Summary: Advanced Technology Academy Practice Football Field Improvements RFB
This Request for Bids document was issued by Advanced Technology Academy in Dearborn, Michigan on May 23, 2019, for the conversion of a 44,040 square-foot grass field into a practice football field comprising approximately one-third the size of a full regulation field. The scope of work includes field engineering and surveying, soil erosion and sedimentation control, sod stripping and topsoil removal, earthwork and excavation, stone drainage trenches, imported topsoil and athletic field mix installation, an automatic irrigation system with all plumbing connections and permitting, fine grading and sodded lawn installation, and a one-year warranty period. A mandatory pre-bid conference was held on May 29, 2019, at 9:00 a.m. at the Academy's facility. Prospective bidders could request site visits and written clarifications until 5:00 p.m. on June 5, 2019. The bid due date was June 11, 2019, at 11:00 a.m., with bids to be submitted in sealed envelopes to Steve Quinlan at the Academy's address. Work was required to commence and be completed by August 11, 2019, to enable field use by August 12, 2019. Alternative completion dates of August 26, 2019, or late October 2019 were identified if the primary deadline was infeasible. The Academy reserved the right to conduct post-bid interviews with selected contractors and to award the contract to one or more qualified contractors at its sole discretion.
All pricing must be submitted as a not-to-exceed lump sum amount on the provided bid pricing form, inclusive of all labor, materials, equipment, insurance, bonds, taxes, overhead, and profit. Contractors must submit a bid bond equal to five percent of the total bid amount and, for contracts of $50,000 or more, performance and payment bonds in the amount of 100 percent of the final contract price. Required bid documents include evidence of necessary licenses, detailed references demonstrating prior experience with excavation and landscaping services for educational institutions, proof of adequate insurance coverage, a familial disclosure affidavit complying with Michigan law, an Iran sanctions compliance affidavit, and a list of all proposed subcontractors. Contractors must demonstrate a minimum Experience Modification Rate of 0.07 and include all Safety Data Sheets for hazardous materials. The Academy is exempt from taxes, but contractors must include state and local taxes on installed materials in their bid prices. Monthly invoices are to be paid on a progress payment basis with appropriate retention, with final payment upon successful completion of all punch list items. Liquidated damages of $500 per calendar day apply for failure to meet the completion deadline. Work must be performed primarily between 7:00 a.m. and 7:00 p.m., Monday through Sunday, or during school holidays, with minimal disruption to Academy operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATA drawings - practice football field improvements.pdf | ||
| SPECS - ATA Practice Football Field - 11x17.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BIDS
FOR
PRACTICE FOOTBALL FIELD
IMPROVEMENTS
Issued May 23, 2019
5253857v.1 26393/104764
ADVANCED TECHNOLOGY ACADEMY
4801 Oakman Boulevard Dearborn, Michigan 48126
5253857v.1 26393/104764 ii
OVERVIEW
PURPOSE
Advanced Technology Academy (hereinafter the “Academy” or “Owner”) is seeking bids from qualified contractors for the purpose of developing vacant land into a practice football field at the Academy. The purpose of this Request For Bids For Practice Football Field Improvements (the “RFB”) is to obtain bids from experienced and qualified contractors to convert an existing grass field comprising 44,040 square feet into a practice football field and related work as set forth in this RFB and the Contract (the “Work”). When completed the practice football field will comprise about one-third the size of a full football field. The Academy may select one or more experienced and qualified contractors to proceed with the negotiation process from those submitting Bids. The process will include the review and evaluation of methods and procedures used to provide effective excavation and landscaping services for the Academy within the scope of this RFB. Past experience will also be judged through the references of each entity. Each Bid must detail the contractor’s experience and expertise in order to allow the Academy to properly and promptly evaluate each Bid, and the failure to do so may cause the Academy to reject said Bid. The Academy will select the Bid, if any, that it deems most qualified to serve the best interests of the Academy, in its sole and absolute discretion. The Academy, in its sole and absolute discretion, reserves the right to request post-Bid interviews from all, some or none of the entities submitting Bids.
DESCRIPTION OF WORK
Generally, the Work consists of the following as set forth in APPENDIX A:
1. Field Engineering and Surveying; including, but not limited to layout and cut and fill staking
2. Soil Erosion Control and Sedimentation Control Measures
3. Sod Stripping and Topsoil Removal, Stockpiling, Placement and Shaping
4. Manhole Adjustment
5. Earthwork and Excavation; including legal exportation of unused soils
6. Stone Drainage Trench
7. Imported and Placement of Sandy Loam Topsoil
8. Imported and Placement of Athletic Field Mix
9. Automatic Irrigation System (include all plumbing connections and permitting, winterization and start up)
10. Fine Grade and Sodded Lawn (see alternate section)
11. One Year Warranty and Guarantee Period
The Contractor shall perform all Work necessary at the Academy in accordance with the respective specifications set forth in APPENDIX B, attached hereto (11x17 format) and incorporated herein by reference. The selected contractor(s) would be responsible for removal of all unused soils and disposal of the same and installation of the new components in accordance with this RFB at the Academy. All Work must be done in accordance with all applicable law, rules, regulations, ordinances and Academy policies and be completed in time for the field to be used by August 12, 2019. Sets of 24”x36” drawings will be available at the pre-bid meeting.
RFB TIMELINE
NOTE: Throughout the remainder of this RFB, a prospective boiler contractor is referred to as the “Contractor.”
| The Academy’s anticipated timeline for its selection process is: |
| Issuance of this RFB |
| May 23, 2019 |
Pre-Bid Conference - Mandatory Held at: 4801 Oakman Blvd.
