot be immediately replaced, to prevent installation delays.
1.06 PROJECT CONDITIONS:
A. The bidder acknowledges that he has examined the site, plans and specifications, and the submission of a proposal shall be considered evidence that examination has been made.
B. It shall be the contracting installer's responsibility to report to the Owner's authorized representative any deviations between drawings, specifications and the site. Failure to do so prior to the installing of equipment and resulting in replacing and/or relocation equipment shall be done at the Contractor's expense.
C. The exact location of all existing utilities and structures and underground utilities are not indicated on the drawings; their locations shall be determined by the Contractor, and he shall conduct his work so as to prevent interruption of service or damage to them. The Contractor shall protect existing structures and utility services and be responsible for their replacement if damaged by him.
D. Minor adjustments in system layout will be permitted to clear existing fixed obstructions. Final system layout shall be acceptable to Landscape Architect.
1.07 CODES AND STANDARDS:
A. The entire installation shall fully comply with all local and state laws and ordinances and with all established codes applicable thereto.
B. Any permits for the installation of construction of the work included under this contract which are required by any of the legally constituted authorities having jurisdiction, shall be obtained and paid for by the Contractor, each at the proper time. He shall also arrange for and pay all costs in connection with any inspections and examinations required by these authorities.
C. In all cases where inspection of the sprinkler system work is required and/or where portions of the work are specified to be performed under the direction and/or inspection of the Owner's authorized representative, the Contractor shall notify the Owner's authorized representative at least 24 hours in advance of the time and such inspection and/or direction is required.
D. Any necessary re-excavation or alterations to the system needed because of failure of the Contractor to have the required inspections shall be performed at the Contractor's own expense.
1.08 SERVICE AND MAINTENANCE:
A. The Contractor shall service the system at the request during the guarantee period and shall be paid for work performed which is not covered by the guarantee. Contractor shall winterize the system the first year as part of this contract, and will provide written instructions to the Owner for future service and maintenance.
B. Return to the site during the subsequent spring season and demonstrate to the Owner the proper procedures for the system start-up, operation and maintenance.
C. After completion, testing and acceptance of the system, the Contractor will instruct the Owner's personnel in the operation and maintenance of the system.
1.09 OWNER'S ACCEPTANCE:
A. The completion of the contract will be accepted and Notice of Completion recorded only when the entire contract is completed to the satisfaction of the Owner's authorized representative.
B. Within ten (10) days of the Contractor's notification that the installation is complete, the Owner, or his Representative will inspect the installation and if a final acceptance is not given, will prepare a "Punch List" which, upon completion by the Contractor, will signify acceptance by the Owner.
C. Final payment will not be made without the receipt of an accurate as-built drawing by the Landscape Architect.
1.10 WARRANTY:
A. It shall be the Contractor's responsibility to ensure and guarantee satisfactory operation of the entire system and the workmanship and restoration of the area. The entire system shall be guaranteed to be complete and perfect in every detail for a period of one year from the date of its acceptance and he hereby agrees to repair or replace any such defects occurring within that year, free of expense to the Owner. Minor maintenance and adjustment shall be by Owner.
B. Contractor to guarantee that all trenches and other disturbed areas to be free from heaving or settling more than one-quarter (1/4"). Should it become necessary to adjust the grade, regrade the trench and reseed. This no-settlement clause shall extend over the entire period of guarantee of the job.
PART 2 - PRODUCTS
2.01 MATERIALS:
A. General:
1. All materials to be incorporated in this system shall be new and without flaws or defect and quality and performance as specified. All material overages at the completion of the installation are the property of the contractor and are to be removed from the site.
2. The Contractor shall use materials as specified. Material other than specified will be permitted only
H. Accessories:
1. Drainage fill: 1/2" x 3/4" washed pea gravel.
2. Fill shall be clean soil free of stones larger than 2" diameter, foreign matter, organic material and debris.
3. Provide imported fill material as required to complete the work. Obtain rights and pay all costs for imported materials.
4. Suitable excavated materials removed to accommodate the irrigation system work may be used as fill material subject to the Landscape Architect's review and acceptance.
PART 3 - EXECUTION
3.01 EXAMINATION:
A. Examine final grades and installation conditions. Do not start irrigation system work until unsatisfactory conditions are corrected.
3.02 PREPARATION:
A. Layout and stake the location of each pipe run and all sprinkler heads and sprinkler valves. Obtain Landscape Architect's acceptance of layout prior to excavating, unless specifically waived by the Landscape Architect.
3.03 EXCAVATING AND BACKFILLING:
A. Excavating shall be considered unclassified and shall include all materials encountered, except materials that cannot be excavated by normal mechanical means. Excavate trenches of sufficient depth and width to permit proper handling and installation of pipe and fittings. Excavate to depths required to provide 2" depth of earth fill or sand bedding for piping when rock or other unsuitable bearing material is encountered.
B. Pipe pulling will be allowed for lateral pipe only, provided soil moisture content and other conditions are suitable to allow for full depth of bury with a minimum of stretching and scraping of the pipe. Landscape Architect reserves the right to determine suitability or conditions. If the pulling method is used, the pipe "plow" shall be a vibratory type.
