This document is a detailed Asbestos Abatement Specification (Part III) prepared by Environmental Testing & Management, Inc. for the Former Woodmont High School project in Piedmont, South Carolina. The specification outlines comprehensive procedures for friable asbestos removal, including strict entry and exit protocols for workers, mandatory respiratory protection requirements, specific work practices, removal procedures, cleanup processes, air monitoring protocols, waste disposal guidelines, and containment removal instructions. The document provides exhaustive step-by-step guidance for contractors, emphasizing worker safety, regulatory compliance with OSHA, EPA, and SCDES regulations, and meticulous environmental protection measures.
The specification mandates that all asbestos-containing materials be removed using wet methods, carefully bagged in 6-mil polyethylene bags, and disposed of at an approved landfill. Contractors are required to use NIOSH-certified respiratory equipment, follow precise decontamination procedures, and undergo rigorous air sampling and visual inspections throughout the abatement process. The specification includes detailed requirements for final clearance testing, with a maximum acceptable airborne fiber concentration of 0.01 fibers per cubic centimeter. Contractors are financially responsible for any failed clearance tests and must re-clean the entire work area at their own expense. The document underscores the critical importance of worker safety, environmental protection, and strict adherence to federal and state asbestos removal regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P. O. Box 896 Mauldin, South Carolina 29662
Phone(864)213-4408 Fax (864)213-4409
ENVIRONMENTAL TESTING & MANAGEMENT, INC.
Former Woodmont High School
ASBESTOS ABATEMENT SPECIFICATIONS
PART III - PROCEDURES FOR FRIABLE ASBESTOS ABATEMENT
3.01 ENTRY AND EXIT FROM WORK AREA
A. Entry into work Area - All workers shall remove street clothing in the change room and put on the required work clothing, ie, disposable whole body suits, head covering and shoe covers. The worker shall then put on his respirator and proceed through the shower to enter the work area. Workers shall not be allowed to enter the work area by passing through the waste decontamination facility.
Contractor shall provide all required items for workers’ protection to meet applicable OSHA and/or EPA standards.
B. Exit from Work Area - All persons exiting from the work area must thoroughly decontaminate themselves to prevent the tracking out of ACM and the contamination of non-contained areas. Therefore, as a minimum, the following procedure is to be followed:
1. Remove disposable clothing in the equipment room. Leave respirator on,
2. Take shower, washing with soap and water,
3. Rinse hair with running water,
4. Remove respirator, wash hair,
5. Wash out respirator, and
6. Exit into clean room to dry off and dress in street clothes.
It is the Contractor’s responsibility to insure that his personnel follow the above procedure and that ACM is not tracked outside the containment.
Former Woodmont HS Asbestos Abatement Part III - Page 2
3.02 RESPIRATORY PROTECTION DURING ASBESTOS REMOVAL
The Contractor will commence the gross removal of the asbestos in the work area in PAPR’s in accordance with 29 CFR 1926.1101, unless the Contractor can provide evidence to the Asbestos Consultant that airborne fiber levels can be maintained in such a manner so as to permit the use of lesser respiratory protection equipment. This evidence will consist of personnel air monitoring data from other projects involving the removal of similar types of materials using procedures similar to those to be used in this project. In any event, it is the responsibility of the Contractor to adequately protect his personnel in the work area and to comply with all applicable OSHA regulations.
All respiratory protection equipment to be used in the conduct of this project is to be NIOSH certified. Each worker will have a respirator personally issued and marked for his use only. The minimum type of respirator will be a half-face dual HEPA cartridge.
NO RESPIRATOR OTHER THAN THIS TYPE (unless of a higher protection factor)
WILL BE PERMITTED ON THE JOBSITE.
3.03 WORK PRACTICES
All work practices followed shall be consistent with the OSHA standard on Occupational Exposure to Asbestos (29 CFR 1926.1101). In particular, the following work practices shall be followed:
1. Workers shall not eat, drink, smoke, chew gum or chew tobacco in the work area, the decontamination unit or the waste load-out area.
2. Workers shall always wear their respirators while inside the work area. Failure to wear the appropriate respirator can result in the worker being removed from the jobsite.
Part III - Page 3
3.04 ASBESTOS REMOVAL PROCEDURES - GENERAL
1. All asbestos removal work shall be performed in accordance with the requirements of the OSHA standard on Occupational Exposure to Asbestos (29 CFR 1926.1101).
2. All items interfering with abatement must be removed and decontaminated before being disposed of.
3. The Contractor will use wet methods to remove the asbestos containing friable materials from this facility. The water used to wet the materials will be amended with a suitable wetting agent. Only airless or other low-pressure sprayers may be used to apply the amended water in a “mist” to the asbestos containing materials. While this is a wet removal, the Contractor is cautioned that excessive amounts of water will not be permitted to stand on the floor.
4. All removed ACM is to be promptly bagged in 6-mil labeled polyethylene bags or wrapped in 6-mil polyethylene sheeting and then labeled. Removed ACM is not to remain on the floor for excessive periods where it can dry out. Bags are not to be overfilled. As bags are filled and sealed, they are to be taken to the waste load-out area where they will be decontaminated. When decontaminated, each bag will be placed in another 6-mil labeled bag, or wrapped again in 6-mil poly sheeting, labeled and stored for disposal. All materials resulting from asbestos removal work shall become the property of the Contractor.