Dearborn, MI 48126 9:00 a.m. – May 29, 2019
| Deadline for Written Requests For Clarifications and Site Visits |
| 5:00 p.m. – June 5, 2019 |
| DUE DATE FOR BIDS |
| 3:00 p.m. – June 10, 2019 |
| Contractor Post-Bid Interviews |
| TBD |
| Academy’s Consideration of the Contract |
| No later than June 19, 2019 |
| Commencement of Work |
| TBD |
| Deadline for Completion of Work |
| August 11, 2019 |
The Academy’s preference is that the practice football field be ready for use by August 12, 2019. If that is not feasible, then August 26 is the next ready date. If neither of these dates are feasible, then the start of the project could be delayed until late October 2019.
PLEASE NOTE: The Academy reserves the right, in its sole and absolute discretion, to make modifications to the RFB timeline set forth in Section 1.3 above as it determines to be in its best interest.
BID SUBMISSION DEADLINE AND REQUIREMENTS
The Due Date for receipt of Bids is:
JUNE 11, 2019 at 11:00 local time (the “Due Date”) Bid Envelope: The opaque envelope containing your Bid must be marked in the lower left hand corner as follows:
SEALED BID ENCLOSED
ADVANCE TECHNOLOGY ACADEMY
PRACTICE FOOTBALL FIELD
[Contractor’s Name] [Contractor’s Address] [Contractor’s Telephone Number] The envelope must also be addressed and delivered as follows:
Advanced Technology Academy Attention: Steve Quinlan 4801 Oakman Boulevard Dearborn, Michigan 48126 Late Bids: Each Contractor is responsible for submission of its Bid. Bids or Bid revisions received after the Due Date will not be accepted or considered. The Academy is not liable for any delivery or postal delays.
| 1.4.3 | Returned Bids: All Bids received after the Due Date will be unopened and made available to the respective Contractor for pick-up, at their sole cost and expense for a period of two (2) weeks from the Due Date. |
| 1.4.4 | Signed Original Bid: Each Bid must be an original and hard copy, and signed by an authorized member of the Contractor’s firm. This member should be the highest-ranking officer at the local level. NO ORAL, FAX or E-MAILED Bids will be accepted. Each Bid must be submitted on the Bid Forms attached to this RFB. |
| 1.4.5 | Copies of Bid: The Contractor shall also submit with the signed original Bid, along with two (2) complete copies of the signed original Bid. |
| 1.4.6 | Opening of Bids: At the specified location and Due Date stated above, all submitted Bids shall be publicly opened and read aloud. Any interested parties may attend. No immediate decision will be rendered. |
| 1.4.7 | E-Mail Clarifications: The Academy intends to communicate with Contractors via e-mail (e.g., RFB clarifications and addenda). Except for the delivery of the Bid itself, references in this RFB to “written” form of communications include e-mail. |
| 1.4.8 | Additional Requests For Clarification or Site Visits: Prospective Contractors may request that the Academy clarify information contained in this RFB, and may also request a site visit at the Academy. All such requests must be made in writing via email. All site visit requests must be made prior to June 5, 2019. The Academy will attempt to provide a written response to all written Requests For Clarification within two (2) business days after the receipt of such request. The Academy will not respond to any Request For Clarification received after 5:00 p.m. on June 5, 2019. Requests For Clarification and inquiries for site visits must be made via e-mail and must be directed to Steve Quinlan at squinlan@atafordpas.org, (Subject Line: Practice Football Field Improvements RFB Request For Clarification/Site Visit). No response will be made to any oral questions. All questions and answers will be posted. No site visits will be granted after June 7, 2019. |
| 1.4.9 | Restrictions On Communication: From the issue date of this RFB until a Contractor is selected and the selection announced, a prospective Contractor shall not communicate about the subject of this RFB or a Contractor’s Bid with the Academy, its Board of Directors, or any individual member, administrators, faculty, staff, students or employees, except for additional Requests For Clarification in accordance with Paragraph 1.4.8 above, or as otherwise required by applicable law. |
| 1.4.10 | Addenda to the RFB: If it becomes necessary to revise any part of this RFB, notice of the revision will be issued and all addenda shall become a part of this RFB. Each Contractor must in its Bid, to avoid any miscommunication, acknowledge all addenda which it has received, but the failure of a Contractor to receive, or acknowledge receipt of, any addendum shall not relieve the Contractor of the responsibility for complying with the terms thereof. All Addenda will be posted to the Academy’s or other designated website. |
| 1.4.11 | RFB/Bid Information Controlling: The Academy intends that all Contractors shall have equal access to information relative to this RFB, and that this RFB contains adequate information. No information communicated, either verbally or in writing, to or from a Contractor shall be effective unless confirmed by written communication contained in an addendum to this RFB, a Request For Clarification or other written response thereto, or in the Bid. |
| 1.4.12 | Finality of Decision: Any decision made by the Academy, including the Contractor selection, shall be final. |
1.4.13 Reservation of Rights: The Academy reserves the right, in its sole and absolute discretion (for this provision and all other provisions contained in this RFB), to accept or reject, in whole or in part, any or all Bids with or without cause. The Academy further reserves the right to waive any irregularity or informality in the RFB process or any Bid, and the right to award the Contract to other than the Contractor submitting the best financial Bid (low bidder). The Academy reserves the right to request additional information from any or all Contractors. The Academy reserves the right to award the Work to one (1) or more Contractors. In the event a Contractor’s Bid is accepted by the Academy and that Contractor asserts exceptions, special considerations or conditions after acceptance, the Academy, in its sole and absolute discretion, reserves the right to reject the Bid and award the Contract to another Contractor.