C. Fill to match adjacent grade elevation with approved earth fill material. Place and compact fill in layers not greater than 8" depth.
D. Provide approved fine grained earth fill or sand to point 4" above the top of pipe, where soil conditions are rocky or otherwise objectionable.
E. Fill to within 6" of final grade with approved excavated or borrow fill materials free of lumps or rocks larger than 2" in any dimension.
F. The top 6" of backfill shall be topsoil, free of rocks, subsoil or trash. Any special soil mixture shall be replaced to the original condition it was prior to irrigation installation.
G. Except as indicated, install irrigation mains with a minimum cover of 18" based on finished grades. Install irrigation laterals with a minimum cover of 14" based on finished grades.
H. Excavate trenches and install piping and backfill during the same working day. Do not leave open trenches or partially filled trenches open overnight.
3.04 UNDERGROUND PIPE:
A. Install plastic pipe in accordance with manufacturer's installation instructions as ASTM D2274. Provide for thermal expansion and contraction.
B. Saw cut plastic pipe. Use a square-in-sawing vice, to ensure a square cut. Remove burrs and shavings at cut ends prior to installation.
C. Make PVC plastic to plastic joints with solvent weld joints. Use only primer and solvent recommended by the pipe manufacturer. Install plastic fittings in accordance with pipe manufacturer's instructions and ASTM D2855. Contractor shall make arrangements with pipe manufacturer for all necessary field assistance.
D. Allow joints to set at least 24 hours before pressure is applied to the system.
E. Uncoil poly-pipe and insert fitting full depth. Secure poly-pipe to insert fittings with stainless steel clamps. Double clamp pipe 1-1/2" diameter and larger.
F. Maintain pipe interiors free of dirt and debris. Close open ends of pipe by capping, taping or other acceptable method when pipe installation is not in progress.
G. All mainline and continuously pressurized pipe is to be installed using open trenches. Lateral pipe may be installed by "Plowing" if soil conditions permit, and soils do not contain gravel, rock, construction debris or other potential damaging material.
H. Install thrust blocks on the mainline pipe work in accordance with pipe manufacturer's written instructions.
3.05 SPRINKLER INSTALLATION:
A. Install fittings and sprinkler heads in accordance with manufacturer's instructions, except as otherwise indicated.
B. Set sprinkler heads perpendicular to finished grades, except as otherwise indicated, and position to prevent contact with grounds maintenance equipment. Install sprinklers 6" off walks and curbs. Locate sprinkler heads to assure proper coverage of indicated sprinkler heads to assure proper coverage if indicated areas. Do not exceed sprinkler head spacing distances indicated.
C. Provide pop-up spray heads and rotary sprinklers ¾" IPS or smaller with two elbow poly swing joint riser as shown on drawings.
D. Provide all quick coupling valves with three elbow swing joint, schedule 40 galvanized steel, as detailed on drawings.
3.06 VALVE INSTALLATION:
A. Electric valve installation shall be as indicated on drawings. All electrical and manual valves shall be enclosed in a minimum ten (10) inch width valve box. Add extensions as required to prevent soil settlement around the valve. Set box flush with finish grade and aligned with adjacent boxes and/or adjoining sitework.
B. Install valve access boxes on a suitable base of gravel to provide a level foundation at proper grade and to provide drainage of the access box. Support box with block or notch box to protect pipe under box.
3.07 DRAINS
A. Although it is intended the system will be winterized using compressed air. Contractor to install manual drain valves at low points in the system to assist in winterization and service.
3.08 ELECTRICAL INSTALLATION:
A. Install electrical control wire in the piping trenches wherever possible. Place wire in trench adjacent to or underneath mainlines but not above. Install wire with slack to allow for thermal expansion and contraction. Expansion joints in wire may be provided at 200 foot intervals by making 5-6 turns of the wire around a piece of 1/2" pipe instead of slack. Where necessary to run wire in a separate trench, provide a minimum cover of 24".
B. Provide minimum 24" slack at remote control valves and at all wire splices to allow raising the valve bonnet or splice to the surface without disconnecting the wires for repair.
1. Chemical analysis indicating:
a. fertility: pH, nitrate nitrogen, ammonia nitrogen, phosphate phosphorous, potassium, calcium, magnesium.
b. suitability: total salinity, boron, sodium, potassium, calcium, magnesium, chloride, sulfate.
2. Physical properities including:
a. organic content
b. particle size distribution
1.04 SUBMITTALS:
A. Submit two certified copies of soil tests for approval prior to initiating work.
1.05 PROJECT CONDITIONS:
A. Known underground and surface utility lines are indicated on the civil drawings.
B. Protect existing trees, plants, lawns and other features designated to remain as part of the landscaping work.
C. Promptly repair damage to adjacent facilities caused by topsoil operations. Cost of repair at Contractor's expense.
D. Promptly notify the Landscape Architect of unexpected sub-surface conditions.
PART 2 - PRODUCTS
2.01 MATERIALS:
A. Provide topsoil as required to complete job. Topsoil must meet testing criteria results specified. All processing, cleaning and preparation of this topsoil to render it acceptable for use is the responsibility of this contractor.