5. All polyethylene, tape, cleaning materials, work clothing and all other items used in the work area that cannot be completely decontaminated shall be disposed of as asbestos contaminated waste. These materials shall be double-bagged in 6-mil polyethylene labeled bags and handled in the same manner as the removed ACM.
6. Prior to calling for a final visual, work area shall be vacuumed using a HEPA vacuum.
During the final visual inspection, the contractor shall use a HEPA vacuum to remove any debris found to be present.
Part III - Page 4
3.05 ASBESTOS REMOVAL PROCEDURES - DETAILED
A. Friable Abatement of Flooring Materials: after removing all carpeting, furniture and fixtures which can be removed from the work areas involved, procedures to be followed include, but are not limited to the following:
1. Install critical barriers in accordance with the SCDES regulations. Two (2) separate layers of 6-mil polyethylene sheeting shall be used for the critical barriers.
2. Build decontamination unit at location approved by the Asbestos Consultant. Build waste load-out at location approved by the Asbestos Consultant.
3. Secure all entrances to the building in a manner approved by the Asbestos Consultant.
4. Install microtraps as required under section 2.06B of this specification. Exhaust microtraps as directed by the Asbestos Consultant. Establish negative air.
5. Install recording manometer at a location in accordance with the SCDES regulations and approved by the Asbestos Consultant.
6. Call for a visual examination of the work area by the Asbestos Consultant or his designee prior to starting abatement. The Asbestos Consultant will verify that the specified amount of negative air has been established before the contractor will be allowed to proceed.
7. Begin abatement by wetting the material. NOTE - NO HOSES OF ANY TYPE WILL
BE ALLOWED IN THE WORK AREA EXCEPT AS NECESSARY TO FILL THE
SPRAY BOTTLES or for use with an airless sprayer.
8. At the end of each workday, hoses supplying water to the shower and used to fill the spray bottles shall be disconnected.
9. The Contractor will only be allowed to unload waste that has been packaged and are labeled in accordance with EPA, OSHA, DOT & SCDES regulations.
10. The bags shall have the ends “goose necked” to minimize the possibility of leakage from the bags. The outer bag shall be free from any visible contamination. All load out shall be through the Contractor’s waste load out/equipment decontamination unit.
11. Once the abatement is complete, the Contractor shall call for a visual inspection of the work area. See section 3.06 B for additional details.
12. Once the area has passed final visual inspection, encapsulation of ALL surfaces in the work area will occur.
13. Clearance air monitoring will be conducted as described in section 3.08.
Part III - Page 5
3.06 Clean-Up
A. General
All work is to be done in a professional manner and to the satisfaction of the Asbestos Consultant and Owner. All existing structures or equipment are to be protected from contamination. Cleaning supplies and equipment are to be furnished by the Contractor.
B. Clean-up Procedure
1. When the gross removal of the asbestos containing materials has been completed, the Contractor will then begin the process of gross clean-up. The Contractor will clean all surfaces. Upon completion of gross cleaning, the Contractor will begin fine cleaning.
2. The Contractor will then clean all physical surfaces a second time, to include cleaning the contained area with a HEPA vacumn as described in section 3.04. On completion of the fine cleaning, a visual inspection will be performed by the Asbestos Consultant or his designee. The work area must be completely free of any visible asbestos dust, debris, etc. If not, the area must be completely re-cleaned at the Contractor’s expense.
3. Upon successful completion of the second inspection, the Contractor will then encapsulate those areas as called for in section 3.05. The work area will be allowed to dry overnight. This will be followed by the final air sampling.
C. Equipment
Equipment, machinery, scaffolding, tools, etc., used within the work area will not be removed without first being thoroughly cleaned with amended water.
Part III - Page 6
3.07 AIR MONITORING
A. General
1. The Asbestos Consultant will provide a SCDES licensed air sampling professional (ASP) to conduct area air monitoring to meet, as a minimum, the requirements of SCDES Regulations 61-86.1 (effective May 27, 2011). The ASP shall work under the direct supervision of a Certified Industrial Hygienist. The ASP, in consultation with the Asbestos Consultant and/or the CIH, shall determine the appropriate number and location of the air samples to be collected.
2. The Contractor shall be responsible for his OSHA compliance monitoring.
3. The Contractor will provide the ASP with disposable suits and provide power in the area being sampled for the ASP.
B. Project Oversight
The ASP will have the authority to represent the Asbestos Consultant in matters pertaining to the asbestos abatement project. This includes the interpretation of the specifications. In addition, the ASP may recommend and advise the Contractor on the work practices employed by the Contractor’s personnel.
C. Purpose of Air Monitoring
The purpose of this air monitoring shall be to verify that the containment is functioning properly and that the area outside the containment remains uncontaminated.
D. Air Sampling Procedures
The ASP shall collect air samples to meet the requirements of SCDES Regulation 61-86.1.