1.4.14 Release of Claims: Each Contractor by submitting its Bid releases the Academy from any and all claims arising out of, and related to, this RFB process and selection of a Contractor.
1.4.15 Contractor Bears Bid Costs: A recipient of this RFB is responsible for any and all costs and liabilities incurred by it or others acting on its behalf in preparing or submitting a Bid, or otherwise responding to this RFB, or any negotiations incidental to its Bid or this RFB.
1.4.16 Irrevocability of Bids: All Bids submitted shall not be withdrawn and shall be irrevocable for a minimum period of ninety (90) calendar days following the Due Date for receipt of Bids set forth above.
1.4.17 Collusive Bidding: By submission of a Bid, the Contractor certifies that its Bid is made without any previous understanding, agreement or connection with any person, firm or corporation making a Bid for the same Work and is in all respects fair, without outside control, collusion, fraud or otherwise illegal action.
BID REQUIREMENTS AND FORMAT
This outlines the information that must be provided by each Contractor and the required format for its Bid. Any Bid not providing the required information, or not conforming to the format specified, may be disqualified on that basis. Please also refer to Sections 1.4 and 4 of this RFB for additional Bid requirements.
A form of Contract (AIA Document A107) under which Work requested under this RFB shall be provided by the successful Contractor (the “Contract” and referred to throughout the Contract as the “Agreement”), will be distributed to prospective bidders at the Pre-Bid meeting (See also Section 3.1 of this RFB). The Contract contains many details relative to the Work requested by the Academy, the terms and conditions under which the Work shall be provided by the Contractor, and should be reviewed carefully by each Contractor prior to submitting a Bid.
Any exceptions to the terms and conditions contained in this RFB or the form of Contract attached to this RFB, or any other special considerations or conditions requested or required by the Contractor MUST be specifically enumerated by the Contractor and be submitted as part of its Bid, together with an explanation as to the reason such terms and conditions of the RFB or form of Contract cannot be met by, or, in the Contractor’s opinion, are not applicable to, the Contractor. The Contractor shall be required and expected to meet the specifications and requirements as set forth in this RFB and the form of Contract in their entirety, except to the extent exceptions or special considerations or conditions are expressly set forth in the Contractor’s Bid and those exceptions or special considerations or conditions are expressly accepted by the Academy. All Pricing factors must be clearly indicated in the manner required on the Bid Forms provided as part of this RFB.
Each Bid must include, at a minimum, the following:
| 1.5.1 | License. Evidence of all licenses held by the Contractor necessary to perform the Work. |
| 1.5.2 | Exceptions. A detailed list setting forth any exceptions to this RFB and/or the Contract, or other special considerations or conditions of the Contractor, including explanations of such exceptions or the reason such terms and conditions of the RFB or form of Contract cannot be met by, or on the Contractor’s opinion are not applicable to, the Contractor. |
| 1.5.3 | References. Each Bid must include detailed evidence that the Contractor has provided or is currently providing excavation and landscaping services preferably related to athletic fields for educational institutions. The Contractor must provide this information, including contact names, addresses, phone numbers and type and scope of services provided. |
| 1.5.4 | Insurance and Bonding. Evidence of the Contractor’s ability to provide adequate insurance coverages and bonds as required by this RFB and the Contract to protect the interests of the Contractor and the Academy. |
| 1.5.5 | Legal Compliance. Demonstrate that the Contractor understands and will comply with all regulatory laws, codes, and requirements of any Local, State, and Federal law that apply to the requirements and obligations under this RFB and the Contract, including, but not limited to, the Michigan Revised School Code (MCL 380.1 et seq.), and any rules and regulations promulgated thereunder. |
| 1.5.6 | Bid Form. A completed Bid Pricing Form provided as APPENDIX C. |
| 1.5.9 | Familial Disclosure Affidavit. All Contractors must provide familial disclosure in compliance with MCL 380.1267 and attach this information to its Bid. The Bid must be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner and/or any employee of the Contractor and any member of the Academy’s Board of Education or the Academy’s Superintendent. The Academy will not accept a Bid that does not include this sworn and notarized disclosure statement. The Familial Disclosure Affidavit is attached to this RFB as APPENDIX D. |
| 1.5.10 | Iran Sanctions Affidavit. In accordance with Michigan Public Act No. 517 of 2012, all Bids must be accompanied by a sworn and notarized statement certifying that the Contractor is not an Iran Linked Business. The Academy will not accept a Bid that does not include this sworn and notarized statement. The Affidavit of Compliance – Iran Economic Sanctions Act is attached to this RFB as APPENDIX E. |
| 1.5.11 | Bid Bond. All Contractors must include “bid security” in the form of a bid bond from a qualified surety, a certified check or a cashier’s check in the amount of five percent (5%) of the Contractor’s total bid amount as a condition for consideration of award. Bid bonds shall be duly executed by the Contractor as principal and having as surety thereon, a company authorized to execute such in the State of Michigan. All Sureties must be listed in the Department of Treasury’s Circular 570. The bid bond shall pledge that the Contractor, with the understanding that if their bid is accepted, will enter into the Contract with the Academy for the services stated in their bid and will furnish bonds covering the faithful performance of the Contract and the payment of all obligations arising thereunder. The attorney who signs the surety bond must file with the bond, a certified and effectively dated copy of the power of attorney. Bid securities will be returned to the successful Contractor after a Contract has been executed, and acceptance of required bonds and insurance is made. The bid security of Contractors not under consideration for award of the Contract will be returned by the Academy in a timely manner. The bid security of all Bidders may be retained until a Contract is awarded. The bid security obligees shall be the Academy and shall become its property in the event that the Contractor fails, within fifteen (15) days of notice of award, to execute the Contract, deliver the performance and payment bonds, and send the required certificates of insurance. The bid security shall be forfeited to the Academy as liquidated damages, not as a penalty. |
| 1.5.12 | Experience Modification Rate. Each Contractor must submit documentation evidencing its current Experience Modification Rate (“EMR”) as part of its Bid. The Academy is seeking Contractors with a minimum EMR of 0.07. |
| 1.5.13 | List of Subcontractors. Each Contractor must provide a list of all subcontractors it will utilize to perform the Work as part of its Bid. Failure to provide a complete list of subcontractors may be grounds for rejection of the Bid as incomplete. If awarded all or a portion of the Work, once the list of subcontractors is approved by the Academy, it cannot be modified by the Contractor without the prior written approval of the Academy and failure to obtain such prior written approval will be grounds for termination of the Contract. |
| 1.5.14 | Safety Data Sheets. Each Contractor shall provide with its Bid all Safety Data Sheets (“SDS”) for all hazardous or other applicable materials that will be brought onto Academy property as part of the Work. |
ORAL INTERVIEWS
The Academy may require selected Contractors to participate in a post-bid interview to discuss their Bid. In that case, the Academy will notify the Contractor’s contact name as listed in its Bid. In accordance with the RFB selection timeline, it is anticipated that interviews will be scheduled during the times set forth in Section 1.3 above.