B. Supplied and/or stockpiled topsoil, shall be fertile, friable sandy, sandy loam soil without admixture of subsoil and free of stones, stumps, root, trash, debris, and other materials deleterious to plant growth. Topsoil shall not frozen or muddy. Ph of existing or supplied soil to range between
6.3 and not more than 7.0. Topsoil that does not meet this pH range shall be amended with approved pH adjusters. Topsoil shall contain not less than 3% and not greater than 10% organic matter determined by loss through ignition. Clay content as determined by Bouyoucous Hydrometer Test shall range from 5%-10%. Silt content shall not exceed 15%.
C. Gradation of Topsoil:
| Sieve Designation Percent Passing 1 inch screen | 100 |
| ¼ inch screen | 97-100 |
| No. 10 U.S.S. mesh sieve | 95-100 |
| No. 140 U.S.S. | 15-35 |
| No. 4 (4.76mm) | 100 |
| No. 10 (2.00mm) | 95-100 |
| No. 18 (1.00mm) | 90-100erial |
| No. 35 (500 micron) | 65-100 |
| No. 60 (250 micron) | 0-50 |
| No. 140 (105 micron) | 0-20 |
| No. 270 (53 micron) | 0-10 |
Percentages shall be based on dry weight of the sample.
D. Gradation of Imported Topsoil for Athletic Fields: Sand (90%-95%), Silt (2%-5%), Clay (2%-4%).
Sieve Designation Percent Retained No. 10 (2.00mm) 3%-10% No. 18 (1.00mm) 3%-10% No. 35 (0.50mm) Greater than 50% No. 60 (0.25mm) Greater than 50% No.100 (0.15mm) Less than or equal to 25% No. 140(0.10mm) Less than or equal to 10% No. 270(0.05mm) Less than or equal to 10%
Percentages shall be based on dry weight of the sample. Athletic Field Topsoil available from:
Osburn Industries, Inc., or approved substitute. 5850 Pardee Road Taylor, Michigan (313) 292-4140
Contact: Tim Osburn PART 3 - EXECUTION
3.01 EXAMINATION:
A. Examine rough grades and installation conditions. Do not start topsoil work until unsatisfactory conditions are corrected.
3.02 FINISH GRADING:
A. Perform topsoiling within contract limits, including adjacent transition areas, to new elevations, levels, profiles, and contours indicated. Provide uniform levels and slopes between new elevations and existing grades.
B. Grade surfaces to assure areas drain away from building structures and to prevent ponding and pockets of surface drainage.
C. Lawn Areas: Supply and spread topsoil to a minimum uniform depth of 4" or as noted. Remove clumps larger than 1" in diameter.
D. Grade lawn areas to a smooth, free draining even surface with a loose, moderately coarse texture ready to accept seed or sod.
E. Provide earth crowning where indicated on drawings.
F. Crowning/mounding to be free flowing in shape and design, as indicated, and to blend into existing grades gradually so that toe of slope is not readily visible. Landscape Architect to verify final contouring before planting.
G. Regardless of finish grading elevations indicated, it is intended that grading be such that proper drainage of surface water will occur and that no low areas are created to allow ponding. Contractor to consult with Owner or Landscape Architect regarding minor variations in grade elevations before rough grading is completed.
3.03 CLEANING:
A. Upon completion of topsoiling operations, clean areas within contract limits, remove tools and equipment. Site shall be clear, clean, free of debris and suitable for site work operations.
END OF SECTION 02921
D. Seed Mixture: Proportioned by weight as indicated below:
Type 1: Athletic Grass Mix (Irrigated Lawn Areas) (ALTERNATE 2) Minimum Minimum
| Proportion Purity Germination Merit Kentucky Blue | 25% | 95% | 80% |
| Baron Kentucky Blue | 25% | 95% | 80% |
| Newport Kentucky Bluegrass 25% | 95% | 80% | |
| Manhattan II Turf Type Rye 25% | 95% | 80% |
Spread at a rate of 7 lbs./1000 sf. No noxious weed seeds permited
Type 2: FOR ALL AREAS OUTSIDE OF PRACTICE FIELD Sunny (Non Irrigated) (BASE BID)
Minimum Minimum Proportion Purity Germination
| Creeping Red Fescue | 60% | 95% | 80% |
| Koket Chewings | 20% | 95% | 80% |
| Perennial Rye | 10% | 95% | 80% |
| Poa Trivialis | 10% | 95% | 80% |
Spread at a rate of 7 lbs./1000 sf. No noxious weed seeds permited
E. Fertilizer: 6-24-3. Granular, non-burning product composed of not less than 50% organic slow acting, guaranteed analysis, professional fertilizer.
F. Ground limestone: Used if required by soil test report. Containing not less than 85% of total carbonates and ground to such fineness that 50% will pass through a 100 mesh sieve and 90% will pass through a 20% mesh sieve.
