Specifictions 25IFB15333.pdf

PDF 148 KB Posted

Attached to
Crushed Limestone, GFP
Solicitation number
25IFB15333
Issued by
Edmunds County, Emery City, South Dakota

About this file

This document is a specification sheet for a crushed limestone surface project for the Mickelson Trail in South Dakota, issued by the state's government agency. The project requires a contractor to furnish and deliver 500 tons of crushed limestone between the Minnekahta and Edgemont Trailheads, starting at approximately mile post 7, with a strict project timeline from July 1st to July 31st. Contractors are mandated to use only belly dump trucks and must adhere to a maximum load limit of 40 tons on bridge crossings. Mickelson Trail personnel will conduct random sampling and testing to ensure material specification compliance, and contractors must provide weight tickets and a pre-delivery material sample.

The limestone material must meet precise gradation specifications, with specific passing percentages across various screen sizes from ¼" to No. 200 sieve. The material must be exclusively crushed limestone, and the agency contact for this project is Jayme Severyn, reachable at 605-280-1811. While no specific pricing details are provided in the document, the specifications indicate a focused, time-limited procurement process with rigorous material quality requirements. The project appears to be part of trail maintenance and improvement efforts, with a clear emphasis on precise material characteristics and delivery conditions.

View the file

Other files

File Type Posted
SDVendorManual_20240822.pdf PDF
SDVendorManual_20240822.pdf PDF
Specifictions 25IFB15333.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Crushed Limestone Surface for Mickelson Trail

Contractor will furnish and deliver Crushed Limestone

1. 500 tons on trail between Minnekahta Trailhead and Edgemont Trailhead Starting at approximate mile post 7.

NO STRAIGHT TRUCKS PERMITTED on this section Belly Dump only.

CAUTION: Bridge crossings are restricted to a load limit of 40 tons MAX.

Quantity bids in the following tonnage:

500 tons

Start date for the project is July 1st to July 31st

Mickelson Trail personnel or a representative will randomly pull samples and test for specification. The contract will provide a sample before delivery.

Weight tickets for gravel surfacing will be required for the project.

Material must meet the following specifications:

Crushed Limestone with the following screens and percentages:

Screen Size: Passing:

¼” 100% No.4 90-100% No.8 50-70% No.40 15-35% No.200 6-16%

MUST BE CRUSHED LIMESTONE.

Agency contact: Jayme Severyn 605-280-1811