INDEPENDENT CONTRACTUAL RELATIONSHIP
It must be understood that this RFB provides for the selection of a contractor to provide the Work for the Academy on an independent contractor basis.
1. scope of work The scope of the Work and specifications/components of the practice football field improvements for the Academy are set forth in APPENDIX A, as well as the other Attachments to this RFB, which are all incorporated herein by reference. The purpose of this RFB is to promote competition. The Academy has included the various specifications and functions in APPENDIX B to ensure development of the practice football field that provides the functionality desired by the Academy. Therefore, if there is any reference in this RFB or the Attachments or resulting contract to a particular product or brand name, it shall be deemed to include the phrase “or substantial equivalent.” All Contractors are responsible for verifying the accuracy of measurements and materials specified prior to submitting its Bid. Any discrepancies in the Specifications shall be immediately communicated to the Academy. Each Contractor is responsible for housing all materials to complete the Work until for installation. All materials are to be wrapped and stored indoors in a well-ventilated area, protected from weather, moisture and soiling.
CONTRACTUAL OBLIGATIONS
FORM OF CONTRACT
Form of Contract: This is a Request For Bids only. Bids will be treated as offers to enter into the Contract (as defined above) with the Academy. The Academy and successful Contractor shall memorialize their contractual relationship and obligations using the form of Contract (AIA A107) that will be made available during and after the Pre-Bid meeting. The Contract contains many details relative to the Work required under this RFB, as well as the terms and conditions under which the Work shall be provided by the successful Contractor. The Contract should be reviewed carefully by each Contractor prior to submitting a Bid. Any exceptions to the terms and conditions contained in the Contract, or any other special considerations or conditions requested or required by the Contractor relative to this RFB or the form of Contract shall be expressly/specifically enumerated by the Contractor and be submitted as part of its Bid, together with an explanation as to the reason such terms and conditions cannot be met by, or, in the Contractor’s opinion are not applicable to, the Contractor, provided however, that exceptions or special conditions of the Contractor will not be binding upon the Academy unless those exceptions or special conditions are expressly accepted by the Academy, and incorporated into the final Contract. Following the selection of the successful Contractor by the Academy, the Contract will be finalized by the parties. The final Contract shall be subject to the review and approval by the Academy’s legal counsel. The below sections contain information relative to selected provisions of the Contract and/or the expectations of the Academy relative to the provision of the Work. This information is provided to assist the Contractor in evaluating the Academy and submitting a Bid, and should neither supplant the terms and conditions of the Contract nor a careful review of the Contract by the Contractor.
PERFORMANCE AND PAYMENT BONDS
The successful Contractor whose Bid and/or awarded contract amounts are $50,000 or more will be required to furnish Performance and Payment Bonds, in a form satisfactory to the Academy, in the amount of 100% of the final Contract amount by a Treasury listed Surety licensed to do business in the State of Michigan, and the attorney-in-fact who executed the Performance and Payment Bonds on behalf of the Contractor shall attach a certified, current copy of its power of attorney. The cost of the Bonds shall be included in each Bid form, if applicable.
PROJECT COMPLETION PERIOD & SCHEDULING
The development of the Work is weighed heavily on the ability of the Contractors to have all Work finished in sufficient time. The Contractor must commence and complete the Work within the timeframes set forth in Section 1.3. Time and coordination are the essence of the Contract. The Academy’s operations must continue uninterrupted throughout the construction process. Certain portions of the Work must be performed and completed in such order as directed by the Academy so as to permit the orderly operation of the Academy’s activities or operations. Each Contractor shall review the Work to assure proper coordination to complete their Work per schedule. The Academy reserves the right to suspend Work wholly or in part if deemed necessary for the best interest of the Academy. This suspension will be without compensation to the Contractor, other than to adjust the contract completion/delivery requirements. The Work shall be performed, primarily, between 7:00 AM to 7:00 PM, Monday through Sunday, or during school holidays. Any changes to the established schedule must have prior approval of the Academy’s representative and scheduled at the least disruptive time possible.
WORKMANSHIP/INSPECTION
Where not more specifically described in any of the various sections of these specifications, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction or installation regularly furnished or required for completion of the services. All Work shall be executed by personnel skilled in their respective line of work. This Work will not be subcontracted without written authorization by the Academy. The Contractor will request the Academy to conduct a site inspection after the Work is complete. The Academy will prepare a “punch-list” during the inspection and will forward a copy of the “punch-list” to the Contractor. After the “punch-list” items have been corrected, the Contractor will request a final inspection with the Academy. Final project approval is contingent upon the Academy’s final inspection and written approval.