G. Granulated sulfur 0-0-0-90 to lower PH. Use if determined by soil tests to be necessary. Apply per soil test recommendations at specified rate.
H. Straw mulch: Used in crimping process only. Clean oat or wheat straw well seasoned before bailing, free from mature seed-bearing stalks or roots of prohibited or noxious weeds.
I. Water: Free of substance harmful to seed growth. Hoses or other methods of transportation furnished by Contractor. Test for excess Alkalinity, if necessary.
J. Wood Cellulose Fiber Mulch: Degradable green dyed wood cellulose fiber or 100% recycled long fiber pulp, free from weeds or other foreign matter toxic to seed germination and suitable to hydramulching.
AVAILABLE MANUFACTURER AND TYPE:
CONWED HYDROMULCH: CONWED CORP., ST. PAUL MN
K. Paper Mulch: Degradable paper mulch, free of foreign debris. Do not use on slopes over 30%. Available manufacturer and type NU Wool Hydro Mulch, Jennison, MI.
L. Tackifier: Liquid concentrate diluted with water forming a transparent 3-dimensional film like crust permeable to water and air and containing not agents toxic to seed germination.
AVAILABLE MANUFACTURER AND TYPE: FINN HYDROSTIK, FAIRFIELD, OH
PART 3 - EXECUTION
3.01 EXAMINATION:
A. Landscape architect must approve finish surfaces, grades, topsoil quality and depth. Do not start seeding work until unsatisfactory conditions are corrected.
3.02 PREPARATION OF SEEDED LAWN AREAS:
A. Limit preparation to areas which will be immediately seeded.
B. Treat lawn areas if required with "Round Up", by Monsanto, per label directions to kill existing vegetation prior to seeding.
C. Loosen topsoil of lawn areas to minimum depth of 4". Remove stones over 1" in any dimension and sticks, roots, rubbish and extraneous matter.
D. Grade lawn areas to a smooth, free draining even surface with a loose, moderately coarse texture. Roll and rake, remove ridges and fill depressions as required to drain.
E. Apply amendments to supplied or existing topsoil, if required by soil test report, at rate determined by the soil test, to adjust pH of topsoil to not less than 7.0 nor more than 6.8. Distribute evenly by machine and incorporate thoroughly into topsoil.
F. Apply fertilizer to indicated turf areas at a rate equal to 1 lb. of actual nitrogen per 1,000 sq. ft. (43 lbs/acre). Omit this process if applied with hydroseeding process.
G. Apply fertilizers by mechanical rotary or drop type distributor, thoroughly and evenly incorporated with soil to a depth of 1" by discing or other approved method. Fertilize areas inaccessible to power equipment with hand tools and incorporate into soil.
H. Restore prepared areas to specified condition if eroded, settled or otherwise disturbed after fine grading and prior to seeding.
3.03 INSTALLATION:
A. Seed lawns only between April 1 and June 1 and fall seeding between August 15 and October 15 or at such other times acceptable to Landscape Architect.
B. Seed immediately after preparation of bed. Seed indicated areas within contract limits and areas adjoining contract limits disturbed as a result of construction operations.
C. Perform seeding operations when the soil is dry and when winds do not exceed 5 miles per hour velocity.
D. Apply seed with a rotary or drop type distributor. Install seed evenly by sowing equal quantities in 2 directions, at right angles to each other.
E. Sow seed at a rate of 7 lbs/1000 sf. (300 lbs/acres).
SECTION 02934 - SODDING : BASE BID. (ALTERNATE 1: BIG ROLL SOD) PART 1 - GENERAL
A. Attention is directed to Bidding and Contract Requirements, and to General and Supplemental Conditions, hereby made a part of this Section.
1.02 DESCRIPTION OF WORK:
A. Extent of sodded lawns is shown on drawings and by provisions of this Section.
B. Types of work required include the following:
1. Soil preparation
2. Sodding lawns
C. Related work specified elsewhere:
1. Section 02810: Irrigation System
2. Section 02921: Topsoil
3. Section 02970: Landscape Maintenance and Warranty Standards
1.03 QUALITY ASSURANCE:
A. Sod: Comply with American Sod Producers Association (ASPA) classes of sod materials.
1.04 SUBMITTALS:
A. Submit sod growers certification of grass species including special shade grown species. Identify source location.
B. Manufacturer's certification of fertilizer.
1.05 DELIVERY, STORAGE AND HANDLING:
A. Cut, deliver and install sod within 24 hour period.
B. Do not harvest or transport sod when moisture content may adversely affect sod survival.
C. Protect sod from sun, wind and dehydration prior to installation. Do not tear, stretch or drop sod during handling and installation.
1.06 PROJECT CONDITIONS:
A. Work notifications: Notify Landscape Architect at least 7 working days prior to start of sodding operation.
B. Protect existing utilities, paving and other facilities from damage caused by sodding operations.
C. Perform sodding work only after planting and other work affecting ground surface has been completed.
D. Restrict traffic from lawn areas until grass is established. Erect signs and barriers as required.
E. Provide hose and lawn watering equipment as required.
F. An irrigation system will be installed prior to sodding. Locate, protect and maintain the irrigation system during sodding operations. Repair irrigation system components damaged during sodding operations at this Contractor's expense.
