SOW_Red_River_NWR_Rip_Rap.pdf
PDF 157 KB Posted
- Attached to
- GAOA - Red River NWR Boardwalk Rehab Rip Rap
- Solicitation number
- 140FGA23Q0027
About this file
This statement of work outlines requirements for a rip-rap delivery project at Red River National Wildlife Refuge. The U.S. Fish and Wildlife Service requires delivery of 1,300 tons of Class 2 rip rap for bank stabilization of Lake Caroline by October 20, 2023. The rip rap must meet specifications provided in an attached sheet. Delivery will be to the Refuge headquarters located at 150 Eagle Bend Point in Bossier City, Louisiana. The period of performance is from October 1, 2023 through completion by October 20, 2023, with a minimum of five loads delivered per day. Justin Holsomback of the Infrastructure Management Branch is the project manager and point of contact for any technical questions. Acceptance will be documented by weight tickets provided at delivery. The related federal contract opportunity is solicitation number 140FGA23Q0027 for the boardwalk rehabilitation project also requiring rip rap at Red River National Wildlife Refuge, issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FGA23Q0027_Amd_0001.pdf | ||
| Questions_and_Answers_Amendment_1_0001.pdf | ||
| Specifications_Red_River_NWR_Rip_Rap.pdf | ||
| Price_Schedule.pdf | ||
| Sol_140FGA23Q0027.pdf | ||
| Notice_to_Offerors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
for
RIP-RAP
At The
Red River National Wildlife Refuge South Atlantic-Gulf & Mississippi Basin Region
1. BACKGROUND
a. The U.S. Fish & Wildlife Service would like to purchase 1,300 tons of Class 2 rip rap for the bank stabilization of Lake Caroline at Red River National Wildlife Refuge in Bossier City, LA See attached spec sheet for materials.
b. Period of Performance: 10/1/2023 – 10/20/2023 with 5 loads per day minimum.
2. GENERAL INFORMATION
a. The Rip-Rap will be delivered to the Red River National Wildlife Refuge Headquarters.
b. The delivery address: 150 Eagle Bend Point, Bossier City, LA 71112.
c. Call the POC to set up delivery.
d. The FWS Project Manager for this project is Justin Holsomback. Any questions regarding the scope of work and technical matters shall be directed to:
Justin Holsomback Civil Engineer
U.S. Fish and Wildlife Service Infrastructure Management Branch Telephone: (404) 314-6434 Email: justin_holsomback@fws.gov
e. Method of Documentation of Acceptance:
Weight tickets