WARRANTY
Contractor shall perform all duties required of this project in such a way that the manufacturer’s warranty is not violated in any manner. Contractor is responsible for identifying any and all deviations of the RFB’s specifications from the manufacturer’s guidelines. All such deviations must be detailed in the Contractor’s Bid at time of submittal. Manufacturer specifications shall prevail in any and all instances where the RFB’s specifications differ from the manufacturer’s specifications. All materials and supplies shall be guaranteed against defects in manufacturing and materials; defective products will be replaced in accordance with the Contract. All materials and products shall be guaranteed against defects in manufacturing and material and such warranty shall cover parts, materials, labor, delivery, and installation in accordance with the Contract. All labor for the installation of the project shall be warranted in accordance with the RFB Specifications and the Contract. If, during the term of the warranty, Academy shall become dissatisfied with the performance of the project for any reason, an authorized dealer will repair or replace the system until the Academy is satisfied with its performance. Please identify in your Bid Form the type and length of warranties provided as part of the services.
PRICING, PAYMENT METHODS, LIQUIDATED DAMAGES AND NO INTERFERENCE
| 3.6.1 | Pricing: Prices quoted are to be F.O.B. to the Academy. All prices shall be net; including transportation, insurance and delivery charges fully prepaid by the successful Contractor to destinations indicated in the Bid. |
| 3.6.2 | Payment: Payment is to be made from Contractor’s invoice in accordance with the Progress Payment schedule set forth in the Contract. Invoices must include a copy of the signed delivery invoices, submitted to cover items received and accepted, and services rendered, during the billing period. Invoices must contain the contract number under which the contract is awarded. |
| 3.6.3 | Invoices: Contractor shall submit monthly invoices for work completed. These will be paid on a regular basis, less an appropriate retention. Final payment will be made upon successful completion of all punch list items, all in accordance with the Contract. The Owner will pay for two final punch list inspections. The cost of any subsequent visits required to clear items from the punch list will be deducted from the retainage. |
| 3.6.4 | Liquidated Damages: It is expressly covenanted and agreed that time is and shall be considered of the essence of the Contract. In the event that the Contractor shall fail to perform the entire work agreed to by or at the times herein mentioned, or within some other certain date subsequent to this to which the time limit for the completion of the work may have been changed, the Contractor shall pay to the Owner as and for liquidated damages and not as a penalty, the sum of Five Hundred Dollars ($500) for each and every calendar day that the Contractor shall be in default. Said sum of Five Hundred Dollars ($500) per day, in view of the difficulty of estimating such damages with exactness is hereby expressly fixed and agreed upon as the damages which will be suffered by the Owner for reason of such defaults. It is also understood and agreed that the liquidated damages herein before mentioned are in lieu of the actual damages arising from such breaches of this Contract, which said sums the Owner shall have the right to deduct from any monies held or otherwise due or to become due to the Contractor or to sue for and recover compensation for damages for nonperformance of this Contract at the time stipulated herein and provided. |
| 3.6.5 | No Interference: The entirety of the work shall be so conducted as to cause as little inconvenience as possible to the Owner, who will continue to occupy the existing building during the progress of the work. Contractor shall not interfere with the continuous operations and shall safely work around all operations. |
SAFETY
The Contractor shall be responsible for providing and for placing barricades, tarps, plastic, flag tape and other safety/traffic control equipment required to protect its employees, the public, surrounding areas, equipment and vehicles. The flow of vehicular traffic shall not be impeded at any time during this project. The safety of the Contractor’s employees and the public is of prime concern to the Academy, and the Contractor must take all necessary steps to assure proper safety during the performance of the Contract. Any Contractor that has a history of safety problems or a high incidence of accidents will not be considered for award of a Contract. The Contractor shall keep the premises clean of all rubbish and debris generated by the Work involved and shall leave the premises neat and clean. All surplus material, rubbish, and debris shall be disposed of by the Contractor at the Contractor’s expense. The work area shall be cleaned at the end of each work day. All materials, tools, equipment, etc., shall be removed or safely stored. The Academy is not responsible for theft or damage to the Contractor’s property. All possible safety hazards to workers or the public shall be corrected immediately and left in a safe condition at the end of each workday. If there is a question in this area, the Academy or its agent will be consulted. The Academy does not assume any responsibility, at any time, for the protection of or for loss of materials, from the time that the contract operations have commenced until the final acceptance of the Work by the Academy or its agent.
INSURANCE OF CONTRACTOR
Unless otherwise specified, the Contractor shall, before commencing work hereunder, procure and thereafter maintain policies of insurance satisfactory to the Owner in the following minimum amounts:
| Property Damage | $1,000,000 (each accident) | ||||
| Bodily Injury | $ 500,000 (each person) | ||||
| Workmen’s Compensation Insurance | All liabilities imposed by | ||||
| Workmen’s Compensation statute | |||||
| Employers Liability Insurance | $ 100,000 | ||||
| Contractual Liability Insurance | $ 500,000 | ||||
| Completed Operations Insurance | $ 500,000 |
Owned, Hired and Non-Ownership Vehicle Bodily injury and Property Damage to the following limits:
| bodily injury | $ 500,000 (each person) | |
| accidental death | $1,000,000 (each accident) | |
| property damage | $1,000,000 (each accident) |
The following party must be named as additional insured: Advanced Technology Academy.