1.07 WARRANTY:
A. Refer to Section 02970 PART 2 - PRODUCTS
2.01 MATERIALS:
A. Sod: An "approved" nursery grown blend of improved Kentucky Blue-grass varieties.
1. Sod containing Common Bermudagrass, Quackgrass, Johnsongrass, Poison Ivy, Nutsedge, Nimblewill, Canada Thistle, Timothy, Bentgrass, Wild Garlic, Ground Ivy, Perennial Sorrel or Bramegrass weeds will not be acceptable.
B. Provide well-rooted, healthy sod, free of diseases, nematodes and soil borne insects. Provide sod uniform in color, leaf texture, density and free of weeds, undesirable grasses, stones, roots, thatch and extraneous material; viable and capable of growth and development when planted.
C. Furnish sod machine stripped in square pads or strips not more than 3'-0" long; uniformly 1" to 1-1/2" thick with clean cut edges. Mow sod before stripping.
D. Fertilizer: Granular, non-burning product composed of not less than 50% organic slow acting, guaranteed analysis professional fertilizer.
1. Type A: Starter fertilizer containing 20% nitrogen, 12% phosphoric acid and 8% potash by weight or similar approved composition.
E. Ground limestone: Containing not less than 85% of total carbonates and ground to such fineness that 50% will pass through a 100 mesh sieve and 90% will pass through a 20 mesh sieve. Use if determined by soil tests to be necessary.
F. Stakes: Softwood, 3/4" x 8" long.
G. Water: Free of substance harmful to sod growth. Hoses or other methods of transportation furnished by Contractor.
H. Topsoil: Refer to Section 02921 PART 3 - EXECUTION
3.01 EXAMINATION:
A. Examine finish surfaces, grades, topsoil quality and depth. Do not start sodding work until unsatisfactory conditions are corrected.
3.02 PREPARATION:
A. Limit preparation to areas which will be immediately sodded. Spread topsoil, fine grade.
B. Treat lawn areas with "Round Up", by Monsanto, per label directions as required to kill existing vegetation prior to sodding.
C. Loosen topsoil of lawn areas to minimum depth of 3". Remove stones over 1" in any dimension and sticks, roots, rubbish and extraneous matter.
icron)
D. Grade lawn areas to smooth, free draining and even surface with a loose, uniformly fine texture. Roll and rake; remove ridges and fill depressions as required to drain.
E. Apply type A fertilizer at the rate equal to 1.0 lb. of actual nitrogen per 1,000 sq. ft. (43 lbs./acre). Apply fertilizer by mechanical rotary or drop type distributor, thoroughly and evenly incorporated with
SECTION 02970 - LANDSCAPE MAINTENANCE AND WARRANTY STANDARDS
A. Attention is directed to Bidding and Contract Requirements, and to General and Supplemental Conditions, hereby made a part of this Section.
1.02 DESCRIPTION OF WORK:
A. The requirements of this section include a one year warranty period from date of acceptance of installation.
B. Related Work Specified Elsewhere:
1. Section 02921: Topsoil
2. Section 02933: Seeding
3. Section 02934: Sodding
1.03 ACCEPTANCE OF INSTALLATION:
A. At the completion of all landscape installation, or pre-approved portions thereof, the Landscape Contractor shall request in writing an inspection for acceptance of installation in which the Landscape Contractor, Landscape Architect and Owner's Representative shall be present. After this inspection a "Punch List" will be issued by the Landscape Architect and/or Owner's Representative. After completion of punch list items, the Landscape Architect, Contractor and Owner's Representative shall re-inspect the project and upon satisfactory a completion of punch list items, issue a written statement of acceptance of installation and establish the beginning of the project warranty period.
B. It is the responsibility of the Landscape Contractor to make the above written request for inspection of installation in a timely fashion. If there is plant material loss prior to the Landscape Contractor's written request for inspection of installation, the Landscape Contractor shall make all replacements of this dead material at no additional cost. These replacements are not considered to be the required one (1) replacement of dead plant material by the Landscape Contractor during the one (1) year project warranty period, as outlined below.
C. Landscape work may be inspected for acceptance in parts agreeable to Owner's Representative and Landscape Architect provided work offered for inspection is complete, including maintenance as required.
D. For work to be inspected for partial acceptance, supply a written statement requesting acceptance of this work completed to date.
1.04 PROJECT WARRANTY:
A. The project warranty period begins upon written acceptance of the project installation by Landscape Architect and Owner's Representative.
B. The landscape contractor accepts responsibility for the irrigation system operation, watering schedule, watering amounts and monitoring system for duration of maintenance and warranty period.
C . The Landscape Contractor shall guarantee trees, shrubs, ground cover bed and sodded areas through construction and for a period of one year after date of acceptance of installation against defects including death and unsatisfactory growth, except for defects resulting from neglect by owner, abuse or damage by others, or unusual phenomena or incidents which are beyond Landscape Contractor's control.