Further, sampling and analysis will follow the procedures of NIOSH method 7400. 25-mm cassettes will be used to collect samples daily at selected locations.
E. Airborne Fiber Levels
If the concentration outside the work area exceeds the average background fiber count as determined by the Asbestos Consultant or 0.005 f/cc, whichever is greater, the Asbestos Consultant or his designee may stop work until the source of the fiber has been located and controlled and the fiber level returns to below 0.005 f/cc.
If the concentration outside the work area exceeds the average background fiber count as determined by the Asbestos Consultant or 0.01 f/cc, whichever is greater, then the Asbestos Consultant or his designee may stop work and declare that the area in question has been contaminated. The Contractor will be responsible for the decontamination of any areas contaminated.
Part III - Page 7
3.08 FINAL (CLEARANCE) AIR SAMPLING
A. General
The Air Sampling Professional (ASP), under the direction of the Asbestos Consultant, will conduct all final air sampling. The ASP, in consultation with the CIH, shall determine the appropriate number and placement of the final air samples. Aggressive air sampling techniques shall be used.
B. Conditions for Conducting Final Air Samples
It is required that all surfaces in the area being tested be completely dry.
C. SCDHEC - Clearance Monitoring
The final air sampling shall be conducted in accordance with the requirements of the SCDES Asbestos Regulations using Phase Contrast Microscopy (PCM).
D. Requirements
1. At the conclusion of any action to remove, encapsulate, or enclose asbestos containing materials (ACM) or material assumed to be ACM, the Asbestos Consultant or his designee shall visually inspect the work area where such action was conducted to determine whether the action had been properly completed.
2. The Air Sampling Professional designated by the Asbestos Consultant shall collect air samples in areas of friable abatement using aggressive sampling methods to monitor air for clearance after the removal is completed.
E. Air Monitoring Requirements
A minimum of five samples shall be collected within the work area. Depending upon the size of work area, additional samples may need to be collected to adequately characterize the asbestos concentration in the work area. The Air Sampling Professional, in conjunction with the Asbestos Consultant, shall decide upon the appropriate number of samples to be collected. Air samples are to be analyzed using Phase Contrast Microscopy.
F. Clearance Criteria
The Final Air Standard is a concentration of less than (<) 0.01 fibers per cubic centimeter of air sampled (f/cc). If any of the air samples collected in the work area equals or exceeds
0.01 f/cc, then the work area shall be considered to have failed the clearance test. If the finals fail the clearance, the Contractor shall reclean the entire work area at the Contractor’s expense.
Part III - Page 8
G. Repeat Tests
The Contractor will be responsible for all costs, including the cost for the Asbestos Consultant, the ASP, and for the analysis of the samples, for any clearance test which fails.
3.09 DISPOSAL OF ASBESTOS WASTE
A. General
1. All asbestos and asbestos-contaminated waste shall be sealed in 6 mil poly bags or wrapped in 6-mil poly sheeting. The packaged waste is to be labeled, transported and disposed of in accordance with the applicable OSHA and EPA Regulations. At the conclusion of the job, all polyethylene material will be disposed of as asbestos waste material.
2. Only an approved asbestos waste hauler will be permitted to remove the bagged material from the jobsite and transport it to the landfill. The Contractor will submit receipts from the landfill to the Asbestos Consultant as evidence that the material was disposed of in an approved manner.
B. Waste Disposal Site
1. The Contractor shall be responsible for obtaining prior approval for a disposal site for the asbestos waste in compliance with the latest SCDHEC and EPA regulations.
2. The Contractor shall strictly adhere to all precautions necessary for the safety and health of the workers in accordance with the latest version of the applicable OSHA and EPA Regulations, especially 29 CFR 1926.1101.
C. Transportation and Burial
1. All asbestos materials shall be carried directly to the previously approved asbestos landfill. The Contractor will contact the landfill to make arrangements regarding the time of the dump operation.
2. The Contractor shall also arrange for a hole to be dug for the burial of the asbestos materials. The bagged asbestos waste shall be carefully unloaded and placed in the hole prepared for the waste. Bags are not to be thrown or dropped into the hole. Any bags found to be broken or leaking shall be placed into a new bag.
Part III - Page 9
D. Alternate Methods
Alternate handling and packaging systems for the debris that maintain the integrity of the disposal systems will be considered by the Asbestos Consultant.
E. Burning
Burning of materials from the abated area shall not be permitted.
F. General Debris
All trash and debris are to be removed from the building property by the Contractor on a daily basis.
G. Waste Water
Waste water may be disposed of by filtering the asbestos-contaminated water in accordance with EPA and SCDES regulations, then disposing of the filtered water in a sanitary sewer system. Waste water that is not filtered shall not be placed into the public sewer system or disposed of in a location other than an approved disposal site.
All waste from the shower and/or any sinks shall be disposed of in a manner similar to that of solid waste materials as previously specified in this Section.
3.10 REMOVAL OF CONTAINMENT
After passing the clearance air sampling, all entrances and exits shall be unsealed. All remaining polyethylene, tape and any other components of the containment shall be double-bagged in labeled 6-mil polyethylene bags and disposed of in accordance with Section 3.09 of this specification.
Part III - Page 10