The Contractor agrees to file with the Owner before commencing work hereunder, copies of policies of such insurance which shall contain by endorsement, the specific requirements/coverages outlined above, together with Certificates of Insurance which shall contain a provision that no change in the amount of said insurance, or termination thereof, shall take place without previous 10 days written notice to the Owner and its written consent to such change or termination.
GOVERNING LAW
The Contract shall be governed by and construed in accordance with the laws of the State of Michigan. The parties hereby agree to the exclusive jurisdiction and venue of courts sitting in Wayne County, Michigan.
INDEMNIFICATION
Contractor shall indemnify, defend and hold harmless the Academy, its Board of Directors, its Directors, in their official and individual capacities, its administrators, employees, agents, contractors, successors and assignees, from and against any and all claims, counter claims, suits, debts, demands, actions, judgments, liens, costs, expenses, damages, injuries and liabilities, including actual attorney’s fees and actual expert witness fees arising out of or in connection with Contractor’s performance of the Contract and/or from Contractor’s violation of any of the terms of the Contract, including, but not limited to: (i) the negligent acts or willful misconduct of the Contractor, its officers, directors, employees, successors, assignees, contractors and agents; (ii) any breach of the terms of the Contract by the Contractor, its officers, directors, employees, successors, assignees, contractors and agents; (iii) any violation or breach of any applicable Federal, State or local law, rule, regulation, ordinance, policy and/or licensing and permitting requirements applicable to the Contract; or (iv) any breach of any representation or warranty by the Contractor, its officers, directors, employees, successors, assignees, contractors and agents under the Contract. The Contractor shall notify the Academy by certified mail, return receipt requested, immediately upon actual knowledge of any claim, suit, action, or proceeding for which Advanced Technology Academy may be entitled to indemnification under the Contract. This paragraph shall survive the expiration or earlier termination of the Contract.
TAXES
The Academy is exempt from taxes. However, when state and local taxes are required on construction materials installed by the Contractor, such taxes must be included in the Contractor’s Bid price.
3.12 SCHOOL DISTRICT CONTRACTOR CODE OF CONDUCT
While performing any Work under the Contract, each Contractor, including its employees, agents and subcontractors, must abide by the Academy’s Contractor Code of Conduct, which is attached hereto and incorporated herein as APPENDIX G.
pricing QUOTES
PRICING
Pricing is to reflect an award by the Academy of Work contemplated in, and in accordance with, the terms and conditions of the RFB and the Contract. Pricing shall be broken down by the Contractor and quoted as required in the Bid Form set forth in APPENDIX C. All pricing shall be a not-to-exceed amount and include all costs and expenses of Contractor to complete the respective Work, such as all supplies, materials, labor, equipment, insurance, bonds (if applicable), taxes, overhead/profit, etc.
APPENDIX A
SUMMARY OF WORK
PART 1 - GENERAL
1.02 RELATED DOCUMENTS:
A. Attention is directed to Bidding and Contract Requirements, and to General and Supplemental Conditions, hereby made a part of this Section.
1.03 DESCRIPTION OF WORK:
A. Extent of each type of work is shown on drawings.
B. The following is an outline of the scope of work and is intended to highlight the major portions, but is not intended to include all work required to be performed. Using this outline, refer to the contract drawings and specifications for full extent of work to be performed under this contract. The major portions are:
1. Field Engineering and Surveying; including, but not limited to layout and cut and fill staking
2. Soil Erosion Control and Sedimentation Control Measures
3. Sod Stripping and Topsoil Removal, Stockpiling, Placement and Shaping
4. Manhole Adjustment
5. Earthwork and Excavation; including legal exportation of unused soils
6. Stone Drainage Trench
7. Imported and Placement of Sandy Loam Topsoil
8. Imported and Placement of Athletic Field Mix
9. Automatic Irrigation System (include all plumbing conncetions and permitting, winterization and start up)
10. Fine Grade and Sodded Lawn (see alternate section)
11. One Year Warranty and Guarantee Period
C. Related Work Specified Elsewhere: See Sheet S-1
1.04 CONTRACTOR'S DUTIES:
A. Except as specifically noted, provide and pay for the following:
1. Labor, materials, and equipment.
2. Tools, construction equipment and machinery
3. Utilities required for construction
4. Other facilities and services required for proper execution and completion of the Work.
Advanced Technology Academy Practice Football Field Improvements RDI Job No.
A21-191
SUMMARY OF WORK
01010 -
1.05 PERMITS:
A. The owner shall pay for all major building and site permits with the City of Dearborn. The contractor shall do the paperwork and the actual "pulling" of said permits.
B. The contractor shall pay for and arrange to obtain all other permits; i.e.:
1. Soil Erosion Permit (if required)
2. Plumbing Permit for irrigation hook up and operation.
1.06 CONTRACTS:
A. Construct work under a single lump sum contract.
B. Specify unit prices as indicated in Section 00300.
1.07 WORK SEQUENCE:
A. Submit to the owner's representative a proposed construction schedule.
B. Arrange and carry out contract work in such a manner as to complete the Work within the contract dates.
C. Consult the owner's representative in programming the Work. Present the Construction Schedule to owner’s representative for review before starting Work.
D. Manage the execution of the Work to meet the referenced schedule, and be responsible for all steps, procedures, and policies necessary thereto. The owner's representative may advise and suggest ways and means for facilitating the Work; however, the full responsibility for management of the Work shall remain with Contractor.
E. Should the contractor's Work fail to progress according to the referenced schedule and if, in the opinion of the owner's representative the Work cannot be completed within the contract time or such extensions granted thereof, either work additional time over the established hours of work, including Saturdays, Sundays and holidays, or enlarge the work force and work without the established hours of work, as required to meet the scheduled time for completion without additional cost to the owner.
