Specifications_Red_River_NWR_Rip_Rap.pdf
PDF 61 KB Posted
- Attached to
- GAOA - Red River NWR Boardwalk Rehab Rip Rap
- Solicitation number
- 140FGA23Q0027
About this file
This document outlines specifications for rip rap material required by the Red River National Wildlife Refuge. The refuge requires delivery of 1,300 tons of Class #2 rip rap, consisting of large stone between 200 and 50 pounds, to be stock piled on site. Delivery must occur between October 1st and October 20th, 2023, with a minimum of 5 loads per day. Certified vehicle scales are available locally, and weight tickets will be required for each delivery. The delivery address is provided.
The related federal contract opportunity is solicitation number 140FGA23Q0027 from the Department of the Interior Fish and Wildlife Service for boardwalk rehab and rip rap work at the Red River National Wildlife Refuge. The opportunity type is a solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FGA23Q0027_Amd_0001.pdf | ||
| Questions_and_Answers_Amendment_1_0001.pdf | ||
| Price_Schedule.pdf | ||
| SOW_Red_River_NWR_Rip_Rap.pdf | ||
| Sol_140FGA23Q0027.pdf | ||
| Notice_to_Offerors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROADWAY SURFACING MATERIAL
Station: _Red River National Wildlife Refuge______ Date:___7/11/2023__ Contact:______Justin Hoslomback _Telephone No.:__404-314-6434_
Material Description (i.e., gravel, aggregate, etc.): _Class#2 RIP-RAP_
Specification Section/Paragraph/No. (Reference applicable State Department Standard and Specification, if known)
Class # 2 Large stone 200 lbs and down to 50lbs stone
Total Tons/Yards Required: Class # 2 (1,300 tons)
1. Check one or more: ___X_ Stock Piled (spot dumped) ____ Tail Gate Spread Thickness: ____
2. Maximum/Minimum Amount to be delivered daily: 5 Loads per day minimum
Attach a delivery and/or local site map.
3. Are there State certified scales in the area? __X__ Yes ____ No NOTE: If yes, weight tickets are required for each delivery.
If no, delivery must be by cubic yards.
4. Required commencement date for delivery: __10/1/2023___
5. Last date for delivery: ___10/20/2023______________
6. Delivery Address: Red River National Wildlife Refuge Headquarters 150 Eagle Bend Point, Bossier City, LA 71112.
File details come from the government source that posted it. Updated .