D. The Landscape Contractor shall warranty plants due to overwatering or under watering by automatic irrigation system during maintenance and warranty period.
1.05 MAINTENANCE
A. To insure guarantee standards, the following maintenance procedures shall be executed during construction and for the full project warranty period.
B. Maintenance of Seeded Lawn Areas:
1. The Contractor shall establish a dense lawn of permanent grasses, free from lumps and depressions or any bare spots, none of which is larger than one foot of area up to a maximum of 3% of the total seeded lawn area. Any part of the seeded lawn that fails to show a uniform growth and/or germination shall be reseeded until a dense cover is established.
2. If seeded in fall or if not considered acceptable at that time, continue maintenance the following spring until acceptable lawn is established.
3. The Contractor shall provide a minimum of two cuttings of the lawn or more as necessary until the inspection and acceptance of installation by the Owner's Representative and Landscape Architect. When the lawn reaches 3 inches in height it shall be cut to 2 inches in height. When meadow lawn reaches 6" in height it shall be cut to 4" in height.
4. The Owner assumes cutting responsibilities following the acceptance of installation by the Owner's Representative and the Landscape Architect.
5. After acceptance of installation, and for the duration of the project warranty period the Landscape Contractor shall continue all other maintenance procedures including fertilizing and weeding, and other operations such as rolling, regrading, replanting, and applying herbicides, fungicides, insecticides as required to establish a smooth, acceptable lawn free of eroded or bare areas.
6. Repair, rework, and re-seed all areas that have washed out, and eroded, or do not substantially germinate.
7. See Section 1.05,B: Items 6 and 7.
8. At conclusion of project warranty period and after receiving written final acceptance by Owner's Representative and Landscape Architect, the Owner shall assume all seeded lawn maintenance responsibilities.
C. Maintenance of Sodded Lawn Area:
1. Maintain sodded lawn areas, including watering, fertilizing, spot weeding, mowing, application of herbicides, fungicides, insecticides, and resodding until a full, uniform stand of sod is knitted to topsoil.
2. Water sod thoroughly, as required to establish proper rooting.
3. Repair, rework and resod all areas that have washed out or are eroded. Replace undesirable or dead areas with new sod.
4. Provide a uniform stand of grass by watering, mowing, and maintaining lawn areas until acceptance of installation. Resod areas, with specified materials, which fail to provide a uniform stand of grass until all affected areas are accepted by Landscape Architect.
5. Mow lawn areas as soon as lawn top growth reaches a 3" height. Cut back to 2" height. Repeat mowing as required to maintain specified height. Not more than 40% of grass leaf shall be removed at any single mowing. Minimum of two cuttings.
6. Sodded areas will be acceptable provided all requirements, including maintenance, have been complied with, and a healthy, even colored viable lawn is established, free of
DESIGN
PLANNING
)114 Rayson Street Suite 2A
Northville, MI 48167
P. 248.374.3222
B. No backfill shall be placed against any masonry or other exposed building surface until permission has been given by the Owner's Representative, and in no case until the masonry has been in place seven days.
C. Compaction in limited areas shall be obtained by the use of mechanical tampers or approved hand tampers. When hand tampers are used, the materials shall be deposited in layers not more than four inches thick. The hand tampers used shall be suitable for this purpose and shall have a face area of not more than 100 square inches. Special precautions shall be taken to prevent any wedging action against masonry or other exposed building surfaces.
3.06 CORRECTION OF GRADE:
A. Bring to required grade levels areas where settlement, erosion or other grade changes occur.
Adjust grades as required to carry drainage away from buildings and to prevent ponding around the buildings and on pavements.
B. Remove all rock or objectionable material larger than 1" any direction prior to commencing landscaping.
C. Contractor shall be responsible for stabilizing grades by approved methods prior to landscaping, and shall be responsible for correction of grades as mentioned above, and clean up of any wash outs or erosion.
END OF SECTION 02220
SECTION 02810 - IRRIGATION SYSTEM
after written application by the Contractor and written approval by the Landscape Architect. Substitutions will only be allowed when in the best interest of the Owner.
B. Pipe and Fittings:
1. Pipe sizes shall conform to those shown on the drawings. No substitutions of smaller pipe sizes will be permitted, but substitutions of larger size may be approved. All pipe damaged or rejected because of defects shall be removed from the site at the time of said rejection.
2. Provide pipe continuously and permanently marked with manufacturer's name or trademark, size schedule and type of pipe working pressure at 73 degrees F. and National Sanitation Foundation (NSF) approval.
3. All mainline piping and underground piping under continuous pressure plus all pipe 2-1/2" or larger whether a lateral or mainline, shall be rigid, unplasticized polyvinyl chloride pipe extruded from virgin parent material, ASTM D 2241. Provide pipe homogeneous throughout and free from visible cracks, holes, foreign materials, blisters wrinkles and dents.
