SPECS 040513 DIVISION 04 _ MASONRY - MORTARING.docx

DOCX document 21 KB Posted

Attached to
Z2DA--ICU-ENDO Window Replacement (436-24-120) Federal contract opportunity
Solicitation number
36C25924R0048
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This federal solicitation requests general contractor services for an ICU/Endo window replacement project. The scope of work involves removing 15 existing casement windows on the third floor of Building 154 at the Fort Harrison VA Medical Center and replacing them with fixed casement aluminum windows. The contractor must follow infection control measures, phase work to accommodate patient care, install window shades, and provide a one-year warranty on all work and materials. The period of performance is 90 days from notice to proceed. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration VISN 19.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--ICU-ENDO Window Replacement (436-24-120), newest first.
File Type Posted
S04 - Site Visit Log Attendance - 14 Feb 24_FE.pdf PDF
S04 - Site Visit Meeting Doc_FE.docx DOCX document
36C25924R0048 0003.docx DOCX document
S05 - RFIs Site Visit- Responses - ICU Endo Window Replacement - 436-24-120.docx DOCX document
S02 - 2_436.436-05-102.154.AE102.BUILDINGS 154 - FIRST FLOOR PLAN WINDOW DETAILS.pdf PDF
36C25924R0048 0002.docx DOCX document
36C25924R0048 0001.docx DOCX document
PCRA - 436-24-120 Bldg 154 ICU-ENDO Window Replacement.pdf PDF
SPECS BUILDING ICU-ENDO WINDOW REPLACEMENT.pdf PDF
DWG SCHEM ICU-ENDO 3rd Floor.pdf PDF
S02 - ICRA ICU-ENDO WINDOW REPLACEMENT.docx DOCX document
SPECS 040531 DIVISION 04 _ MASONRY - TUCK POINTING.docx DOCX document
36C25924R0048.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Environment of Care Phase II 436-SLP-104

SECTION 04 05 13

MASONRY MORTARING

PART 1 GENERAL

1.1 DESCRIPTION:

Section specifies mortar materials and mixes.

1.2 RELATED WORK:

A.Mortar used in Section:
1.Section 04 05 31, MASONRY TUCK POINTING.

1.3 SUBMITTALS

A.Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B.Certificates:
2.Indicating that following items meet specifications:
a.Portland cement.
b.Masonry cement.
c.Mortar cement.
d.Hydrated lime.
e.Fine aggregate (sand).
g.Color admixture (if necessary to match existing).
C.Laboratory Test Reports:
1.Mortar, each type.
2.Admixtures.
D.Manufacturer's Literature and Data:
1.Cement, each kind.
2.Hydrated lime.
3.Admixtures.
4.Liquid acrylic resin.

1.4 PRODUCT DELIVERY, STORAGE AND HANDLING

A.Deliver masonry materials in original sealed containers marked with name of manufacturer and identification of contents.
B.Store masonry materials under waterproof covers on planking clear of ground, and protect damage from handling, dirt, stain, water and wind.

1.5 APPLICABLE PUBLICATIONS

A.Publications listed below form a part of specification to extent referenced. Publications are referenced in text by basic designation only.
B.American Society for Testing and Materials (ASTM):
C4004Organic Impurities in Fine Aggregates for Concrete
C9105Masonry Cement
C10907Compressive Strength of Hydraulic Cement Mortars (Using 2in. or 50MM Cube Specimens)
C14404Aggregate for Masonry Mortar
C150-05Portland Cement
C20706Hydrated Lime for Masonry Purposes
C27007Mortar for Unit Masonry
C307-03Tensile Strength of Chemical - Resistant Mortar, Grouts, and Monolithic Surfacing
C32100/R05Bond Strength of ChemicalResistant Mortars
C34802Flexural Strength of Hydraulic Cement Mortars
C59508Blended Hydraulic Cement
C78007Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry
C97905Pigments for Integrally Colored Concrete
C1329-05Mortar Cement

PART 2 PRODUCTS

2.1 HYDRATED LIME

ASTM C207, Type S.

2.2 AGGREGATE FOR MASONRY MORTAR

A.ASTM C144 and as follows:
1.Light colored sand for mortar for laying face brick.
2.White plastering sand meeting sieve analysis for mortar joints for pointing
B.Test sand for color value in accordance with ASTM C40. Sand producing color darker than specified standard is unacceptable. Color is to match existing.

2.3 MORTAR CEMEMT

ASTM C1329, Type N, S or M.

2.4 PORTLAND CEMENT

A. ASTM C150, Type I.

2.5 WATER

Potable, free of substances that are detrimental to mortar, masonry, and metal.

2.6 MASONRY MORTAR

A.Conform to ASTM C270.
B.Admixtures:
1.Do not use mortar admixture and color admixtures unless approved by Resident Engineer.
2.Submit laboratory test report showing effect of proposed admixture on strength, water retention, and water repellency of mortar.
3.Do not use antifreeze compounds.
C.Colored Mortar:
1.Maintain uniform mortar color for exposed work throughout.
2.Color of mortar for exposed work in alteration work to match color of existing mortar.
D.Color Admixtures:
1.Proportion as specified by manufacturer.
2.For color, see Section 09 06 00, SCHEDULE FOR FINISHES.

2.7 COLOR ADMIXTURE

A.Pigments: ASTM C979.
B.Use mineral pigments only. Organic pigments are not acceptable.
C.Pigments inert, stable to atmospheric conditions, nonfading, alkali resistant and water insoluble.

PART 3 – EXECUTION

3.1 MIXING

A.Mix in a mechanically operated mortar mixer.
1.Mix mortar for at least three minutes but not more than five minutes.
B.Measure ingredients by volume. Measure by the use of a container of known capacity.
C.Mix water with dry ingredients in sufficient amount to provide a workable mixture which will adhere to vertical surfaces of masonry units.
D.Mortar that has stiffened because of loss of water through evaporations:
1.Re-tempered by adding water to restore to proper consistency and workability.
2.Discard mortar that has reached its initial set or has not been used within two hours.
E.Pointing Mortar:
1.Mix dry ingredients with enough water to produce a damp mixture of workable consistency which will retain its shape when formed into a ball.
2.Allow mortar to stand in dampened condition for one to 1-1/2 hours.
3.Add water to bring mortar to a workable consistency prior to application.

3.2 MORTAR USE LOCATION

A.For brick veneer over frame back up walls, use Type N portland cement-lime mortar or Type S masonry cement or mortar cement mortar.
B.Use Type N mortar for other masonry work, except as otherwise specified.
C.Use Type N mortar for tuck pointing work.

- - - E N D - - - 04 05 13- 3