END OF APPENDEX A
APPENDIX B
SPECIFICATIONS FOR WORK
Specifications are attached as a separate 11x17 print format document. CAD drawings will be distributed at the Pre-Bid meeting on May 29, 2019. CAD drawings also may be accessed by emailing Steve Quinlan at squinlan@atafordpsa.org (please type in the subject line 2019 Practice Football Field Improvements Specifications) or by picking up copies at:
Advanced Technology Academy 4800 Oakman Boulevard Dearborn, MI 48126 Attn: Steve Quinlan
APPENDIX C
BID PRICING FORM
ADVANCED TECHNOLOGY ACADEMY
REQUEST FOR BIDS FOR PRACTICE FOOTBALL FIELD IMPROVEMENTS
Contractor Information
Contractor Name:
Business Address:
| Contact Person: |
| Telephone: |
| E-Mail: |
| Fax: |
PRACTICE FOOTBALL FIELD IMPROVEMENTS PRICING
Contractor declares familiarity with location of proposed work and conditions under which it must be performed, that Drawing(s) and Specifications have been carefully examined, are understood and accepted as adequate for the purpose, and agrees to Contract with, Advanced Technology Academy hereinafter referred to as Owner, to perform everything required to be performed and to furnish all labor, materials, tools, equipment, utility, transportation services and supervision necessary to perform and complete, in a satisfactory manner, all work required in conjunction with above named project, and to accept as full payment thereof, subject to additions and/or deletions required by Contract, the sum of Dollars.
TOTAL BASE BID $
COST OF PERFORMANCE & PAYMENT BONDS: $
ANALYSIS OF BID:
Unit Costs submitted for Contract additions/deletions, inclusive of any maintenance and guarantee period not separately listed. Total must equal Base Bid above. Contractor responsible to verify estimated quantity material. All work to be installed complete, as detailed on Drawing(s), within quote Base Bid.
| Quantity |
| Description and Size |
| Unit Cost |
| Total Cost |
| Lump Sum |
| Mobilization |
| 1 ea. |
| Temporary Inlet Filter (include removal) |
| $ |
| $ |
| 660 lf. |
| Temporary Silt Fence (include removal) |
| $ |
| $ |
| 12,000 sf. |
| Asphalt Pavement and Base Removal |
| $ |
| $ |
| 2,300 cy. |
| Earthwork and Excess Earth Removal |
| $ |
| $ |
| 2 | ea. |
| Adjust Sewer Manhole Rim Elevations | |
| $ | |
| $ |
| lf. | |
| Drainage Trench - Complete | |
| $ | |
| $ |
| cy. | |
| Imported Screened Sandy Loam Topsoil, |
| Complete (4” depth) |
| $ |
| $ |
| cy. | |
| Imported Athletic Field Topsoil, Complete |
| (6” depth) |
| $ |
| $ |
| sy. | |
| Fine Grade Seeded Lawn,Type 2, on 4” Topsoil |
| (north of practice football field) |
| $ |
| $ |
| sy. | |
| Fine Grade Sodded Lawn on 4” Topsoil |
| (outside practice football field) |
| $ |
| $ |
| sy. | |
| Fine Grade Sodded Lawn on 6” Athletic Field Topsoil (practice football field) |
| Lump Sum |
| Automatic Irrigation System, Complete |
ADVANCED TECHNOLOGY ACADEMY PRACTICE FOOTBALL FIELD
RD JOB NO.
A21-191
TOTAL BASE $
Unit Costs Contractor shall submit installed unit prices for items of stated below. Prices shall include all material, equipment, labor, profit and overhead required for the complete installation of the work item. The owner reserves the right to increase or decrease the Total Base Bid on the basis of the unit prices stated. The owner reserves the right, prior to the bid award to negotiate with the bidder on any or all unit prices listed in this proposal. Contractor ‘mark-up’ will not be paid in addition to the provided unit prices.
1 cy. Undercutting and removal of unsuitable soils $ /CY
1 cy. 1”-3” crushed concrete (install and compact) $ /CY
4” diameter Perforated Drain Tile (inc. fittings) $ /LF
6” diameter Solid Drain Tile (inc. fittings) $ /LF
REQUIRED ALTERNATES
Contractor shall submit installed prices for items of stated below. Prices shall include all material, equipment, labor, profit and overhead required for the complete installation of the work item. The owner reserves the right to increase or decrease the Total Base Bid on the basis of the alternate prices stated. The owner reserves the right, prior to the bid award to negotiate with the bidder on any or all alternate prices listed in this proposal. Contractor ‘mark-up’ will not be paid in addition to the provided prices.
1. Sodding:
Substitute standard sod with BIG ROLL Sod
ADD / DEDUCT: $
2. Seeding:
Substitute Athletic Grass Mix (Type 1) for standard sod.
ADD / DEDUCT: $
VOLUNTARY ALTERNATES
Contractor shall submit installed prices for items of stated below. Prices shall include all material, equipment, labor, profit and overhead required for the complete installation of the work item. The owner reserves the right to increase or decrease the Total Base Bid on the basis of the alternate prices stated. The owner reserves the right, prior to the bid award to negotiate with the bidder on any or all alternate prices listed in this proposal. Contractor ‘mark-up’ will not be paid in addition to the provided prices.
1. ADD / DEDUCT: $
2. ADD / DEDUCT: $
3. ADD / DEDUCT: $
Contractor acknowledges following addenda covering revisions to Drawing(s) or Specifications; Cost of such revisions has been included in quoted base bid.
WARRANTIES
Please detail the type and length of all warranties offered by the Contractor under this Bid for the following: 1) labor/installation; and 2) materials and equipment. Please detail what is covered by each warranty, what conditions are part of the warranty and what are the exclusions to the warranty, if any.