4. PVC Pipe 2" diameter or larger shall be SDR 26, Class 160 unless stated otherwise on the drawing.
5. PVC Pipe 3" and smaller shall be solvent weld type.
6. PVC pipe fittings for sizes 3" and smaller shall be ASTM D2466 schedule 40 PVC molded fittings suitable for solvent weld. All threaded PVC pipe fittings shall be ASTM D2467, Schedule 80 PVC.
7. Saddle and cross fittings are not permitted. Use male adapters for plastic to metal connections. Hand tighten male adapters plus one turn with a strap wrench.
8. All pipe downstream from zone valves, sized 2" and smaller, shall be flexible non-toxic polyethylene pipe. Polyethylene pipe shall be ASTM rated at 80 PSI minimum working pressure, and in conformance with ASTM 2239, NSF approved. Pipe larger than 2" size shall be PSI as specified for C.
Connect each remote control valve to one station of a controller except as otherwise indicated.
Where there is to be more than one valve per station, make required splice at the control timer.
D. Make splices only at valves, unless otherwise unavoidable. Locate all field splices on the as-built drawing.
3.09 FLUSHING AND TESTING:
A. After all new sprinkler piping and risers are in place and connected for a given section and all necessary division work has be completed, and prior to the installation of sprinkler heads, all control valves shall be opened and a full head of water used to flush out the system.
B. Sprinkler main shall be tested under normal water pressure for a period of 12 hours. If leaks occur, repair and repeat the test. Give Landscape Architect 24 hours notice prior to testing.
C. Testing of the system shall be performed after completion of each section or completion of the entire installation; and any necessary repairs shall be made, at the Contractor's expense, to put the system in good working order before final payment by the Owner.
D. Adjustment of the sprinkler heads and automatic equipment will be done by the contractor upon completion of installation to provide optimum performance. Minor adjustments during the guarantee period will be made by the owner.
3.10 CLEAN UP:
A. Contractor shall keep the premises free from rubbish and debris at all times and shall arrange his material storage so as not to interfere with the Owner's operation of the job. Contractor shall remove and legally dispose of all unused material, rubbish and debris, including unsuitable excavated material from the site.
SECTION 02933 - SEEDING (SEE ALTERNATE 2. SEEDING IN ALL AREAS OUTSIDE OF PRACTICE FIELD SHALL BE BASE BID)
PART 1 - GENERAL
1.01 RELATED DOCUMENTS:
A. Attention is directed to Bidding and Contract Requirements, and to General and Supplemental Requirements, which are hereby made a part of this Section.
1.02 DESCRIPTION OF WORK:
A. Extent of seeded lawns is shown on drawings and by provision of this Section.
B. Types of work required includes the following:
1. Soil preparation
2. Seeding lawns
3. Mulching
4. Hydroseeding lawns (Contractor's option)
C. Related Work Specified Elsewhere:
1. Section 02921: Topsoil
2. Section 02970: Landscape Maintenance and Warranty Standards
1.03 SUBMITTALS:
A. Submit seed vendor's certification for required grass seed mixture, indicating percentage by weight and percentages of purity, germination and weed seed for each grass species.
F. After seeding, rake or drag surface of soil lightly to incorporate seed into top 1/8" of soil. Roll with light lawn roller.
3.04 MULCHING:
A. Place straw mulch on seeded areas within 24 hours after seeding.
B. Place straw mulch uniformly in a continuous blanket at a rate of 2-1/2 tons per acre or (2) 50 lb. bales per 1,000 sq. ft. of area. A mechanical blower may be used for straw mulch application when acceptable to the Architect.
C. Crimp straw into soil by use of a "crimper". Two passes in opposite direction required.
3.05 HYDROSEEDING: (Optional Method)
A. Use a hydromulcher (sprayer) and apply mixture(s) at the following rate. Mix in accordance with manufacturer's recommendations.
B. Apply hydroseed slurry to indicated areas. Use tackifier only on erosion prone areas. Apply fertilizer with hydro mix.
Seed: 300 pounds per acre Fertilizer: 400 pounds per acre Tackifier: 60 gallons per acre Wood Cellulose Fiber Mulch: 2000 pounds per acre
C. Care must be taken not to get hydroseed materials on buildings, walks, roadways, plant beds etc.
the soil to depth of 1" by discing or other approved methods. Fertilize areas inaccessible to power equipment with hand tools and incorporated it into soil.
F. Dampen dry soil prior to sodding.
G. Restore prepared area to specified condition if eroded, settled or otherwise disturbed after fine grading and prior to sodding.
3.03 INSTALLATION:
A. Lay sod to form a solid mass with tightly-fitted joints. Butt ends and sides of sod strips. Do not overlay edges. Stagger strips to offset joints in adjacent course. Remove excess sod to avoid smothering of adjacent grass. Provide sod pad top flush with adjacent curbs, sidewalks, drains and seeded areas.
B. Do not lay dormant sod or install sod on saturated or frozen soil.
C. Install initial row of sod in a straight line, beginning at bottom of slopes, perpendicular to direction of the sloped area. Place subsequent rows parallel to and lightly against previously installed row.
D. Peg sod on slopes greater than 3 to 1 to prevent slippage at a rate of 2 stakes per yd. of sod.
E. Water sod thoroughly with a fine spray immediately after laying.
F. Roll with light lawn roller to ensure contact with sub-grade.
G. Sod indicated areas within contract limits and areas adjoining contract limits disturbed as a result of construction operations.
3.04 MAINTENANCE:
weed, undesirable grass species, disease, and insects.
7. After acceptance of installation, and for the duration of the project warranty period the Landscape Contractor shall continue all maintenance procedures including fertilizing, weeding, rolling, regrading, resodding and applying herbicides, fungicides, insecticides as required to establish a smooth acceptable lawn, free of eroded or bare areas. The landscape contractor is not responsible for mowing after acceptance of installation.
8. See Section 1.05,B: Items 6 and 7.
9. At Conclusion of project warranty period and after receiving written final acceptance by Owner's Representative and Landscape Architect, the Owner shall assume all sodded lawn maintenance responsibilities.
1.06 FINAL ACCEPTANCE:
A. At the conclusion of the project warranty period the Landscape Contractor shall request a project inspection for final acceptance in which the Landscape Contractor, Landscape Architect and Owner's Representative shall be present. After this inspection a "Punch List" will be issued by the Landscape Architect. Upon completion of all punch list items, the Landscape Architect and Owner's Representative shall reinspect the project and issue a written statement of final acceptance. Upon final acceptance the Owner assumes all main-tenance responsibilities for the landscape of the project. PART 2 AND 3 - PRODUCTS AND EXECUTION Not Applicable.
Project:
Advanced Technology Academy Practice Football Field 4800 Oakman Boulevard
Dearborn, MI 48126
Client:
Advanced Technology Center 4800 Oakman Boulevard Dearborn, MI 48126
| Job Number: | A21-191 |
| Drawn: | MS |
| Checked: | MR |
A. Attention is directed to Bidding and Contract Requirements and General and Supplemental Requirements, which are hereby made a part of this Section.neces mainlines. PE 2306 fittings for polyethylene pipe shall be ASTM D2609 insert type fittings. Saddle and cross fittings not permitted. All joints shall be secured with stainless steel band and screw clamps.
9. Primer and solvent for use with PVC pipe to conform to ASTM D2564. Primer to be purple in color. Solvent to be appropriate for pipe and fitting type and weather conditions.
END OF SECTION 02810
SECTION 02921 - TOPSOIL
1.04
DELIVERY, STORAGE AND HANDLING:
A. Deliver seed and fertilizer materials in original unopened containers, showing weight, analysis and name of manufacturer. Store in a manner to prevent wetting and deterioration.
1.05 PROJECT CONDITIONS:
3.06 LAWN ESTABLISHMENT:
A. Establish dense lawn of permanent grasses, free from lumps and depressions. Any area failing to show uniform germination to be reseeded; continue until dense lawn established. Damage to seeded area resulting from erosion to be repaired by Contractor.
A. Refer to Section 02970
3.05 ACCEPTANCE:
A. Refer to Section 02970
END OF SECTION 02970
Date:
Scale:
05.07.19
1.02 DESCRIPTION OF WORK:
A. Extent of irrigation system work is shown on drawings and by provisions of this Section.
B. The sprinkler system shall be constructed using sprinklers, valves, piping, fittings, controllers, wiring, etc., of size and types as shown on drawings and as called for in these specification. The system shall be constructed to grades and conform to areas and locations as shown on the drawings.
C. Sprinkler lines shown on the drawings are essentially diagrammatic. Spacing of the sprinkler heads or quick coupling valves are shown on the drawings and shall be exceeded only with the permission of the Owner's authorized representative.
D. Unless otherwise specified or indicated on the drawings, the construction of the sprinkler system shall include the furnishing, installing and testing of all mains, laterals, risers and fittings, sprinkler heads, quick coupling valves, control valves, and other necessary specialties and the removal and/or restoration of existing improvements, excavating and backfill, and all other work in accordance with plans and specifications as required for a complete system.
Related work specified elsewhere:
1. Section 02934: Sodding
2. Section 02950: Trees, Shrubs and Ground Covers
1.03 QUALITY ASSURANCE:
A. The Contractor shall maintain continuously a competent superintendent, satisfactory to the Owner, with authority to act for him in all matters pertaining to the work.
10. All above grade pipe shall be type 'M' copper. Fittings shall be cast brass or wrought copper.
Control System
C.. The automatic controllers and valves shall be as shown on drawings.
D. Control Wire and Connections:
1. Control wire shall be Type UF, UL approved, for direct burial and shall be Size 14 or larger, as noted on the plans. Conductor to be single strand soft annealed copper.
2. 24 volt control wires to be red in color. Common wire to be white in color.
3. Low voltage wire connectors to be made using 3M DBY connectors.
4. 120 volt or heavier splices made underground to be made using 3M DBY connectors.
E. Sprinkler Heads and Valves:
1.