ACKNOWLEDGEMENT OF ADDENDA TO RFB
The Contractor acknowledges receipt of the following addenda:
Addendum Number __________________dated_________________________ Addendum Number __________________dated_________________________ Addendum Number __________________dated_________________________
SUBCONTRACTORS
Our subcontractors will be:
Name: Address: Specialty:
The undersigned declares that he has carefully examined the instructions, the Specifications and the Contract, and agrees to furnish these items and the Work within such Specifications for the price set forth in this Bid. The undersigned and/or its representative attended the Pre-Proposal Conference/Walk-Through and fully understands the detail drawings presented and discussed. The undersigned has carefully checked all of its Bid figures and understands that it shall be responsible for any error or omission in this Bid and is in receipt of all addenda as issued. The undersigned understands that the Academy reserves the right to accept or reject in whole or in part any and all Bids, to waive informalities and irregularities therein, and to award the Contract to other than the Contractor submitting the best financial Bid (low bidder) and to award the Contract to one (1) or more Contractors in the Academy’s sole and absolute discretion.
If award is made to our firm based upon our Bid, we agree to enter into the attached form of Contract with the Academy to furnish the Work in strict accordance with this Request For Bid, the Contract and our Bid. My signature certifies that the Bid as submitted complies with all terms and conditions as set forth in this Request For Bid and the Contract, unless specifically enumerated as an exception as part of our Bid. The undersigned certifies that he/she is authorized to sign as a Representative for the undersigned Contractor.
THE BELOW CONTRACTOR HEREBY SUBMITS THIS BID PRICING FORM IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE RFB.
Contractor Name:________________________________________________________
Authorized Individual Name:_______________________________________________ Position/Title:____________________________________________________________
Signature:_______________________________________________________________
Date:_________________________
B-3
APPENDIX D
FAMILIAL DISCLOSURE AFFIDAVIT
The undersigned, the owner or authorized officer of ________________________ (the “Contractor”), pursuant to the familial disclosure requirement provided in the Advanced Technology Academy’s (the “Academy”) Request For Bids For Boiler Replacement, hereby represents and warrants that, except as provided below, no familial relationships exist between the owner or any employee of the Contractor, and any member of the Board of Directors of the Academy or the Superintendent of the Academy. A list of the Academy’s Board of Directors and its Superintendent may be found at http://www.atafordpas.org/.
List any Familial Relationships:
CONTRACTOR:
By:
Its:
| STATE OF | ) | ||
| )ss. | |||
| COUNTY OF ____________ | ) |
This instrument was acknowledged before me on the _____ day of ____________, 2018, by __________________________.
, Notary Public ______________ County, My Commission Expires:
Acting in the County of :
APPENDIX E
AFFIDAVIT OF COMPLIANCE – IRAN ECONOMIC SANCTIONS ACT
Michigan Public Act No. 517 of 2012 The undersigned, the owner or authorized officer of the below-named Contractor (“Contractor”), pursuant to the compliance certification requirement provided in the Advanced Technology Academy’s (the “Academy”) Request For Bids For Practice Football Field Project (the “RFB”), hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that in the event Contractor is awarded a contract as a result of the aforementioned RFB, the Contractor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the Academy’s investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date it is determined that the person has submitted the false certification.
| CONTRACTOR: | |||
| Name of Contractor | |||
| By: | |||
| Its: | |||
| Date: | |||
| STATE OF | ) | ||
| )ss. | |||
| COUNTY OF ____________ | ) |
This instrument was acknowledged before me on the _____ day of ____________, 2018, by __________________________.
, Notary Public ______________ County,
| My Commission Expires: |
| Acting in the County of |
APPENDIX F
FORM OF CONTRACT
ATTACHED
APPENDIX G
Advanced Technology Academy Contractor Code of Conduct The purpose of the Advanced Technology Academy and its employees is to provide a safe, positive learning environment for the students of the Academy. In providing that environment it is mandatory that all employees, visitors, and contractors follow certain levels of conduct, dress, and demeanor. This Code of Conduct outlines the expectations of the Advanced Technology Academy for persons both contemplating performing work and performing work for Advanced Technology Academy in the capacity of a contractor or sub-contractor. These rules will become part of the mandatory working conditions of the contract and failure to comply by the any contractor, subcontractor, management, employee, or contracted consultant may result in the cancellation of the contract.
In general it is expected that everyone entering an Advanced Technology Academy facility, whether a school, support facility, or the surrounding grounds, must dress, act, and talk in a manner that is conducive to the education process of children while assuring their overall safety and security. The following rules have been established to assure that this is done:
1. Every contractor employee that enters or leaves the building must sign in and out at the school office as designated by the school administrator. This sign in sheet must record the name, time in and out, the firm, and the signature of the individual.
2. All contractors shall be furnished by their company a badge or identification that is to be worn while in the building. Such identification shall clearly indicate the individual’s name and the name of the firm they are working for.
3. Prior to the beginning of a job, the contractor shall furnish the Academy with a list of individuals expected to be on the job, contact persons with phone numbers, and a schedule of the activities to take place.
4. The contractor shall provide the Academy with a scope of work and check with him prior to drilling or penetrating any walls, floors, or ceilings.
5. Each person working in a school building or on school property shall comply with the following:
· No drinking or possession of liquor or alcoholic beverages and or possession of any kind of illicit drugs or narcotics
· No use of Academy facilities or equipment including telephone, computers, internet access, fax, kitchen, maintenance or office equipment
· No smoking or use of any tobacco products anywhere within the building at any time nor outside the school on Academy property during normal school hours (This is a law and punishable as a civil infraction by local authorities)
· A reasonable…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .